ML20133G892

From kanterella
Jump to navigation Jump to search
Forwards Application for Amend to License NPF-15,requesting Rev to TSs 3.8.1.14 & 3.8.1.15, AC Sources - Operating, Surveillance Requirements
ML20133G892
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 01/14/1997
From: Nunn D
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20133G895 List:
References
RTR-NUREG-1432 NUDOCS 9701160204
Download: ML20133G892 (2)


Text

. . _ _ _ . .

kM -

SOUTHE RN CAlliORNI A E EDISON TE"-

An I:DISON INTERNATIONAL Company l January 14, 1997 i 1

4 U. S. Nuclear Regulatory Commission Attention: Document Control Desk ,

Washington, D.C. 20555 Gentlemen:

Subject:

Docket Nos. E0-361 and 50-362 j Proposed Technical Specification Change Number 476 San Onofre Nuclear Generating Station Units 2 and 3

References:

(1) Letter, Mel B. Fields (NRC) to Harold B. Ray (SCE),

Subject:

" Issuance of Amendment for San Onofre Nuclear Generating i Station, Unit No. 2 (TAC No, M86191) and Unit No.3 l (TAC No. M86192)," dated February 9, 1996 i

(2) NUREG-1432, Standard Technical Specifications, Combustion

Engineering Plants (CE0G STS), September, 1992 (3) Letter, R.W. Krieger to William H. Bateman,

Subject:

" Request 3

for Enforcement Discretion, Emergency Diesel Generator

Surveillance Testing, San Onofre Nuclear Generating Station, j Unit 3, dated January 13, 1997 l

l Enclosed is Amendment Application Number 150 to Facility Operating License NPF-15,fortheSanOnofreNuclearGeneratingStation(SONGS), Unit 3. The Amendment Application consists of Proposed Technical Specification Change Number 476 (PCN-476). This is a request for an exigent Technical Specification change l as a followup to the Request for Enforcement Discretion, reference 3, above.

The proposed change is requested to temporarily restore provisions of refueling interval diesel generator surveillances as they were prior to their revision as part of NRC Amendment Nos. 127 and 116, referenced above, for SONGS Units 2 f and 3. NRC Amendment Nos. 127 and 116 approved changes to the SONGS Units 2 /

and 3 Technical Specifications that adopted the recommendations of NUREG-1432, i

"StandardTechnicalSpecificationsCombustionEngineeringPlants,"submittedas/g) part of Proposed Technical Specification Change Number 299 (PCN-299) with /l exceptions as noted and discussed.

P. O. Box 128 San Clemente. CA 9267J41128 , ,

714 368-1480 9701160204 970114

, Fax 714-368-1490 PDR ADOCK 05000361 P PDR

Document Control Desk The proposed change, for Unit 3 only, would temporarily replace Surveillance Requirements (SRs) 3.8.1.14 and 3.8.1.15 with the SRs that had existed for this i testing in the previous (pre-TSIP) TS. During TSIP implementation, Edison personnel recognized that the new TS 3.8.1 surveillances contain less rigorous l kW loading limitations than were present in the corresponding pre-TSIP TS l 3/4.8.1,"A.C. Sources." Consequently, the diesel generators were tested to a more rigorous set of performance standards than allowed by the new TSIP SRs. At the time of NRC review and approval of our TSIP application, Edison should have requested delayed implementation of these TSIP refueling interval surveillances until the next scheduled refueling outage.

l This change is not being requested for Unit 2 since that Unit is currently

. shutdown for a refueling outage and has completed the testing in accordance with l the current TS.

i The Southern California Edison Company requests this amendment be issued as an exigent TS change, effective as of its date of issuance for a period until performance of the new (post-TSIP) SRs in the next refueling outage, and prior to return to Mode 4 from the Unit 3 Cycle 9 refueling outage. The exigent circumstances for this TS amendment request exist, per 10 CFR 50.91, due to the I recent discovery of the inappropriate crediting of previous test results to the I post-TSIP SRs.

If you would like additional information regarding this Amendment Application, please let me know.  !

Sincerely, Dwight E. unn Vice President Engineering and Technical Services Enclosure cc: L. J. Callan, Regional Administrator, NRC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3 M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3