MONTHYEARML20216J0681999-09-29029 September 1999 Forwards Rev 3 of AP600 Design Control Document, Incorporating Documentation Changes Resulting from Final Review Performed to Check Consistency of Implementation of Approved Design Change Proposals.With Summary of Changes ML20207G5411999-06-0808 June 1999 Discusses Request Made by Westinghouse on 981109 That Proprietary WCAP-14252,Rev 1,be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20195D5201999-06-0404 June 1999 Discusses Westinghouse Request That Change Pages Submitted on 980921 to WCAP-14292 Be Withheld from Public Disclosure. Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20196G2431999-05-21021 May 1999 Informs That USNRC Has Published in Fr Encl Notice of Proposed Rulemaking Re AP600 Design Certification Rule. Rulemaking Allows Applicants or Licensees to Construct AP600 Std Plant Design by Referencing Design Certification Rule ML20206G5411999-05-0505 May 1999 Forwards Draft Environ Assessment Re Proposed Certification of AP600 Std Plant Design.Environ Assessment Will Be Used as Basis for NRC Finding of No Significant Environ Impact Resulting from Certification of AP600 Design ML20205J3351999-04-0707 April 1999 Informs That USNRC Staff Has Completed Review of Rev 2 of AP600 Design Control Document,Verified That All of Changes in Rev 2 Are Acceptable & Determined That AP600 Dcd,Rev 2, Can Now Be Used in Proposed Design Certification Rule NSD-NRC-99-5827, Forwards Rev 2 to AP600 Design Control Document.Attachment 1 Provides Summary of Changes Made as Part of Mar 1999 Rev to AP600 Design Control Document1999-03-31031 March 1999 Forwards Rev 2 to AP600 Design Control Document.Attachment 1 Provides Summary of Changes Made as Part of Mar 1999 Rev to AP600 Design Control Document ML20205D3051999-03-25025 March 1999 Requests Amend to 920626 Application for Design Certification of AP600,including AP600 SSAR & AP600 Dcd,To Reflect Sale of CBS Commercial Nuclear Business to W ML20203C5481999-02-10010 February 1999 Forwards Rev 1 to AP600 Design Control Document (DCD) for Docket File.Dcd Provides Reference Basis for AP600 Design Certification ML20199H8671999-01-20020 January 1999 Forwards Comments on AP600 Design Control Document,Submitted by Westinghouse ML20199B1121999-01-0707 January 1999 Advises That Info Contained in NSRA-APSL-92-0268 & Containing Presentation Matl Used in 921209-10 Meeting,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA ML20198B4601998-12-14014 December 1998 Discusses W Ltr NTD-NRC-95-4556,dtd 950918,provided as Status Rept on Proprietary Matl Submitted to NRC to Support AP600 Design Review Effort.Proprietary Info in Encl Have Been Removed from AP600 Docket File & Being Returned ML20197G3501998-11-30030 November 1998 Forwards AP600 Design Control Document, Vols 1-12 for Docket File.Submittal Closes Confirmatory Items 1.5-1 & 1.5-2 from Sept 1998 Final SER Re Certification of AP600 Std Design NSD-NRC-98-5806, Forwards non-proprietary Rev 1 to WCAP-14253 & Proprietary Rev 1 to WCAP-14252, AP600 Low-Pressure Integral Sys Test at or State Univ Final Data Rept. Proprietary Rept Includes Vols 1-4.Proprietary Info Withheld,Per 10CFR2.7901998-11-0909 November 1998 Forwards non-proprietary Rev 1 to WCAP-14253 & Proprietary Rev 1 to WCAP-14252, AP600 Low-Pressure Integral Sys Test at or State Univ Final Data Rept. Proprietary Rept Includes Vols 1-4.Proprietary Info Withheld,Per 10CFR2.790 ML20195E9331998-11-0909 November 1998 Requests That Rev 1 to WCAP-14252, AP600 Low-Pressure Integral Sys Test at or State Univ Final Data Rept, Vols I- Iv,Be Withheld (Ref 10CFR2.790) ML20195B4631998-11-0404 November 1998 Requests That Proprietary Presentation Matl from Dec 9-10, 1992 W/Nrc Meeting on AP600 Test Program, Be Withheld from Public disclosure.Non-proprietary Presentation Matl,Encl ML20155G9021998-11-0303 November 1998 Advises That Info Contained in 981012 ltr,NSD-NRC-98-5795, Will Be Withheld from Public Disclosure,Per 10CFR2.790(b) (5) & Section 103(b) of AEA of 1954,as Amended ML20155G9271998-11-0202 November 1998 Forwards Copy of NRC Staff FSER for Westinghouse AP600 Design.Staff Completed Review of Design & Issued Final Design Approval & FSER on 980903.Without Encl ML20155G7591998-11-0202 November 1998 Forwards Copy of NRC Staff FSER for Westinghouse AP600 Design,Per Discussion at Sept 1997 Meeting.Staff Completed & Issued Final Design Approval of FSER on 980903.Without Encl NUREG-1512, Informs That 20 Copies of NUREG-1512, Final Safety Evaluation Rept Re Certification of AP600 Standard Design Being Forwarded1998-10-13013 October 1998 Informs That 20 Copies of NUREG-1512, Final Safety Evaluation Rept Re Certification of AP600 Standard Design Being Forwarded NSD-NRC-98-5795, Informs That Figures from Rev 0 & Rev 3 of PRA Which Indicate Location of H Igniters Should Be Considered Proprietary.Nonproprietary Versions of AP600 General Arrangement Drawings Were Provided in Rev 7 of SSAR1998-10-12012 October 1998 Informs That Figures from Rev 0 & Rev 3 of PRA Which Indicate Location of H Igniters Should Be Considered Proprietary.Nonproprietary Versions of AP600 General Arrangement Drawings Were Provided in Rev 7 of SSAR ML20154A4091998-09-29029 September 1998 Advises That Certain Info Contained in Westinghouse Ltr NTD-NRC-95-4506,dtd 950713,submitting WCAP-14425,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5).Figure 3-1 Will Be Placed Into Public Record ML20153G2521998-09-25025 September 1998 Advises That Proprietary Matl Discovered by NRC in NSD-NRC-97-4966 & Proprietary Matl Noted by W in NSD-NRC-98-5772 Will Be Withhheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20207F2781998-09-21021 September 1998 Requests That Proprietary Changes,Comprising Rev 2 to WCAP- 14292, Low-Pressure Integral Sys Tests at Oregon State Univ Test Analysis Rept, Be Withheld from Public Disclosure ML20151X4381998-09-15015 September 1998 Informs That Staff Has Decided to Accept Claim That Info in WCAP-14135,Rev 1 Is Proprietary & Will Be Withheld from Public Disclosure,Per W 980821 & 26 Ltrs NSD-NRC-98-5788, Forwards Formal Transmittal of Correspondence Previously Sent Informally Over Period of 980702-0826.Index of Encl Matl Provided1998-09-15015 September 1998 Forwards Formal Transmittal of Correspondence Previously Sent Informally Over Period of 980702-0826.Index of Encl Matl Provided ML20153C1001998-09-15015 September 1998 Advises That Matls Re AP600 Notrump Final Validation Rept, WCAP-14807,marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20151X4041998-09-11011 September 1998 Discusses Revised Tier 2 Info for AP600 Design.Staff Revised Decision on Whether Fire Protection Should Expire at First Full Power Encl ML20151V1711998-09-0808 September 1998 Advises That Info Re Westinghouse AP600 Std Safety Analysis Rept Through Rev 4 & PRA Through Rev 5 Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5).Disposition of SSAR & PRA Proprietary Info Encl ML20151V2231998-09-0808 September 1998 Informs That NRC Determined That WCAP-14132 Encl in Westinghouse Ltr NTD-NRC-94-4244,dtd 940729 & Marked as Proprietary,Will Be Withheld from Public Disclosure,Per to 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20151S9181998-09-0303 September 1998 Advises That Info Marked as Proprietary Re Westinghouse AP600 Design Ltrs Concerning Pxs Scaling & PIRT Closure Rept WCAP-14727,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20239A3111998-09-0303 September 1998 Forwards Final SER Which Summarizes Staff Safety Review of AP600 Design Against Requirements of Subpart B of 10CF5R52 & Delineates Scope of Technical Details Considered in Evaluating Proposed Design ML20239A1481998-09-0303 September 1998 Forwards Notice of Issuance of Final Design Approval & Final SER for AP600.FDA Allows AP600 Design to Be Referenced in Application for Construction Permit or Operating License Under 10CFR50 or Application for Combined License NSD-NRC-98-5781, Informs That W Determined That AP600 FSER Contains No Proprietary Info1998-09-0101 September 1998 Informs That W Determined That AP600 FSER Contains No Proprietary Info ML20151V8521998-09-0101 September 1998 Extends Invitation to Attend Ceremony on 980911,where NRC Will Present Final Design Approval for AP600 Std Nuclear Reactor Design to Westinghouse ML20151V2201998-08-31031 August 1998 Informs That EPRI Documents, GOTHIC Containment Analysis Package Qualification Rept, GOTHIC Containment Analysis Qualification Manual, & Listed Documents Dtd Sept 1993 Will Be Withheld from Public Disclosure ML20151V8431998-08-31031 August 1998 Extends Invitation to Attend Ceremony on 980911,where NRC Will Present Final Design Approval for AP600 Std Nuclear Reactor Design to Westinghouse ML20238F3241998-08-31031 August 1998 Advises That AP600 RAI Responses Encl in Westinghouse Ltrs NTD-NRC-95-4598,dtd 951117,as Modified by NSD-NRC-98-5776, Dtd 980826,marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) ML20238F5991998-08-31031 August 1998 Refers to W 980821 Revised Response to Insp Rept 99900404/97-01 That Contained All Substantive Info Provided w/DCP/NRC-1074 Ltr.Nrc Will Destroy DCP/NRC-1074,as Requested NSD-NRC-98-5783, Forwards non-proprietary Rev 2 to WCAP-14989, Accident Specification & Phenomena Evaluation for AP600 Passive Containment Cooling Sys1998-08-28028 August 1998 Forwards non-proprietary Rev 2 to WCAP-14989, Accident Specification & Phenomena Evaluation for AP600 Passive Containment Cooling Sys NSD-NRC-98-5782, Forwards Corrected Pages 4-28 Through 4-32 to Be Inserted in Rev 2 to non-proprietary WCAP-14953, AP600 Pxs Scaling & PIRT Closure Rept. Pages Were Originally Submitted W/Incorrect Header Which Stated W Proprietary Class 21998-08-28028 August 1998 Forwards Corrected Pages 4-28 Through 4-32 to Be Inserted in Rev 2 to non-proprietary WCAP-14953, AP600 Pxs Scaling & PIRT Closure Rept. Pages Were Originally Submitted W/Incorrect Header Which Stated W Proprietary Class 2 ML20237E4421998-08-27027 August 1998 Advises That Info Contained in Ltr DCP/NRC-0985,dtd 970821, Sought to Be Withheld,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended NSD-NRC-98-5778, Provides Commitment to Include Requested Changes Into AP600 Design Control Document.Discussion W/Vijuk on 980825 Re Disposition of Ltrs DCP/NRC1074,dtd 971016 & DCP/NRC1324,dtd 980403,formalized1998-08-27027 August 1998 Provides Commitment to Include Requested Changes Into AP600 Design Control Document.Discussion W/Vijuk on 980825 Re Disposition of Ltrs DCP/NRC1074,dtd 971016 & DCP/NRC1324,dtd 980403,formalized ML20237E0731998-08-26026 August 1998 Advises That Info in WCAP-14812,revs 1 & 2, Accident Spec & Phenomena Evaluation for AP600 PCS, Will Be Withheld from Public Disclosure NSD-NRC-98-5777, Provides Revised Response to NRC Ltr Re W Requests for Withholding Info Re AP600 PCS Final Data rept,WCAP-14135 & WCAP-141381998-08-26026 August 1998 Provides Revised Response to NRC Ltr Re W Requests for Withholding Info Re AP600 PCS Final Data rept,WCAP-14135 & WCAP-14138 NSD-NRC-98-5776, Forwards Proprietary Revised Response to Ref NRC Ltr Re W Requests for Withholding Info Re AP600 Design Certification Test Program,Notrump Computer Code,Wcobra/Trac Computer Code & Loftran Computer Code.Proprietary Info Withheld1998-08-26026 August 1998 Forwards Proprietary Revised Response to Ref NRC Ltr Re W Requests for Withholding Info Re AP600 Design Certification Test Program,Notrump Computer Code,Wcobra/Trac Computer Code & Loftran Computer Code.Proprietary Info Withheld ML20238F8031998-08-26026 August 1998 Requests That Proprietary W Revised Response to NRC Ltrs Re Requests for Withholding Info,Be Withheld from Public Disclosure IAW 10CFR2.790 NSD-NRC-98-5774, Informs That W Faxed Last Response Re Afser Open Item 1.1-1 to NRC on 980821.Last of Attachments Supporting Several of Responses Faxed to NRC Over Past Several Days Were Express Mailed to NRC on 980821.Responses Close Subject Open It1998-08-24024 August 1998 Informs That W Faxed Last Response Re Afser Open Item 1.1-1 to NRC on 980821.Last of Attachments Supporting Several of Responses Faxed to NRC Over Past Several Days Were Express Mailed to NRC on 980821.Responses Close Subject Open Item NSD-NRC-98-5772, Forwards non-proprietary & Proprietary Info in Response to NRC Ltrs Re W Requests for Withholding Info.Separate Ltr & Affidavit Justifying Proprietary Nature of Info,Encl. Proprietary Info Withheld,Per 10CFR2.7901998-08-21021 August 1998 Forwards non-proprietary & Proprietary Info in Response to NRC Ltrs Re W Requests for Withholding Info.Separate Ltr & Affidavit Justifying Proprietary Nature of Info,Encl. Proprietary Info Withheld,Per 10CFR2.790 ML20237D3161998-08-21021 August 1998 Requests That W Response to NRC Ltrs Re Requests for Withholding Info Be Withheld from Public Disclosure,Per 10CFR2.790 1999-09-29
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20207G5411999-06-0808 June 1999 Discusses Request Made by Westinghouse on 981109 That Proprietary WCAP-14252,Rev 1,be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20195D5201999-06-0404 June 1999 Discusses Westinghouse Request That Change Pages Submitted on 980921 to WCAP-14292 Be Withheld from Public Disclosure. Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20196G2431999-05-21021 May 1999 Informs That USNRC Has Published in Fr Encl Notice of Proposed Rulemaking Re AP600 Design Certification Rule. Rulemaking Allows Applicants or Licensees to Construct AP600 Std Plant Design by Referencing Design Certification Rule ML20206G5411999-05-0505 May 1999 Forwards Draft Environ Assessment Re Proposed Certification of AP600 Std Plant Design.Environ Assessment Will Be Used as Basis for NRC Finding of No Significant Environ Impact Resulting from Certification of AP600 Design ML20205J3351999-04-0707 April 1999 Informs That USNRC Staff Has Completed Review of Rev 2 of AP600 Design Control Document,Verified That All of Changes in Rev 2 Are Acceptable & Determined That AP600 Dcd,Rev 2, Can Now Be Used in Proposed Design Certification Rule ML20199H8671999-01-20020 January 1999 Forwards Comments on AP600 Design Control Document,Submitted by Westinghouse ML20199B1121999-01-0707 January 1999 Advises That Info Contained in NSRA-APSL-92-0268 & Containing Presentation Matl Used in 921209-10 Meeting,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA ML20198B4601998-12-14014 December 1998 Discusses W Ltr NTD-NRC-95-4556,dtd 950918,provided as Status Rept on Proprietary Matl Submitted to NRC to Support AP600 Design Review Effort.Proprietary Info in Encl Have Been Removed from AP600 Docket File & Being Returned ML20155G9021998-11-0303 November 1998 Advises That Info Contained in 981012 ltr,NSD-NRC-98-5795, Will Be Withheld from Public Disclosure,Per 10CFR2.790(b) (5) & Section 103(b) of AEA of 1954,as Amended ML20155G7591998-11-0202 November 1998 Forwards Copy of NRC Staff FSER for Westinghouse AP600 Design,Per Discussion at Sept 1997 Meeting.Staff Completed & Issued Final Design Approval of FSER on 980903.Without Encl ML20155G9271998-11-0202 November 1998 Forwards Copy of NRC Staff FSER for Westinghouse AP600 Design.Staff Completed Review of Design & Issued Final Design Approval & FSER on 980903.Without Encl NUREG-1512, Informs That 20 Copies of NUREG-1512, Final Safety Evaluation Rept Re Certification of AP600 Standard Design Being Forwarded1998-10-13013 October 1998 Informs That 20 Copies of NUREG-1512, Final Safety Evaluation Rept Re Certification of AP600 Standard Design Being Forwarded ML20154A4091998-09-29029 September 1998 Advises That Certain Info Contained in Westinghouse Ltr NTD-NRC-95-4506,dtd 950713,submitting WCAP-14425,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5).Figure 3-1 Will Be Placed Into Public Record ML20153G2521998-09-25025 September 1998 Advises That Proprietary Matl Discovered by NRC in NSD-NRC-97-4966 & Proprietary Matl Noted by W in NSD-NRC-98-5772 Will Be Withhheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20153C1001998-09-15015 September 1998 Advises That Matls Re AP600 Notrump Final Validation Rept, WCAP-14807,marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20151X4381998-09-15015 September 1998 Informs That Staff Has Decided to Accept Claim That Info in WCAP-14135,Rev 1 Is Proprietary & Will Be Withheld from Public Disclosure,Per W 980821 & 26 Ltrs ML20151X4041998-09-11011 September 1998 Discusses Revised Tier 2 Info for AP600 Design.Staff Revised Decision on Whether Fire Protection Should Expire at First Full Power Encl ML20151V1711998-09-0808 September 1998 Advises That Info Re Westinghouse AP600 Std Safety Analysis Rept Through Rev 4 & PRA Through Rev 5 Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5).Disposition of SSAR & PRA Proprietary Info Encl ML20151V2231998-09-0808 September 1998 Informs That NRC Determined That WCAP-14132 Encl in Westinghouse Ltr NTD-NRC-94-4244,dtd 940729 & Marked as Proprietary,Will Be Withheld from Public Disclosure,Per to 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20239A1481998-09-0303 September 1998 Forwards Notice of Issuance of Final Design Approval & Final SER for AP600.FDA Allows AP600 Design to Be Referenced in Application for Construction Permit or Operating License Under 10CFR50 or Application for Combined License ML20239A3111998-09-0303 September 1998 Forwards Final SER Which Summarizes Staff Safety Review of AP600 Design Against Requirements of Subpart B of 10CF5R52 & Delineates Scope of Technical Details Considered in Evaluating Proposed Design ML20151S9181998-09-0303 September 1998 Advises That Info Marked as Proprietary Re Westinghouse AP600 Design Ltrs Concerning Pxs Scaling & PIRT Closure Rept WCAP-14727,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20151V8521998-09-0101 September 1998 Extends Invitation to Attend Ceremony on 980911,where NRC Will Present Final Design Approval for AP600 Std Nuclear Reactor Design to Westinghouse ML20238F3241998-08-31031 August 1998 Advises That AP600 RAI Responses Encl in Westinghouse Ltrs NTD-NRC-95-4598,dtd 951117,as Modified by NSD-NRC-98-5776, Dtd 980826,marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) ML20238F5991998-08-31031 August 1998 Refers to W 980821 Revised Response to Insp Rept 99900404/97-01 That Contained All Substantive Info Provided w/DCP/NRC-1074 Ltr.Nrc Will Destroy DCP/NRC-1074,as Requested ML20151V2201998-08-31031 August 1998 Informs That EPRI Documents, GOTHIC Containment Analysis Package Qualification Rept, GOTHIC Containment Analysis Qualification Manual, & Listed Documents Dtd Sept 1993 Will Be Withheld from Public Disclosure ML20151V8431998-08-31031 August 1998 Extends Invitation to Attend Ceremony on 980911,where NRC Will Present Final Design Approval for AP600 Std Nuclear Reactor Design to Westinghouse ML20237E4421998-08-27027 August 1998 Advises That Info Contained in Ltr DCP/NRC-0985,dtd 970821, Sought to Be Withheld,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20237E0731998-08-26026 August 1998 Advises That Info in WCAP-14812,revs 1 & 2, Accident Spec & Phenomena Evaluation for AP600 PCS, Will Be Withheld from Public Disclosure ML20237C4801998-08-20020 August 1998 Informs That Staff Will Withhold from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended, Presentation Matl from 970212-14 ACRS Meeting Encl in W Ltr NSD-NRC-98-5744 Dtd 980803,until Policy Matter,Clarified ML20237D4391998-08-18018 August 1998 Confirms Phone Conversation Between NRC & W Re Submittal of Final Portions of Documentation Necessary to Complete Review & Issue Final SER & Final Design Approval for AP600 ML20236V6671998-07-30030 July 1998 Advises That Info Contained in WCAP-14601,rev 2,submitted in Westinghouse Ltr NSD-NRC-98-5712,dtd 980616 & Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20236V8621998-07-30030 July 1998 Informs That Proprietary Info Encl in Westinghouse Ltr NSD-NRC-98-5736,dtd 980713 Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20236U7811998-07-29029 July 1998 Advises That WCAP-14270,rev 1, AP600 LP Integral Sys Test Facility Scaling Rept, Encl in Ltr NSD-NRC-98-5718,dtd 980619 & Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA ML20236U7831998-07-29029 July 1998 Informs That Certain Info in AP600 Ssar,If Proposed for Change That Refs AP600 Std Design,Will Require Prior NRC Approval Before Proposed Change Can Be Implemented.Tier 2* Info for AP600 Design & Staff Decision Encl ML20236U8131998-07-29029 July 1998 Advises That WCAP-14471,rev 0, Steam Condensation Events at Osu AP600 Facility Submitted in Ltr NSD-NRC-96-4661,dtd 960306 & Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA ML20236V0511998-07-29029 July 1998 Informs That AP600 Boron Dilution Transient Analysis Encl in Westinghouse Ltrs NSD-NRC-96-4792,dtd 960808 & NSD-NRC-98-5739,dtd 980720 & Marked as Proprietary Will Be Withheld from Public Disclosure Per 10CFR2.790 ML20236V0411998-07-28028 July 1998 Discusses Return of Proprietary Matl to Westinghouse Docketed Under AP600 Design Review.Proprietary Documents Listed in Encl 1 Removed from AP600 File & Returned for Disposition or Retention ML20236T1691998-07-22022 July 1998 Advises That Proprietary Matl Encl in NSD-NRC-96-4700,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)5) & Section 103(b) of AEA of 1954,as Amended ML20236S1321998-07-22022 July 1998 Informs That Matls Documented in Encl Table,Associated W/Westinghouse AP600 WCAPs Submitted in Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20236S1431998-07-22022 July 1998 Informs That Encl Table Associated W/Westinghouse AP600 Design Ltrs Will Be Marked as Proprietary & Will Be Withheld from Public Disclosure Pursuant 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20236S1511998-07-22022 July 1998 Informs That Matl Encl in NTD-NRC-94-4215 & NTD-NRC-95-4436, Marked as Proprietary,Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20236S1601998-07-22022 July 1998 Informs That Encl Table,Associated W/Westinghouse AP600 Ltrs,Will Be Marked as Proprietary & Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20236S9321998-07-22022 July 1998 Advises That Info in on AP600 Large Scale Test Facility Will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20236T3101998-07-22022 July 1998 Discusses W 941031 Submittal by Ltr (NTD-NRC-94-4330) of AP600 Notrump Core Makeup Tank Preliminary Validation Rept & Requests That Info Be Withheld from Public Disclosure. Determined Info Proprietary & Will Be Withheld from Public ML20236T4091998-07-22022 July 1998 Informs That Info Related to Wgothic lumped-parameter & Distributed Parameter Nodalization of AP600 & Wgothic Heat Sink & Flow Path Description Including Areas,Thickness & Evaluations Will Be Withheld,Per 10CFR2.790(b)(5) & 103(b) ML20236T1361998-07-22022 July 1998 Advises That Info Contained in TRs WCAP-12945-P-A & WCAP-14747,respectively Submitted in Ltr NTD-NRC-95-4406, Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEC of 1954,as Amended ML20236S9841998-07-22022 July 1998 Informs That Staff Plans to Return NSD-NRC-94-4246, NSD-NRC-94-4327 & NSD-NRC-94-4318 Transmittals to Westinghouse W/O Proprietarty Determination,Due to Info Being Provided in Documents Submitted at Later Date ML20236S9621998-07-22022 July 1998 Advises That Info in NSD-NRC-97-5424 on AP600 Passive Containment Cooling Sys Will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20236S9131998-07-22022 July 1998 Informs That WCAP-14776 (Rev 2) Encl in Westinghouse Ltr NSD-NRC-97-5202,dtd 970620 Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended 1999-06-08
[Table view] |
Text
'
~hfgi fQ
)
e l
'N p Qtog*'o p.
-'t UNITED STATES 1
.j NUCLEAR REGULATORY COMMISSION
~f o,
WASHINGTON, D.C. 20555-0001 December 10, 1996
~
Mr. Nicholas J. Liparulo, Manager Nuclear Safety and Regul2 tory Analysis Nuclear and Advanced Technology Division Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, Pennsylvania 15230
SUBJECT:
DISCUSSION ITEMS ON THE AP600 SCALING AND PIRT CLOSURE REPORT, WCAP-14727
Dear Mr. Liparulo:
As a result of its review of the June 1992 application for design certifica-tion of the AP600, the staff has determined that it needs additional informa-tion.
Specifically, by letter dated September 18, 1996, Westinghouse submit-ted WCAP-14727 (AP600 Scaling and PIRT Closure Report).
The enclosure to this letter contains discussion items concerning this report. We propose that the enclosed discussion items serve as agenda items for a currently unscheduled meeting concerning this report.
During this meeting the staff will determine which of the enclosed discussion items need to be formally addressed by Westinghouse.
You have requested that portions of the informt. tion submitted in the June 1992, application for design certification be exempt from mandatory public disclesure. While the staff has not completed its review of your request in accordance with the requirements of 10 CFR 2.790, that portion of the submitted information is being withheld from public disclosure pending the staff's final determination. The staff concludes that these followon ques-tions do not contain those portions of the information for which exemption is sought. However, the staff will withhold this letter from public disclosure for 30 calendar days from the date of this letter to allow Westinghouse the opportunity to verify the staff's conclusions.
If, after that time, you do not request that all or portions of the information in the enclosures be withheld from public disclosure in accordance with 10 CFR 2.790, this letter will be placed in the NRC Public Document Room.
I
\\
g00@
[5i8 EM @3HE3 00b 9701150223 961210 PDR ADOCK 05200003 A
PDR
Mr. Nicholas J. Liparulo December 10, 1996 If you have any questions regarding this matter, you may contact me at (301) 415-1132 or Bill Huffman at (301) 415-1141.
Sincerely, original signed by:
Joseph M. Sebrosky, Project Manager Standardization Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No.52-003
Enclosure:
As stated cc w/ enclosure:
See next page QISTRIBUTION: Enclosure to be held for 30 days
- 0ccket File' PDST R/F TQuay
- PUBLIC TKenyon DJackson BHuffman JSebrosky WDean, 0-17 G21 JMoore, 0-15 B18 EJordan, T-4 D18 ACRS (11)
Alevin, 0-8 E23 RJones, 0-8 E23 LLois, 0-8 E23 TCollins, 0-8 E23 GHolahan, 0-8 E2 DOCUMENT NAME: A: TEST PRT.COM Ts veceive a copy of this document,IndiceTe in the boa: *C" = Copy without ettechment/ enclosure
- E" = Copy with attactanent! enclosure "N" = No copy 0FFICE PM:PDST:DRPM SC:SNS;aSSA D:PDST:DRPM l l
NAME JSebrosky W
Alektf#7%
TRQuay n,)(
DATE
/z/4/96 V
/v/fl446 )
tt / ro /96dTMV 0FFICIAL RECORD COPY
Mr. Nicholas J. Liparulo Docket No.52-003 Westinghouse Electric Corporation AP600 cc: Mr. B. A. McIntyre Mr. John C. Butler Advanced Plant Safety & Licensing Advanced Plant Safety & Licensing Westinghouse Electric Corporation Westinghouse Electric Corporation Energy Systems Business Unit Energy Systems Business Unit P.O. Box 355 Box 355 Pittsburgh, PA 15230 Pittsburgh, PA 15230 J
Mr. M. D. Beaumont Mr. S. M. Modro l
Nuclear and Advanced Technology Division Nuclear Systems Analysis Technologies Westinghouse Electric Corporation Lockheed Idaho Technologies Company One Montrose Metro Post Office Box 1625 11921 Rockville Pike Idaho Falls, ID 83415 Suite 350 Rockville, MD 20852 Enclosure to be distributed to the following addressees after the result of the proprietary evaluation is received from Westinghouse:
Mr. Ronald Simard, Director Ms. Lynn Connor Advanced Reactor Programs DOC-Search Associates i
Nuclear Energy Institute Post Office Box 34 1776 Eye Street, N.W.
Cabin John, MD 20818 Suite 300 Washington, DC 20006-3706 Mr. Robert H. Buchholz GE Nuclear Energy Mr. James E. Quinn, Projects Manager 175 Curtner Avenue, MC-781 LMR and SBWR Programs San Jose, CA 95125 GE Nuclear Energy 175 Curtner Avenue, M/C 165 Mr. Sterling Franks San Jose, CA 95125 U.S. Department of Energy NE-50 Barton Z. Cowan, Esq.
19901 Germantown Road Eckert Seamans Cherin & Mellott Germantown, MD 20874 600 Grant Street 42nd Floor Pittsburgh, PA 15219 Mr. Charles Thompson, Nuclear Engineer AP600 Certification Mr. Frank A. Ross NE-50 U.S. Department of Energy, NE-42 19901 Germantown Road Office of LWR Safety and Technology Germantown, MD 20874 19901 Germantown Road Germantown, MD 20874 Mr. Ed Rodwell, Manager PWR Design Certification Electric Power Research Institute 3412 Hillview Avenue Palo Alto, CA 94303
i.
\\
Coments on Scaling and PIRT Closure Report t
l-Non-Scaling-Related Material 1.
For OSU, " unanticipated phenomena" are handled appropriately, but there
(
is no discussion of anomalous behavior related to hardware. Two specific j
instances are the break orifice flow in SB5 and the leaking check valve RAls, and must be addressed by Westinghouse.
that affected the DVI line breaks.
These are the subject of outstanding 2.
Changes in PIRT rankings acoear to be based primarily on the results of j
code calculations, and not on insights from test results.
If this is 1
i true, it is inconsistent with the intent of the staff in requesting preparation of the report.
Since the objective of the test was to i
produce data to validate the code, changing phenomena rankings based on those calculations appears to be a circular process with no underlying physical basis.
(This issue is raised again in the scaling-related section, in a similar context.)
i i
l 3.
In the discussion of applicability of PRHR results on p. 6-41, it is still not entirely clear that a full range of conditions has been considered for the PRHR heat exchanger.
Is there a progression of events that could result in significant heating of the IRWST, such that its subcooling would be reduced while heat fluxes are still relatively high?
Could this have an impact on heat transfer /CHF?
4.
There is no discussion of fuel rod reactivity or core level phenomena in the LBLOCA PIRT (Section 2.2.2).
5.
On p. 2-8, cold leg / accumulator flow asymetries and accumulator dis-charge phenomena are not discussed. Also, why is DVI a separate item under "Downcomer," when the discussion indicates that it has been covered by other downcomer phenomena?
6.
Section 2.2.3, p. 2-14: why is the hot leg nozzle bypass path not modeled?
7.
In Table 2.4-8, why is loss of offsite power assumed to trip the pumps
(" Core--Forced Convection)? Why is it not tied to receipt of an "S" signal or CMT actuation?
8.
Table 2.4-11, p. 2-62: Justifications are missing.
9.
Selection of initial / boundary conditions for LTC calculations h.
been the subject of much discussion between the staff and Westinghouse.
Westinghouse states on p. 2-67 that "the most limiting thermal-hydraulic conditions" are used. Westinghouse needs to be able to justify that the selected conditions are, in fact, "most limiting."
Enclosure
- - -. ~. - -
L t
j
- 10. The argument is made once again on p. 64 that, since single tube experi-j ments show an enhancement of boiling heat transfer when the tube is oriented horizontally (compared to a vertical orientation), using.
vertical data to model the upper horizontal section of the "C" tube should be " conservative." The staff does not believe that this has been conclusively demonstrated. On a qualitative basis, one can develop.
reasonable explanations for.the enhancement of heat transfer on a single horizontal tube. However, the situation in a tube bundle is somewhat different; for instance, while there is nothing to interfere with bubble rise from a single tube, a horizontal bundle of tubes could act to trap vapor in the interior of the bundle more readily than might be expected in a vertically-oriented bundle, leading to earlier dryout than might be predicted from single-tube or vertical bundle results.
The staff has l
previously suggested to Westinghouse that sensitivity analyses be performed, bounding the heat transfer performance of the heat exchanger to demonstrate that it can meet its performance requirements; that suggestion is renewed here.
- 11. On p. 9-4, Westinghouse should be careful about how the ADS test loop is characterized. The text says there is "no geometrical distortion relative to the plant."
In one sense, this may be reasonably accurate (if the piping layout of the facility still represents the configuration in the plant). However, the detailed facility design is not exactly the same as the plant, with spool pieces and orifices / nozzles representing some valves in they system. Although Westinghouse attempted to match loss coefficients, flow areas, L/D, etc., there is still the potential for some distortion relative to the AP600 in this approach [ Westinghouse rayld provide confirmatory data from the later (outside design certifica -
tion) tests using 6 valves to demonstrate that the distortion was min! mal]. Also, the staff notes that there are.tn ADS trains in the plant, and the piping configurations for the two are not identical (from the ptessurizer to the sparger).
- 12. On p. 10-10, Westinghouse says " sufficient instrumentation has been provided" to acquire data on LTC phenomena. The operability of and uncertainties associated with those instruments are not addressed, however.
(This is primarily an issue to be addressed in the code 4
validation review.)
i Scaling-Related Material
- 13. The organization of the report is not conducive to easy review.
It would be more efficient to put a detailed descriptions and scaling bases for the facilities in an early chapter, rather than in 7 and 8.
14.
In principle, the report follows Wulff's methodology in the top-down scaling analysis. However, the concept of inertia and impedance matrices has not been properly explored.
These matrices are generated in a multi-loop system analysis, and particularly become very eseful for analyzing complex and interacting flow path systems such as the AP600 SBLOCA scenarios.
In view of the complexity of the problem, specifically in view of the time-consuming work associated with finding flow rates at each branch of a junction of a multi-loop system, the report uses one
s dominant flow loop as a so-called " equivalent loop" and focuses on each phenomenologically distinct phase in order to obtain the most dominant r i
group (s) governing that specific phase. This is a more practical approach and ignores the details of scalina criteria for flow distribu-tion and component interactions.
Such a practical approach crn be accepted as long as the flow distribution and component interactions are
(
show not to be important relative to a more important phenomenon result-ing from a single loop analysis, and as long as _the results are properly analyzed, discussed, and finally the approach taken is justified in view of the multi-loop interactive flow paths.
In most cases, at the begin-i ning such assumptions are listed without a convincing technical discus-i sion. Justifications are essential to show that the chosen single loop i
system captured dominant processes and phenomena and their associated i
scaling criteria for a given distinct phase of transients. Westinghouse is encouraged to implement convincing discussions as to why they.are using such a single, non-interactive flow path and yet not losing 1
essential information about flow distribution and component interactions.
- 15. Validation is necessary to demonstrate that the correct n's have been identified in the top-down scaling analysis, and to show that all the
~
important phenomena have been taken into account. This can be done by balancing the mass conservation equation; if the important mass inflows and outflows are considered, then the equation will balance. Another validation process is to compare the experimental data coming from i
different test facilities using (dP*/dt*).vs. t* or, preferably, P* vs.
t*.
The staff understands that this may not be easy, but it is the only way to confirm the validity of the methodology and the characteristic w groups, and it increases confidence in the scaling analysis. Note:
the staff has explicitly recommended to Westinghouse numerous times in the past that validation of the PIRTs usina results of the testina orocrams should be a key objective of this type of study.
The foregoing comment, which is based on Professor Kojasoy's scaling review, essentially makes that same point once again in a slightly different context.
- 16. As part of the two-tier scaling approach, a component-level scaling analysis, which eventually led to the local-level (bottom-up) scaling, was carried out for the CMT and PRHR separate-effects tests.
The r groups were properly derived from the relevant balance equations for each component. However, the r groups were not numerically evaluated and compared using experimental data and calculated plant values.
It is thus difficult to assess whether the separate-effects tests were properly designed and whether the experimental data were the proper data for code validation.
- 17. Use of NOTRUMP and WCOBRA/ TRAC to calculate the normalizing reference fluid and flow values for scaling and code assessment purposes appears to lead to a circular reasoning process.
When validation of the code (s) is a primary objective of the scaling and experimental program, there is no technical justification for using the same computer code (s) to evaluate the reference values for scaling purposes. The reference normalization values should not be calculated using a code whose validity is in question.
- 18. There is a lack of uniformity and consistency in nomenclature in the m
m
_ - -. ~. - - - - -. - -
report. Although each chapter contains a nomenclature section, not all symbols in the text are defined.
For instance, the subscript "f" in Chapter 8 was never described in the text and does not appear in the nomenclature.
i Specific comments by chapter:
)
J Chapter 3--Top-down scaling based on Wulff's method
)
- 19. The methodology is demonstrated for the Passive Cooling, ADS Blowdown, IRWST Injection, and Sump Injection phases. The high-pressure depressur-ization phase of an SBLOCA was not addressed at all; it was considered to be similar to the same phase.in operating reactors. While the thermal-hydraulic behavior of the phase may be reasonably well-known, this phase sets up the initial conditions for the following (Passive Cooling) phase.
Since the scaling groups are defined by initial and operating conditions that are selected and/or controlled for a test facility and prototype, it is essential to demonstrate the methodology for the initial phase, as well.
- 20. The Passive Cooling phase is analyzed in two periods:
single-phase natural circulation and two-phase natural circulation.
This appears to be an oversimplification of the complete process. The phase is initiated i
by an "S" signal, causing actuation of the CMTs and PRHR. These two processes are coupled and their comparative magnitudes are affected by break location and size, and the parameters associated with the PRHR and two CMT natural circulation loops, as well as the other four primary loops (two on each side) that were in operation before CMT and PRHR actuation. As noted previously, reducing the actual flow paths ignores i
1 the scaling criteria associated with flow distributions and component interactions.
If these are not important, it should be convincingly demonstrated here rather than simply providing an assumption without justification. This would clarify (a) whether the replacement of an actual multi-loop system with a single-loop system and compensating CMT flow to the break flow have a technical basis; (b) whether all important processes have been covered; and (c) whether the resulting dimensionless groups are the most relevant groups characterizing this phase of the transient.
- 21. There still appear to be problems with Figs. 3.3.2 and 3.3.3.--even the corrected version of Fig. 3.3.3 seems not to have the loop right.
22.
Selection of reference parameters is the most critical selection for a scaling procedure. The pressure should be scaled as P* =
P - P_
P - P_i n_,_
P
- 7,,_,n AP where P is the minimum pressure and P is the maximum pressure.
In a in given pEenomenologically distinct phaseTor period) of a transient, P.
would be the initial pressure and P,in would be the final pressure for the specific phase. As a result, for each distinct phase or period, the pressure scale should be adjusted to make pressure variation limited by
~
OSP*fl.0 and 05(dP*/dt*)s1.0 The comments on p. 3-21 with regard to Wulff's recommendation are not correct.
Each phase should be scaled with a different AP.
23.
In treating two-phase flows, the balance equations are properly weighted by single-and two-phase volumes. However, each is assumed to be constant.
Is that true? Is such an assumption necessary? For a given transient, these volumes are changing.
- 24. The vapor or liquid (preferably vapor) mass balance equation should be included in a drift-flux (or mixture) model formulation of_ the two-phase flow field. This balance equation has not been considered in the top-down scaling presented in this chapter. This is the balance equation that will give indications about phase distributions.
25.
Equation (3-63) is correct.
However, the discussion following the equation depends where the equation is applied.
The staff understands that there is no general model or correlation for critical flow which is valid for a wide range of pipe lengths, pipe diameters, and upstream conditions, including subcooled liquid.
However, use of a simple critical flow model instead of the discussion following Eq. (3-63) would be more convincing.
- 26. Neglecting inertia effects in Eq. (3-72) appears to be reasonable, but why? One of the objectives of a scaling analysis is to reveal and differentiate important terms from unimportant terms.
If a term is not important, the scaling analysis should show that it is negligibly small when compared to other terms.
- 27. r groups emanating from the dimensionless balance equations at each phase of the transient are properly documented and the significance of each r group is adequately described.
Figures comparing a groups between AP600, OSU, and SPES-2 are informative and helpful.
However, there is signifi-cant scatter and variations between NOTRUMP calculations, hand calcula-tions, and experimental data, and it is unclear why the hand calcula-tions, in general, seem to be best in terms of agreement. Also, some values of r groups are significantly higher than unity.
It would be helpful if discussion addressing these discrepancies was provided.
- 28. Although the scaling bases for the two facilities described in Chapters 7 and 8 are conceptually different from one another, the analysis of r groups and ratios of r groups, as well as the comparisons among the scaled-up test results and AP600 behavior indicate that the facility tests and AP600 plant calculations compare reasonably well.
In spite of deficiencies in the top-down scaling procedure discussed above, the tests and plant calculations appear to capture the highly rated key phenomena identified in the PIRT process.
.n n
o Chapter 4--CMT testing 29.
From the physical point of view, each mode of operation is satisfactorily described and the component-level bhlance equations are carefully non-dimensionalized to derive the proper a groups.
Up to this point, everything is well-documented. However, several problems were encoun-tered in reviewing design criteria for experiments and analyzing experi-mental results:
a.
Numerical values of the r groups were not evaluated in the report, making it difficult to assess the nature of scale distortions.
b.
From information given in the report, it is concluded that the recirculation phase scaling requires that
._8,,_
y; A
v p
p Is this correct? If so, then geometric and kinematic scaling require that the CMT cross-sectional area scaling ratio is the same as the inlet and outlet piping cross-sectional area ratios.
This type of information was not documented, making it difficult to judge the nature of geometric similarity between the test facility and the prototypic CMT.
For example, it is impossible to assess if the Ri similarity requirement is satisfied for the CMT recirculation mode.
c.
Figures 4.3.1 - 4.3.4 are not clearly documented and do not support the text explanations and conclusions reached at the bottom of p. 4-17.
d.
Equation (4-20) should define the free convection heat transfer coefficient, not the relevant Nu.
e.
The CMT drain-down mode balance equations and a groups were developed with great care from a mechanistic point of view.
However, as in the case of the recirculation mode, a numerical evaluation of the r groups in this report would facilitate a comparative similarity analysis.
(They could possibly be brought over from the CMT scaling report.)
f.
Figures 4.3.7 - 4.3.11 do not represent narrative explanations of the figures given at the top of p. 4-28.
Component-level similar-ity requirements and scaling distortions are not documented numerically, making it difficult to judge if scaling distortions are reflected in r group ratios, and if the important phenomena are adequately simulated in the CMT tests.
g.
Test overlaps between the separate-effects tests and the SPES-2 and OSU integral facilities are properly documented with regard to pressure, mass flow, and fluid temperature.