I CAROLINA POWER & LIGHT COMPANY
~
MEETING WITH THE NUCLEAR REGULATORY COMMISSION AUGUST 10,1992 1
f iI' BRUNSWICK NUCLEAR PROJECT 22003~
c.
G) 0 D
A O K O O O 24 P
PDR a
r CAROLINA POWER & LIGHT COMPANY
'~
BRUNSWICK NUCLEAR PROJECT MEETING WITH THE NUCLEAR REGULATORY COMMISSION AUGUST 10,1992 AGENDA 1:00 p.m. - 1:15 p.m.
Opening Remarks Al Watson 1:15 p.m. - 1:45 p.m.
Status of Nuclear Engineering Ashleigh Lucas Department Short-Term Actions Drilled in Anchors Block / Masonry Walls Structural Steel Short-Term Structuralintegrity 1:45 p.m. - 2:00 p.m.
Status of Other Short Term Actions Jack Spencer Deferred Equipment Maintenance issues Backlogs of Temporary Conditions and Operator Work-arounds
. Other 2:00 p.m. - 2:30 p.m.
Pre-Startup/ Post-Startup Work item Jack Spencer Classification and Post-Startup Backlog Disposition 2:30 p.m. - 3:00 p.m.
Comments Regarding CP&L's July 23 Stewart Ebneter Submittal to the NRC 1
o j
PERFORMANCE IMPROVEMENT PROGRAM I
SHORT TERM ACTIONS l
(REQUIRED PRE-STARTUP)
COMPLETION ITEM SCHEDULE DESCRIPTION NO.
A-Equipment Corrosion Problems Prior Complete corrosion repairs to existing service water lubrication l
Al water piping supports. [ DESIGN COMPLETE, FIELD WORK COMPLETE ON 88 to Start-up OF 144 ITEMS)
- COMPLETE **
A2 Perform a third-party walkdown of non-pipe support short term structural integrity items and pipe supports in areas with high corrosion potential to validate design assumptions.
Address any identified deficiencies in accordance with the methodology in l.
[ CORROSION WALKDOWNS COMPLETE, NO REPAIR ISSUES NOTED]
Prior Address corrosion repairs of seismic instrument racks in accordance A3 with the methodology in Enclosure 2. [8 RACKS EACH UNIT. DESIGN to l
IBSUED FOR 4 RACKS. 3 REMOVED WITH REPLACEMENTS IN FABRICATION]
Start-up l
l f
2
c PERFORMANCE IMPROVEMENT PROGRAM SHORT TERM ACTIONS (REQUIRED PRE-STARTUP)
B Deferred Equipment Maintenance Issues-B1 Correct the 480 VAC emergency bus feeder breaker spring tension.
Prior (TOTAL OF 58 BREAKERS.
3 REFURBISHED TO DATE]
to Start-up.
B2 Repair the Unit 1 UPS primary-inverter.
Complete-B3 Complete the Unit 1 battery discharge tests. [ UNIT 1 BATTERIES.
Complete BEING CHANGED OUT DURING SPRING OUTAGE]
B4 Complete'the Unit.2 turbine' exciter coupling changeout and Complete alignment.
B5
, Install modifications to enhance Unit 2 turbine partial arc Installation operation. [ INITIAL' WORK ~ SCOPE COMPLETED - REVISED WORK SCOPE TO BE Complete COMPLETED 9/18]
~
B6 Complete refurbishing.the Unit.2 control valve power packs'and Complete changing"out1 turbine electro-hydraulic control system accumulators.
B7 Complete inspection of cylinder 4L on emergency diesel generator 3.
Complete B8 Replace the '2BL ' reactor feed pump -wear ring.
Complete B9 Repair the IB control rod drive' pump.
Complete B10 Replace current transformers in the emergency busses that would Complete require a dual unit outage.
B11~
Modify main stack radiation monitor. isokinetic sampling probe.
- COMPLETE **
9 3
_ _, _ =.
PERFORMANCE IMPROVEMENT PROGRAM BHORT TERM ACTIONS (REQUIRED PRE-STARTUP)
C - Potential Structural Deficiencies C1 Complete Unit 1 and Unit 2 Drywell Phase 2 miscellaneous steel Prior walkdowns and Unit 1 and Unit 2 Reactor Building Phase 1 to Miscellaneous steel walkdowns.
Complete preliminary bounding load Start-up studies.
Address repairs, as required in accordance with the methodology in Enclosure 2.
[ UNIT 2 REACTOR BUILDING DHASE I WALKDOWN 96% COMPLETE.
UNIT 2 DRYWELL. PHASE 2 WALKDOWN 10%
COMPLETE.
IRREGULARITIES BEING EVALUATED - NO OPERABILITY ISSUES IDENTIFIED TO DATE]
C2 Repair of five reinforced concrete non-load bearing wall panels in Prior the diesel generator building to restore them to their design to configuration. [ PHYSICAL WORK COMPLETE - FINAL ENGINEERING REVIEW Start-up IN PROGRESS]
C3 Complete repairs to structural angle restraints for diesel Prior generator building block walls to restore the walls to their design to configuration. [ PHYSICAL WORK COMPLETE - FINAL ENGINEERING REVIEW Start-up IN PROGRESS]
C4 Perform a design review and a field inspection review,.when Prior necessary, of the non-safety masonry walls at the Brunswick Plant to to verify the walls are appropriately classified.
Address any Start-up identified deficiencies in accordance with the methodology in.
[ REVIEWS COMPLETE. UPGRADES IDENTIFIED. DESIGNS IN PROGRESS]
C5 Remove accessible non-functional through-bolts and install cover Complete plates over the holes in the diesel generator building walls.
C6 Perform an integrity inspection (i.e.,
for cracks, general Prior condition) of unreinforced masonry walls that are classified as to safety-related.
Address any identified deficiencies in accordance Start-up with the methodology in Enclosure 2.[WALKDOWN COMPLETE. EVALUATIONS NEARING COMPLETION]
4
PERFORMANCE IMPROVEMENT PROGRAM SHORT TERM ACTIONS (REQUIRED PRE-STARTUP)
C - Potential Structural Deficiencies Prior Complete repairs of upgrading seismic classification walls in the C7 control building (elevation 49 foot) that have been determined to to be required post-earthquake for control room habitability Start-up requirements. [ COMPLETE EXCEPT FOR WALL 6C WHICH IS IN PROGRESS]
i I
Perform a review of IE Bulletin 80-11 program for the Brunswick Prior C8 Plant.
The review will address existing masonry wall functions to including missile barrier, tornado barrier, ventilation barrier, ct Start-up other functions for which it is not analyzed.
Address any f
identified deficiencies in accordance with the methodology in.
[ REVIEWS COMPLETE. UPGRLUES IDENTIFIED. DESIGNS IN l
PROGRESS]
Prior ccmple*s long term qualification of the emergency diesel generator C9 to f
exhaust line supports to include tornado loading requirements.
[ WORK COMPLETE'- 3 SUPPORTS OPERABLE, 1 FUNCTIONAL PENDING Start-up j
CALCULATION REVIEW)
C10 Review the IE Bulletin 79-02 (Pipe Support Anchor) Program to
- COMPLETE **
f ensure compliance and to ensure methods of inspection used would have detected deficient bolt installation.[ REVIEW COMPLETE, VALIDITY OF PROGRAM CONFIRMED)
- COMPLETE **
Complete field inspections to assure that calculations supporting C12 interim seismic operability of the service water system pumps are I
valid.
Address any identified deficiencies in accordance with the methodology in Enclosure 2.
[ REVIEW COMPLETE. INTERIM PUMP OPERABILITY CONFIRMED]
Prior Perform a third-party review of the short term structural integrity C12 program to address evaluation techniques, field validation of to critical assumptions, and a review of communications from the Start-up Technical Support organization to the Engineering organization.
Address any identified deficiencies in accordance with the methodology in Enclosure 2.
[ THIRD PARTY REVIEW COMPLETE. REPORT UNDER REVIEW) 5
PERFORMANCE IMPROVEMENT PROGRAM SHORT TERM ACTIONS (REQUIRED PRE-STARTUP)
C - Potential Structural Deficiencies Prior C13 Complete repairs of recirculation system ring header hangers.
[ SPRING CAN WORK IN PROGRESS. 7 OF 9 COMPLETE UNIT 2, 2 OF 9 to COMPLETE UNIT 1.
SNUBDER SUPPORT UPGRADE DESIGNS TO DE ISSUED IN Start-up AUGUST)
Prior Complete design-and installation of additional pipe supports for C14 the service water lubrication water piping. [88 OF 144 COMPLETE.
to Start-up TARGET COMPLETION DATE IS 9/1]
CIS Address seismic repairs of electrical motor control centers in
- COMPLETE **
accordance with the methodology in Enclosure 2.
[ PHYSICAL WORK COMPLETE. ALL MCCs OPERABLE]
l
l I
PERFORMANCE IMPROVEMENT PROGRAM SHORT TERM ACTIONS (REQUIRED PRE-STARTUP) l D - Backlogs of Temporary Conditions and Operator Work-Arounds Prior Temporary conditions involving short term structural integrity D1 to items will be reduced in accordance with the methodology in Start-up.[47 COMPLETE]
Prior Temporary conditions other than short term structural integrity D2 to items will be reduced in accordance with the methodology in Start-up
[43 COMPLETE]
1 Reduce the number of operator work-around items (disabled Prior D3 annunciators, RTGB indicator deficiencies, and caution tags) in to j
accordance with the methodology in Enclosure 2.
[204 COMPLETE]
Start-up Prior Reduce the outage backlog of corrective maintenance in accordance l
D4 to with the methodology in Enclosure 2.
[4119 COMPLETE]
Start-up i
Prior Reduce the outage backlog of preventative maintenance in accordance f
D5 to j
with the methodology in Enclosure 2.
[ WORK IN PROGRESS]
Start-up i
I 7
l PERFORMANCE IMPROVEMENT s*ROGRAM SHORT TERM ACTIONS (REQUIRED PRE-STARTUP)
E - Equipment Deficiencies Discovered During Walkdowns Perform hot side walkdown inspections.
Address any identified Walkdown Complete El deficiencies in accordance with the methodology in Enclosure 2.
1 Perform cold side walkdown inspections.
Address any identified Walkdown Complete E2 deficiencies in accordance with the methodology in Enclosure 2.
WORK SCOPE
[ APPROX 2000 IRREGULARITIES IDENTIFIED FROM HOT AND COLD SIDE WALKDOWN.
APPROX 500 UNDER EVALUATION.]
IDENTIFIED AND IN PROGRESS FOR APPROX 1500.
l l
l l
8 l
l 1
PERFORMANCE IMPROVEMENT PROGRAM I
SHORT TERM ACTIONS (REQUIRED PRE-STARTUP)
I F - Other F1 Correct leakage on a feedwater check valve hinge pin and a main Complete steam isolation valve (MSIV) packing (total was less than percent of Technical Specification allowed limit) and a nitrogen 50leak on a drywell cooler, which was identified during Unit 1 drywell inspections. [F010A AND B TO BE CHANGED OUT PRIOR TO UNIT 1 STARTUP. UNIT 2 VALVEB REPLACED FALL 91 OUTAGE]
Prior Complete repairs to neutron monitoring detectors in accordance with F2 the methodology in Enclosure 2.
[ UNIT 1 - 3 OF 3 IRMs REPAIRED, 3 to OF 11 LPRMs REPAIRED. UNIT 2 - 1 OF 1 SRM REPAIRED, 1 OF 3 IRMs Start-up REPAIRED, 4 OF 8 LPRMs REPAIRED.]
Complete the Unit I secondary containment isolation test scheduled Complete F3 for the next refueling outage (Reload 8).
l F4 Complete 4kV bus crosstie modification (part of 10 CFR 50.63 Prior implementation). [ PHYSICAL WORK COMPLETE. ACCEPTANCE TESTING to Start-up SCHEDULED TO COMPLETE 8/17]
l l
(
t l
9
BRUNSWICK NUCLEAR PROJECT i
OUTAGE PROGRESS
SUMMARY
AS OF AUGUST 6,1992 i
I April 21 Emergent Total WORK ITEM Existing Complete Added Complete Work items Completed j
Short Term Structuralintegrty 212 47 12 0
224 47.
Other Temporary Condklons 204 35 17 8
221 43 Temporary Caution Tags U1 80 15 18 0
98 15 Temporary Caution Tags U2 60 25 24 15 84 40 Disabled Annunciators Ut 20 2
1 0
21 2
Disabled Annunciators U2 20 1
1 0
21 1
t Reactor-Turbine Generator Board -
80 63 24 4
104 67 Unit 1 Reactor-Turbine Generator Board -
71-60 46 17 117 77 Unit 2 s
Outage Work Request / Job Orders 783 212 581 155 1364 367
-Unt1 Outage Work Request / Job Orders 673 346 677 230 1350 576
- Unit 2
[
NonW Work Request / Job 993 328 1673 807 2666' 1135 Orders - Una i Non-Outage Work Request / Job 1A 777 2415 1264 3997 2041
' Orders - Unit 2 l
.10
BRUNSW CK NUCLEAR P 90JEC-~
PRE-STARTU 3 EXCE 3TIO \\ VIETHODOLOGY L>
SCOPE 390 CESS 3RE-SC 9E E.\\ N G 3AC(LOG 9EVI EW CO V Vll-~~~E.E 3 _AN-~ \\lUCL EA 9 SA.= E-~Y CO VI VllTTE E S ~~E V AN AG E 9 l
11
'e Log c Procoss For Distinguishing mmt 524 i
L' Pre-and Post-Startup Work items Work Ust 1
~
ltems (such as maintenance, design or structural deficiencies etc.) which are not currently seneduled, on the pre-startup list, or new emergent items.
9F Pre-Startup Determination
,e Teen.
Yes Spee or NM cornmetmem to Pro. Startuo No g Safety System Avalthallity j
+
I Does item 4
eet Scapden
- F0ccxeteo Commitment l
+
,.rw.e.c r.sm.
cr - om
" '**88'*"'*
FOnerator Work Arounos
~
- Enom.a w m ea m
+
. cat s. w om p'Ocarating Rollacility l
a um rew me a 4
i
( Other y,,
mr PNSC Review ena Assessment NP Site V. R Review w
Post-Startup Li tl Pre-Startup List h v, Y" 12
BRUNSWICK NUCLEAR PROJECT POST-STARTU1 BACK_OG D SPOS TION POST-STARTUP BACKLOG ORGANIZATION s
WORK PROCESS IMPROVEMENTS l
L +
RISING. STANDARDS SPECIFIC TO BACKLOGS u
f i
+
m N
13 9
-...,e,
,---_____________-e
.