Summary of 890222 Meeting W/Licensee in Bethesda,Md to Discuss Characterization of & Proposed Actions For,Cracks Found in Unit 1 Recirculation Sys Safe Ends.Potential Implications for Unit 2 Also Addressed
ML20246L512
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/15/1989
From: Tourigny E
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8903240201
Download: ML20246L512 (7)


Text

.

8 o o, UNITED STATES

[,

  • g- NUCLEAR REGULATORY COMMISSION l

5 E WASHING TON, D. C. 20666  !

% , , , , . +# March 15, 1989 Docket Nos. 50-325' and 50-324 LICENSEE: Carolina Power and Light Company FACILITY: Brunswick Steam Electric Plant, Unit 1 AND 2

SUBJECT:

SUPNARY OF FEBRUARY 22, 1989 MEETING WITH CAROLINA POWER'-

& LIGHT COMPANY General On February 22, 1989, the NRC staff met with the Carolina Power & Light Company (CP&L) to discuss the characterization of, and the proposed actions for, the cracks found in the Brunswick Steam Electric Plant (Brunswick), Unit 1, recirculation system safe ends. Potential implications for Brunswick Unit 2 l were also addressed. The meeting was held at Bethesda, Maryland and a list of attendees is included in Enclosure 1. Enclosure 2 contains the meeting l agenda. i Unit 1 is currently in a refueling outage and Unit 2 is operating. A refueling outage for Unit 2 is planned to consnence in September 1989.

Discussion Intergranular stress corrosion cracks (IGSCC) were found in all ten recirculation system safe ends. The licensee originally planned to weld overlay four safe '

ends and justify "as is" the remaining six safe ends'. The licensee advised the NRC staff during the meeting that all ten safe ends would be weld overlayed g before Unit I returned to service. The weld overlay would ensure safe plant  ;

operation for one cycle. The licensee is considering replacing Unit I recircu- i lation system piping during the next refueling outage which is scheduled in 1990.

The licensee presented a justification for continued operation (JCO) for Unit 2 assuming that the same degree of safe end cracking was present in that operating unit. There is no evidence at this time that there is safe end cracking in

) Unit 2, but since both units have approximately the same service time and j' conditions it is not unreasonable to postulate that there may be some cracks in

! the safe ends. The licensee is also considering replacing Unit 2 recirculation system piping in an upcoming refueling outage, but not necessarily the one to start in September 1989.

I 9903240201 DR 890315 9 ADOCK 05000324 .

PNU q p

1 . 8 March 15, 1989

! We requested the licensee to provide some additional details in their safe end cracking analysis and in the JC0 for Unit 2. Since the licensee was already committed to provide a submittal on this subject by March 13, 1989, we agreed that the additional details can be made part of the March 13, 1989 submittal.

fN W -

E. G. Tourig y, enior Project, Manager  ;

Project Directorate 11-1 }'

Division of Reactor Projects I/II

Enclosures:

As stated l

l cc w/ enclosures:

See next page j i.

I i

l I

I

l i

Mr E. E. Utley Brunswick Steam Electric Plant Carolina Power & Light Company Units 1 and 2 I

'1 cc:

l Mr. Russell B. .Starkey, Jr. Mr. J. L. Harness Project Manager Plant General Manager Brunswick Nuclear Project Brunswick Steam Electric Plant Box 10429 .

P. O. Box 10429 Southport, North Carolina 28461 Southport, North' Carolina 28461 ,

i Mr. R. E. Jones, General Counsel Mr. H. A. Cole ,

Carolina Power & Light Company Special Deputy Attorndy General  ;

P. 0. Box 1551 State of North Carolina i' Raleigh, North Carolina 27602 Post Office Box 629 Raleigh, North Carolina 27602 Mr. Mark S. Calvert Associate General Counsel Mr. Robert P. Gruber Carolina Power & Light Company Executive Director .

Post Office. Box 1551 Public Staff - NCUC  !.

Raleigh, North Carolina 27602 Post Office Box 29520 )

Raleigh, North Corolina 27626-0520 Ms. Grace Beasley Board of Commissioners i Post Office Box 249  !

Bolivia, North Carolina 28422 'l l

Mrs. Chrys Baggett State Clearinghouse Budget and Management 116 West Jones Street Raleigh, North Carolina 27603 Resident Inspector  !

U. S. Nuclear Regulatory Commission i Star Route 1 Post Office Box 208 Southport, North Carolina 28461 '

Regional Administrator, Region II  !

U. S. Nuclear Regulatory Commission  ;

101 Marietta Street, Suite 2900 Atlanta, Georgia 30323 Mr. Dayne H. Brown, Chief

, Radiation Protection Branch  ;

Division of Facility Services N. C. Department of Human Resources 701 Barbour Drive Raleigh, North Carolina 27603-2008 l l

l-l --

I U[ ,

1 ..

I- i

.v Enclosure 1-NRC/CP&L MEETING Brunswick SEP Safe

End Cracking I

Feb ruary 22, 1989 '

i Name Affiliation .

E. G. Tourigny USNRC, .NRR, Brunswick SEP PM W. R. Murrey CP&L - Brunswick Licensing T. L. Brinkman General Electric Co.

R. H.-Jordan CP&L - BSEP R. B. Starkey CP&L - BSEP Pete Riccardella Structural Integrity' Assoc.

Jerome J. Blake USNRC, RII W. A. Koo USNRC, NRR, DEST EMTB Ron Ganble Novetech i l

Robert Hermann NRC/NRR i

Michael Fox APTECH L. W. Wheatley CP&L A. J. Giannuzzi Structural Integrity Associ.

G. M. Gordon Genera 1' Electric Co.

Ray Hanford CP&L, Nuclear Engrg. Dept., Matls Enrg Joe Holder CP&L - BSEP Robin Jones EPRI I

-l i

1

____-____m_ _ . _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ - _ - . _ - _ _ _ _ _ _ _ _ _ _ _ _

l <

- >- ENCLOSURE 2 CP&L/NRC. MEETING IGSCC INSPECTION FINDINGS / REPAIRS I

FEBRUARY 22, 1989  ;

AGENDA l I. INTRODUCTIONS (B. MURRAY - CP&L)

II. UNIT 1 RPV N07.tLE/ SAFE END WELDS ,

o INSPECTION RESULTS (T. BRINKMANN - GE) o FINAL REPAIR ANALYSIS (P. RICARDELLA - SIA) o CHIN SHAN REPAIRS (G. GORDON - GE)

III. UNIT 1 THERMAL SLEEVE ATTACHMENT WELDS l o INSPECTION HISTORY (T. BRINKMANN - GE) o METALLURGICAL SAMPLE (R. JORDAN - CP&L)  !

o 4 REPAIR METHODOLOGY .(P. RICARDELLA - SIA)

~

o CHIN SHAN THERMAL SLEEVE / SAFE ENDS REPAIRS (G.GORDON - .

t GE) ,

IV. UNIT 2 JUSTIFICATION FOR CONTINUED OPERATION (THERMAL SLEEVE ATTACHMENT WELDS) o BACKGROUND (L. WHEATLEY - CP&L) o ANALYSIS (P. RICARDELLA - SIA)  ;

o CURRENT STATUS OF HYDROGEN WATER CHEMISTRY I (R. JORDAN - CP&L, G. GORDON - GE, R. JONES - EPRI)

V. NRC REQUEST FOR ADDITIONAL INFORMATION o UT TECHNIQUES (T. BRINKMANN - GE) l o TECHNICAL RESPONSE (P. RICARDELLA - SIA)

VI. OPEN DISCUSSION t

l l

r March 15, 1989 We requested the licensee to provide some additional details in their safe end cracking-analysis and in the JC0 for Unit 2. Since the licensee was already  !

committed to provide a submittal on this subject by March 13, 1989, we agreed that the additional details can be made part of the March 13, 1989 submittal.

Originial Signed By:

E. G. Tourigny E. G. Tourigny, Senior Project Manager Project Directorate 11-1 Division of Reactor Projects I/II

Enclosures:

As stated cc w/ enclosures:

See next page

[BSEP MTG

SUMMARY

)

/ /

UFC :LA:PD21: :PM:PD2 :D:P 1- - -

.s eggg.--_-: g -

flAM PAnderson  : stu ves  :  :  :  :

. . . . : _ - _ _ /- _ - _ _ -- : - - _ - - _g ny.. :---:________---_:___________-:---__-----__:-----------

bd:ER DATE :03//S/89 _____:...--g/89

03 //eI'/89 :03//.)  :  :  :  :

OFFICIAL RECORD COPY

I L.:. ,

I 1'

DISTRIBUTION FOR MEETING

SUMMARY

DATED: March 15, 1989 Facility: Brunswick Steam Electric Plant *

' Docket?:Filei NRC & Local PDRs PDll-1 Reading J. Sniezek, 12-G-18 E. Reeves P. Anderson E. Tourigny OGC-WF <

E. Jordan, MNBB-3302 NRC Participants ACRS(10) ,

i

  • Copies sent to persons on facility service list I

!