Summary of 921217 Meeting W/Util Re Possible Concerns W/ Control Bldg Emergency Air Filtration Sys Chlorine Detection Logic.List of Attendees & Viewgraphs Encl
ML20127C336
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 01/11/1993
From: Carpenter C
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 9301140138
Download: ML20127C336 (17)


Text

_

t I fM%g

/ o UNITED STATES

$' 3 ' ,h NUCLEAR REGULATORY COMMISSION

w AsniscioN, D. C. 20s55 January 11, 1993

\ . . . . . f' Doc ket Nos. 50-325 and 50-324 LICENSEE: Carolina Power & Light Company FACILITY: Brunswick Steam Electric Plant, Units 1 aad 2

SUBJECT:

SUMMARY

OF MEETING HELD TO DISCUSS I'G5SIBLE CONCERNS WITH THE BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2, CONTROL BUILDING EMERGENCY AIR FILTRATION SYST[M CHLORINE DETECTION LOGIC On 1hursday, December 17, 1992, the staf f met with Carolina Power & Light Company (CP&L, the licensee) to discuss possible concerns with the Brunswick Steam Electric Plant (BSEP), Units 1 and 2, Control Building Emergency Air filtration (CBEAF) System chlorine detection logic. The meating was he.ld at the request of the licensee in order to expedite informing the Nuclear Regulatory Commission staff about the licensee's further response to BSEP Unit i Licensee Event Report (LER) 1-92-018, " Failure of the CBEAF System to Meet Single failure Criteria for Radiation and Fire Events," dated September 11, 1992.

On August 12, 1992, while reviewing the Nuclear Network Operati_ng Experience (OE) Report #5366 concerning " Preferred / Standby" switch arrangements on the Standby Gas Treatment (SBGT) Systems at Quad Cities, the CP&L/BSEP SBGT system engineer determined that the OE was applicable to the CBEAF system. A review of the CBEAF system was performed and single failures within the start logic were identified. Adverse Condition Report (ACR) B92-642 was then generated and a Special Procedure was performed on August 14, 1992, which demonstrated that system operation was in accordance with ACR 892-642. The licensee reported this condition to the staff on September 11, 1992,- in LER l-92-018.

The licensee prepared an Engineering Evaluation Report (EER 92-0352) which proposed a resolution to the CBEAF concern via a two-phase approach. A 10 CFR 50.59 review was then performed by CP&L, which determined that Phase 1, which included the resolution of logic failures, could be accomplished without NRC staff review. The second phase was determined to require changes to the BSEP Technical Specifications (TS) and would thus require NRC review. The licensee expects to submit a formal request for amendment to the TS by January 8,1993.

The staff requested that copies of the 10 CFR 50.59 evaluations be sent to the project manager for review. The staff also requested that the licensee include in the formal submittal, at a minimum, the following:

1. A discussion on the separation of the various instrument trains indicating which portions are lE and non-lE. T
2. A discussion on how the system meets the single-failure criteria. o\

\k

  • ~
rm u

[

+ n ..c-9301140138 930111 PDR ADOCK 05000324 P PDR i

.- . ... - - - . . . . . . _ . .. . . . . . . - - ~ ~ . ._- . . _ .

e January 11, 1993

3. A discussion on how the system meets the requirements of IEEE Standard 297.
4. The final design documentation.
5. What, if any compensatory measures (e.g., potassium iodine pills, self-contained breathing apparatus, training provided to the operators,) will be in place.
6. A discussion of the maintenance history of the present system.

Enclosed are the list of attendees and the licensee's presentation slides.

ORIGINAL SIGNED llY:

C. E. Carpenter, Jr., Pro. ject Engineer Project Directorate 11-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation

[nclosures:

1. Attendance List
2. Slides cc w/ enclosures:

See next page ulHRUNIl0N:

Docket file OGC NRC/ Local PDRs E. Jordan MNBB 2701 PD 11-1 Reading P. Milano 14-E-21 T. Murley 12-G-18 R. Architzel 8-D-1

f. Miraglia 12-G-18 1. Moghissi 8-D-1 J. Partlow 12-G-18 J. Mauck 3-D-23 S. Varga- 14-E-4 P. Loeser 8-H-7 C. Lainas 14-H-3 J. Wing 10-E-4 E. Adensam 14-B-20 R. L. Prevatte C. E. Carpenter 14-B-20 ACRS (10)

R. H. Lo 14-B-20 L. Pilsco, EDO 10-A-19 S. Little 14-8-20 E. Merschoff, R-Il cc: Licensee & Service List 130000 0FC LA:PD21:DRPE PE:PD21:DRPE- PM:PD21:DRPE D: ' 1;DRPE d CECarpenter:tms PDMil ano@~

NAME Slittle je L'Adeisam DATE 01/ 1 /93 01/ 7 /93 Ol/en/93 01/ 1) /93 Document Name: BRN85143,M1S

Mr. R. A. Watson Brunswick Steam Electric Plant -

Carolina Power & Light Company Units-1 and 2 Cc:

Mr. R. B. Richey Mr, H. A. Cole Vice President Special Deputy Attorney General Brunswick Nuclear Project State of North Carolina Post Office Box 10429 Post Office Box 629 '

southport, North Carolina 28461 Raleigh, North Carolina 27602 Mr.11. Ray Starling Manager - Legal Department Mr. Robert P. Gruber Caroiina Power & Light Company Executive Director.

Post Office Box 1551 Public Staff.- NCUC Raleigh, North Carolina 27602 Post Office Box 29520 Raleigh, North Carolina 27626-0520 '

Mr. Kelly Holden, Chairman ,

Board of Commissioners Mr. R. B. Starkey, Jr.

Post office Box 249 Vice President Bolivia, North Carolina 28422 Nuclear Services Department Carolina Power & Light Company Resident inspector Post Office Box 1551 U. S. Nuclear Regulatory Commission Raleigh, North Carolina 27602 Star Route 1, P.O. Box 208 '

Southport, North Carolina 28461 -

Regional Administrator, Region !!

U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 2900 Atlanta, Georgia 30323 Mr. Dayne H. Brown, Director Division of Radiation Protection N. C.-Department of Environmental, Commerce and Natural Resources Post office Box 27687 Raleigh, North Carolina 27611-7687 Mr. J. W. Spencer Plant General Manager Brunswick Steam Electric Plant J Post Office Box 10429 'i Southport, North Carolina 28461 Pubitc Service Commission State of South Carolina Post Office Orawer 11649 ,

Columbia, South Carolina 29211 l

. I l

-. .. . . .. . ... . . . . . - . - . . . . . - . ~ . . =.- . . . . - ..

4 ENCLOSURE 1 li f llRD ATJ1 W 1 LS NAME AFFILIATION TELEPHONE C. E. Carpenter NRC/NRR/P02-1 301-504-1465 Patrick Milano NRC/NRR/PDl-2 301-504-1428 Ralph Architzel NRC/NRR/DSSA 301-504-2804-Isabel Moghissi NRC/NRR/DSSA 301-504-2852 Jerry Mauck NRC/NRR/HICB 301-504-3248 Paul Loeser NRC/NRR/HICO 301-504-2825 James Wing NRC/NRR/PSAB ___

301-504-1076 R. L. Prevatte* NRC/R-II/ SRI-BRUNSWICK _ 919-457-9531 Dave Waters CP&L/BLU 919-546-3678 Tony Harris CP&L/BU1_ 919-546-3077 __

Deborah Norton- CP&L/NED/ BESS / MECH _919-546-29,76 Norman Smith CP&L/NED/ BESS /I&C 919-546 2381 Rex Allen CP&L/NED/ BESS /l&C __

0i9-546-2414 __

Participated via telephone froin site.

h J

d

W ENCLOSURE 2 T

NRC TECHNICAL PRESENTATION BRUNSWICK NUCLEAR PLANT CBHVAC SINGLE FAILURE CONCERNS l

DECEMBER 17,1992 L

l l

AGENDA e CURRENT SYSTEM CONFIGURATION / SINGLE FAILURE CONCERNS e PLANNED MODIFICATIONS e TECHNICAL SPECIFICATION CHANGES e MODIFICATION IMPACT ON CURRENT STARTUP SCHEDULE e

SUMMARY

CBEAF PROBLEM IDENTIFICATION

  • Operating Experience Report (OE) #5366 concerning " Preferred / Standby" switch arrangements on the Standby Gas Treatment Systems is entered on the Nuclear Network:-

6/17/92

  • OE is reviewed by SBGT system engineer.

Although the OE was not applicable to BNP, engineer suspects OE may apply to CBEAF:

8/12/92.

  • CBEAF System is reviewed and single failures within the start logic are identified. Adverse Condition Report B92-642 is generated: 8/12/92
  • A Special Procedure (TCF #92-0048) is prepared

-which will demonstrate system-operation agrees.

with that stated in the ACR: 8/13/92 l-L -* Special procedure is performed and Chlorine L Detection Failure is identified: 8/14/92

  • CBEAF problem identified in Licensee Event Report (LER) 1-92-018: 9/11/92

CONTROL BUILDING EMERGENCY .

AIR FILTRATION SYSTEM - SINGLE FAILURE 1 (CCMACTS SHOWN IN *NONAL* OPERAUNG POSmON)

I l

TRAIN A TRAIN B LOGIC LOGIC l

I (PREFERRED) (STANDBY) l d

h OPENS ON , OPENS ON OPDE ON , OPENS ON

~b QLORNE DETECTION SYS. IC TRAIN A TRAN B C OLORNE DETECTION SYS. ZI

~

ISOLATION OR FALLME START START ISOLATION OR FALLME CLO9ES ON CLOEES ON a OSES m I CLOSES ON Z Z RADIATION / SMOKE ZZ NNTRAN A NNTRANZZ B RADIAllON/SWJE Z Z 1908.ATION ISOLATION

" CLO6ES ON reE- ? g s='r= CLOSES ON TRAN B

ca^'ra

TRAN A

_ ]Z Z Z rReFE-

"a0

"~N TRER TBER

-/- STAPOBY/ -/ g (

g -/- STMOBY/ -/- -

7 ~~PFIEFEfflED 7 7- PfEFENED7 FM STMT FM START

\

OPENS OPENS .

TRAM A B(BGGES TRAM 8 MEN [) DAMPERS AND ) W SEC[')

CDW)TBER [)) DAMPERS SEC ( STARTS SER FAN A AND [))EtERGEES

( FALS TO START WHEN FALSTO START

'() STARTS EMER FAN 8 j TREM (.)

Y f

CONTROL BUILDING EMERGENCY AIR FILTRATION SYSTEM EXISTING CONFIGURATION CONTROL BUILplNG SERVICE WATER BUILDING l 1-X-AT-29 U 2-X-AT-29U l l t-X-AT-2979 2-X-AT-2979 l l l 1 I  :

L OR OR N'

^

x"-

Y DN DN PRESENT DESIGN I ' II  :

NOT PROTECTED AGAINST: s ,

V 1- LOSS OF POWER smote ceTecTm ISOLATES 8* ^

2- INADVERTANT ISOLATION (SPURIOUS) C8eAF 3- SINGLE COMPONENT FAILURE

CONTROL BUILDING EMERGENCY AIR FILTRATION SYSIt-M - SINGLE FAILURE 2 (CONTACTS SHOWN IN

  • NORMAL
  • OPERATNG POSmON)

TRAIN A LOGIC CHLORINE (PRC.5TED) LOGIC u

, OPENS ON , OPENS ON

_/_ CFLORNE DETECT)CN SYS. _c_ TRAN A .; [ '

ISOLATION OR FAILUPE START mm CLOSES ON CFLORNE ANALYZERS R OSESCN SKHAL FBCM ggg TRAN A ISCLATION ,

CLOSES ON tiiu u O D - d NN

- TRAN B

" -- N TRER _ s_ s

> SERVICE WATER 4-

/ STAPOBY/ -- h y =^'

l 7 - PIEFEFEED7 FM STE OPENS Om'"m^ TO

[ MA 4 ISOLATE C) DieTamR SEC (D) STARTS DAMPERS EMER FAN A AND /'))ENERGGES

( FAIUS TO START

~

k MEN TRAN A AND B START LOGC h

CONTROL BUILDING EMERGENCY -

AIR FILTRATION SYSTEM - PHASE I (CONTACTS SHOWN IN HORMAL' OPERATING POSmON)

TRAIN A TRAIN B LOGC LOGC (PREFEFHED) (STAfDBY) d a

OPENS ON OPDE m .

~d OLORDE DETECTION SYS. OPBS ON CH_ORRE DETECTION SYS. ZC ISOLATION OR FAL17E ROGES ON-- 880NAL FROM-b ISOLATION OR FALLNE

> TRAN 8 -- TRAN B --

CLOTS ON ST M TBER

~

CLOTS ON Z Z RADIATX)N/ SMOKE RADIATION /SWOKE ZZ 180LAT10N ISOLATION C CLOSES ON g a= LOGESmouON mFeRReo -+ Ocee m ==' emu  :: encremeo n

TRAN B 4 m FRou - CLOGES ON TRAN A _

, ~ F8 N 7- TRAN A -- A N g'

Eag T==a t852 ' .

_+ ruoen _ =m ," = sTuoeYi

. ,-,s,m meo,# ,, S1 , mST,!" +mereno-+-

OPENS DEBERGGES OPENS DW SEC CjTRER D DAMPERS MO j

)DEBERGGES TRAN A MEN TRANB )

j DAAf'ERS AND k j)

/ STARTB Enst FAN A FALS TO START FALS TO START STARTS BER FANB

' W SEC TRER (~ [ )D lf

_____.___...__________m___ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ --

CONTROL BUILDING EMERGENCY ,

' AIR FILTRATION SYSIt-M i PROPOSED CHANGE CONTROL BUILDING SERVICE WATER BUILDING DIV I DN 11 DNI DIV 11 DIV I DN 11 DIV I DN11 g IX-AT-2977 2X-AT-2977 IX-AT-2977-1 2X-AT-2977-1 ;g IX-AT-2979 2X-AT-2979 IX-AT-2979-1 2X-AT-2979-1 g  ;

. I  ! l  ;

m m OR m i

,b

[R/ Q N"/

t DIV DIV t DESIGN PROVIDES PROTECTION AGAINST:

1- LOSS OF DMSIONAL POWER EAm TES -

2- iNADVERTANT ISOLATION (SPURIOUS) som mAM &

l 3- SINGLE COWONENT FAILURE 4 4- FAILURE TO DETECT CL 2 '

CBEAF MODIFICATION MILESTONES e CBEAF problem identified in Licensee Event Report (LER) 1-92-018: 9/11/92 e Prepare and approve Engineering Evaluation Report 92-0352 outlining plan to resolve CBEAF '

issues in a two phase approach: 10/15/92 o Prepare and issue Phase I which included the resolution of the start / timer logic tailures:

10/30/92 e Prepare and issue specification for Chlorine Detectors (purchase orders were placed-shortly thereafter): 11/25/92 e Partial issue of Phase II (raceway design):

12/18/92- In progress e Prepare and issue balance of Phase 11 which includes the resolution of the Chlorine Detection-System input-to the CBEAF: 1/6/93 - In progress e Testing and Delivery-of new Chlorine Detectors required to support design: 1/30/93 - In progress e Projected modification installation completion date: 3/25/93 - In progress

r l

^

TECHNICAL SPECIFICATION CHANGES

  • MODIFICATION RELATED CHANGES
1. SPEC. 3.3.5.5 ACTION STATEMENT
2. SPEC. 4.7.2.d.3 SURVEILLANCE REQUIREMENT 4
  • ELIMINATION OF TSI
1. SPEC. 3.7.2 APPLICABILITY ENHANCEMENT
2. SPEC. 3.7.2 ACUO!! STATEMENT REVISIONS
3. SPEC. 3.7.2 LCO REVISION
4. BASES UPliRADE OF SPECS. 3/4.7.2 AND 3/4.3.5.5 i
  • INSTRUMENTATION ADDITION
1. ADD RAD. AND FP INST. TO SPEC. 3/4.3.5.5
2. REVISE SPEC. 3.3.5.5 LCO AND ACTION STATEMENT
3. REVISE 3/4.3.5.5 TO TABLE FORMAT
  • TSC REO.UEST TO BE SUBMITTED:BY 1/8/93 g < . m--w.-,--w-,, c wmm--,.--w, -- , -, , ,, --- -- - - .--,, e,&-,e.,wv

i l

MODIFICATION STARTUP IMPACT AREAS OF CONCERN:

o CURRENT MODIFICATION OPERABLE DATE  ;

ONE MONTH AFTER PLANNED WORK COMPLETION DATES.,

o EXISTING SPARE CABLES REQUIRED FOR INSTALLATION FOUND UNACCEPTABLE e DELAYS IN DELIVERY OF SEISMICALLY QUALIFIED CHLORINE DETFCTORS <

e NEW SCOPE IDENTIFIED IN PROCESS OF DESIGN e WORK TO INSTALL NEW CABLE RACEWAYS i

EXTENDS BEYOND PRESENT SCHEDULE i

l-

  • DIFFICULTIES IN OBTAINING BALANCE OF i

MATERIAL REQUIRED TO COMPLETE INSTALLATION

$ - - . , . . . . , . J_... . . . _ . , _ - . . . , - . . . . . - , , - . - , , . ,.-, . .,-_ . ..--m.e. , -,- - ,, , .-.-

MODIFICATION STARTUP IMPACT e REVIEW / APPROVAL OF TS CHANGE REQUEST e POTENTIAL NEED FOR EITHER:

1. AUTHORIZATION TO OPERATE (JCO)
2. TS WAIVER OF COMPLIANCE e BASIS FOR REQUEST
1. CALCULATED DOSES STILL WITHIN GDC-19 CRITERIA
2. PRA -- 1.1 x 10 4
3. CALCULATION CONSERVATISM

- CLOUD SHAPE

- TOTAL STEAM LINE BREAK RELEASE (FSAR VS. TS)

- PUFF RELEASE ASSUMED (TURBINE BUILDING FAILURE)

- NO ATMOSPHERIC DILUTION ASSUMED

4. SHORT DURATION REQUESTED (FOUR MONTHS)

SUMMARY

l

  • SINGLE FAILURE CONCERNS IDENTIFIED BY PROACTIVE TECHNICAL SUPPORT SYSTEM ENGINEERS
  • MODIFICATIONS TO RESOLVE SINGLE FAILURE CONCERNS ALSO SUBSTANTIALLY REDUCES POSSIBILITY OF INADVERTENT CHLORINE ACTUATIONS
  • TECHNICAL SPECIFICATION CHANGES REO.UIRED FOR MOD AND TO ELIMINATE TSI .

- AMENDMENTS NEEDED PRIOR TO STARTUP

- 3/15/93 REQUEST DATE FOR ISSUANCE

  • MODIFICATION DELAYS MAY RESULT IN REO.UEST FOR AUTHORIZATION TO OPERATE

- REQUEST TO BE SUBMITTED CONCURRENT WITH TSC

- 3/1/93 REQUEST DATE FOR ISSUANCE

-. _. - _ _ _ _ . _ _ _ . . _ _ - .