oR UNITED STATES 0
NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 November 4, 1992 Docket Nos. 50-261 50-325 and 50-324 50-400 LICENSEE:
CAROLINA POWER & LIGHT COMPANY FACILITY:
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1
SUBJECT:
SUMMARY
OF MEETING HELD ON SEPTEMBER 2, 1992, REGARDING INTEGRATED SCHEDULING PROGRAM This refers to the meeting conducted at the request of Carolina Power & Light Company (CP&L) at One White Flint North, Rockville, Maryland, on September 2, 1992. The purpose of the meeting was for CP&L to brief the NRC on the progress of their Integrated Scheduling Program (ISP).
A list of attendees and a copy of the CP&L handouts are enclosed (Enclosures 1 and 2).
This meeting is the third ISP meeting including the June 10, 1992, and July 29, 1992, ISP meetings with CP&L. During this meeting, CP&L discussed the prioritization process in the scheduling of projects within the scope of the ISP. The prioritization process will be applied to Level II ( NRC Commitment) and Level III (CP&L Initiatives) projects. Level I items (NRC Requirement),
projects with specific implementation dates in response to a rule, order or license condition, will not be scheduled with the ISP prioritization process.
For those other projects (Level II and Level III projects), the ISP will assign rankings through a Schedule Index. CP&L discussed the methodology and the use of probabilistic risk analysis data to generate the Schedule Index.
Following the meeting, CP&L provided the staff with a copy of the prioritization procedure, Nuclear Generation Group Manual (NGGM 305-05),
"Prioritization Process".
This procedure is now available in the NRC Public Document Room (PDR).
The staff informed CP&L that the final policy paper on ISP should be issued shortly, and no significant changes from the proposed policy paper are expected. The present draft Brunswick ISP contains a substantial update of the Level II projects. CP&L informed the staff that the next draft ISP will incorporate, in detail, the guidance of the Commission's ISP Policy paper regarding the scheduling of Level II items.
090097 s\\i 9211100207 921104 PDR ADOCK 05000281
~r7V PPDR i
IJ "S
November 4, 14g
-2 The Brunswick ISP should be substantially complete for submittal to the staff at the next ISP meeting.
ORIGINAL SIGNED BY:
Ronnie Lo, Senior Project Manager Project Directorate II-1 Division of Reactor Projects -
I/II
Enclosures:
- 1. List of Attendees
- 2. Meeting Handouts cc w/enclosures:
See next page DISTRIBUTION:
Docket Fild N. Blair NRC/Local PDRs K. Hate' PD II-1 Reading D. Wigginton T. Murley L. Plisco, EDO F. Miraglia E. Merschoff, Region II J. Partlow S. Varga G. Lainas S. Little R. Lo E. Adensam E. Mershoff, RII OGC E. Jordan M. Campe F. Emerson R. Gibbs OFFICE LA:PD21:D PM:PD21:JWPE
- DRPE PM:PD.-
DRPE NAME RLo:tm _ozafari Date
/
/92
/ />/92
_/_/92_//92 OFFICE
,p:PD21:D NAME YEAdensa____
Date
/
(//7/92 Document Name: CP&L9292.MTS
ENCLOSURE 1 ATTENDEES Ronnie Lo NRR/PD II-1 E. G. Adensam NRR/PD II-1 K. Campe NRR/PRAB Fred Emerson CP&L/NED Russell Gibbs CP&L/NED Neil Blair CP&L/NED Kumar G. Hate' CP&L/NED Dave Wigginton NRR/PD IV-1 INTEGRATED SCHEDULE PROGRAM (ISP)
FOR NUCLEAR GENERATION September 2, 1992
INTEGRATED SCHEDULE PROGRAM (ISP)
PURPOSE OF TODAY'S MEETING THIRD IN A SERIES OF WORKING-LEVEL MEETINGS BETWEEN CP&L AND NRC TO FAMILIARIZE NRC WITH THE ISP EFFORTS THESE COMMUNICATION SESSIONS WILL HELP ENSURE THE ISP SUBMITTAL AND SUBSEQUENT FEEDBACK CONTAIN NO SURPRISES FOR EITHER THE NRC OR CP&L PLAN TO FOCUS ON PRIORITIZATION PROCESS APPLICATION OF PRA TO THE PRIORITIZATION PROCESS RESPOND TO FOLLOW-UP ITEMS FROM LAST SESSION NEED CANDID FEEDBACK (WWS134)
INTEGRATED SCHEDULE PROGRAM (ISP)
PRIORITIZATION PROCESS Three (3) components Priority number (1 - 9)
Schedule Index (0 - 100)
Economic Evaluation ( 2 $250K)
Priority number Priority 1 - 3 implies fix it now (as dictated by Tech Specs)
Priority 1 - 3 automatically given a Schedule Index of 100 Priority 1 - 3 projects do not show up on ISP ISP only contains items that need attention for the long range ISP projects ranked by Schedule Index (WWS1341 INTEGRATED SCHEDULE PROGRAM (ISP)
PRIORITIZATION PROCESS (Continued)
Schedule Index provides a ranking of major projects by key attributes Nuclear Safety (32)
Industrial Safety (29)
Unit Availability (12)
Unit Capacity (10)
ALARA (9)
Plant Enhancement (8) 100 Attribute weights modified by Scaling Factors
(-1.0 - + 1.0)
Quantifiable impact statement (WWS134)
INTEGRATED SCHEDULE PROGRAM (ISP)
PRA APPLICATION TO PRIORITIZATION PROCESS METHODOLOGY/ASSIGNMENT OF NUCLEAR SAFETY SCALING FACTORS LESSONS LEARNED/CONCLUSIONS (WWS1341 INTEGRATED SCHEDULE PROGRAM (ISP)
METHODOLOGY OBJECTIVE DETERMINE WHICH PLANT SYSTEMS AT BRUNSWICK ARE OF HIGH, MODERATE, AND LOW IMPORTANCE IN PREVENTING AND MITIGATING CORE DAMAGE AND INCORPORATE INTO GUIDANCE FOR ASSIGNMENT OF NUCLEAR SAFETY SCALING FACTORS (WWS134)
INTEGRATED SCHEDULE PROGRAM (ISP)
METHODOLOGY DEVELOPED SYSTEM IMPORTANCE RANKINGS BASED ON CHANGES IN CORE DAMAGE FREQUENCY PERFORMED IMPORTANCE RANKING ANALYSIS OF EVENTS IN THE BRUNSWICK PRA MODEL IDENTIFIED MOST IMPORTANT EVENT FOR EACH IMPORTANT PLANT SYSTEM PERFORMED SENSITIVITY ANALYSIS OF THE MOST IMPORTANT EVENT IN EACH SYSTEM TO DETERMINE SYSTEM IMPORTANCE RANKINGS.
CREATION OF PLANT-SPECIFIC NUCLEAR SAFETY SCALING FACTORS (WWS134)
INTEGRATED SCHEDULE PROGRAM (ISP)
LESSONS LEARNED MAXIMUM BENEFIT FROM PRA INVOLVEMENT IN PRIORITIZATION WAS ACHIEVED WHEN PRACTICAL PLANT EXPERIENCE WAS COMBINED WITH PRA ANALYST EXPERIENCE WRITTEN RATIONALE FROM PRA PROVED VERY BENEFICIAL IN EDUCATING SYSTEM ENGINEERS ON PRA OPERATOR ACTIONS NEED TO BE ADDRESSED UNIQUELY IN ASSIGNING SCALING FACTORS INSIGHT FROM THE MODEL AND/OR SPECIAL STUDIES PROVED S
USEFUL EVEN THOUGH SOME INITIATIVES WERE BEYOND LIMITATIONS IWWS134)
INTEGRATED SCHEDULE PROGRAM (ISP)
PRA APPLICATION INSIGHT TOTAL NUMBER OF PROJECTS REVIEWED 106 CHARACTERIZATION OF PROJECTS REVIEWED USE OF ENGINEERING JUDGMENT 100%
WITHIN PRA LIMITATIONS 82%
THE PRA MODEL CAN BE EFFECTIVELY USED TO ASSESS PLANT INITIATIVES WHEN SUPPLEMENTED WITH ENGINEERING JUDGMENT (WWS134)
INTEGRATED SCHEDULE PROGRAM (ISP)
KEY ACCOMPLISHMENTS TO-DATE BRUNSWICK ISP PACKAGE FOR INITIAL OCTOBER 1992 SUBMITTAL GOING THROUGH MANAGEMENT REVIEWS ISP EFFORTS AT ROBINSON FOR THE APRIL 1993 SUBMITTAL INITIATED (WWS134) 10