ML20127B825
ML20127B825 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 10/15/1976 |
From: | Kalat S EBASCO SERVICES, INC. |
To: | |
Shared Package | |
ML17198A241 | List:
|
References | |
FOIA-84-455 QCIP-2, NUDOCS 8506220064 | |
Download: ML20127B825 (16) | |
Text
_ _ _ .
4 *
. ' 3ASCO $CW1CC J ::f.O.T.'.T!AT C.")
d'l WAirill'OkD STCfdl CL.Ja cC STAT!Oi; - UNIT NO 3
.. l l !
l PROCEDU: E FOR: )
SOILS CCNTROL PROCEDun: ;c:ng:-
OCIP-2 ,
e <
M . ISSUE SU12!AP.Y m
w
[ TSMUF/DATC PPS art 3 , APPROVED l RUIARKS !
'4 A/ Draft M+
M. Teacht l
i h . ' C' (E o A/ 9/17/75 hin J. O. Booth ( f % g.
L e
i z 4 h;
4
- f. <
a p H r-M 5/ Draft M. Teachin *
~
O ,L "y 5 9,/30/75 I J,:
2 I f '- q 3/.
19/14/75 M. T M
hin f-
J. O. Booth L 5'
d D-(
s' I* '
U h, i C/Drafe f. Teachin / -
6/16/76 7. Howard Complete procedure revised. ,
vi .
C/ 6-29-76 . wa / .V M Myron Teachin W. C. Grigie' E /
S D DRAFT / Revised par. 2.0. 5.2. 5.5 g 8-13-76 F. 4 and 6.1 to incorporate H '
E
- comments from Letter LPL s 5533.
D/ 8-20-76 F. Howard / W. C. Grig E DRAFT 8-31-76 F. Howard Revised par. 2.0 and 5.2 F DRAFT 10-1-76
[F.'Howard // L/
- Revised 2.0. s1.4 and 6.4.17.
Added 8.0.
8506220064FOIA 850222 PDR PDR 4s CARDE84-455 FM.EDOW OF INFORMADON FOR11 NO. E-1 (12-12-7t.) M MQlMS{
f 44 -45'T C,[488 i
4 ESASCO SERVICES INCORPORATED WATERFORD STEMt ELECTRIC STATION - UNIT NO 3 PROCEDURE FOR:
PROCEDURE NU'IBER:
SOILS CONTROL QCIP - 2 i
ISSUE SUtetARY
~ f" 5
u ISSUE /DATE PREPARED APPROVED RDtARKS F/10-15-76 S. Kalac W. C,,Crigg
)
5 -
E
= '
i a E
, I8 5
E 2
I::
- g ll E l
I a
U 1
i N
FORPt NO. ASP-III-1-3 (10-13-75)
I r l
.. F E';A%0 SER" ICES INCORNMATED
. . No. QCIP-2
. ISSUE: 11ATERF0ltD STEN! E1.ECTRIC STATION - Ui4IT NO 3 PACi: 1 0F 10 4
1.0 PURPOSE This procedure outlines a means to verify and record compliance with applicable drawings, specifications, procedures, codes, regulatory requirements and documented instruccians relating to soils inspection
~
at the construction site.
2.0 SCOPE N -
The scope of the procedure applies to safety-related items and services involving . excavation and backfill operations. The soils' control so activities will be performed in the excavated areas,' borrow-stockpile j areas, the plant backfill and earth, structure backfill areas. In-place inspections and tests as well as laboratory tests and analyses will h be performed as a combined program for control of incargrated activities a in all areas.
5 The scope of inspection activities shall be divided into two types 5 of inspection, full scale Q. C. inspection of soils operations when 13 F the Contractor does not have a Quality Assarance Program and
$ Designated R Inspection in order to monitor Contractor's performance when first-level quality Control activities are performed by the Contractor.
E E 3.0 IUTERENCES I
$ 3.1 Ebasco Services Incorporated '
g Ebasco Specification. -
Excavation and Backfill, E
- Seismically Designed Category I Structures, Project Identification No.
I LOU 1564.482 3
8 3.2
'8 J. A. Jones Construction Company., '
Construction Wirk Procedure, E Backfill and Compaction,
[
W-WP-12 E 3.3 J. A. Jones Construction Company, S Site Inspection And Test Procedure ' i
$ Backfill sad Compaction Inspection g W-SITP-12 F 3.4 Barrow-Agee Labs.,
i Laboratory and Field Testing l Backfill Materials j
- l
)
i
. . . . . l 1
1
)
i
E
\ s t fl SM w F ELIASCO SERV 1Cr3 ANCORNKATED NO. ocLP-2 b
, WATERFORD IX E1ICTRIC STATION - UN1T NO 3 Pace: 2 OF10 j
4.0 DEFINITIONE s a All definitions of material type, placement and compacticn activities are ,
, contained in Reference 3.
5.0 RESPONSIBILITIES / !
.s-- )
The responsibilities of perdorming Quality Control soil related activities shall be divided as follows:
5.1 Material Acceptanen - The performen:le of inspections of the back-w / (filt, material to} determine sacerigl acceptability whether by test fills, g 5
, in the borrow pic, stockpiles on in trucks shall be performed by Ebasco Services Incorpath ed. '
E constructionActifittes-Finalinspectionofexcavatedorstripped g o 5.2 u areas shall be pctfermed by Ebasco Services Incorporated. When place-
> ment and compaction operations are performed by a contrac,ter that I does not hara a Quality Assurance Program, first-level inspection of g these operations shall be> performed by Ebasco. When the centractor u has an accepted Quality Assurance Program, Desigr.sted Inspection of l placement and compactions shall be performed by Ebasco as n fined in u i Proc,edure No. ASP-III-ll.
~
m , a
' ~
$ 5.3 Soils Testing The in-place and laboratory soils testing shall be 5 performed by nerzrw Age Labs. msder the dira:cion of Ebasco Services g
Incorporated.
~ 4
- 5. 4 Documentation - All Quality Cont,rol records required by this procedura.
h z -shall be prepared by the proper agency as stated above and then compiled into a single package for each backfill lift by Ebasco
[ Services Incorporated.
8 5.5 Acceptance en E Preliminary Acceptance - All test datk generated by the field labora-H tory, for specification acceptance shall be reviewed and signed for
- acceptance in the field by Ebasco's Quality Control Inspector. This l
g signature shall appear on each appropriate testing form.
l o ,
p Final Acemptante ,- All soil related activities shall be the responsi- -
% bility of Ebasco fervices Incorporated. Acceptability shall be l
@ , documentee in w?t ics on Fora QCIP-2-4 and attached to documentation j j package described above. .
l i 5.6 To comply with the applicable sections of the above stated inspection i
requirements Ebasco Services Incorporated shall institute the <
followir.g Quality Control program and personnel:
g.
t o
te 3
'j])>
s 't . .
'hhUI : f l E!!ASCO SCR'llCCS INColtNRATED NO.
OCIP-2
, l WATERFORD STlWi I:!.r.CTRIC STATION - UNIT NO 3 l'AC F. : 3 0F 10 5.6.1 The Senior Quality Control Supervisor is responsible for supervising and performing the following jobsite Quality Control activities:
, I
~
a) Performing inspection of borrow pit - stockpile material to determine material acceptability.
b) Performing inspection of all soil construction activities and operations, c) Directing Soils Laboratory and testing ecations.
" d) Enforcing qua,lity pontrol documentation requirements h . and preparing the quality control records required by this procedure for the final acceptance of the work.
- 5.6.2 Quality Control Civil Supervisor, reporting to a Lead 4
5 Quality Control Engineer (Civil)'will receive technical g assistance from the Site Soils Engineer as required and shall be responsible for supervision of soils inspector (s) g who shall perform inspections to verify a satisfactory quality level as defined in. applicable documents. He shall ,
u siso be responsible for Sueprvising and directing the Soils {
, Laboratory and observing Field Testing as well as: .
u .
s g a) Assuring that tests, certifications and awa=4 nations
.- are accomplished in accordance with the applicable ,
e design drawings, specifications and any other governing documents. . . . !
g - -
a b) Accepting or rejecting work tests in accordance with the .
E
- pecifications and procedures and documenting same, !
5 including preparation of Statistical Analysis of compacted l g backfill where provided for by the specifications, j
{ 5.6.3 Civil Quality control Inspector (s), reporting to the !
> Quality Control Civil Supervisor, are responsible for the 0 a following: ,
E a) Performing inspections of work and witnessing or S performing soil tests in the work areas.
.. g g b) Provide the assistance during the performance of soils i
laboratory operations.
c) Preparing documentation of all operations requiring specific reports and/or form completion, and submitting same to the Quality Control Civil Supervi'sor for review and further action as required.
l
") .
en= .m .c ,,, . . , . . . . . . . '
i I
~
.. F - E1;ASCO SERVICES INCORIVRATED NO. QCIP-2 ISSUC: WATERFORD, STEA!! ELECTRIC STATION - UNIT NO 3 L' ACE: 7, OF m -
-t>
i 5.6.4 The Site Soils Engineer, reporting to the Home -
- Office Supervising Soils Engineer and consulting with i che Senior Resident Engineer shall be a qualified soils engineer who is familiar with the design intent and shall be responsible for the following
a) Maintain liaison with the Supervising Soils Engineer of the Ebasco Home Office in order to ensure that field operations yield the design intent.
, b)
- Consult with the Senior Resident Engineer, Quality 9 Control Supervisor, Field Superintendents and 2 Contractors to provide technical assistance, in g accordance with the specifications, in establishing g field methods and construction procedures for
, specified compliance.
c) The Site Soils Engineer, representing the Home g Office design organisation responsible for the formation,, review and approval of specification and its revisions, shall have the authority to-u deviate and qualify specifications in isolated g cases when in his technical opinion, the specifications g will not yield the required results (design intent)
- s in a certain situation. He shall in this case, w review and approve detailed written documentation i h of the deviation encountered and the earthwork '
- performed on and Ebasco Nonconformance Report, E Field Change.Requ'est or Design Change Notice.
5 6.0 PROCEDURE ..
~
g .
8 3.1 Test Fills h
Test fills will be constructed for the purpose of determining the optimum construction technique to achieve the design conditions.
5 Test fills shall be conducted, inspected and tested as required g by the specifications and the general requirements of this ,
o Soils Inspection Procedure.
E l
$ The Senior Quality Control Supervisor or his inspector shall .
E observe and document results of the following operations when. )
required by the specifications. -
l l
6.1.1 Surveying and layout ,
6.1.2 Excavation - -
I j
6.1.3 Rackfill !
. I 6.1.4 Compaction, including equipment performan:e and I operational characteristics.
6.1.5 Field density tests "
-~, , - -
.. p EnASCO SF.RVICES INCORPORATED . NO.QCTP-2
. . ISSUE: WATERFORD STEAM ELECTRIC STATION - UNIT NO 3 l' ACE: s OF 10 6.1.6 Trench inspection 6.1.7 Mapping 6.1.8 Laboratory Tests 6.1.9 They shall act as a liaison with the Supervising )
Soils Engineer and the Senior Resident Engineer concerning the progress of the test fill and obtaining the required j approvals for any design changes.
m 9 6.1.10 They shall be responsible for the maintenance of formal 2 records of all operations and observations as required g by the specification and any approved changes thereto.
, 6.2 Borrow and/or Stocknile Areas - Material Acceptance 6.2.1 Perform visual inspection either at the pic or on site .
g to assure that ill a'reas are cleaned of all undesirable a material such as trees, roots, vegetation, muck and sile 5 in a==ordance with specification tou 1564.482 and u document results od, Fora QCIP-2-1. .
~5 g 6.2.2 Monitor loading or delivery of backfill material to
- s insure that only asterial which meet the specifications g is used as backfill.
6 6.2.3 g Inspect, sample and test Class A borrow materials a to determine. compliance of gradation and moisture content with the specifications and record the results on k fora QCIP-2-1. One set of tests shall be ru*t for every 3 1,000 cubic yards of borrow material or for each O working shift whichever represents the smaller quantity in of asterial.
E'
[
6.3 Excavated or Strioned Areas in 6.3.1 Prior to start of backfill operations, excavated or 5 stripped areas shall be inspected to assure proper E drainage and a sound base and for conformance to the
$ specified requirements and the results recorded on M Pora QCIP-2-2.
6.3.2 Material that exceeds the permissable moisture content -
any be dried by specified means or removed and replaced with new fill. Reworked fill material shall be tested for noisture content and the results recorded on Fora QCIP-2
- 6.3.3 After satisfaction of all specified prerequisites, l proof compaction of the final excavated grade may begin i if required. Proof compaction shall be accomplished to the satisfaction of the Engineer before the fill !
i operation begins.
+ .
l
.. F . EBASCO SERVICES INCORPORATED NO. QCIP-2 ISSUE: WATERFORD STEMI ELECTRIC STATION - UNIT NO 3 L' ACE: 6 0F 10 4
6.4 Soil Related Construction Activiev Inspections All soils placements, inspection and testing operations shall be conducted in accordance with the drawings and specifica *.ms.
Inspections results shall be recorded on Fora QCIP-2-3 for e .
shif t by each inspector and shall include the following:
1 6.4.1 Material has been determined to be suitable and released 1 for backfill. I l
6.4.2 Base to receive backfill has been properly prepared l
" and compacted to the density required. '
' l q 6.4.'3 Backfining is accomplished in the proper sequence
! w in accordance with Ebasco Drawing No. LOU-1564-G490.
se
~
M 6.4.4 Sand backfill materials for Class "A" fill are spread 5 and leveled in zaFers not e=ceedins 15 inches Frior to compaction. -
6.4.5 Clay for Class "A" backfill and material selected from u the excavation for Class "B" backfill is placed in
= .
layers not exceeding ten inches prior to compaction.
M .
g 6.4.6 Fin material is deposited uniformly over entire area
, being fin ed to a particular stage or level.
h 6.4.7 When required,' fill material shall be disc-harrowed g after spreading and before compaction to bland and a
aerate the material into a texture that can be consolidated into a homogeneous mass by the compaccion operations.
g 6.4.8 Surface of each lift is kept reasonably smooth and free
, , of ridges or grooves which would adversely affect proper g- compaction of subsequent lifts.
z 6.4.9 Hauling equipment uses paths different from each other
, in order to aid compaction of the entire area and to g avoid overcompaction of any given area.
~
U 6.4.10 If area to receive fill is an original excavstion, or l compacted more than two days previously, surface shall be cleaned of all loose debris and improperly compacted asterial. Area then shall be proof rolled and accepted prior to subsequent backfill.
~
6.4.11 When two sections of fin join, fin placed first must have its slope shaved a minimum of three feet to expose undisturbed compacted asterial.
l
- 6.4.12 Compaction
- is achieved with proper equipment operating ,
- and proper speed. '
t
. . 8
.' . . y
. b!!ASCOSERVICESINCOR1tKATED . N0. QCIP-2 gg3pg; 17ATEiUI)RD STENI CLECTnIC ST.\ TION - UNIT NO 3 :'ACC: 7 0F 10 4
6.4.13 Compaction is reasonably uniform within any one layer over entire area.
6.4.14 All layers are compacted v full.. width.
6.4.15 In restricted areas, fill does.not contain material greater than three inches in size.
i 6.4.16 Reasonable care is taken to protect waterproofing .
3 asebrane boards, i
i F- 6.4.17 anekfill placed againee waterproofina ===brane boards does.not contain any particle greater than is inch in size.
'$ 8*
'6.4.18 No fill is placed during, heavy rain or on top of or into a pool of water.
E 6.4.19 Material has been compacted until the specified density h
is obtained and verified by in-place density testing.
6.4.20 Surface of fill areas to be eloped to effect drainage
, away from building and $nto site drainer,e pattern.
g Low areas to be pumped if required.
N -
Q 6.5 soils Laboratory
- g. .
h -
The following functions are performed by the soils laboratory g staff under the direction of the Quality Control Civil Supervisor.
g 6.5.1 Testing materials to be used as backfills to determine 3 their suitability; borrow materials are sampled and 8 gradation and compaction tests performed to determine y the moisture-density reistionships with respect to the g[ specified standaids.
. e -
5 6.5.2 Performing gradation tests (including noisture content i determinations) on the materials from the work points
- h. in the borrow and stockpile' areas or out of delivery p
- trucks to determine their suitability for use in the 4
compacted backfill. -
li -
6.5.3 . Testing materials being used as " cast fill" to establish
- ' the optimsa number of passes of the compactor to obtain the required density.- .
i 6.5.4
- Performing field density noisture and gradation tests l
- on materials from the compacted backfill in accordance with the specifications to assure the suitability of the materials and their proper compaction.
r -
. O a
+ .
ypen pen , n ep.Ttv .t . a. #9m * * * *
\
l I
l
. . . ' ._ s -
- l. EL'.scu 50 VIC s INC: ;nn;A C l
.+
tss!r- - l . u.ut::ce s z=: :::: ::C s c.T:= - tr.: her- so -e CTC.
er 10 OCI 6.5.5 Perf : sing any addi:iceal :es:s am re utred := assure
- te adequacy of the tested sa:erial as retaired by ::e !
specif1:ations.
6.6 Soil Testiar % -. _
All soil testing ammti be cceducted is accordance vi:3 the drawings.
~
specifications and applicable codes and procedures. Terification of soil testing small be indicated on the fe:ts listed bel =w for es:h fill at each elevacima for each shif..
. (
M 6.6.1 Test Fills - These tests shall be run in ace =r's- - vi*h h Section 6.1 of this proced ,ure and recorded en :he appr prtate forms.
E -
- 3 6~.6.2 Material Acceptance - These' rests shall be run i= ac-Ordance g with Section 6.2.3 of this procasure anc results ree rded j om Form QCIP-2-1.
~
! 6.6.-3 Excavated and str1pped aream, hose tes*s shall be ru=
is accordance with Section 6.3 cf this procedure and
, y recorded on the appropriate farms. -
x -
U 6.6.4 In Placa n===f ty Tests (Barrow-Agee Labs Test Terms. CC:7-2-3) z
- s +
4
.4 a) One test for every 20,000 ft.' or less cf Class A 4
u antarial yt ,.d.
E b) One tast' for every 40.000 f t.' er less of Class 3 -
asterial placed. -
5 . - * '
I 6.6.5 laboratory Testing (Sarrow-Agee labs. Forms. QCI?-2-3) 8 -
t a) One 3 point Proctor Test and Grada:ic=2 Test for erery [
E to 10 is place densities.
". b) One 5 point Proccar Test and Gradazion Tes: f=r every l g- _ 100 in placa desaities.
o '
C . c) One 6 point Proc.or, one Cradatics, and 3 sets of
$ 18==16mi- Balative Density Tests to be run ca 2 -
site (Proctor and Gradation) and off si:e (all tests) for every 200-in place densicias.
6.7 Documentation and *derk Acceptance All documentatica concerning each fill shall be forwarded to the Ihasco Senior Quality Control Separvisor upon its campistion for
. final work accaptance. The docummatation reviawed for the acceptance of each fill shall include the following forms when applicable. -
6.7.1 Material Acceptance Inspectics Tets No. GCI?-2-1.
-. a.
FORM Nrt. Mv.TTT.t.a rm. e t ses
.. F . bASCO SERVICES INCORPORATED . NO. ()CIP-2 l
ISSUE: , UATETJORD STCN! PLECTRIC STATION - UNIT N0 3 PAGE. 9 0F 10
- , 6.7.2 Excavation and Stripping Form No. QCIP-2-2.
i 6.7.3 Daily Backfill Inspection Report Form No. QCIP-2-3.
6.7,4 Soil testing forms including In Place Density, Proctor, and Gradation Test Summary forms in accordance with Peabody Services testing procedure.
6.7.5 At the completion of this review a Backfill Acceptance Form No. QCIP-2-4 shall be issued. If all areas of . ,
the work are in accordance with the drawings and i
specifications, this form shall be signed by the Senior
- h" Quality Control Supervisor or .his inspector attached !
to the forms listed above "and filed by Ebasco. If any
,h of the areas reviewed indicates a nonconformance to 88; the specifications, the remedial action required shall <
l
- be noted on this form by the Senior Quality Control 5 Supervisor or his inspector and the form then forwarded back to the responsible party for correction. This 4
g procedure shall continue until all areas are acceptable at which time the form shall be signed and filed.
m 7.0 ATTACHMErfS E
g 7.1 Form No. QCIP-2-1, Borrow Material Inspection Report M:
7.2 Form No. QCIP-2-2, Excavation and Stripping Inspection Report
{
g 7.3 Form No. QCIP-2-3, Daily Backfill Inspection Report i 7.4 Form No..QCIP-2-4, Backfill Acceptance Report g F 8.0 INSPECTION AND TESTING DESIGNATION ,
es; 8.1 Test Fills (Paragraph 6.1) - 100% by Ebasco.
E.
V
- 5 8.2 Borrow and/or Stockpile Areas - Material Acceptance (including l
.. materials in trucks) - (Paragraph 6.2) - 100% by Ebasco.
m
~ h 8.3 Excavated or Strippe'd Areas - (Paragraph 6.3) Final inspection by 4 Ebasco. .
l 8.4 Inspection of placement and compaction operat1ons (Paragraph 6.4).
8.4.1 When the work.is performed by a Contractor that does not have i,
an acceptable Quality Assurance Program: 100% by Ebasco 8.4.2 When the work is performed by a Contractor that has an acceptable Quality Assurance Program: One per day, by checklist, when work is in progress.
l l
1 i .
=>
- i -
i l
FORM NO. ASP-TTT-1-4 fin.11. m l
l l
MU :
l EISASCO SERY&CES INCOktVHATI.D N'8 i A t t'-2
, h . WATERTORD STC#t T.I.CCTRIC STATION - Ifit8T NO 3 l' ACE :10 OF 10 8.5 In-place density testing and soils laboratory testing-100 by the soils laboratory staff under the direction of the EBasco Quality Control Civil Supervisor. ,
8.6 brkAcceptance(Paragragh6.7)-EbascoSeniorQualityControl Supervisor. :
I 8
a
. .i u
'l 5 !
= -
M 8 3 .
t 1
u i
= i u
E i
= I.
4 u ;
E B .
4 t
M .
g .....- ;
8 -
5 X
a m
- c i
E .
4 9
Mft%f M S 8894 99* 4 ..ee ee e..
F ESASCO SERVICES INCORPORATED
, WATERFORD UNIT NO. 3 BORROW MATERIAL, INSPECTION REPORT hC.. Inspector Date
- 1. Material Location: Truck Borrow Pit other
- 2. Material to be Placed on Fill No. El.
Reject Accept -See Comments
- 3. Visual Inspection
. s
- 4. Moisture Content Check: Test No. Result !
- 5. Gradation Check: Test No. Result %
Comments:
1 r
. l l
l Borrow Material Acceptable as Class A Fill
, Q. C.. Signature Date Form No. QCIP-2-1 (6/16/76) !
, l l
.__. - - - , , - - m-- ---
Fara No. CCIP-2-2 6/16/76 s .
ERASCO SERVICES INCORPORA*ED WATERFORD UNIT NO. 3 EXCAVATION AND STRIPPING INSPECTION REPORT 1
Q. C. Inspector Date Fill Location El. :
i Accept i Rej ect
- See Comments BASE
- 1. Drainage Conditions: *
- 2. Regrading of Base To Provide Adequate Drainage:
- 3. Composition of Base Materials l
i
- 4. Stripping Of Objectionable Materials On Surface:
1
- . a i
- 5. Moisture Content Of Base Material Test No._ Test Result I
- 6. Moisture Content Of Reworked Or Replaced Base Material:
I Test No. Test Result %
- 7. Base Densityi
^
- 3. Proof Compaction Performed Properly If Required:
SLOPES i I
- 9. Stripping of Slopes:
- I l
Commaats: l l
l
) . . . . . ..
Base and Slopes Acceptabic For Backfill:
\ \
i l i
l
Fus + -63 6/16/76 EBASCO SERVICES INCORPORATED WATERFORD UNIT No. 3 DAII.Y BACKFILL INSPECTION REPORT Q. C. Inspector -
Date i
- 1. Fill Placement Arcs / Location El.
j
- 2. Fill Surface Area ft. . Number of tests required: In Place Density Gradation Proctor Special
! 3. Verify fill location is release for placement and compaction:
! Representative
.. Borrow material released as backfill: Material acceptable: Yes
- No
- 3. Spreading and compaction equipment satisfactory
- Yes No
- i. Base to receive fill properly prepared and compacted: Yes No 1 Backfilling done in proper sequence: Yes No I. Fill material properly placed and spread to a maximum loose thickness of 15 inches:
Yes No 1 Fill material disc-harrowed, if necessaryr Yes No to.' Surface of each lift reasonably smooth and free of ridges or grooves Yes No 1
ll. Ilauling equipment using different paths: . Yes No L2. Surface properly treated: Yes No l (3. Fill junctions properly treated ' Yes No * -
- 14. Layers compacted to full width: ' Yes No 1
'5.
. Fill material not greater than 3 inches in size in restricted areas: Yes No
!6. Fill thickness not greater than 6 inches in the loose state in restricted areas: Yes No_
.7. Waterproofing membrane protected during backfilling operations: Yes No (8. Backfill placed against waterproofin5 membrane contains no particles larger than is inch:
Yu k l
'9. No fill placed during heavy rain or on top of or into standing water Yes No
!O. Material testing is properly performed In Place Density Yes No
. Lab Yests Yes No Not Required I
Special Yesta Yes No Not Required II. Comments:
Backfilling operations Acceptable:
, ,, -..__._-- -,-_ ,.._- __m_,,-,-.-_.__,..,m_ -
, , c_-_,_.__,._y , , . , _ _ _ , . - u_ _ _ _ _ _ . _ . - , - _ _ , , - , _ , _ . - , . - - . , --_7- . - - _ _ , - , . _ _ _ _ _
r 8-20-76 4
- EBASCO SERVTCCS INCORPORATED WATERFORD (JNIT NO. 3 r
-~ ,_
BACKFILL ACCEPTANCE REPORT Q. C. Inspector Date \
i "
Fill Location: El.
l Reject j Accept Sece Comments 3
) 1. Material Acceptance Testing (Fora QCIP-1) i'
- 2. F.xcavation And Stripping Testing (Fora QCIP-2):
- 3. Backfill Construction (Fora QCIF-3):
i 1
i 4. Laboratory Testing (Barrow-Agee Test Form) i Comments:
l I , . .
j .
k , *
.i I
e i
1 l
)
I e
i Fill Acceptedt Q. C. Sinnature para a
,,r...._, . _ _ _ .. __,,_. . _ _ - _ - , .__.__.,._,.m.,m _ _,_.__ _ __ ._ ._ ,m._ . . _ _ , . , _ _ _ _ , _ _ _ _ . , _ _ . , , . . ~ - . . , . _ _ . , _ , .