}l ELASCO SE*d'IC *f. I 'CORrouTED l'.
g WATERFORD STCAM CL' CrRIC STATION - UNIT NO 3 J
1 PROCEDURE FOR:
SOILS CONTROL PROCEDURE C13ER:-
QCIP-2 se ISSUE SU1 DIARY B
[
ISSUr /DATE l
PPE ARED APPROVED l
RDIARKS A/ Draft esicka 13 a/1/75 J
' g g., Q A/,9/17/75 N
chin J. O. Booth M
B/ Draft M. Teach 9/30/75 B/.
f * #*
19/14/75 M. T hin J. O. Booth m
C/Drafe
. Teachin /
6/16/76 Y. Howard Completa procedure revised.,
m M
.$.# =
C/ 6-29-76 F. Howa /
8 Myron Tamehin W. C. Gr1 M
m D DRAFT 7/[#
Revised par. 2.0. 5.2. 5.5 g
8-13-76 F.
oa and 6.1 to incorporate H
comments from Letter LPL E
5533.
D/ 8-20-76 F.
ard /
W. C. Grig h
i E DRAFT 8-31-76 F. HoEdT Revised par. 2.0 and 5.2 N
F DRAFT F. Howar Revised 2.0, 3.4, and 6.4.17.
10-L-76 Added 8.0.
O j
B506220074 850222 PDR FOIA GARDE 84-455 PDR FHccuv.m ur INeunMnigung ACI REQUEST FORM NO.'E-1 (12-12-74) g_gf Cfksto
.-=
s
.. Z..
I a
ERASCO SERVICES INCORPORATO 4
WATERFORD STEAM ELECTRIC STATION - UNIT NO 3 PROCEDURE FOR:
PROCEDURE NT!BER:
SOILS CONTROL
@D-2 l
ISSUE SUIMARY 3"
.B APPROVED REMARK 3 ISSUE /DATE PREPann mI sag.a d..h':4 E
F/10-15-76 S. Kalac W.C.Grigg//
h AM G Drafe B. Dickson Revised 6.6.5 a); sdded d).
u 12/8/76
- uu h
$$M
. $4 k - - J C/1-3-77 B. Dickson
.C.Griggef[
l w
d h
H Draft dd. M 11-22-77 S. A. Kalat Daleted 6.4.18, 6.7.5, 7.4, j
and form no. QCIP-2-4.
Revised form no. QCIP-2-3.
A$ YQAAk m
H/12-6-77 S. A. Kalat F. D. Rose I
3 E
f 1
1 6
e I
L
-9 FORM NO. ASP-III-1-3 (10-13-75)
_....u_..-
1
.o.
M: H.
EBASCO SERVICES INCCRPOMATED NO.
.QCIP-2 l
. WATERFORD STEAM KLECTRIC STATION - UNIT NC 3 PACE: 1 0F 10 1.0 PURPOSE This procedure outlines a means to verify and record conpliance with applicable drawings, specifications, procedures, codes, regulatory requirements and documented instructions relating to soils in n ection at the construction site.
2.0 SCOPE The scope of the procedura ci ab as to safety-related items and services involving excavation and bac.:~311 operations. The soils control activities will be performed in the excavated areas, borrow-stockpile as{
areas, the plant backfill and earth structure backfill areas. In-place inspections and tests as well as laboratory tests and analyses will be h.a performed as a combined program for control of intergrated activities in au areas.
as g
The scope of inspection activities shall be divided into two types of inspection, full scale Q.C. inspection of soils operations when the E
Contractor does not have a Quality Assurance Program and Designated Inspection in order to monitor Contractor's performance when first-level Quality Control activities are performed by the Contractor.
y zu
3.0 REFERENCES
=
3.
es!
3.1 Ebasco Services Incorporated, y
Ebasco Specification, Excavation and Backfill, E
Seismically Designed Category I Structures, Project Identification No.
e LOU 1564.482 O
3.2 J. A. Jones Construction Coupany, 3
Construction Work Procedure, Backfill and Compaction, W-WP-12 g'
3.3 J. A. Jones Construction Company, S
Site Inspection and Test Procedure Backfill and Compaction Inspection g
W-SITP-12 3.4 Barvow-Agee Labs.,
Laboratory and Field Testing Backfill Materials i
(
.. PORK NO,;,,ASf. I._II..l.-4 (10-13-75)..
1 2-n
ISSUE: H l
EBASCO SERVICES INCORP0 HATED NO. QCIP-2 WATERFORD STERI ELECTRIC STATION - UNIT NO 3 PAGE: 2 0F10 4.0 D_EFINITIONS An definitions of material type, placement and compaction activales are contained in Reference 3.
t 5.0 RESPONSIBILITIES The responsibilities of performing Quality Control soil related activities shall be divided as follows:
{
5.1 Material Acceptance - The performance of inspections of the back-I fin material to determine material acceptability whether by cast fills, g
in the borrow pit, stockpiles or in trucks shall be performed by Ebasco Services Incorporated.
Eg 5.2 Construction Activities - Final inspection of excavated or stripped areas shan be performed by Dasco Services Incorporated. When place-ment and compaction operations are performed by a contractor that 5
does not have a Quality Assurance Program, first-level inspection of j
g these operations shall be performed by Dasco. When the contractor has an accepted Quality Assurance Program, Designated Inspection of
, placement and compactions shan be performed by Ebasco as. defined in u
Procedure No. ASP-III-11.
m y
5.3 Soils Testing - The in-place and laboratory soils testing shall be j
- s performed by Barrow Ages Labs. under the direction of Dasco Services j
g Incorporated.
4 I
M 5.4 Documentation - All Quality Contyol records required by this procedure E
shan be prepared by the proper agency as stated above and then g
i compiled into a single package for each backfin lift by Dasco Services Incorporated.
8 5.5 Acceptance Preliminary Acceptance - All test data generated by the field labora-tory, for specification acceptance shall be reviewed and signed for 5
~ acceptance in the field by D asco's Quality Control Inspector. This signature shall appear on each appropriate testing form.
g Op Final Acceptance - All soil related activities shall be the responsi-bility of Dasco Services Incorporated. Acceptability shall be E
documented in writing on Foru QCIP-2-4 and attached to documentation package described above.
5.6 To comply with the applicable sections of the above stated inspection requirements, nasco Services Incorporated shan institute the fonowing Quality Control program and personnel:
l i
FORM NO. ASP-In l-4. (10-13-75) w
, =-
,..---.n, v,,
e
--ee
t ISSUE: E EBASCO SERVICES INCORPOMATED No. QCIP-2 I,
WATERFORD STEAM ELECTRIC STATION - t; NIT NO 3 PACE: 3 OF 10 4
5.6.1 The Senior Quality control Supervisor is responsible for supervising and performing the following jobsite Quality Control activities:
a) Performing inspection of borrow pit,- stockpile material to determine material acceptability.
b) Performing inspection of all soil construction activit,ies 4
and operations.
I
~
c) Directing Soils Laboratory and testing operations.
h" d) Enforcing quality control documentation requirements and pr2 paring the quality control records required by i
this procedure for the fina1 acceptance of the work.
P 5.6.2 Quality Contro1 Civil Supervisor, reporting to a Lead as Quality Contro1 Engineer (Civil) will receive technical I
assist.nce fro. the Site So11s Engineer as required nd sha11 be responsible for supervision of soils inspector (s) g who sha11 perform inspections to verify a satisfactory quality level as defined in app 11 cable documents. He shall also be responsible for Sueprvising and directing the Soils u
Laboratory and observing Pie 1d Testing as well as:
j S
g a) Assuring that tests, certifications and===ia=tions are accomp11shed in accordance with the applicable design drawinga, specifications and any other governing S
documents.
E b) Accepting or rejecting work tests in accordance with the a
specifications and procedures and doctamenting same, including preparation of Statistical Analysis of compacted g
backfi11 where provided for by the specifications.
(
5.6.3 Civil Quality Control Inspector (s), reporting to the a.
Quality Contro1 Civil Supervisor, are responsible for the a
fo11owing:
m E
a) Performing in pactions of work and witnessing or y
performing soil tests in the work areas.
g b) Provide the assistance during the performance of soils j
laboratory operations.
c) Preparing documentation of all operations requiring specific reports and/or form completion, and submitting same to the Quality Control Civil Supervisor for review and further, action as required.
L i
i
~
s.
i' I
FORM NO. ASP-III-1-4 (10-13-75)
l C
3 EnASCO SERVICES INCORPORATED No. QCIP-2 j
.g.
. WATERFORD, STEAM ELECTRIC STATION - UNIT NO 3 PAGE: c 0F m ISSUE:I.'.'
-9 1
5.6.4 The site Soils Engineer, reporting to the Home Office Supervising Soils Engineer and consulting with t
~
the Senior Resident Engineer shall be a qualified soils engineer who is familiar with the design intent and shall be responsible for the following:
a)
Maintain liaison with the Supervising Soils Engineer of the Ebasco Bone Offica in order to ensure that field operations yield the design. intent.
b)
- Consult with the Senior Resident Engineer, Quality
,g Control Supervisor, Field Superintendents and 2
Contractors to provide technical assistance, in accordance with the specifications, in establishing B
i g
field methods and construction procedures for specified compliance.
c)
The Site Soils Engineer, representing the Home g
Office design organization responsible for the formation., review and approval of specification and its revisions, shall have the authority to u.
deviate and qualify specifications in isolated cases whea in his technical opinion, the specifications
=
l will not yield the required results (design intent)
- s in a certain situation. He shall in this casa, pa review and approve detailed written documancation 4
G of the deviation encountered and the earthwork y
performed on and Ebasco Nonconformance. Report, a
Field Change. Request or Design Change Notice.
E 6.0 PROCEDURE 5
8 6.1 Test Fills ao Test fills will be constructed for the purpose of determining the optimum construction technique to achieve the design conditions.
Test fills shall be conducted, inspected and tested as required by the specifications and the general requirements of this vi 5
Soils Inspection Procedure.
g The Senior Quality Control Supervisor or his inspector shall observe and document results of the following operations when b
required by the specifications.'
6.1.1 Surveying and layout 6.1.2 Excavation 6.1.3 Backfill i.
2 6.1.4~
Compaction, including equipment performance and operational characteristics.
6.1.5 Field density tests I
1
.u
EDASCO SERVICES ZNCORPORATED NO. QCZP-2 ISSUE:.R.s WATERFORD STEAM EI.ECTRIC STATION - UNIT NO 3 PACE: e, CF 10 6.1.6 Trench inspection 6.1.7 Mapping 6.1.8
. Laboratory Tests 6.1.9 They shan act as a liaison with the Supervising Soils Engineer and the Senior Resident Engineer concerning the progress of the test fin and obtaining the required approvals for any design changes.
ug 6.1.10 They shall be responsible for the maintenance of formal x
records of all operations and observations as required 3
Iry the specification and any approved changes thereto.
3 6.2 Borrow =d/or Stocknile Areas - Material Acceptance 6.2.1 Perform visual inspection either at the pit or on site to assure that all areas are cleaned of an undesirable g
asterial such as trees, roots, vegetation, auck and silt o
l l
in accordance with specification LOU 1564.482 and document results on, Fora QCIP-2 _1.
u m
y 6.2.2 Monitor loading or delivery of backfin material to
- s insure that only asterial which meet the specifications g
is used as backfill.
5 6.2.3 Inspect, sample and test Class A borrow materials g
z to determine compliance of gradation and noisture content with the specifications and record the results on fora QCIP-2-1.. One set of t.asts shall be run for every 1,000 cubic yards of borrow material or for each i
8 working shift whichever represents the smaller quantity a
of material.
x" 6.3 Excavated or Scrioned Areas 5
6.3.1 Prior to start of backfill operations, excavated or a
5 stripped areas shan be inspected to assure proper C
drainage and a sound base and for conformance to the i
specified requirements and the results recorded on E
Fora QCIP-2-2.
6.3.2 Material that exceeds the permissable moisture content any be dried by specified means or re eved and replaced with new fin. Rauerkad fin asterial shall be tested for moisture content and the results recorded on Fora QCIP-2-2.
6.3.3 After satisfaction of an specified prerequisites, proof compaction of the final excavated grade may begin if required. Proof compaction shan be accomplished i
to the satisfaction of the Engineer before the fill operation begins.
1
=>
vneme un sen vs, s a nn
..s_.
EBASCO SERVICES INCORP0 MATED RO. QCIP-2
~~
ISSUE: H WATERFORD. STEAM EI.ECTRIC STATION - UNIT NO 3 PACE: 6 OF 10 6.4 Soil Related Construction Activity Inspections All soils placements, inspection and testing operations shall be conducted in accordance with the drawings and specifications.
Inspections results shall be recorded on Form QCIP-2-3 for each shift by each inspector and shall include the following:
6.4.1 Material has been determined to be suitable and released for backfin.
6.4.2 Base to receive backfill has been properly prepared and compacted to the density required.
6.4.'3 Backfining is accomplished in the proper sequence 5
in accor. dance with Ebasco Drawing No. LOU-1564-G490.
w as g
6.4.4 Sand backfin asterials for Class "A" fin are spread 3
and leveled in layers not exceeding 15 inches prior to compaction.
g 6.4.5 Clay for Class "A" backfin and material selected from the excavation for Class "B" backfill is placed in u
layers not exceeding ten inches prior to compaction.
=
8 l
g 6.4.6 Fin unterial is deposited uniformly over entire ares being fined to a particular stage or level.
l 6.4.7 When required, ' fin material shan be disc-harrowed g
after spreading and before compaction to blend and a
serate the material into a texture that can be consolidated into a homogeneous mass by the compaction operations.
g 6.4.8 Surface of each lift is kept reasonably smooth and free r
of ridges or grooves which would adversely affact proper
,g-compaction of subsequent lifts.
z 6.4.9 Hauling equipment uses paths different from each other in order to aid compaction of the entire area and to avoid overcompaction of any given area.
z E<
6.4.10 If area to receive fin is an original excavation, or l
eampacted more than two days previously, surface sha n-be cleaned of an loose debris and improperly compacted material. Area then shan be proof rolled and accepted prior to subsequent backfill.
6.4 n When two sections of fin join, fill placed first must have its slope shaved a mini== of three feet to expose i
undisturbed compacted material.
1 i
6.4.12 Compaction *is achieved with proper equipment operatin's j
and proper speed.
i
+
,, M S R M 4CD TTT 9 O
89 A 9O U%i e
- * * * * * * * * *** * * * * * ~ " * * * " * * * * * * * *
~-
u.
n M.y H _.
EAASCO SERVICES INCORPORATED 16 0. QCIP-2
. WATEltMRD STEAM ELECTRIC STATION - UNIT NO 3 PACE: 7 0F 10 4
6.4.13 Compaction is reasonably uniform within any one layer over entire area.
6.4.14 All layers are compacted to full width.
6.4.15Inreachetedareas,filldoesnotcontainmaterialgreater j
than three inches in size.
1 6.4.16 Reasonable care is taken to protect waterproofing membrane -
boards.
e 6.4.17 Backfill plac'ed against waterproofing membrane boards does u
k not contain any particle greater than inch in size.
h 6.4.18 Material has been compacted until the specified density is
- e obtained and verified by in-place density testing.
=
2 6.4.19 Surface of fill areas to be sloped to effect drainage away from building and into site drainage pattern. Lov areas to g
be pumped if required.
t 6.5 Soils Laboratory
- s2 The following functions are performed by the soils laboratory staff E,
under the direction of the Quality Control Civil Supervisor.
l
{
6.5.1 Testing materials to be used as backfills to determine m:
their suitability; borrow materials are sampled and g
gradation and compaction tests performed to determine 3
m the moisture-density relationshfps with respect to the specified standards.
O 6.5.2 Performing gradation tests (including scisture content determinations) on the asterials from the work points in 5
the borrow sad stockpile areas or out of delivery trucks to determine their suitability for use in the compacted a
backfill.
{
l 6.5.3 Testing materials being used as " test fill" to establish the optima number of passes of the compactor to obtain the g
required density.
6.5.4 Performing field density noisture and gradation tests on
~
asterials from the compacted backfill in accordancie with the specifications to assure the suitability of the materials and their proper compaction.
t
+
i i
l Y
i l
i f
i l
_l
. FOM NO.._A.S..P. I_I.I._.1-4 (10-13-75) i
{
- i.,
I EEASCO SERVIC::S INCORNKATED
.10.
QCIP -2 ISSUE:
H. "
. WATERTORD ST1!.E CLECTRIC STATION - UNIT NO 3 PACE: 8 Or 10 4
6.5.5 Performing any additional tests as required to assure the adequacy of the tested material as required by the specifications.
6.6 Soir Testina All soil testing shall be conducted in accordance with the drawings, specifications and applicable co' des and p'rocedures. Verification of soil testing shall be' indicated on the forms listed below for each fill at at each elevation for each shift.
88' 6.6.1 Test Fills - These test.s shall be run in accordance with h
Section 6.1 of this procedure and recorded on:the appropriate 5w
'*i 6*.6.2 Material Acceptance - These tests shall be run in ac'ordance-c 8*
with Section 6.2.3 of this procedure and results recorded 5
on rors oCIP-2-1..
6.6.3 Excavated and stripped areas - These tests shall be run in accordance with Sec' tion 6.3 of this procedure and 5
recorded on the appropriate farms.
nr S
6.6.4 In Place Density Testa (Barrow-Agee Labs Test Forms, OCIP-2-3)-
- n 2
3h a) Das test for every 20,000 ft.
or less of Class A sa g
{
asterial placed.
b) One test'for every 40,000 ft.
of less of Class B asterial placed.
l 5
I 6.6.5 Laboratory Testing (Barrow-Agee Labs. Forms QCIP-2-3) 6 8
d a) One 1 point Proctor check and Gradation Test for every
!il.:
10 in place densities.
e-5 b) One 5 point Proctor Test and Gradation Test for every 100 in place densities.
g-C
- One 6 point Proctor, one Gradation, and 3 sets of C
c)
Mar 4==-Minimum Relative Density Tests to be run on E
site (Proctor and Gradation) and off site (all tests) for every 200 in place densities.
s d) Additional tests may be requested at the engineer's discretion.
_6_. 7 Documentation and Work Acceptance All doctamentation concerning each fill shall be forwarded to the Ebasco Senior Quality Control Supervisor upon its completion for final work acceptance. The documentation reviewed for the acceptance of each fill shall include the following forms when applicable.
i 6.7.1 Meterial Acceptance Inspection Form No. QCIP-2-1.
FORM NO. ASP-III-1-4 (10-13-75)
._.._ _ _ r
c,...
W: 9 _._
ERASCO SERVICES INCORPORATED 100. ocip_2
. WATERFORD S*EAM EI.ECTRIC STATION - UNIT NO 3 PACE: 9 OF 9 4
6.7.2 Excavation and Stripping Form No. QCIP-2-2.
6.7.3 Daily Backfill Inspection Report Form No. QCIP-2-3.
6.7.4 Soil testing forms including In Place Density, Proctor, and Gradation Test Summaary forms in accordance with Peabody Services testing procedure.
I 7.0 ATTACHMENTS 7.1 Form No. QCIP-2-1, Borrow Material Inspection Report 7.2 Form No. QCIP-2-2, Excavation and Stripping Inspection Report g
7.3 Form No. QCIP-2-3, Daily Backfill Inspection Report ua y
8.0 INSPECTION AND TESTING DESIGNATION I=
Test Fills (Paragraph 6.1)'- 100% by Ebasco.
8.1 I
E j
g, 8.2 Borrow and/or Stockpile Areas - Material Acceptance (including 2.
l E
materials in trucks) - (Paragraph 6.2) - 100% by Ebasco.
u 5
8.3 Excavated or Stripped Areas - (Paragraph 6.3) Final inspection by l
E Ebasco.
S i Ei 8.4 Inspection of placement and compaction operations (Paragraph 6.4) l O
I E
8.4.1 When the work is performed by a Contractor that does not have I
E an acceptable Quality Assurance Program: 100% by Ebasco 8.4.2 When the work is performed by a Contractor that has an accep-l g
table Quality Assurance Program: One per day, by checklist, when work is in progress.
j E'
8.5 In-place density testing and soils laboratory testing-100% by the soils laboratory staff under the direction of the Ebasco Quality Control Civil Supervisor.
g O
T:
8.6 Work Acceptance (Paragraph 6.7) - Ebasco Senior Quality Control Supervisor.
0 f
4 e
i 2
a Jom no. asp-III-li(10-13-75)
[
I
6 EBASCO SERVICES INCORPORATED WATERFORD UNIT NO. 3 i.
5 BORROW MATERIAL INSPECTION REPORT Q. C. Inspector Date j
1.
Material Location: Truck Borrow Fit Other i
2.
Nacerial to be Placed on Fill No.
El.
Reject Accept
- . Sea Comments i
3.
Visual Inspection.
i 4.
Moisture Content Check: Test No.
Result Z
~
i
)
1 l
5.
Gradation Check: Test No.
Result Z
i i
t' - ts:
I a
1 i
Borrow Material Acceptable as Class A Fill i
Q. C. Signature Date j
.i Form No. QCIF-2-1 (6/16/76) t t
1
i Fara No. (CIP-2-2 I
6/16/76 EBASCO SERVICES INCORPORAT C WATERFORD UNIT NO. 3 i
EXCAVATION AND STRIPPING INSPEC"ICN PIPORT l
~
Q. C. Inspector Date Fill Location El.
Accept Reject See Comments BASE 2
1.
Drainage Conditions:
2.
Ragrading Of Base To Provide Adequate Drainage:
3.
Composition of Base Material:
~
i 4.
Stripping Of Objectionable Materials on Surfaces l
5.
Moisture Content Of Base Material: Test No.
Test Result i
6.
Moisture Content Of Bevorkad Or Baplaced Base Material:
Teec No.
Test Rasult I
~~-
7.
Base Density:
4 8.
Proof Compaction Performed Properly If Baquired:
g,gg 9.
Stripping of Slopes:
~
Commaats:
. ~.
I i
l Base and Slopes Acceptable For Backfill:
a _e _e.
._n......
i
~ _-
I l
Form No. OCIP-2-3 (12-6-77)
EBASCO SERVICES INCORPORATED WATERFORD UNIT NO. 3 1
DAILY BACKFILL INSPEC"' ION REPORT t
Q. C. Inspector Shift Date j
1 1.
Fill Area / Location Contr.
E1.
2.
Fill Surface Area Sq. yt.
3.
Borrow material released as backfill: Yes No 4
Spreading and Compaction equipment satisfactory: Yes No 5.
Base to receive fi11' properly prepared and compacted: Yes No 6.
Backfilling done in proper sequence: Yes No 7.
Fill asterial properly placed and spread to a bwi== loose thickness of 15 inches:
Yes No 8.
Lift surface reasonably smooth and free of ridges or grooves: Yes No 9.
Hauling equipment using different paths: Yes No 10.
Fill Junctions properly treated: Yes No 11.
Layer compacted to full width: Yes No 12.
Fill material less than 3 inches in size in restricted areas: Yes No 13.
Waterproofing membrane protected during backfill operations: Yes No 14.
Backfill against waterproofing asebrane contains only material less than h inch:
Yes No 15.
In-place density testing properly performed: Yes No N/A 16.
Co m es:
i i,
Backfill Operations Acceptable:
Q. C. Inspector.
Date 4
.+
2 m
., -. - ~ -
-,-.n-,
~-.
-