s i n / s le 7'

,,h 8' -

Procedure No. W-SITP-12

,. j, . .

1

.( l ' *I t

/s ..F

'ck J. A. JONES CONSTRUCTION COMPANY d

SITE INSPECTION AND TEST PROCEDURE .

FOR BACKFILL AND COMPACTION INSPECTION s

WATERFORD SES UNIT NO. 3 CONTRACT NO. W3-NY-4 EHGINEERING CONSTRUCTION QUALITY ASSURANCE REV. DATE REVIEVED BY DATE REVIEWED BY DATE APPROVED BY DATE o xis u sd - .,srss :d2rm sM LOL e.Rh' ava,a o

FREEDOM OF INFORMATION ACT REOt)EST pgj62[g 7 850222 CARDE84-455 PDR , .

6k

. . _ . __ _ - _ - _ _ _ ~ _- -_ - - - _ - ._ _ _ _ - _ .- - .- _ _ - . _ - . . . .

1 . . .

! + '

( .- .

l; PACE OF J. A. JONES CONSTRUCTION COMPANY 4

I PROCEDURE NO.

SITE INSPECTION AND TEST PROCEDURE: W-SITP-12 REV. NO. O DATE: 12/15/75 i TITLE: BACKFILL AND COMPACTION INSPECTION PROJECT TITLE: WATERFORD SES UNIT NO. 3 CONTRACT No. W3-NY-4

1

! 1.0 PURPOSE l .

To specify the inspection and surveillance activities that will be per-formed by J. A. Jones Quality Assurance / Quality' Verification personnel to assure that backfill is placed and compacted in accordance with approved '

drawings, specifications and procedures. .

l 2.0 SCOPE j

This procedure governs the placing and compaction of backfill material

' for Waterford SES Unit No. 3, Phase I Concrete Construction.

30 DEFINITIONS

~

l l 3.1 Class "A" fill shall be either sand containing no more than twelve

! (12) percent material passing a number 200 selve or Pleistocene clay.

Class "B" fill shail be selected sand, silt, clay, or a combination I 3.2 i thereof, selected f rom the excavation. ,

t 33 Location of Class "A" and Class "B" fill shall be as shown on Ebasco

  • Orawing No. LOU-1564.497 501,, " General Backfill Plan and Sections".

4.0 REFERENCES

} 4.1 J. A. Jones Construction Work Procedure, W-WP-12, "Sackfilling and

. Compactfon".

4.2 Ebasco Services, Inc. Specification No. LOU-1564.482, " Filter and Backfill". .-

4.3 Ebasco Orawing No. LOU-1564-G-490; " Nuclear Plant Island Structure - '

Construction Sequence."

I 5.0 RES'PONSIBILITIES 5.1 Ebasco Services, Inc. Is responsible for the furnishing of all back- )

fill material and for all testing of backfill material and compacted

! backfill. '

( .

5.2 J. A. Jones is responsible for the proper placing and compaction of ,

! backfill in accordance with approved drawings, specifications and l i

procedures.

  • I _

j i . (

PAGE OF

' kJ.A.JONESCONSTRUCTIONCOMPANY 4

PROCEDURE NO.

SITE INSPECTION AND TEST PROCEDURE:

W-SITP-12

. . REV. No. O TITLE: 8ACKFILL'AND COMPACTION INSPECTION DATE: 12/15/75 FR TECT TITLE: WATERFORO SES UNIT NO. 3 CONTRACT NO. W3-Ny-4 i -

t . .

6.0 INSPECTION .

r .

1 , The assigned, Quality Verification inspector (s) shall perform surveillance

' ' inspection as required to assure that the requi'rements IIsted below are l f.f," f. *.Whpk s S-w h4eonw/' 54d Syd64- kvSwb'Dlc-AdSet/

an.M&:epH.

Sackfilling is accompilshed in the proper sequence in accordance

! 6.1

! with Ebesco Orawing No. LOU-1564-G-490.

i $etregarwlc. br.sh"

! 6.2 Base to receive backfill has been prope ly compacted to C f " -

l - Ed!'Y 8-em. D.nsityi E I'"{ru C } %<.'O.

6.3 Sand 'for ' Class "A" fill is spread and leveled in ' layers not exceed-1 Ing 15 inctes prior to ccapaction, '

. . i j 6.4 Clay for Class "A" backfill and material selected from the excavation i *

  • for Class "B" backfill is placed .in layers not exceeding e4gk inches prior to compaction. $7 l

m.w4 Fill material is deposited over entire area being filled to a parti-j y, 6.5 g cular stage or level.

l ,

t 6.6 When required, fill material shall be disc-harrowed after spreading

~"~

and before compaction to blend-and aerate the material into a tex-

'ture that can be consolidated into a homogeneous mass by the compac-tion operations. ,

6.7 Layers of fill material are placed to essentially equalize effective i

f pressure at the base of the mat.

' Surface of each lif t is kept reasonably smooth and free of' ridges or 6.8 grooves which would adversely affect proper compaction of subsequent

, lifts. .

694 . Hauling equipment uses paths different from each other in order to aid .

compaction of the entire area and to avoid overcompaction of any given area.

!t 6.10 if area,to receive fill is an original excavation, or compacted more i than two days previously, surfaces shall be cleaned of all loose debris and improperly compacted material.

4 ,

f d \ .

l -

L I g P

.-_.-,..-)_._,. ,.__ _ . . - _ , - _ _ _ _ _ , _ _ _ _ . , . _ , . , , . _ . , , ., , . _ , , . , _ , _ . , _ , _ , , , . . _ _ . _ , , , _ , _ _ _ _ _ , . _ _ . , ,

+

i .

J. A. JONES CONSTRUCTION COMPANY PAGE OF l

SITE INSPECTION AND TEST PROCEDURE:- PROCEDURE NO.

W-SITP-12 REV. NO. 0 i TITLE: BACKFILL AND COMPACTION INSPECTION DATE: 12/15/7e PROJECT. TITLE: WATERFORD SES UNIT NO .

3 CONTRACT NO. W3-NY-4

! 6.11 When~ two sections of fill join, fill placed first must have its slope shaved a minimum of three feet to expose undisturbed com-pacted material.  !'

Gi.pa nyf ac} cued & *ACf'k/'*MYn'Y S' h #W #g A

n.

6.1) Compaction is reasonably uniform within any one layer over entire

, area. .

6.13 All layers are compacted to full width.

In restricted areas, fill does not contain material greater than

~

6.14 three Inches in size. A Reasenable care is taken totect pTo s"

.( '

6.15 waterproofing membran ,e. .

6.16 BaclAfill placed against waterproofing membrane does not contain any ~

a particle greater than 1 inch in size. .

h, ..

6.17 No fill is placed during heavy rain or on top of or into a pool of water. .

>o 6.18 Material testing is properly performed and does not unduly affect progress of work.

70 DOCUMENTATION The assigned Quality Verification inspector (s) documents his surveillance activities by filling out the Daily Backfill inspection Report (Attachment A). This report shall be filled out for each inspector for each shift when inspection is performed.

8.0 ATTACHMENTS 8.1, Daily Backfill Inspection Report h ygy*.M: $ds W

' q ,/ .5.f#

J%c --

s,wifii/ /)ee.u6 L GauefbfGW *

@ n.D d &.. fn'7 4 s !" m'6 ! & Cg<.-

D pw, --g.,,,--,-,----,~-,--------a ,y . -,., ,_.,-,m~- - , , , , - --~-,.,---.,----,--n--.

wn- - - - _ -- -- _, - - - - .

. ._ - =__- - - - . _ - -

W-SITP-12

\ Attcchment A i

J. A. J0NES CONSTRUCTION COMPANY

, WATERFORD UNIT NO. 3 DAILY 8ACKFILL INSPECTION REPORT Q. V. Inspector

  • Date
1. Fill Placement Area / Location _

J

2. Engineer's written release for placement and compaction obtained: Yes No
3. Materials released by Engineer: Yes ( No
4. Spreading and compaEtion equipment satisfactory: Yes _, No
5. Base to receive fill properly compacted: Yes Wo
6. Backfilling done in proper sequence: Yes No'

)

~

7. Fill material properly placed and spread: Yes No
8. Fill meterial disc-harrowed., if necessary:. Ye's_,, No ,

1.

9. Surface of each Ilft reasonably smooth and free of ridges or grooves: Ye s,_k No
10. Hauling equipment using different paths: Yes No i

i

11. Surface properly treated: Yes No  ;

~

12. Fill Junctions properly treated: Yes No 13 Layers compacted to full width: Yes No
14. Fill material not greater than 3 inches in size in restricted areas: Yes No l 15. Waterproofing membrane protected during backfilling operation: Yes No
16. Backfill placed aga' inst waterproofing membrane contains no parti.cles larger than t Inch:

Yes No l ,

17 No fill placed during heavy rain o'r on top of or into standing /

water: Yes No

18. Material testing is properly performed and does not unduly affect progress of work:

Yes No ,

19 Comments:

_i r e

t T

lestructions for Comoleting Daily Backfill Inspection Report

1. Area / Location shall be recorded as coordinates from centerline of Reactor Vessel.
2. Obtain copy of Engineer's Release and attach to this report.

3 Obtain copy of signed " Requisition on Warehouse", Ebasco Form No.136(X)/2-75 and attach to this report.

4. Items'4-18 Inclusive are self-explanatory and reflect requirements of this procedure, J. A. Jones Construction Work Procedure W-WP-12, and Ebasco Specification LOU-1564.482.
5. If comments a.e required or further explanation of an item is needed, the comments are to be entered in the space provided (ltem 19). Any comment or explanation should be preceded by the item number, e.g. Item 17 - light rain during fill operations.,

item 18 - testing operations slowing down compaction due to malfunction of test equipment. Additional sheets may be used, if required.

6. In the event that a "No" is checked for any one of items 2-18 inclusive, a "Stop 1

Wbrk Order" will be issued and the following information recorded under item 19:

(1) Stop Work Order Number (2) Date issued (3) Individual notified (Name and title)

(4) .Date deficiency corrected '

(5) Date Stop Work Order rescinded

  • 8 G

6 4

4 S

1

, . . . s Instructions for Completing Daily Backfill inspection Report ,

a

1. Area / Location shall be recorded as coordinates from centerline of Reactor Vessel.
2. Obtain copy of Engineer's Release and attach to this report.

q 3. Obtain copy of signed " Requisition on Warehouse", Ebasco Form No.136(x)/2-75 and attach to this report.

i

4. Items 4-18 inclusive are self-explanatory and reflect requirements of this procedure, J. A. Jones Construction Work Procedure W-WP-12, and Ebasco Speci fication LOU-1564.482.

' 5. If comments are required or further explanation of aa item is needed, the comments are to be entered in the space provided (Item 19). Any comment o,r explanation should be preceded by the item number, e.g. Item 17 - light rain during fill operations.,

item 18 - testing operations slowing down compaction due to malfunction of test equipment. Additional sheets may be used, i f required.

6. In the event that a No" is checked for any one of items 2-18 inclusive, a "Stop Work Order" will be issued and the following information recorded under item 19:

(1) Stop Work Order Number (2) Date issued (3) Individual notified (Name and title)

(4) Date deficiency corrected '

(5) Date Stop Work Order rescinded 0

4 4

6