l EtACCO CC3\\'lCD' li 00R!W ATPD
*d UATraroto STIZ!! CLJCriuC STAT 20N - Uti1T NO 3 PROCEDUCE FOR:
SOILS CONTROL PROC 1:Dunc :c:3ER:-
OCIP-2
1 ISSUE SUb21AP.Y S
Ti 10 Tssur/D?.Tc PR_tPARCD APPROVED RDIARKS m
A/Drsft j
3;. g.
- p. Ltze a't>
g A/.9/17/75 chin J. O. Booth I
h 7%
5 i
B/ Draft M. Teach j
ls
{
i 9/30/75 i
.l B /.
C'2" l.
- 'i 19/14/75 M.Temphin
.e.,.0
,Joach l
b jf f?fa.'*Ath W{'
~
L C/Drafe M. Teachin /
.g 6/16/76
- 7. Howard M
>1Nts procedure revised.
- .,L'
'Com g
,h",*
^
M R
- .# e s
C/ 6-29-76 F. Howa /
Myron Teachin W. C. Gri M
E
/
S D DRAFT Revised par. 2.0, 5.2. 5.5 y
8-13-76 F.
a and 6.1 cc incorporate H
comments from Letter LPL O
5533.
D/ 8-20-76 F. Howard W. C. Grig I
8506220056 B50222 PDR FOIA PDR GARDEB4-455 i
~
IhtA>ei Or INr Utwn a suis ACT REQUEST FORtt No. C-1 (12-12-74) g,9 g
liO. QC II'-2 EUASCO SER'.' ICES iNCottl'01MTl;D l
i IT,f,U C:
D
. WATCRTOltD STEN! ELCCTRIC STATION - tdIT NO 3 PACE. 1 0F o 1.0 PURPOSE This procedure outlines a means to verify and record compliance with l
applicable drawings, specifications, procedures,. codes, regu* story requirements and documented instructions relating to soils inspection at the construction site.
i 2.0 SCOPE i
The scope of the procedure applies to safety-related items and services involving excavation and backfill operations. The soils control activities will be performed in the excavated areas, borrow-stockpile wl areas, the plant backfill and earch, structure backfill areas. In-place inspections and costs as well as laboratory tests and analyses will be performed as a combined program for control of intergrated activities in all areas.
sa m'
l The scope of inspection activities shall be divided into two types of inspection, full scale Q. C. inspection of soils operations when E
Ebasco Services, Inc. is doing the work and random inspection when others are doing the work.
D m
o E
3.0 REFERENCES
3 N
3.1 Ebasco Services Incorporated, j
d Ebasco Specification.
E Excavation and Backfill, Seismically Designed Category I Structures, Project Identification No.
z g
LOU 1564.482 3.2 J. A. Jones Construction Company, l$
Construction Wo'rk Procedure.
4 Backfill and Compaction, W-WP-12 z
l E
3.3 J. A. Jones Construction Company, S
Site Inspection And Test Procedure 4
Q Backfill and Compaccion Inspection W-SITF-12 E
3.4 Barrow-Agee Labs.,
Laboratory and Field Testing j
Backfill Macerials j
~
I y
+
om
~_..__
~
l.
ELASW S!2 VICES 1lCHNKAT!3 No. OC!P-2 ICCUT:
D WAT!300RD. STrMI ELECTRIC STATION - UNIT NO 3 l'ACC: 2 Or 9
l l
j l
4.0 DEFINITIONS All definitions of asterial type, placement and compaction activitics are contained in Reference 3.
5.0 REspowsIBIt.ITIES The responsibilities of perfroming Quality Control soil related i
activities shall be divided as follows:
5.1 Material Acceptance - The performance of inspections of the back-fill asterial to determine material acceptability whether in the borrow pit, stockpiles or in truchs shall be performed by nasco k'd Services Incorporated.
i b
5.2
- Construction Actiticies - The performance inspections of
[
the placement and compaction operations and other soil related y
backfill activities shall be performed by the agency performing i
j the work.
O The inspection of construction activities stated in Section 6 of this procedure applies to Ebpeco services Incorporated when the placement and compaction opeirations are being performed by Ebasco "
Services. Soil related construction activities performed by others shall be quality controlled by their own Quality Control personnel in
~g accordance with their own inspection procedure approved by Dasco.
z D
Ebasco's Q.C. will perform random _ surveillance inspections of Contractor activities in accordance with Section 6.4 of this g
g procedure at least once 'per week.
E 5.3 Soil Testina - The in-place and laboratory soil testing sh:ll be performed by Barrow Agee Labs. under the direction of Dasco z
Services Incorporated.
I 3
5.4 Documentation - All Quality Control records required by this 8
procedure shall be prepared by the proper atency as stated above i
and then compiled irico a single package for each backfill lif t g
by Basco Services Incorporated.
l 2
D 5.5 Acceptance I
,g Preliminary Acceptance - All test data generated by the field O
laboratory, for specification acceptance shall be reviewed and 2
signed for acceptance in the field by.Ebasco's Quality Control Inspector. This signature shall appear on each appropriate E
testing form.
i
^
~
i Final Acceptance - All soil related activities shall be the responsibility of Dasco Services Incorporated. Acceptability l
shall be dwted in writing on Foru QCIF-2-4 and attached to the documuration package described above.
5.6 To comply with the applicable sections of the above stated i
inspection requirements. Dasco' Services Incorporated shall institute the following Quality Control program and personnel:
a i
5.6.1 The Senior Quality Control Supervisor is respone151e for supervising and performing the following jobsit. '2us11ty Control activities:
a) Performing inspection of borrow pit - stockr h-material to deccraine asterial seceptabiller d
nr
.--.m r
r.-
s--
i l
EnASCO SURV[CES INCORPulMTLD NO. OCIP-2 g UCp D
WATERTORD STTVI E?.CCTR8C STAT 20N - UNET WO 3 PACC: 1 OF o e
b)
Performing inspection of all soil construction activities and operations.
c)
Directing Soils Laboratory and testing operations, d)
Enforcing quality control documentation requirements and perpering the quality control records required by this procedure for'the final acceptance of the work.
5.6.2 Quality control Civil Supervisor, reporting to a Lead
\\
1 h"'
Quality control Engineer (Civil) will reesive technical I
assistance from the Site Soils Engineer a.s required and g
shall be responsible for supervision of soils inspector (s) who shall perform. inspections to verify a satisfactory w*
quality level as defined in applicable documents. He y
shall also be responsible for Supervising and directing j
the Soils Laboratory and observing Field Testing as well as:
ol a)
Assuring that tests, certifications and examinations are accomplished in accordance with the applicable u
g design drawing),, specifications and any other governing documents.
3~
b)
Accepting or rejecting work tests is accordance H
h with the specifications and procedutes and do'umenting c
same, including. preparation of Statistical Analysis g
of compacted backfill where provided for by the a
specifications.
E 3
5.6.3 Civil Quality Control Inspector (s), reporting to the g
Quality Control Civil Supervisor, are responsible for the following:
y, H
a)
Performing inspections of work and sdenessing or g
performing soil. tests in the work areas.
8 E
b) h Provide the assistance during the performance of soils laboratory operations.
<c l
c)
Preparing documentation of all operations requiring i
specific reports and/or form completion, and submitting same to the Quality Control Civil Super-
)
visor for review and further action as required.
I
-tm I
.= :L--
n -
l EUASCO SERVICES INC01tl\\utATED NO. OC l l*-2 i
I ISSUC:
D
-i>
l WATERl'01 D, STC,Vt 11ECT!!1C STATION - UNIT NO 3 PACC:
y, OF o 1
i 5.6.4 The Site Soils Engineer, reporting to the llome Offico Supervising Soils Engineer and consulting with the Senior Resident Engineer shall be a qualified soils engineer who is familiar with the design intent and shall be responsible for the following:
a)
Maintain liaison with the Supervising Soils Engineer N '
of the Ebasco Home Office in order to ensure that field operations yield the design intent.,
b)
Consult with the Senior Reside'nt Engineer, Quality 3
Control Supervisor, Field Superintendents and 2
Contractors to provide technical assistance, in 3
accordance with the specifications, in establishing g
. field methods and construction procedures for specified compliance.
5 c)
The Site Soils Engineer, representing the Home g
Office design organization responsible for the formation,, review and. approval of specification o
l and its revisions, shall have the authority to deviate and qualify specifications in isolated ug*
cases when in his technical opinion, the specifications g
will not yield the required results (design intent)
- s in a certain situation. Ha shall in this case, y
review and approve detailed written documentation of the deviation encountered and the earthwork y
performed on and Ebasco Nonconformance Report, Field Change.Raquest or Design Change Notice.
z E
6.0 PROCEDURE S
8 6.1 Test Fills E'
Test fills will be constructed for the purpose of determining the optimum construction technique to achieve the design conditions.
5 Test fills shall be conducted, inspected and tested as required by the specifications and the general requirements of this ca 8
Soils Inspection Procedure.
p N
D The Senior Quality Control Supervisor or his in'pector shall s
E observe and document results.of the following operations when required by the specifications.
l.
6.1.1 Surveying and layout 6.1.2 Excavation l
6.1.3 Reckfill 6.1.4 Compaction, incruding equipment performance and operational characteristics.
i l
6.1.5 Field density tests f
t
-.w
-~
% o-P. 5 l
l
- ~....
-.e..*J.-...,...m.,.m....,
t f
l I::UE-3
- JATCIO23 0~I14; *' -"' IIC S*f.** i - 1 JIT ':0 3 k'ff-I:
c CF c
-t>
l 6.1.6 7:esch ins,ee:10:
6.1.7 Ma;pi=g l
i
6.1.8 laters
ry Tests 6.1.9 They shall a:: as a ?
- m' <~. vi:h the ScM: rising Sctis Engiseer a=4 :te Senior assiden: Ingi:eer crecer:1:3
- se pr:gress of the tas: fill a=d ch: *
- t the ret. ired approvals for a=y design cha ges.
m c
6.1.10 Thev shall be resp::sible f:r te sain:e z-e cf f:::a
=
x ree.1rds of all cperati.~. s and chse:rati es as req = red 3
'ry :he specificarice a=d a y a:pr: red chs:ges : tere:.
r,a
=
6.2 Scr-w aM /er s.ee c *1e x..,, _ g..
.j %
m i
6.2.1 Perfers visual i= spec: ice either a: :he pi: er c si:e to assure that all areas are e'a= =' cf all m % irable g
asterial such as trees, roc:s. vega:ation, acci asd sil:
z in accordance with specifica:Ima 1.T if 64.422 and h
- = re m :s y.r. QC1,-2-1.
i, zu=
6.2.2 Monitor 1"*=
or delivery cf hacifill material to 5
insure that only as:arial w d see: the specifica:ie s
=
l is used as hak'*".
H<
i u
6.2.3
! aspect, sampla and tes: Class A bcrrow antarials l
g
- determine campH =-= ef gradatio= and acist re - ::ar:
z with the specifica:is=s and record.he results c=
z
- g fers QCIP-2-1.
Coe set cf :ests shall be :::= f:: every
~5 1.000 cubic v.ards of be m.c material er f each O
werkimg shif C 8 ever represe: s :ta =wa"er q a::ity of antarial.
se=
6.3 Earava:ad or 5:-iroed Areas z
m.
e 6.3.1 Prior to start of W h**'? cperati=es, excavased er 5
stripped areas shall be isszec:ed :s assure pre:er 7
drainage and a soc =d base a 4 for ::cforzz=ce :o the specified requi m es a:d the results re:Orded==
E Tora QCIP-2-2.
6.3.2 Material that exceeds.be permissable acisture==_ e::
any be driad by specified means or renewed and re; laced with asw fill. Emuorked fill asterial shall be rested for asisture content and the results recorded on Fora QCIP- -2.
6.3.3 After satisfa-time of all specified prerequisites, proef compa ::en of the fi=al excava:ed grade may kgi if required. 7:ocf comp ::i== e=?? be are=selished to the satisfaction of :he I:gi=eer bef:re :he fill operation begins.
~.
g l
ECASCO SERVICES INCORPORATED NO. QCIt'-2 ISSUE:
WATEnronD STriM ELECTRIC STATIO:: - UNIT No 3
- ' ACE: 6 0F 9
6.4 Soil Related Construction Activity Insnoctions
~ All soils placements, inspection and testing operations shall be conducted in accordance with the drawings and specifications.
Inspections results shall be recorded on Form QCIP-2-3 for each shift by each inspector and shall include the following:
6.4.1 Material has been determined to be suitable and released for backfill.
6.4.2 Base to receive backfill has been properly prepared W
and compacted to the density required.
6.4.'3 Backfilling is accomplished in the proper sequence d
in accor, dance with Ebasco Drawing No. LOU-1564-G490.
m
[
6.4.4 Sand backfill materials for Class "A" fill are spread y
and leveled in layers not exceeding 15 inches prior to compaction, e
g 6.4.5 Clay for Class "A" backfill and material selected from g3 the excavation for Class "B" backfill is placed in layers not exceeding ten inches prior to compaction,
=
y g
6.4.6 Fill material is deposited uniformly over entire area being filled to a particular stage or level, we h
6.4.7 When required, fill material shall be disc-harrowed after spreading and before compaccion to blend and aerate the material into a texture that can be consolidated 2
into a homogeneous mass by the compaction operations.
g 6.4.8 Surface of each lift is kept reasonably smooth and free of ridges or grooves which would adversely affect proper
,g compaction of subsequent lifts.
e 6.4.9 Hauling equipment uses paths different from each other in order to aid compaction of the entire area and to
,g
- c. void overcompaction of any given area.
E 6.4.10 If area to receive fill is an original excavation, or h
compacted more than two days previously, surface shall be cleaned of all loose debris and improperly compacted material. Area then shall be proof rolled and accepted prior to subsequent backfill.
6.4.11 When two sections of fill join, fill placed first must have its slope shaved a minimum of three feet to expose undisturbed compacted material.
6.4.12 Compaccion'is achieved with proper equipment operatin'g and proper speed.
- m G
4 D
e
L1- ;co SI:.ICi:S INC01;lticAT!:D
- 50. OCTI'-2 D
Ig!;tt;;.
, yAT;;iu'Ol;D STr>.*t
- !:CT1;IC STATION - UNIT NO 3 j'ACC 7 01'9 6.4.13.
Compaction :
reasonably uniform within any one layer over entire.rea.
- 6. 4. l'4 All layers t e compacted to full width.
6.4.15 In restricec areas, fill does.not contain material greater char. chree inches in size.
N.
6.4.16 Reasonable c.re is taken to protect waterproofing 3
membrane boc ds.
W j
6.4.17 Backfill pla ed against waterproofing membrane boards do contain c y particle greater than 15 inch in size.
B
~6.4.18 No fill is p aced during heavy rain or on top of or m,
W into a pool f water.
b 6.4.19 Material has beert compacted until the specified density h
is obtained ad verified by in-place density testing.
2g 6.4.20 Surface of f 11 areas to be.aloped to effect drainage away from bu iding and into site drainage pattern.
3 Low areas to be pu= ped if required.
m
.h 6.5 Soils Laboratorv ti S
The following functie: s are perfor[ned by the soils laboratory g
staff under the dirac ion of the Quality Control Civil Supervisor.
g' 6.5.1 Testing mate:ials to be u' sed as backfills to determine 3
their suitab.lity; borrow materials are sampled and 8
gradation an: compaction tests performed to determine m;
the moisture-lensity' relationships with respect to the E
specified st;idards.
H 6.5.2 Performing g: Idation tests (including moisture content determinatiots) on the materials from the work points
~
m.
in the borrot and stockpile' areas or out of' delivery p
trucks to de' traine their suitability for use in the compacted bac: fill. -
6.5.3.
Testing mater.als being used as " test fill" to establish the optimum rimber.of passes of the compactor to obtain the retuired density.
6.5.4 Performing fi :ld density moisture and gradatis.n tests on materials ' rom the compacted backfill in accordance with the spec.fications to assure the suitability of the materials and their, proper compaction.
+
F0101 NO. A!;P-III-1-4 (10-13-75)
l.
ECASCO S~.nVICCS INCOn:VKATED 40.
CCIP -2 l
D ISS!*E:
. MATIITORD STP.V; CI.CCTE!C STATICN - 1* NIT NO 3
- 'Act
- 4 or 9
+
6.5.5 Perfor=ing any additional tests as required to assure the adequacy of the tested =sterial as required by the specifications.
6.6 Soil Testing All soil testing shall be conducted in accordance with the drawings, specifications and applicable codes and procedures. Verificatica of
~
soil testing shall be indicated on the for=s listed belev for each fill at each elevation for each shift.
M 6.6.1 Test Fills - These tests shall be run in acccrdance with h
Section 6.1 of this procedure and recorded en the appropriate u
forms.
g 6'.6.2 Material Acceptance - These tests shall be run in accordance
$l3 with Section 6.2.3 of this procedure and results recorded on Foru QCIP-2-1.
h 6.6.3 Excavated and stripped areas - These tests shall be run g
in accordance with Section 6.3 of this procedure and g3 recorded on the appropriate farms.
m S
6.6.4 In Place Density Tests (Barrev-Agee Iabs Test Fer=s. OCIP-2-3) x a) One test for every 20,000 ft.
or less of Class A 2
wT material placed.
8 b) One test'for every 40,000 ft.
or less of Class B material placed.
5 h
6.6.5 I.aboratory Testing (Barrov-Ages, I. abs. Ferns, QCI?-2-3) 8 m;
a) One 3 point Proctor Test and Gradation Test for every E
10 in place densities.
s b) m.
One 5 point Proctor Test and Gradation Test for every 100 in place densities.
z.
g O
c) One 6 point Proctor, one Cradation, and 3 sets of Mm*"--Minimun Relative Density Tests to be run,cn E
site (Proctor and Gradation) and off site (all tests) for every 200.in place densities.
6.7
- DocuNntation and Uprk Acceptance
- All docunentation concerning each fill shall be forwarded to the Ebasco Senior Quality Control Supervisor upon its completion for final work acceptance.
The documentation reviewed for the.
acceptance of each fill shall include the following for=s when applicable.
6.7.1 Material Acceptance Inspection Forn No. QCIP-2-1.
%m
... - - ~.,
.s
-~ ~
e,--
FOICI NO. ASP-III-1-4 (10-13-75)
l.
D:!d;CO SEn'.'ICC:: INCOllPO!:AT13)
'30 OCTP-2
' ISSUl::
D UATI:GFORD STC.*J! 1 LI:CTRIC STATION - UNIT NO 3 l'Ac t : n 01' o 6.7.2 Excavation and Stripping Form No. QCIP-2-2.
6.7.3 Daily Backfill Inspection Report Form No. QCIP-2-3.
6.7.4 So'il testing fore.s including In Place Density, Proctor.
and Gradation Test Summary forms in accordance with Peabody Services testing procedure.
6.7.5 At the completion of this review a Backfill Acceptance Form No. QCIP-2-4 shall be issued. If all areas of the work are in accordance with the drawings and W:
specifications, this form shall be signed by the Senior h
Quality Control Supervisor or.his inspector attached to the forms listed above and filed by Ebasco.
If any g
of the areas reviewed indicates a nonconformance to w
the specifications, the remedial action required shall 88 3
be noted on this form by the Senior Quality Contr.ol W
h Supervisor or his inspector and the form then forwarded back to the responsible party for correction. This g
procedure shall continue until all areas are acceptable o
at which time the form shall be signed and filed.
g v
7.0 ATTACHMENTS m
S
=
7.1 Form No. QCIP-2-1, Borrow Material Inspection Report
- 3..
M:
y 7.2 Form No. QCIP-2-2, Excavation and Stripping Inspection Report S
7.3 Form No. QCIP-2-3, Daily Backfill Inspection Report 2
7.4 Form No..QCIP-2-4, Backfill Acceptance Report g-8 v}E H
E E'
S
!2sk 1
~
FORM NO. ASP-III-1-4 (10-13-75)
t EBASCO SERVICES INCORPORATED WATERFORD U:11T No. 3 1
.EORRO*.1 MATERIAL INSPECTION REPORT l
Q. C. Inspector Date 1
1.
!!sterial Location: Truck Borrow Pit Other 2.
Material to be Placed on Fill No.
El.
Reject Accept
- See Comments 4
3.
Visual Inspection 4.
Moisture Content Check: Test No.
Result 5.
Gradation Check: Test No.
Result i
Comments:
i I
. Borrow Material Acceptable-as Class A Fill Q'. C. Signature' Data Form No. QCIP-2-1 (6/16/76) 4
~
~
Form No. OCT!'-2-2 4
N 6/16/76 EBASCO SERVICES INCORPORATED WATERFORD UNIT NO. 3 EXCAVATION AND STRIPPINC INSP!"CTION REPORT Q. C. Inspector Date Fill Location El.
Accept Reject See Comments BASE 1.
Drainage Conditions:
2.
Regrading Of Base To Provide Adequate Drainage:
\\
3.
Composition Of Base Material:
4.
Stripping Of Objectionable Materials On Surface:
S.
Moisture Content of Base Material: Test No.
Test Resylt 6.
Moisture Content Of Reworked Or Replaced Base Material:
Test No.
Test Result t
7.
Base Density:
8.
Proof compaction Performed Properly If Required:
SLOPES 4
9.
Stripping of Slopes:
Comments:
i i
Base and Slopes Acceptable For Backfill:
e,,.
,.m
4 s u... ~.,_,
6/16/76 EBASCO SERVICES INCORPORATED WATERFORD UNIT NO. 3 i
DAILY BACKTILL INSPECTION REPORT i
Q. C. Inspector Date W-1.
Fill Placement Arca/ Location El.
I 2.
Fill Surface Area ft., Number of tests required: In Place Density Gradation Proctor Special 3.
Verify fill location is release for placc=ent and compaction:
Representative 4.
. Borrow material released as' backfill: P.aterial acceptable: Yes
- No 5.
Spreading and compaction equipment satisfactory: Yes No 5.
Base to receive fill properly prepared and compacted: Yes No 1.
Backfilling done in proper sequence: Yes No 1
3.
Fill material properly placed and spread to a maximum loose thickn'ess of 15 inches:
Yes No
).
Fill material disc-harrowed, if necessary: Yes No 10.
Surface of each lift reasonably smooth and free of ridges or grooves: Yes No 11.
llauling equipment using different paths:
Yes No' L2.
Surface properly treated:
Yes No
.3.
Fill junctions properly treated:
Yes No
(
i4.
Layers compacted to full width:
Yes No
.5.
Fill material not greater than 3 inches in size in restricted areas:
Yes No
.6.
Fill thickness not greater than 6 inches in the loose state in restricted areas: Yes No___.
.7.
Waterproofing membrane protected during backfilling operations:
Yes No
.8.
Backfill placed against waterproofing membrana contains no particles larger than, inch:
Yes No
.9.
No fill placed during heavy rain or on top of or into standing water:
Yes No
'In Place Density Yes No ND.
Material testing is properly performed:
Lab Tests Yes No Not Required Special Test's Yes No Not Required 1
- Comments: -
~~~ ' - ~ ~~ ~
~-
~
1 Backfilling Operations Acecptable:
,~
s-,
e
8-20-/ei EBAF.C0 SET 31CC" I!'CORl' ORATED WATERTORD tJ::IT NO. 3 r
EAC :FILt. ACCT.PTA :CE ntPORT 6 Inspactor Date L cation:
El-Reject Accent See Co.t:nts.
Matarial Acceptance Testing (Form QCIP-1):
Excavation And Stripping Testing (Form QCIP-2):
)
Brckfill Construction (Form QCIP-3):
Lcboratory Testing (Barrow-Agee Test Form):
ents:
L Accepted:
Q. C. Signature pa a 9'
i-r - i i nim mas i d