o' ,

.- 3

~. , ,

o Procedure No. . W-SITP-8 EBASCO SERVICES INCORPORATED J. A. JONES CONSTRUCTION COMPANY 8

QUALITY ASSURANCE ,,

SITE INSPECTION AND TEST PROCEDURE ENGINEERING

~

FOR This Document is:

gRev.ewed Witneut Comments WATERSTOP INSPECT 10N O Rev.ewea wien comments es Noted; incorporate Comments, and Roswomat:Procaca With ceder.

C Rejected; Revise and Resubmit NOTE:

Revrew 'of this document, with or witnout comments. is for osneret coneorm.nc. w,in tne .omeeie specifications only and in no v.ay re:esves

' WATERFORD SES UNIT NO. 3 ,,..,,, ,the,om manufacturer

,,,, ,e,oo nsor ec,,.>,

i,,,,

CONTRACT NO. W3-NY l+ aa"v-v o' e" mat *ia's. *avia ment, services anc cocumentation in strect accoroence w,th tne Pur.

Q e Date: J/8/76 ENGINEERING CONSTRUCTION QUALITY ASSURANCE DATE REVIEWED BY DATE APPROVED BY DATE REV. DATE REVIEWED BY O r e/r.s/rr n/b ' u lo/uhr $m ld If7i A JEll ^^A "l'YlM'

  • l Nh 5'd/ ~
, * /c)s7/75 AM ll 7 m 7

$ lYlh5 W b 1///yl7f N w ll r \ ci a a > ll /

3 w ns Bad, sekt ita ' sd> f#pgML.nz. '

() ' /

9

, '-hv,v1 Or iteUNMnitON ACT REQUEST

. 34-*fr 8506220167 850222 t V

PDR FOIA GARDEB4-455 PDR .

6 &

, _ _ .- _ _ . . . ,.._,,.m.,, . . _ . . . - , - , , - . . , , - , . - _ _ - ~

v t t

J. A. JONES CONSTRUCTION COMPANY PAGE1 0F 3 PROCEDURE NO.

SITE INSPECTION AND TEST PROCEDURE:

W-SITP-8 REV. NO. 3 TITLE: WATERSTOP INSPECTION DATE: 2 02-78 PROJECT TITL::: WATERFORD SES UNIT NO. 3 CD NTRACT NO. W3-NY-4 t

1.0 PURPOSE To, specify the inspections and examinations that will be performed by J. A. Jones quality Assurance personnel to assure that waterstops are in accordance with contract drawings and specifications.

2.0 SCOPE This procedure covers the handling and Installation of waterstops for Waterford SES Unit No. 3, Phase I, Concrete Construction.

3.0 REFERENCES

3.1 Ebasco Services, Inc. Specification No. LOU-1564.476, latest

- revi sion, "Wate Stops". .

3.2 J. A. Jones Construction Work Procedure No. W-WP-8, " Handling and installation of Waterstops".

4.0 RESPONSIBILITIES 4.1 Ebasco is responsible for supplying factory spliced waterstops and the materials for field made splices, with the proper certifications as required by Reference 3.1.

4.2 J. A. Jones is responsible for the proper handling, splicer train-Ing, splicing and installation of waterstops..as required by Reference 3.1 and 3 2 and in accordance with approved construction drawings. J. A. Jones is also responsible for field testing in

accordance with Reference 3.1.

4.3 J. A. Jones Engineering and Construction Supervisory personnel are responsible to train the craftsman (splicer), who will be making production splices prior to the performance of the work.

J. A. Jones Engineering and Construction Supervisory personnel are 4.4 responsible to complete and main.tain all records as required by Reference 3 2.

i .

, , , , . , , . , _ _ ,,_,m.w _. _.,.y,,,_.. _ _ , _-,,m_,.,.-,, , , . - . . , , . , , , , , _ _ _ ,m_,,.w_, ._% __,, ,, __ ,, y. _ --_-_w_ . - ~ , . , , , - ..-,,,_,,,..e,

c.

e J. A. JONCS CONSTRUCTION COMPANY PAGE 2 OF 3 PROCEDURE NO.

SITE INSFECTION AND TEST PROCEDURE: W-S IT P-8 REV. NO. 3 TITLE: WATERSTOP lNSPECTION

, DATE: 20278 PROJECT TITLE: WATERFORD SES UNIT NO. 3 CONTRACT NO. W3-NY-4 4.5 J. A. Jones quality Assurance personnel are responsible to assure compilance with this procedure and Reference 3.2. Also, to assure that only trained personnel (craftsmen) are used for making job-made splices.

5.0 DEFINITIONS 5.1 Waterstops - A continuous sheet of matenal designed to bridge across either a closed or an open joint Ir, concrete to prevent the passage of water through the joint.

5.2 Test Unit - Shall be as defined in Reference 3.1.

6.0 INSPECTION 6.1 The assigned quality Verification Inspector (s) shall, as a .

minimum, perform and document the following inspections.

6.1.1 Assure that only trained splicers are used for making job-made splices.

6.1.2 Assure that the proper equipment is used for making splices and that the equipment is in good working condition.

6.1.3 Assure that splice joint configuration Is correct.

6.1.4 Assure that the technique specified in Paragraphs 9.3, 9.4 '

and 9.5 of Reference 3.2 for joining. is followed by craftsmen. i Assure that factory-made waterstops, job-made waterstops,

~

6.1.5 splices and waterstop materials are handledl in such a manner as to prevent damage.or contamination from deleterous materials.

6.1.6 Assure that waterstops are Installed in accordance with l

l approved construction drawings.

6.1.7 Assure that the testing frequency specified in Paragraph

7 0 below is complied with.

l

, _ . , . - - - , - - ____- , , ,,,e ,,,,,_7__.,7__,wr_, - - _ _,, p..._,, , _ - - , - , - - , - _ _ , , . . ,

9 -...--.__-m., .,_%. ..w,% %

b PAGE 3 0F 3 J. A. J0: CONSTRUCTION COM"ANY PROCEDURE NO.

SITE IFSPECTION AND TEST PROCEDURE:

W-SITP-8 REV. NO. 3 DATE: 2-02-78 TITLE: WATERSTOP INSPECTION WATERFORD SES UNIT NO. 3 CONTRACT No. W3-NY-4 PROJECT TITLE:

7.0 TESTING Test units shall be made to meet the following requirements:

7.1 Three (3) test units shall be made by each splicer for qualifica-tion.

In addition, one (1) test unit shall be made if there is reason to question the quality of work or as may be deemed necessary by Ebasco.

7.2 One (1) test unit shall be made for each ten (10) field splices.

7.3 Test units may be taken from splices made as production splices or from a companion splice placed alongside the actual waterstop to be used for the sole purpose of obtaining test samples. Companion splices shall be made under actual field conditions.

7.4 The assigned Quality Verificat' ion Inspector (s) shall identify the test splice with the splicer's Ji A. Jones badge number and assure delivery to the testing agency. .

7.5 J. A. J'ones shall furnish Ebasco one (1) copy of the test data report. J. A. Jones will document the acceptabi,lity of job-made waterstop splices on the Waterstop Splice log, Attachment 9.1.

8.0 RECORDS AND DOCUMENTATION 8.1 The assigned Quality Verification Inspector (s) shall perform the inspections listed Paragraph 6.0 and record the information on Attachment 9.1, Waterstop Splice Log.

t 8.2 All records, upon completion of the work or as otherwise specified, will be turned over to the Ebasco Quality Assurance Supervisor

) for the purchaser's records.

9.0 ATTACmiENT 9.1 Waterstop Splice Log (Form No. W-SITP-8.1) 4 9

i

l 1

. 8

. f P o  % T S I T S -

N -

E W .

t M e M o e O .

h C N ..

S m r

o F

N EO A CI I T .

LA PC SO L

s s

i n SD O r N n EE u TCT e e

t3 .G SI P O ELE n . L TPC SC S uO A E l

N' E I C Y LT I UI L MN P

  • I U S S N NO .P O D O OR O I EE N LO T TCT F S CI P 5R R ULE EE E DPC NT T OSC OA 4 R A S E JW W P V w e

A M w

J m

, e ce i c l l pi S p

- S e n c oni i ol ti p cnS ua d pt oms roe . e PCT

=

PCT

~

s l

i a ER t CE i I B n LM i PU 1 SN d

9 n a

t s '

n re S e or 'R S

m t u ct E h ea CD c pn a sg I I L t .

t P t ni *. O

\ I S S i