Rev 2 to Nuclear Project Operating Procedure POP-N-702, Personnel Training,Qualification & Certification
ML20127C156
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/05/1976
From: Wilson L
J.A. JONES CONSTRUCTION CO.
To:
Shared Package
ML17198A241 List: ... further results
References
FOIA-84-455 POP-N-702, NUDOCS 8506220157
Download: ML20127C156 (7)


Text

e N .

s .

J. A. JONES CONSTRUCTION COMPANY s

CORPORATE STANDARD NUCLEAR PROJECT OPERATING PROCEDURES Modified to Fit Waterford Unit 3 Concrete Phase 1 Construction Contract No. W3-NY-4 F/ g

  • /0 coq

%22l3

%0

  • ar, '

( FREEDOM OF INFORMATION P0P-N-702 ACT REQUEST

' PERSONNEL TRAINING, QUALIFICATION AND CERTIFICATION N LI7ot 8506220157 850222 '

PDR FOIA GARDE 84-455 PDR

\ .

_,_,_m.'.

"^4--"'~-* '*-*-

-e v --- - - - - - - - - - , - - , ---,v.- - ----

d.A. JONES CONSTRUCTION COMPANY Page 1 of 6; PROCEDURE NO.

NUCLEAR PROJECT OPERATING PROCEDURE POP.N -702

. TITLE OF PROCEDURE: Issue Date:

PERSONNEL TRAINING, QUALIFICATION AND' CERTIFICATION 10/15/75 PROJECT TITLE:

Rev. No. & Date:

WATERFORD UNIT NO. 3, PHASE I CONCRETE CONSTRUCTION Revision 2 PREPARED BY: DATE 3/5/"/6 -

APPROVED 8Y:

  1. j M

ATE L. R. Wilson 12/2/74 j, g,}\* ,

PROJ;,MGR' ag gg, gfgg,

~

1.0 PURPOSE 1.1 This procedure defines the methods of training, qualifying, and certifying personnel performing inspection, examinations and testing of designed quality items.

2.0 SCOPE 2.1 The requirements of this procedure apply to those personnel who perform inspections, test'and nondestructive. examinations that assure the quality of nuclear power plants during construction.

3.0 DEFINITIONS 3.1 Certification (Personnel): The action of determining, verifying

  • and attesting in writing to the qualifications of personnel.

3.2 Examination

An element of inspection consisting of investigation

-of materials, components, supplies or services to determine con-formance to those specified requirements which can be determined by such investigation. Examination is usually nondestructive and includes simple physical manipulation, gaging, and measurement.

3.3 Inspection

A phase of quality assurance which, by means of exami-4tation, observation or measurement, determines the conformance of materials, suppliers, components, parts, appurtenance, system pro-cesses or structures to predetermined quality requirements.

3.4 Qualifications

The characteristics or abilities gained through education, training and experience that enable an individual to perform a required function.

3.5 Testing

The determination or verification of the capability of an

-item to meet specified r'equirements by subjecting the item to set

  • of physical, chemical, environmental or operating conditions.

FORM NO. 1122 06 JUNE '74

- ~ -.. a.-- '

_ . . . . . . - .~ - . .

. ,r--.- - - - - - . __#-. 7- - , , . . , _ . . . , . . .

3 - .

m 1

J.A. JONES CON,STRUCTION COMPANY Page 2 of 6 NUCLEAR PROJECT OPERATING PROCEDURE '

POP.N -702 TITLE OF PROCEDURE: lssue Date:

PERSONNEL TRAINING,-QUALIFICATION AND CERTIFICATION 10/15/75 PROJECT TITLE: Rev. No. & Date:

WATERFORD UNIT NO. 3, PHASE I CONCRETE CONSTRUCTION

/ 6 l

4.0 REFERENCES

4.1 Qualification and Certification of Personnel, POP-N-505. -

4.2 Indoctrination and Training, P0P-N-605.

4.3 J. A. Jones Construction Company's, ',' Quality Assurance Personnel Training and Certification Program.",

4.4 ANSI N45.2.6, " Qualifications of Inspection, Ixamination, and Testing Personnel for the Construction Phase of Nuclear Power Plants." .

5.0 GENERAL

. 5.1 The Project Quality Assurance Manager shall evaluate and determine the need for formal training of quality assurance personnel assigned to the construction phase of nuclear projects.

5.2 The Project Quality Assurance Manager shall assure an adequate num-ber of personnel are trained and certified to perform the required inspections, examinations and tests as reflected by the project

,, work schedule in accordance with this procedure.

53 All quality assurance personnel assigned .to a project shall be ,

Indoctrinated and trained in the project requirements and the J. A.

' Jones safety program by Industrial Relations in.accordance with P0P-N-605, " Indoctrination and Training."

5.4 Construction personnel performing special processes, proof and operational checkout test shall be trained, qualified and certified in accordance with POP-N-505, " Qualification and Certification of Personnel." -

'R-2 .5. 5 Quality Assurance personnel verifying that work activities conform to quality requirements, shall be certified by the J. A. Jones Cor-

.porate Quality Assurance Training Office and/or the Project Quality Assurance Manager as being qualified to perform his assigned task D in accordance with this procedure. The Project Quality Assurance Manager shall assure the initial and continued proficiency of quality assurance personnel by appropriate education, training,

. . expe ri ence, testing, evaluation and periodic reviews in accordance with the requirements of Reference '4.4; FORM NO. 1122 06 JUNE ~74

. . - ...-.3 . ... ,_ ..,,,..,....

. ...2 ....... ...

. ._-.~......--'-..-..--- . . _ . . . .

~

I 4

J.A. JONES CONSTRUCTION COMPANY Page 3 of 6.

- PROCEDURE NO.

WUCLEAR PROJECT OPERATING PROCEDURE

, POP.N -702 l TITLE OF PROCEDURE: Issue Date:

PERSONNEL TRAINING, QUALIFICATION AND CERTIFICATION 10/15/75 PROJECT TITLE: Rev. No. & Date:

WATERFORD UNIT NO. 3, PHASE I CONCRETE CONSTRUCTION 5' "'

3 76 i 5.6 Quality Assurance personnel involved in the performance evaluation -

and/or supervision of nondestructive examination shall be certifled in accordance with the requirements specified in SNT-TC-1A., "Re-commended Practices for Nondestructive Testing Personnel Qualifica-tion and Certification."

57 The extent to which the individual requirements of this procedure

. apply will depend upon the importanc'e, nature and scope of the work to which the individual is assigned. The requi rements are to

.be applied, as appropriate, to both the selection and utilization of these personnel.

5.8 it is the responsibility of the Project Quality Assurance Manager

.an d his Supervisors to assure that personnel selected and assigned

.to their respective groups, meet the requirements of this pro-

-cedure prior to performing Quality Assurance inspection, examina-

, tion and testing activities.

6.0 PROCEDURE .

. 6.1 Selection of Quality Assurance personnel:

6.1.1 The Project QA Manager with the assistance of his QA Super-visors shall evaluate and review the qualifications of and select Quality Assurance personnel. To the extent possible

.. Quality Assurance personnel shall be selected for their sknowledge of QA principles and practices, past experience.

training and education for the primary construction disci-pline and activities to which they will be assigned.

6.2 Project Indoctrination:

6.2.1- All new project Quality Assurance personnel shall attend the Industrial Relation Project Indoctrination and Training session. .

6.2.2 Quality Assurance Supervisors shall assure that their as-

~

signed personnel are indoctrinated in the project QA pro-gram, QA principles and practices, applicable codes, stan-

.dard procedure methods and instructions prior to any work

  • activity assignment where these requirements are applicable.

FORM NO 3122 06 JUNE '74 ,

'...._.7..._....

7-. , , - - . _ , , , , , , . _ -.--.--,n-

~

J.A. JONES CONSTRUCTION COMPANY Page 4 of 6 PROCEDURE NO.

NUCLEAR PROJECT OPERATING PROCEDURE POP.N -702 TITLE OF PROCEDURE: Issue Date:

PERSONNEL TRAINING,-QUALIFICATION AND CERTIFICATION 10/15/75 PROJECT TITLE: Rev. No. & Date:

WATERFORD UNIT NO. 3, PHASE I CONCRETE CONSTRUCTION 3[5/76

6.3 Qualifications

The following requirements are considered minimum capabilities

. required to perform quality assurance functions.

6.3.1 All Training and Certification shall be in accordance with

Reference 4.3 6.3.2 All personnel performing nondestructive examinations shall

.be quallfled and certified in accordance with SNT-TC-1A,

-applicable for the technique and methods used.

4.3 3 ' Personnel performing inspections of structural, civil,

. mechanical, electrical and instrumentation systems shall

.-wiemonstrate capability or proficiency to the satisfaction of the Project Quality Assurance Manager or his subordinate supervisors. .

6.4 Training of Quality Assurance personnel shall be provided for by 1

. the Project Quality Assurance Manager, in conjunction with and assis-4ance by the Corporate Quality Assurance Department.'

4.4.1 Training shall be formal (classroom study) or informal (on

.the job, home study) at the discretion of the Project

, r. Quality Assurance Manager.

3 dote: Nondestructive examination personnel shall be train-ed and quali fled in accordance wi th SNT-TC-1 A. -

.6.4.2 Formal training courses shall be a minimum of 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> in l

, . length and may be presented in hourly sessions.

Blote: Formal training courses, developed in complex areas, d

shall be based on: 1

% Job. description (fu..ctional) of the position

~-The objective of the' course l

-The probable " entry level" skills of the participants l l

.A course outline providing a means of fulfilling the )

stated objectives. .

I

. l

)

FORM NO.1122 0G JUNE ~74 ,

J l

_ ~ . . .- .._..-m.., . - - . . , _ _ . . _ . . _ . _ - _ . , _ . - . -

~ '

t J.A. JONES CONSTRUCTION COMPANY Page 5 of 6 i

PROCEDURE NO.

NUCLEAR PROJECT OPERATING PROCEDURE .*

POP.N-702 TITLE OF PROCEDURE: Issue Date:

PERSONNEL TRAINING. QUALIFICATION AND CERTIFICATION 10/15/75 PROJECT TITLE:

Rev. No. & Date:

1/ATERFORD UNIT NO. 3, PHASE I CONCRETE CONSTRUCTION Revis ion 2 3/5/76-6.4.3 Informal training may be combined with formal training or '

may be utilized to increase an individual's proficiency -

In a specific area.

'6.4.4 The appilcability of formal versus informal training pro-grams is determined through comparing the individual's previous education and experi,ence and his level of com-potence, as evidenced through oral examination during inter-view, references by previous employers, and certificates from training and educational institutions with the require-ments'of the position.

6.4.5 Formal training courses shall be supported by attendance records, lecture outlines, course objectives and test results.

-6.4.6 Successful participants shall be certified by the J. A. ,

Jones Corporate Quality Assurance Training Office and/or

f the Project Quality Assurance Manager in the areas covered by the course. .

6.4.7 All Individuals shall successfully complete an examination of the same type and degree as the formal course partici-pants prior to being certified in a given area.

7.0 QUALITY ASSU;.~ CE

  • See Procedure above.

8.0 RECORDS AND REPORTS R-2 8.1 Individual records of qualification and certification training shall contain:

8.1.1 Positlon descrlption. .

8.1.2 Individual's Personal Resume, ,

.-8.1 3 Listing of Special Training Courses Attended. . '

't 8.1.4 Copy of Speclal Train'ing Course Examination.

l FORM NO 1122-06 JUhE '74

.e+- r

. e+.e. . .- **"

a6

--~e-- - - - - , -- ---m--,,e---e . - - . - , ,

i

^

.s 4 4 .

J.A. JONES CO,NSTRUCTION COMPANY Page 6 of 6 PROCEDURE NO.

NUCLEAR PROJECT OPERATING PROCEDURE POPeN 702 TITLE OF PROCEDURE: Issue Date:

PERSONNEL TRAINING, QUALIFICATION AND CERTIFICATION 10/15/75 PROJECT TITLE: Rev. No. & Date:

Revision 2 WATERFORD SES UNIT NO. 3. PHASE I, CONCRETE CONSTRUCTION 3/5/76 8.1.5 Copy of Certificate of Completion for each course attended.

8.1.6 Letter of Certification Indicating level of certification.

8.1.7 Copies of Special Process Test and Certification Record.

8.1.8 Appiicable Physical Examination Records e

o e

e 8

e e

e 4

e em FORM NO. 1122 06 JUNE '74

..- - . - . - . - . . . - . . . . . . . . - . - - . -- .. .. -- -.- - - ; -- *-. -- - - - . -.- ' ~ ~

- '~