J.A. JONES CONSTRUCTION CO.
To:
Shared Package
ML17198A241 List: ... further results
References
FOIA-84-455 POP-N-702, NUDOCS 8506220153
Download: ML20127C140 (6)


Text

-

e .

6 .\ . . .

~

J. A. JONES CONSTRUCTION COMPANY CORPORATE STANDARD NUCLEAR PROJECT OPERATING PROCEDURES Modified to Fit Waterford Unit 3 Concrete Phase I Construction Contract No. W3-NY-4 FREEL>OM OF INFORMATKM ACT REQUEST SV- vsf Cfle6 P0P-N-702 PERSONNEL TRAINING, QUALIFICATION AND CERTIFICATION 8506220153 850222 PDR FOIA

.. GARDE 84-455 PDR _ _.

o m -. t .

J.A. JONES CONSTRUCTION COMPANY Page 1 of 5 PROCEDURE NO.

NUCLEAR PROJECT OPERATING PROCEDURE POP N -702 TITLE OF PROCEDURE: , issue Date:

PERSONNEL TRAINING, QUALIFICATION AND CERTIFICATION '

10/15/75 PROJECT TITLE: Rev. No. & Date; WATERFORD UNIT NO. 3, PHASE I CONCRETE CONSTRUCTION Revision 1 1/15/76 PREPARED BY; DATE APPROVED BY:,

  • . DATE L. R. Wilson PROJ MGR' /-6" M 12/2/74 g { {i og gg, j/,rf,y, 1.0 PURPOSE 1.1 This procedure defines the methods of training, qualifying, and cartifying personnel performing inspectlon, examinations and testing of designed quality items. -

2.0 SCOPE 2.1 The requirements of this procedure apply to.those personnel who perform inspections, test and nondestructive examinations that assure the quality of auclear power plants during construction.

3.0 DEFINITIONS 31 Certification (Personnel): The action of determining, verifying and attesting in writing to the qualifications of personnel.

~

3.2 Examination

An element of Inspection consisting of investigation of materials, components', supplies or services to determine con-formance to those specified requirements which can be determined by such investigation. Examination is usually nondestructive and includes simple physical manipulation, gaging, and measurement..

3.3 Inspection

A ' phase of quality assurance which, by means of exami-nation, obseryation or measurement, determines the conformance of materials, siippliers, components, parts, appurtenance, system pro-cesses or structures to predetermined quality requirements.

3.4 Qualifications

The characteristics or abilities gained through education, training and experience thac enable an individual to '

perform a required function.

35 Testing: The determination or verification of the capability of an item to meet speciflied requirements by subjecting the item to set '

of physical, chemical, environmental or operating conditions.

FORM NO. 1122 06 JUNE '74

a j.' '

J.A. JONES CONS'7RUCTION COMPANY Page 2 of 5 i PROCEDURE NO.

f NUCLEAR PROJECT OPERATING PROCEDURE p ,

TITLE OF PROCEDURE: Issue Date; PERSONNEL TAAINING. QUALIFICATION AND CERTIFICATION 10/15/75 PROJECT TITLE: Rev. No. & Date:

WATERFORD UNIT NO. 3. PHASE I CONCRETE CONSTRUCTION "I

4.0 REFERENCES

i E

, ,, 4.1 Qualification and Certification of Personnel, IbOP-N-505.

4.2 Indoctrination and Traini g, P0P-N-605. ,

4.3 J. A. Jones Construction Company's, " Quality Assurance Personnel Tralriing and Certification Program."

t 4.4 ANS J N45 2.6, " Qualifications of Inspection, Examination, and

, , Test,ing Personnel for the Construction Phase of Nuclear Power

  • Plants."

5.0 j CENERAL i

5.1 The Project Quality Assurance Manager shall evaluate and determine the need for formal training of quality assurance personnel assigned to the construction phase of nuclear projects. '

5.2 The Project Quality Assurance Manager shal t assure an adequate num-

[t ber of personnel are trained and certifled to perform the required inspections, examinations and tests as reflected by the project

., work schedule in accordance with this procedure. ..

~

5.3 A}l qua'lity assurance personnel assigned to a project shall be Indoctrinated and trained in the project requirements and the J. A.

Jones safety program by industrial Relations in accordance with P0P-N-605, " Indoctrination and ITraintrig."

r

, 5.4 Construction personnel performing special processes, proof and i

operational checkout test shall be tralned, quallfled and certified in accordance with POP-N-505, " Qualification and Certification of Personne1."

5.5 Quality Assurance personnel verifying that work activities conform to quality requirements

  • shall be certified by the J. A. Jones Cor-porate Quality Assurance Training Office and/or the Project Quality Assurance Manager as being quallfled to perform his assigned task D

in accordance with this procedure. The Project Quality Assurance Manager shall assure the Initial and continued proficiency of '

quality assurance personnel by appropriate education, training, experience, testing, evaluation and periodic reviews.

Fo#M 880 ll22 0e JU8e('74

  • - ~ ~ *~~'*A-'-~~~----

--( . . . . - --

e m

J.A. JONES CONSTRUCTION COMPANY Page 3 of 5 PROCEDURE NO.

NUCLEAR PROJECT OPERATING PROCEDURE POP N -702 TITLE OF PROCEDURE: Issue Date:

PERSONNEL TRAINING, QUALIFICATION AND CERTIFICATION 10/15/75 PROJECT TITLE: Rev No. & Date:

WATERFORD UNIT NO. 3, PHASE I CONCRETE CONSTRUCTION ev s n1 5.6 Quality Assurance personnel involved in the performance evaluation and/or supervision of nondestructive examination shall be certified in accordance with the requirements specified in SNT-TC-I A, "Re-commended Practices for Nondestructive' Testing Personnel Quali fica-tion and Certification."

57 The extent to which the individual requirements of this procedure apply will depend upon the importance, nature and scope of the work to which the Individual is assigned. The requirements are to be applied, as appropriate, to both the selection and utilization of these personnel .

5.8 it is the responsibility of the Project Quality Assurance Manager and his Supervisors to assure that personnel selected and assigned to their respective groups, meet the requirements of this pro-cedure prior to performing quality Assurance inspection, examina-tion and testing activities.

6.0 PROCEDURE .

, 6.1 Selection of Quality Assurance personnel:

6.1.1 The Project QA Manager with the assistance of his QA Super-visors shall evaluate and review the qualifications of and, select Quality Assurance personnel. To the extent possible Quality Assurance personnel shall be selected for their knowledge of QA principles and practices, past experience, training and education for the primary construction disci-pline and activities to which they will be assigned.

6.2 Project Indoctrination:

i.

6.2.1- All new project Quality Assurance personnel shall attend the industrial Relation' Project Indoctrination and Training ses s ion.

6.2.1 Quality Assurance Supervisors shall assure that their as-signed personnel are Indoctrinated in the project QA pro-gram, QA principles and practices, applicable codes, stan-dard procedure methods and Instructions prior to any work activity assignment where these requirements are applicable.

FCNIM NO. 1122 06 JUNE *74 .

- _ =-. - . - - _ .

/

. . l-m ^

J.A. JONES CONSTROCTION COMPANY Page 4 of 5 PROCEDURE NO.

NUCLEAR PROJECT OPERATING PROCEDURE POP N -702 i TITLE OF PROCEDURE: Issue Date:

PERSONNEL TRAINING, QUALIFICATION AND' CERTIFICATION 10/15/75 (8ROJECT TITLE: Rev. No. & Date:

WATERFORD UNIT NO. 3,' PNASE 1 CONCRETE , CONSTRUCTION

6.3 Qualifications

The. following requirements are considered minimum capabilities required to perform quality assurance 'functions. ,

6.3.1 All Training and Certification shall be in.accordance w(th Reference 4.3 ,

6.3.2 All personnel performing nondestructive examinations shall be qualified'and certified in accordance with SNT-TC-1 A, applicable for the technique and methods used.

6.3.3 Personnel performing inspections of structural, civil,-

mechanical, electrical and instrumentation systems shall demonstrate capability or proficiency to the satisfaction of the Project Quality Assurance Manager or his subordinate

, supervisors.

6.4 Training of Quality Assurance personnel shall be provided for by the Project Quality Assurance Manager, in conjunction with and assis-tance by the Corporate quality Assurance Department. -

6.4.1 Training hall be formal (classroom study) or informal (on the job, home study) at the discretion of the Project Quality Assurance Manager. ,

Note: Nondestructive examination personnel shall be train-ed and qudlified in accordance with SNT-TC-1 A.

6.4.2 Formal training courses shall be a minimum of 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> in length and may be/presested in hourly sessions.

Note: Formal training ecurses, developed in complex areas, shall be baseL on:

The job description (functionel) of the position The objective of the course r The probable " entry level',' skills of the participants A course outline providing a means of fulfilling the stated objectives.

-1' FORM NO. 1122 06 JUNE '74 5

, , _ , . _ . . - . . . .. . . - ~ == ~ ~ ~ ~

d

. . - - _ _ _ _ _ . - -. ..- _ _ _ . .~

4 . . . . . . . . . . . - - - - - . - . . . . . . . . . - - . . - - - . . - - - . - - . - . . . - -- - - -

e . .

. . 7 '

J.A. JONES CONSTRUCTION COMPANY Page 5 of 5 PROCEDURE NO.

NUCLEAR PROJECT OPERATING PROCEDURE POP.N- 702 TITLE OF PROCEDURE: Issue Date:

PERSONNEL TRAINING, QUALIFICATION AND CERTIFICATION 10/15/75 PROJECT TITLE: Rev. Nc. & Date:

Revision 1 WATERFORD UNIT NO, 3, PHASE I CONCRETE CONSTRUCTION 1/15/76 6.4.3 Informal training may be combined with formal training or

. 'may be utilized to increase an individual's proficiency in a specific area.

6.4.4 The applicability of formal versus informal training pro-grams is determined through comparing the individual's previous education and experience and his level of com-potence, as evidenced through oral examination during inter- l view, references by previous employers, and certificates '

from training and educational institutions with the require-ments of the position.

l 6.4.5 Formal training courses shall be supported by attendance records, lecture outlines, course objectives and test results.

6.4.6 Successful participants shall be certified by the J. A.

Jones Corporate Quality Assurance Training Office and/or I

$ the Project Quality Assurance Manager in the areas covered by the course.

6.4.7 All Individuals shall successfully complete an examination t of the same type and degree as the formal course partici-pants prior to being certified in a given area.

7.0 QUALITY ASSURANCE See Procedure above.

8.0 RECORDS AND REPORTS

., 8.1 Individual records of qualification and certification training shall.be maintained by the Site Quality Assurance Department.

FORM NO 1122 06 JUNE '74 t