MONTHYEARML20217K9011999-10-18018 October 1999 Proposed Tech Specs 3.6.2.2 Loc,Allowing Plant to Operate with Two Independent Trains of Containment Cooling, Consisting of One Fan Cooler Per Train,Operable During Modes 1,2,3 & 4 ML20211F5501999-08-24024 August 1999 Proposed Tech Specs Page Xviii, Index Administrative Controls, Originally Submitted with TS Change Request NPF-38-220 ML20211F3701999-08-24024 August 1999 Proposed Tech Specs,Revising Efas,Originally Submitted on 980702 as TS Change Request NPF-38-207 ML20210M9681999-08-0404 August 1999 Existing & Proposed marked-up TS Pages Modifying TS 3.5.2 by Extending AOT to Seven Days for One LPSI Train Inoperable & AOT of 72 Hours Imposed for Other Conditions ML20210M9861999-08-0404 August 1999 Existing & Proposed TS Pages Modifying TS 3.5.2 by Extending AOT to Seven Days for One HPSI Train Inoperable & TS 3.5.3, Changing end-state to Hot Shutdown with at Least One Operable Shutdown ML20210H1771999-07-29029 July 1999 Proposed Tech Specs 3.8.1.1 Re EDG AOT Increase from 72 H to Ten Days ML20210H2371999-07-29029 July 1999 Proposed Tech Specs 3.6.2.1 Extending Allowable Outage Time to Seven Days for One Containment Spray Sys Train Inoperable ML20210B3411999-07-19019 July 1999 Proposed Tech Specs 4.5.2.f.2,increasing Performance Requirement for LPSI Pumps ML20210D0521999-07-15015 July 1999 Proposed Tech Specs Creating New TS for Feedwater Isolation Valves ML20210D1071999-07-15015 July 1999 Proposed Tech Specs Adding TS Bases Control Program to TS Administrative Controls Section & Correcting Editorial Error Identified in TS Following Issuance of Amend 146,dtd 981019 ML20209H3191999-07-15015 July 1999 Proposed Tech Specs Pages Modifying TS 3/4.4.8.1,Figures 3.4-2 & 3.4-3 to Extend RCS Pressure Temperature Curves to 20 EFPY ML20209D4091999-07-0707 July 1999 Proposed Tech Specs,Revising Actions 19 & 20 for Table 3.3-3 for Functional Unit 7 Emergency Feedwater, Items B & C,Per 980702 TS Change Request NPF-38-207 ML20196E9971999-05-24024 May 1999 Rev 3 to NTP-203, Emergency Plan Training ML20195B1811999-05-20020 May 1999 Proposed Tech Specs Changes to Bases B 3/4.3.1 & 3/4.3.2, B 3/4.6.3,B 3/4.7.1.2 & B 3/4.7.12 ML20204H2591999-03-16016 March 1999 Rev 0 to STD-100-237, Procedure for Modification of RCS Pressure Boundary for Installation of Mechanical Nozzle Seal Assemblies (Mnsa) for Waterford Nuclear Generating Station Unit 3 ML20204H2511999-03-16016 March 1999 Rev 1 to C-NOME-EP-0189, Engineering Procedure for Installation of Mechanical Nozzle Seal Assemblies for Waterford 3 ML20203C4891999-02-0505 February 1999 Proposed Revised Tech Specs Pages 3/4 3-12a & B 3/4 3-1a Re Reactor Trip Circuit Breaker Surveillance Interval Extension ML20199D9851999-01-12012 January 1999 Proposed Tech Specs,Adding Requirement That CR Intake Monitors Be Operable & SRs Be Applicable During Movement of Irradiated Fuel ML20199E0861999-01-12012 January 1999 Proposed Tech Specs Re Rev 1 for TS Change Request NPF-38-174 ML20198G2401998-12-23023 December 1998 Proposed Tech Specs,Modifying LCO for 3.3.3.7.1 for Chlorine Detection Sys by Changing Alarm/Trip Setpoint from 3 Ppm to 2 Ppm ML20196D2181998-11-30030 November 1998 Proposed Tech Specs Pages 3/4 8-8,3/4 9-8,3/4 9-9 & B 3/4 9-2,revised for Consistency Between Action Statements & NUREG-1432,Rev 1, Std Tech Specs for CE Plants ML20154E4171998-10-0606 October 1998 Proposed Tech Specs Pages Re TS Change Request NPF-38-212, Modifying Requirement to Perform Mtc Test Near End of Each Cycle ML20154E1141998-10-0101 October 1998 Proposed Tech Specs Modifying TS 3.3.3.7.3 & SR 4.3.3.7.3 for Broad Range Gas Sys ML20153D5771998-09-23023 September 1998 Proposed Tech Specs Revising Description Re Reactor Power Input Used by Operating Bypass Permissive & Trip Enable of 10-4% Bistable ML20153B4441998-09-18018 September 1998 Proposed Tech Specs Modifying Notes in Tables 2.2-1 & 3.3-1 Re Reactor Protective Instrumentation ML20151W5971998-09-11011 September 1998 Proposed Tech Specs Re Notes in Table 2.2-1 Re Reactor Protective Instrumentation Trip Setpoints Limits & Table 3.3-1 Re Reactor Protective Instrumentation ML20237A7921998-08-12012 August 1998 Proposed Tech Specs,Increasing Max Boron Concentration in SITs & Rwsp from 2300 Ppm to 2900 Ppm ML20236U7361998-07-29029 July 1998 Proposed Tech Specs Pages Revising TS 6.9.1.11.1 to Replace Ref to Abb Combustion Engineering SBLOCA ECCS Performance Evaluation Model ML20236H1501998-07-0202 July 1998 Proposed Tech Specs Section 3/4.3.2,adding Restriction on Period of Time Channel of Efas Instrumentation Can Remain in Tripped Condition ML20249C8321998-06-29029 June 1998 Proposed Tech Specs 3.7.6.1,3.7.6.2,3.7.6.3,3.7.6.4 & 3.7.6.5,revising Control Room Ventilation to Be Consistent w/NUREG-1432 ML20249C7901998-06-29029 June 1998 Proposed Tech Specs Adding Footnote to Action Statements to Allow CR Ventilation Sys to Be Unisolated Periodically Under Administrative Controls ML20249A3101998-06-12012 June 1998 Proposed Tech Specs Pages,Adding Footnote to TS Refueling Operations,Surveillance Requirements 4.9.7.2,to Effect Limited Deviation to Allow Crane Main Hook Electrical Interlocks to Be Replaced W/Administrative Controls ML20248B7611998-05-28028 May 1998 Proposed TS Pages Supporting Change to TS 3.7.1.2, Surveillance Requirement 4.7.1.2 & Bases for Emergency Feedwater Sys ML20248H7871998-05-25025 May 1998 Rev 1 to Waterford Unit 3 Second Interval ISI Plan ML20247P2431998-05-21021 May 1998 Proposed Tech Specs Re Design Feature Suppl ML20217P8411998-05-0101 May 1998 Rev TS Pages Changing Actions Required Should Channel of Recirculation Actuation Signal (RAS) Be Placed in Tripped Condition,Replacing TS Pages Submitted in 970603 Submittal ML20217L9971998-04-30030 April 1998 Small Break LOCA ECCS Performance Analysis Using Abb/Ce Suppl 2 Model ML20217D5181998-03-25025 March 1998 Proposed TS 3.9.8.1,3.9.8.2,TS Action 3.9.8.2a,3.8.1.2 & Bases 3/4.9.8 ML20198R3081998-01-21021 January 1998 Errata to Proposed TS Change Request NPF-38-196 Which Changed TS 3.1.1.1,3.1.1.2,3.10.1 & Figure 3.1.-1 by Removing Cycle Dependent B Concentration & Boration Flow Rate from Action Statements ML20198R1251998-01-21021 January 1998 Corrections to Proposed Tech Spec 3/4.1 Re Reactivity Control Sys ML20197C6431997-12-22022 December 1997 Proposed Tech Specs Page Supplementing TS Change Request NPF-38-186,by Retaining Operations Superintendent in Paragraph 6.2.2.f of Administrative Controls Section ML20202C2911997-12-0101 December 1997 Rev 0 to Pump & Valve Inservice Test Plan for Second 10-Yr Interval. Page 23 of Incoming Submittal Not Included ML20199A0011997-11-13013 November 1997 Errata to Proposed Tech Specs Change Request NPF-38-193, Replacing Pages 13 Through 21 ML20199A1101997-11-13013 November 1997 Proposed Tech Specs,Modifying 6.8.4.a, Primary Coolant Sources Outside Containment to Add Portions of Containment Vacuum Relief Sys & Primary Sampling Sys to Program ML20217M0221997-10-28028 October 1997 Rev 8 to RW-001-210, Process Control Program ML20217H5931997-10-14014 October 1997 Revised Page of App B of FOL, Environ Protection Plan (Nonradiological) ML20217G2421997-10-0707 October 1997 Proposed Tech Specs Modifying 3.3.3.7.3 & Surveillance Requirement 4.3.3.7.3 for Broad Range Gas Detection Sys ML20211F8141997-09-25025 September 1997 Proposed Tech Specs Pages Modifying LCO 3.6.1.2, Containment Leakage, Associated Action & SR 4.6.1.2 ML20141G7131997-07-0707 July 1997 Proposed Tech Specs Expanding Applicability of TS 3.7.1.3 to Include Mode 4 Operational Requirements & Maintains 91 Percent Minimum Condensate Storage Pool Level Previously Requested for Modes 1,2 & 3 ML20141D8551997-06-26026 June 1997 Proposed Tech Specs Revising TS Tables 3.7-1 & 3.7-2 by Changing MSSVs Orifice Size from 26 Inches to 28.27 Inches & Relocating Orifice Size from TS to TS Bases 1999-08-04
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20196E9971999-05-24024 May 1999 Rev 3 to NTP-203, Emergency Plan Training ML20204H2591999-03-16016 March 1999 Rev 0 to STD-100-237, Procedure for Modification of RCS Pressure Boundary for Installation of Mechanical Nozzle Seal Assemblies (Mnsa) for Waterford Nuclear Generating Station Unit 3 ML20204H2511999-03-16016 March 1999 Rev 1 to C-NOME-EP-0189, Engineering Procedure for Installation of Mechanical Nozzle Seal Assemblies for Waterford 3 ML20248H7871998-05-25025 May 1998 Rev 1 to Waterford Unit 3 Second Interval ISI Plan ML20202C2911997-12-0101 December 1997 Rev 0 to Pump & Valve Inservice Test Plan for Second 10-Yr Interval. Page 23 of Incoming Submittal Not Included ML20217M0221997-10-28028 October 1997 Rev 8 to RW-001-210, Process Control Program ML20217H5931997-10-14014 October 1997 Revised Page of App B of FOL, Environ Protection Plan (Nonradiological) ML20141B0441997-05-0808 May 1997 Performance Improvement Plan ML20138D8951996-10-0606 October 1996 Rev 5 to Odcm ML20117A5681996-07-28028 July 1996 Ldcr 97-0047-Location of Cabinets C-3A(B) & C-4 Outside Cvas Boundary - Rev 1 ML20116B1441996-04-17017 April 1996 Rev 6 to Procedure NTC-216, Emergency Plan Training Initial ML20116B1531996-04-17017 April 1996 Training Course Description Emergency Plan Continuing Training ML20138D8891996-01-11011 January 1996 Rev 7 to RW-001-210, Process Control Program ML20086C0191995-05-31031 May 1995 Basement Monitoring Program Rept 6 ML20070P8701994-02-17017 February 1994 Rev 7,change 5 to Waterford III Pump & Valve IST Plan ML20056F2061993-08-19019 August 1993 Rev 7,Change 4 of Waterford Unit 3 IST Plan for Pumps & Valves ML20118A7181992-09-16016 September 1992 Rev 5 to Waterford 3 Steam Electric Station 10-Yr Inservice Insp Program,First Interval ML20114C7711992-06-12012 June 1992 Rev 2 to Administrative Procedure UNT-005-014, Odcm ML20101B8321992-05-29029 May 1992 EDG Reliability Program Description & Comparison W/Nrc Reg Guide 1.155,Section 1.2 ML20141M4281991-06-21021 June 1991 Rev 1 to Technical Procedure UNT-005-021, Safety-Related Radioactive Matl & Radioactive Sources Purchase,Receiving, Surveying,Opening & Disposal ML20058P1191991-06-14014 June 1991 Mgt Manual Vol IV to Site Policy W1.501, Quality Reporting ML20141M4271991-05-25025 May 1991 Rev 4 to Administrative Procedure UNT-005-001, Safety- Related Waste Mgt & Control ML20141M4251991-04-25025 April 1991 Rev 7 to Technical Procedure HP-001-152, Safety-Related Marking,Handling & Storage of Radioactive Matl ML20141M4241991-01-0404 January 1991 Rev 1 to Technical Procedure HP-002-223, Waste Monitoring ML20065N7561990-08-24024 August 1990 Rev 4 to Administrative Procedure RW-001-210, Process Control Program ML20059A5631990-08-13013 August 1990 Rev 4 to 10-Yr Inservice Insp Program First Interval 1985-1995 ML20065N7481990-08-0303 August 1990 Rev 0 to UNT-005-014, Odcm ML20116B1221989-12-11011 December 1989 Rev 2 to Nuclear Training Procedure NTP-203, Emergency Plan Training ML19325E4681989-10-31031 October 1989 Summary of Change 2 to Rev 6 to Pump & Valve Inservice Test Plan. ML20246E0171989-08-0404 August 1989 Change 1 to Rev 6 of Pump & Valve Inservice Test Plan ML20245D0161989-06-19019 June 1989 Change 1 to Rev 5 of Pump & Valve Inservice Test Plan ML20082M2781989-05-0909 May 1989 Rev 3 to Administrative Procedure RW-1-210, Process Control Program ML20195H9271988-11-18018 November 1988 Rev 0 to UNT-5-013, Administrative Procedure Fire Protection Program ML20154S1941988-09-22022 September 1988 Rev 6 to Pump & Valve Inservice Test Plan ML20154B3761988-05-11011 May 1988 Rev 0 to Procedure OP-100-012, Post-Trip Review ML20238D0091987-12-0707 December 1987 Rev 2.1 to Nuclear Operations Procedure NOP-003, Records Mgt Sys ML20195G9331987-12-0101 December 1987 NSID-TB-87-11, Westinghouse Circuit Breakers Type Ds/Dsl: Welds on Breaker Pole Shaft ML20236L3341987-10-15015 October 1987 Rev 3 to 10-Yr Inservice Insp Program Waterford Steam Electric Station Unit 3 ML20082M2731987-07-10010 July 1987 Rev 2 to Administrative Procedure RW-1-210, Process Control Program ML20147D7981987-07-0707 July 1987 Rev 6 to Surveillance Procedure HP-1-230, Offsite Dose Calculation Manual ML20235G6051987-06-30030 June 1987 Functional Design Spec for SPDS Enhancement Program ML20238D0271987-06-26026 June 1987 Rev 1 to Radwaste Dept Administrative Procedure RW-1-200, Record Preparation,Filing & Storage ML20234B0171987-06-26026 June 1987 Rev 1 to Nuclear Plant Island Structure Basemat Surveillance Program ML20238D0251987-06-24024 June 1987 Rev 0 to Maint Departmental Procedure MD-1-008, Collection & Transmittal of Maint Records & Documents ML20216E8321987-06-12012 June 1987 Public Version of Emergency Plan Implementing Procedures, Including Rev 7 to EP-2-052, Protective Action Guidelines & Rev 10 to EP-2-060, Radiological Field Monitoring ML20238D0151987-01-14014 January 1987 Rev 2 to QA Procedure QAP-010, QA Records ML20114B7241986-09-20020 September 1986 Rev 5 to Technical Procedure RW-2-200, Packaging Radioactive Solid Waste (DAW) for Dispsosal ML20206D4681986-06-16016 June 1986 Rev 2 to 10-Yr Inservice Insp Program ML20151Z0521986-01-31031 January 1986 Rev 3 to CEN-39(A)-NP, CPC Protection Algorithm Software Change Procedure ML20151Z0641986-01-31031 January 1986 Rev 0 to CEN-323-NP Reload Data Block Constant Installation Guidelines 1999-05-24
[Table view] |
Text
.-
o %_ .,
.g .
J. A. JONES CONSTRUCTION C0f tPANY CORPOPATE STANDARD NUCLEAR PROJECT OPERATif G PROCED'JRE
,.; >,0 yodified to Fit Waterford Unit 3
' ' .Y E,8
- . '* - Goncrete Phase I Construction
, '? r V 4(
.- ENG!NERM _
. Contract No. W3-NY-4 00 Cunt m G"" " 5, C'
,14 p DEC 1 N
-- ig;yMENT W
. - 40 *T888E age
'9 '
Tt/,CorETf5 -
T/0 cor.5NTS /> -
C.'CS CONSI. CO. 75 317 7.:J2cT2D - CONTROLLED DOCUMEllI ST2L" I3/
1, 9/.:3Q -
SEI NO.
< ,. ,in .-
a,,47t: // /xW i ,
f.,,Q:}
'] POP-N-605
{l s ./ INDOCTRINATION AND TRAINING - ,
_a
FREEDOM OF iMATM ACT REQUEST e50622o149 850222
$SRDE8 55 PDR U-4TT kPl ..
, . ~ . - - - - - - . , , - - - , - - - - - - - -e--
q
}. ' , . , ;.
t J.A. JONES CONSTRUCTION COMPANY Page 1 of 5 PROCEDURENO.
NUCLEAR PROJECT OPERATING PROCEOURE POP tJ - 605 TITLE OF PROCEDURE:
Issue Date:
IMDOCTRINATION AND TRAINING 10/15/75 PROJECT TITLE: Rw. No. & Date:
REVISION O -
UATERFORD UNIT #3 PHASE 01, CONCRETE CONSTRUCTIO:: 10/15/75 PREPARED BY: DATE APPROVED BY- - - , DATE L! R. Wilson 8/27/74
'N
,$h% _-
PROJ. MGR. ,## *2+ ~.7J cA McR. /c/z..-p V
~
1.0 Purpose
.:.l.1 This procedure specifies the requirements for '""
,- indoctrination and training of riewly employed -
E' ~
' <'personnel. ..- ? I '. .
" ~-
b:
' ' J:
. .c.
3,'l
2.1 This procedure applies to the Indoctrination and Training of J. A. Jones Personnej. associated with the. fabrication, j assembly, installation, erection, maintenance and repair i of components, systems and structures of Nuclear Power
. Plants. .
3.0 Definitions
'i None -
4.0
References:
~
- s *.
4.1 "Organizatiori and Responsibilities", POP-N-100. -
4.2 " Safety and Fire Protection", POP-N-602..
. . . . .' :. a*
4.3 " Personnel", POP-N-603. ,., ,
~
+
~
4.4 "First Aid", P'OP-N-604. .
7 4.5 " Quality Assurance Program and Organization", POP-N-700.
.~.
~
5.0 General
5.1 All personnel employed by J. A. Jones' at the project
' site shall receive basic indoctrination in tha general Safety Requirements and proce61res, Quality Assurance
, Requirements, project housekeeping and fire protection site. -
1
- l FORM #10. I122 06 JUNE 74 - . .
i
.f,(( * *
] f
'b }' . . . ,
. . .- t
,.y ;
J.A. JONES CONSTRUCTION COMPANY page 2 of 5 e *
. PROOECUAE NO. i NUCLEAR PROJECT OPERATINO PROCEDURE p _
j TITLE OF PROCEDURE: Issue Date:
INDOCTRINATION AND TRAINING 10/15/75- -
I PROJECT TITLE: Rev. No. & Date; j WATERFORD UNIT #3 PHASE #1, CONCRETE COiSTRUCTION h7 5.2 All n'on-manual personnel shall receive basic *
- indoctrination in J. A. Jones policies and procedures, company benefits and programs, and special project -
information or requirements in addition to para. 5.1.
h 5.3 Industrial Relations shall coordinata and davalop -
i , ' specific training programs that are required to .
.ij develop tha technical capabilities of personnal. ,
. ..- n- . !
.,'. , ,3g> e ,
,i
6.0 Procedure
' 8*
- . ,' . ' . .c.
.:. .. ,(. *
' 6.1 Industrial Relations will coordinata tha frequency
. v, and time of Indoctrination meetings. The threa phases j 7- 'F o'f indoctrination will.be designed, and revised as -
j .. ,
' required, to acquaint new employaas with. tha employer,,
the project, the work., and applicabla rules and regula-
, ( ,
4,?, ,
. tions. The indoctrination process will be coordinated ,
j ' with personnel, first aid, and timekeeping requirements j . . to assure prompt and orderly processing of new employans.
l .
1 6.1. l' Primary indoctrI. nation will fall into thase.
categories , .
'6.1.1.1 Salar'iad-Exempt personnel will raciava
. . . indoctrination from tha head of tha
,)
l .
1 Industrial Relations' Department to
. include tha following: .
/ '
e Re-location information and '
' .' A
+
' .i ' coordination. ' '
~
. , . ?.
- , . ,.. w ... .
l ,- ( .s . . , ' . , , ;- D
- e Company banafits and programs. '
>.c..
i
.o speci.al'or project information ,
- ..I .
and requirements.
.,- . w, l .
'g
-8 *
5
& . g. .
j .
y l ronM NO.11:2 06 JUNE '74 ,
,--y-_.-. ,,,.m.,-,n #._.,m__ - _ _ , , _ , , ,,_ - . . _ . _....m,m,.m,,,,_,,. _.t.. _.r, ,__,_.-__m._,,~.,,,,,_..m ,.._,,__,__-m .
rjg ,
' ~ ' "[' " "
! ,t . .
- .F e .
p Y- J.A. JONES CONSTRUCTION CO.*APANY Patre 3 of 5 PRCOEQURE NO. '
/ , NUCt. EAR PROJECT OPERATING PROCEDURE L- -
POP.N - 605 !
issus Date: l TITLE OF PROCEDURE:
INDOCTRINATION AMD TRAINIMp, 10/15/75. - _.
PHOJECT TITLE:
Rev. tio. & Cate:
I, UATERFORD UNIT #3 PHASE #1, CONCRETE CONSTRUCTION /15 5 ,
- i. '
6.1.1.2 Non-manual and non-ev.empt salaried'or l
hourly personnel will receive indoctrina-
. tion from the Personnel Section or the
'l Industrial Relations Department Head to
." <.. include:
.f, @"' e Policies and procedures.
e' Company benefits and programs. .
1 y
- Special or project information e
.. .and requirements. . .
.; All employees will receive a Safety 6.1.1.3 !
Orientation indoctrination from the j .
Safety Department which shall include:
w- ' .
o Project ruleh and brief introduction !
i . . . .to the project.
Safety rules and requirements, tha
~
e i
safety program, and fire protaction
,. : ' procedure. *
~r: * ". e j .
Emergency procedures and plans. .
Requir,ements for personal protective
! - . e
- safety' equipment such as hard hats, eye protection, ear protection, and l.' . othr protective devices. ,
l ,
r, i -
~
Specific' indoctrination will fall into these j --
6.1.2 " '
b ,> .
c,ategories: .
s.o.
e .
V 1*
. $ g i '
c L/ '
4 l . .
\
q . ,
f v-,, .,-.,--.,,,---n--,.e,,,,.wn,-,,.,._,_,,,,,-n,-e ,--,- _ m n _ n - - ,,, -.---,w.- .pm,----,-,.- --.
1 -
- i. ., .. -
7;. ..
- o , .
J.A. JONES CONSTRUCTION COMPANY paa 4 of 5 NUCt. EAR PROJECT OPERATING PROCEDURE POP.n - 605 TITLE OF PROCEDUAE: Issue Dme:
INDOCTRINATICN AND TRAINING 10/15/75 ,
PROJECT TITLE: . . Rev. No. C4 Date:
/ Revision 0 UATERFORD UNIT #3 PIIASE d'll CONCRETE CONSTRUCTION 10/15/75 6.1.2.1 Salaried-e.E.empt. personne1, immediately after processing, will have their particular duties explained by their
,- . department head who will also indoc-
.. .- trinate them concerning specific Quality
'.y -
- 2. ,
- Assurance, safety, or other requirements *
. of the area or department.
. :' s
- 1'
- 6.1.2.2 . Non-manual and non-exempt salaried *or
,- .~ '
hourly personnel, immediately after processing, will receive indoctrination
. . as to duties, specific Qual-ity Assurance, and safety responsibilities from their section supervisor.
6.1.2.3 Manual employees will receive specific
' instruction as to duties, Quality Assurance, and safety requirements ,
immediately upon arriving at their assignsd work area by their immediate '
, , ',- supervisor.
" 6.1. 3 Follow-up indoctrination sessions will be
- conducted by those supervisors set forth. in
, paragraph'6.1.2 above and will consist of a brief review of safety' rules, Quality Assurance requirements and'o;;her items mentioned initially.
At this session,'qu'stions e are to be solicited relative to any areas of uncertainty the employee
/ may have. This session is to'take place during J' - ..
the third week of employment. ,
t y *.* l' t. .
\ .
FOHM 140,1122 06 JUNE '74 -
~ m ., - _..____m _.-,_r_____ _ , , _ _ _ ,_ _ _ _ . _ . . , _ _ , _ _ . _ _
1 . .
.y. . -
J.A. JONES CONSTRUCTION COMPANY p ., ,, , q ,g q r- PR CECURE NO.
NUCLEAR PROJECT OPERATING PROCEDURE POP N - 605 TITLE OF PROCEDURE: Issue Date; INDOCTRINATION AND TRAINING 10/15/75 ' -
PROJECT TITLE: . IIev. No. & Date; Revision 0 UATERFORD UNIT #3 PHASE #1, CONCRETE CONSTRUCTION 10/15/75 6.2 Industrial Relations shall assist in conducting the indoctrination sessions. Special indoctrinations may be developed and implemented if necessitated by local conditions.
- h'. .
6.3.1 Industrial Relutions shall take the action
- - ,1 necessary to support established apprenticeship training programs.
, 6.3.2 In the event apprenticeship training. programs are not established, Industrial Relations, through
,s ' Personnel, shall seek semi-skilled individuals-to work as helpers and receive on-the-job training in selected skills.
- 6.3.3 Key' Management personnel shall constantly evaa.uate subordinate employees for inherent
. potential and will develop, for employees with.
potential, on-the-job, formal and informal training p,rograms to increase their capacity for
,. and subsequent assumption of increasingly respon-
.ible positions.
6.3.4 Each depar.tment manager shall assure that the employees in his area of responsibility are trained in, and fam'iliar with those portions
. . of their duties impacting qualj.ty.
~
7.0 Quality Assurance: .;, . .
7.1 Qualitykssuranceshallverify, through. periodic audi.tc that employees are proficient it.that portion of thair
.- .. duties impacting quality. ,
8.0 R'ecords and Reports: '. .
8.1 Reference POP-N-603, "Pc,: sonnel".