i Procedure No. W-SITP-7 J. A. JONES CONSTRUCTION COMPANY SITE INSPECTION AND TEST PROCEDURE ,

FOR INSPECTION OF CONCRETE PLACING, CURING, FINISHING AND REPAIR I

! WATERFORD SES UNIT NO. 3 '

I CONTRACT NO. W3-NY-4 ENGINEERING CONSTRUCTION QUALITY ASSURANCE REV. DATE REVIEVED BY DATE REVIEWED BY DATE . APitROVED BY DATE O 'I* N'10 Wkh >>Jsclu Y /m //brbr & //

l /$'0 76 O /k *- > 11khr $W l.2lfbc hh5

, Z S~7*7b d --D 3~/7/7G '

Wr Sffkh f76 I

! IETEG

" / CC fiUT3 g!; cr..

.. r:3 [ -

- - 1 a.v- ' 3 ,,, , ,, e

' ~

4A/

CL:00 C[' c]s af w .- .

  1. FREEDOM OF INf0RMATM)N ACT REQUEST

. g y.y W e506220132 FOIA 850222 * -

PDR PDR GARDE 84- 55 pp I A I - _ . _ _ - - _ _ _ _ _ - . _ . _ _ _ - _ _ - _ . .

= .

? .

J. A. JONES CONSTRUCTION COMPANY PAGE 10F 5 SITE INSPECTION AND TEST PROCEDURE: PROCEDURE NO.

W-SITP-7 REV. NO. 2 TITLE: INSPECTION OF CONCRETE PLACING, CURING, FINISHING AND REPAIR DATE: 5/7/76 i

, PROJECT TITLE: WATERFORD SES UNIT NO. 3 CONTRACT NO. W3-NY-4 i

1.0 PURPOSE l

l To specify the surveillance and Inspection activities that will be per-I formed by J. A. Jones quality Verification personnel to assure that con-

. crete pl aci ng, curi ng, finishing and repair activities are correctly performed.

2'. 0 SCOPE

}

This procedure covers the plao4ng, curing, finishing and repair of structural concrete for Waterford .SES Unit No. 3, Phase l Concrete Construction.

3.0 - -

REFERENCES

, 3.1 .J. A. Jones Construction Work Procedure, W-WP-7, " Concrete Placing, Curing, Finishing and Repair".

I 3.2 Ebasco Specification No. LOU-1564.472, latest revision, " Concrete Placement, Curing and Finishing," as applicable.

J 3.3 ANSI N45.2.5-1974, " Supplementary quality Assurance Requirements for Installation, inspection and Testing of Structural Concrete and Structural Steel During the Construction Phase of Nuclear Power Plants".

4.0 RESPONSIBILITIES _ ,

~

4.1 The Owner is responsible for furnishing material and services as defined in the Contract. The Engineer is responsible for material receiving inspection, procedure review, testing and documentation of such tests as required.

4.2 J. A. Jones is respons,Ible for forming, placing, curing, finishing and repair of structural concrete in accordance with approved drawings, specifications and procedures.

4.3 J. A. Jones quality Verific. ..on personnel are responsible for surveillance and verification of the concrete placement, curing, finishing and repair activities conducted by J. A. Jones construc-tion personnel.

e e

.t J. A.' JONES CONSTRUCTION COMPANY PAGE 2 OF 5 SITE INSPECTION AND TEST PROCEDURE: PROCEDURE NO.

W-$1TP-7 REV. NO. 2 TITLE: INSPECTION OF CONCRETE PLACING, CURING, FINISHING AND REPAlR DATE: 5/7/76 PROJECT TITLE: WATERFORD SES UNIT NO. 3 CONTRACT N0. W3-NY-4 i

J 5.0 INSPECTION

! 51 The assigned Quality Verification inspector (s) shall, as a minimum, perform the following Inspection / verification / surveillance activities:

5.1.1- Verify that all actions listed on J. A. Jones Concrete Pre-Placement Checklist Record are satisfactorily completed and j that each blank on this form is properly signed and dated or marked "N/A" If not applicable. The inspector (s) shall in .

dicate acceptance of these actions by signing and dating the appropria'te areas of this form.

~

I R-1 5.1.2 " Deleted" -

5:13 Perform surveillance of concrete transportation to assure that means of conveyance are mortar-t'ight and will deliver the concrete without 'egregation or loss of slump.

5.1.4 Verify that concrete is placed within 60 minutes or 300 re-

. volutions, whichever occurs first, after water is added.

4 5.1.5 Perform surveillance to assure that concrete which has be-l~

. come excessively stiffened so that it cannot be placed in satisfactory condition without the addition of water is not j deposited in the work.

l 5.1.6 Perform surveillance to assura that all concrete is discharged

, vertically until the concrete comes to rest in the structures.

5.1.7 Perform surveillance of concrete deposition to' assure that concrete is deposited as.near as practicable to its final position.

5 1.8 Perform surveillance to assure that the free height of drop of concrete does not exceed five (5) feet.

. 5.1 9 Perform surveillance to assure that concrete chutes, when

! used, have slopes between I to 3 and I to 2 inclusive.

i

-..,-,.-,.,.-y- .r----7-..--.r-,.we,w--.,-,r.- -.,y-,,-.-, ,,,,--,,--r- - - , , .,_,, .--.,_.,,,-,------,e -----,-----wrw.---+--------,---e w , -

1

, i s

I

- J. A.' JONES CONSTRUCTION COMPANY PAGE 3 0F 5

\

SITE INSPECTION AND TEST PROCEDURE: PROCEDURE NO.

W-SITP-7 REV. NO. 2 TITLE: INSPECTION OF CONCRETE PLACING, CURING, FINISHING AND REPAIR DATE: 5/7/76 PROJECT TITLE: WATERFORD SES UNIT NO. 3 CONTRACT NO. W3-NY-4 R-1 5.1.10 Perform surveillance to assure that concrete is placed in accordance with the applicable J. A. Jones Concrete Pour Plan which has been reviewed by Ebasco for each specific pour.

5.1.11 Perform survelliance to assure that any tendency to segre-pation is corrected by shoveling stones into mortar, not mortar over stones.

5 1.12 Perform surveillance to assure that bedding planes of con-crate are approximately horizdntal. -

5.1.13 Perform surveillance to assure that concrete is consolidated to maximum practicable density, is free from rock pockets

~

and fits tightly against all form surfaces and embedded items.

5.1.14 Perform surveillance to assure that correct vibrators are used, i.e. Internal high-frequency type with a speed of not less than 6000 revolutions per minute.

" 5.1.15 Perform surveillance to assure that vibrators are inserted vertically at approximate two (2) foot intervals and with-drawn slowly to prevent formation of pockets and that vibra-tors are not used to transport concrete. Vibrators shall penetrate the layer being placed and the underlayer as well.

Adequate vibrating, melding and blending of succeeding batches will be assured by survelllance.

5.1.16 Perform surveillance'to assure that cdntact of vibrators with reinforcing steel is minimized and that form or surface vibrators are not used without Engineer's approval.

5.1.17 Perform surveillance to assure that stone pockets or mortar pondages are not formed. Should these occur, they will be dug out, reformed and refilled.

5.1.18 Perform surveillance to assure that the top layer of any block or any day's work is trued-up to a rectangular edging strip set horizontally in the forms and that, if work is

! suspended on any section for more than one hour, the horizon-l tal edges of the concrete next to the forms on surfaces which

! will be exposed are brought to a horizontal plane perpendi-l cular to the plane of the forms.

I i

1

~ '

J. A. JONES CONSTRUCTION COMPANY I PAGE 4 0F 5  !

SPECIAL PROCESS PROCEDURE "*

W-SITP-7 TITLE: INSPECTION OF CONCRETE PLACING, CURING, FINISHING AND REV. NO. 2 REPATR

s. DATE 577/76 l PROJECT TITLE:

WATERFORD SES UNIT NO. 3 CONTRACT NO. W3-NY-4 i

q.g 5.1.13 Should the placement of concrete be curtailed for any reason, or if the placing gets out of sequence, the Quality Verification Inspector shall test the surface i j

of .ny concrete that is suspect of setting up before i j

consolidation with fresh concrete. Testing shall be by inserting a blunt and rod into the suspected concrete sur-face at various location to assure adequate coverage of the suspected area. If the rod cannot be inserted to a depth greater than three (3) Inches the. Inspector shall notify the ConstructionlSuperintendent that a possible

.-cold joint condition exists, continued placement shall Alscontinue, and action must be taken in accordance with paragraphs 3.4, 7.13.4.3, and 7.13.4.4 of J. A. Jones

.alork Procedure W-WP-7 " Concrete Placing, Curing, Finishing and Repairs". Form, W-SITP-7.1 shall be used to completely sfocument the above inspection, which shall include area

, Mfected, batch number of epoxy used, etc.

.5.1.20 Perform surveillance to assure that wash water is removed

, in a manner to prev.ent staining of exposed surfaces.

' 5.1.21 Verify that, except for slip forming, each placement, in 4

multiple lift work is allowed to sit for at least 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> aprior to start of a subsequent placement.

2 5.1.22 Perform surveillance that all curing of concrete is*done

~ by continuous maintenance of water on all exposed surfaces

-unless otherwise approved by the Engineer. *

'5.1.23 Verify that curing temperature'Is maintained above 50 F and "that

~leastconcrete the first is seven maintained in a moist condition for at (7) das after placement. Curing Information shall be recorded on Attachment C.

5.'1.24 Perform surve'lliance to assure that concrete repair and finishing is performed in accordance with approved specifi-

, cations procedures and drawings.

5.1.25 Collect a copy of the concrete delivery ticket for each con-crate truck from the Ebasco QA Representative in the pouring a rea.

Tickets shall be attached to the Daily Concrete inspection Report, Reference Attachment B.

e

,-n,-.- ,--,-.,----..-.-.-,------,.,,,--,e-.--,n,,_ , ,,.--,,,-w,,, _,---w,_..ww--,

_____c.-.,,,.y,, , , , , , , , ,,,_,mm,-g--- - - , , , , , ,

  • i t, - '

.. , l s .

J. A. JONES CONSTRUCTION COMPANY PAGE SOF 5 PROCEDURE NO.

F!IE INSPECTION AND TEST PROCEDURE:

W-SITP-7 REV. NO. 2 TITLE: INSPECTION OF CONCRETE PLACING, CURING, FINISHING AND R.EPAIR DATE: 5/7/76 PROJECT TITLE: WATERFORD SES UNIT NO. 3 CONTRACT N0. W3-NY-4 .

5.1 The Quality Verification Supervisor shall, as a minimum, perform the following functions:

5.2.1 Indicate his approval of the Concrete Pre-Placement Checklist Record by dating and affixing his signature

.to'this form'. (Reference Attachment A) .

S.2.2 Act as Contrac' tor's representative in signing of Ebasco
  • Services, Inc. Pre-Placement Checklist, if requi red.

, )

5.2 3 -

Assure that the Engineer's approval has been obtained prior to the placement of any concrete and secure a copy for inclusion :In the quality Records File. .

6.0 DOCUMENTATION J. A. Jones Quality Verification personnel dill provide necessary documenta-tion by use of the following forms: ,

6.1 J. A. Jones Concrete Pre-Placanent Checklist Record.

6.2 Ebasco Pre-Placement Checklist.

6.3 J. A. Jones Concrete Inspection Report.

6.4 J. A'. Jones Curing Log. ,

70 ATTACHMENTS 7.1 J. A. Jones Concrete Pre-Placement Checkilst Record.

7.2 J. A. Jones' Daily Concrete Inspection Report. '

7.3 J. A. Jones Concrete Curing Log.

9 6

BulLDING SCH. POUR DATE

~

J. A. JONES CONSTRUCTI0ll COMPANY W-SITP-7 Attachde't n A POUR NO.

ACTUAL POUR MTE

  • IMTERFORO UNIT 110. 3 ELEV. -

COIBCRETE PRE-PLACEMENT CHECKLIST RECORO J. A. JONES SUPERVISION C0MPLETED ANO INSPECTEO

  • flame J. A. JONES ENGINEER Date Time Per Dwe & Rev . Name QUALITY VERIFICATION REfMRK$

Date Time Per Own & Rev. Name Date ilme Per 0 4 t. Rev

f. CONCRETE
a. Sandblast- . '
b. Greeneut
c. Traat. ment
2. F04;'S
e. Direision
b. Line & Grade .
c. Clean *
d. Ticht
e. Craced * *
f. Ccatin<t ,
g. Chi-fer Strips
h. Key W ys .

I. Eleck Outs s J. khalers & ,

StrenoSacks

k. L'aterstui
1. Pelease Acent *
1. RE l'IFG:tC I::G .
a. Bar Ouant i t les
b. Snc inri I
c. Elevatica
d. Cad.: eld Itapping
  • 4 E'*5 E D S
a. Q nnt i ty
b. Line & Crade
c. Elevation
d. Identification .

i GEF:E7/

. L -

a. ft nlin-<,

1

b. Instru entation
c. Weather Protection APPROVED AREA SUPERINTEN0kNT BRTE APPROVED Q. V. SUPERVISOR DRTE

. \ -

e ,

e o

l . .

l -

e .- t

s ATTACHMENT B o '
  • J. A. JONES CONSTRUCTION COMPANY f

I WATERFORD UNIT NO. 3 l l

DAILY CONCRETE INSPECTION REPORT i l

Report No: Date: Shift:

1 Quality Verification Inspector:

4 1

Placoment Area /Locatlon: *

i 4 _

j Area / Location Released 8y Engineer (Ebasco): Yes No Date: i Concrete Delivery Acceptable: Yes No Coments:

i \

i Concrete Placement Acceptable: Yes No *

Comments

i i

Consolidation Acceptable: .Yes No Coments/Resul ts :

i

, Finishing Acceptable: Yes No Comments /Results:

1 1

a Curing Acceptable: Yes No Comments:

Other Comments or Remarks

i i

Form No. W-SITP-7.1 1

}

\

. - - - - - . _ - - . . - . . . - _ , - ..--,r

, - . - - . - - , - - - , - - , _ _ , - . . . _ - , , _ _ _ , . - - _ _ . - - , , __m_-. - - _ . , , - , - . _r, . . . ~ - _