,, EBASdD SERVICES INCORPORATETL s ,

l i

.- ---- . WATERFORD STEAM EI.ECTRIC STATION - UNIT NO 3 PROCEDURE FOR: Concrete Preplacement Inspectica PROC. NO. OcTP -4 ISSUE

SUMMARY

E w

h ISSUE /DATE PREPARED APPROVED -

RDfARKS 5

A/1-25-74 J F Gregory .

(A .

14 "B" Draft d

~

Update of QC 4.0-4 u 8/22/75 , y, S B / 9 75 C. Satte le J. O. Booth 5 _-

so "C" DRAFT . ovard, Ranumbered forms and revised h 10-28-75 form " Concrete Preplacement

- Checklist Record".

E

~

C/11-29-75 kF. Howard )0- I M.

J. O. Booth Revised form " Concrete Preplace -

, ,et _ _ ment Inspection Checklist" g "D" Draft F. Howard .* To delete "the integrity of"

, 1-14-76 in Section 6.3.2.1. Revised Form No. QCIP-6-2.

? f . hU .WN

$ D/1-21-76 F. How d ,

J. O. Booth Changed " evaluate" to " inspect' g in Par. 6.3.2.1.

S "E" DRAFT F. Howard -

Revised Form No. QCIP-6-2. .

4 2-12-76 y

E/3-16-76

/4 F. Howard 7 SSM J. O. Booth

  • IM, -

"F" Draft F. Howard Revised paragraph 2.2, 5.1.1, 10-13-76 6.3.2.1 '

Added Section 8.0 f , E a

a F/11-5-76 F. Howrid W. C. Criggs T

[% 3

,fjE '#k G W 8506220130 850222 [ [ ggt PDR j hDE g,gni t

- 55 j m @

~ FRE% of NORW N ACT REQUEST FORM .. ASP-IIIf1-3. (10-13-75) ,

M -45'5" c.[ y.Iy -

o IBASCO serif 1CES INCORPORAT1r0

(

WATERFORD STEAM ELECTRIC STATION - UNIT NO 3 PROCEDURE FOR: Concrete Preplacement Inspection PROCEDURE lRDIBER:

QCIP-6 o

ISSUE

SUMMARY

f" B

Di m ISSUE /DATE PREPa_nen APPROVED . REMARKS Y s-23 '7 "G" Draft -

Revised Section 6.0 and Form E 3-22-77 S. A. Kalat QCIP-6-2.

J A.ko'tsk 142-72 W.C.Grigga[,f-- D. $ - -

x .

G/4-11-77 S. A. Kalac s

E a

E I8 tn S

m I

E E

I e

l PonM NO. ASP-III-1-3 (10-13-75) -

'I38UE:.G l . ESASCO SCRVICES INCORPORATED . NO. QCIP-6 i

- m i

. WAT /ORD STEAM ELECTRIC STATION - IT NO 3 PAGE: 1 OF 4 l g,

l 1.0 PURPOSE 1.1 This procedure is intended to be instructions for those Quality Control inspection functions which are required before placement of concrete to ensure that a quality product is obtained.

2.0 SCOPE 2.1 This procedure covers the inspection and check-off of the condition of .

the excavation, existing concrete surfaces against which concrete will l be placed, forms, placing of reinforcing steel, and placing of embedded i

items prior to final clearance for concrete placement.  ;

4 m h 2.2 The procedure includes those inspections required for release of  ;

! ******** Pl***"**** "h** ***h*' fi*-lev 81 P acement l inspection or 5w placement Designated Inspection is performed by nasco.

. m

! y

3.0 REFERENCES

! I 3.1 Ebasco Specifications LOU 1564.472 - Concrete Masonry g

} 3.2 n asco Speceifications LOU 1564.473 - Concrete Rainforcing Steel, Furnishing, Fabrication and Delivery l z u, 3.3 nasco QCIP Control of Concrete Materials and Mixes 5 3.4 nasco QCIP Receiving Inspection, Storage and Testing of Concrete i g Rainf,orcing Steel 3 v -

j 3.5 nasco QCIP Inspection of Concrete Reinforcing Steel Machanical

! - Splices (Cadwelds) 3.6 ACI Manual of Concreta Inspection 1

8 4.0 DEFINITIONS I E.

f. 4.1 None l

a

! 5.0 RESPONSIBILITT 4

Ig 5.1 The Quality Control Civil Supervisor shall be responsible for implementing 4 the requirements of this procedure.

E 5.1.1 Es shall assign Civil Inspectors to perform concrete preplacement inspection activities as defined in this procedure.

1

! 5.1.2 Re shall be responsible for reviewing test reports for acceptance.

! 5.1.3 Es shall be responsible for assuring that the inspection results are properly recorded.

! 5.1.4 He shall ensure that there are no incomplete discrepancy or l nonconformance reports pertaining to the area being prepared for j placement of concrete.

+ .

i

- - - , , - - , , , , . - , , ---..-v -----,-----------.w--a n-------.-, n.-,--~,-,,- -- .,- ...,,,-----~~-w,.- ~---~ - --=-~--

  • ' ISSUE: G l . ERASCO . SERVICES INCORPORATED . NO. QCIF-6 a n ,

. WAT. JORD STEAM ELECTRIC STATION - IT NO 3 PAGE: 2 OF 4 4,

i 5.1.5 He shall prepara Fora QCIF-6-2, Concrete Preplacement Inspection I ,

Checklist. In the preparation of this form, he shall indicate which items are not applicable and which items are to be completed by the QC Inspector and/or the Field Engineer.

4 5.2 The Quality Control Civil Engineer shall be responsible to provide )

! technical assistance to the Quality Control Civil Supervisor. l l

5.3 The Quality Control Civil Inspector reports to the Quality control Civil Supervisor and is responsible for the inspection of civil items of - I this procedure. l 5.3.1 The Quality Control Civil Inspector shall coordinate with the

, k Field F.ngineer and with inspectors of other disciplines whereas j the work is of a specialized nature.

1

  • 5.4 The Quality Control Mechanical Inspector shall be responsible for the I

W inspection of mechanical items of this procedure. ,

t i B 5.5 The Quality Control Welding Inspector shall be responsible for the 1

O inspection of mechanical splices in reinforcing steel and for the inspection of welds on embedded pipe.

u

, 5.6 The Quality Control Electrical Inspector shall be responsible for the S inspection of electrical items of this procedure.

l'

$ 5.7 The Field Engineer shall be responsible for checking line and grade.

!a 1

i 6.0 PROCEDURE I

  • E 6.1 Excavation and Foundation G 6.1.1 The Field Engineer shall ensure that the location, subgrade g elevation, and dissensions of the excavation and/or foundation i are as required by drawings. He shall also verify the location and cut-off elevation of all piles in the foundation.

} {

a G 6.1.2 The QC Civil Inspector shall ensure that the surface preparation, I

including any soil compaction tests, is in accordance with g applicable drawhss and specifications. He shall also verify the number of piles in the foundation, if any.

$i 6.2 Concrete Surfaces g G l G 6.2.1 The'QC Civil Inspector shall ensure that the underlying concrete surfaces are suitably cleaned and prepared in accordance with applicable specifications, that the surfaces are approximately level, and have been wet for a minimum of two hours prior to piscing fresh concrrM*. sad that standing water has been removed.

G 6.2.2 The QC Civil Inspector shall ensure the placement surface is

- clean of any loose asterial or debris that is detrimental to the concrete.

G 6.3 Forms  ;

+ .

  • em . . -e- . , .. . . ..

+

f

- - - - --,.,w - - , - - - , .--n-- ,.e - - - - - - - - , - - . , --,,e- , - -we w . -. e-,,-- , . - , - -- - - - - - - - - - , - - -------,.a , -w- - - - - - - , . , , , , , - , - -

ISSUE _

G l . EBASCO SERVICES INCORPORATED . NO. QCIP-6

. WAI.10RD STEAM ELECTRIC STATION - IT NO 3 PAGE: 3 OF 4 9

G 6.3.1 The Fie.1d Engineer shan ensure that the line and grade of the forms are correct, forms are adequately braced, form panels are

- properly secured to provide rigidity, and that any blockouts are I --

the correct size and at the correct location and elevation.

l G 6.3.2 The QC Civil Inspector shan ensure that the form material and i

tie rods shan be of the type required by specification, the form j joints shall be smooth, tight, and unyielding, chamfers and l

fillets are in place where required, any blockouts are of the correct dimension, and no tie wires win be showing on exposed

surfaces or joints.

mi G 6.4 Rabar G 6.4.1 The Field Engineer shan be responsible for rebar location, g quantity, and spacing.

I na G 6.4.2 The QC Civil Inspector shan ensure that the rebar is of the g correct grade and size, has correct spacing, has lap splices

' - of correct length, and that adequate concrete cover wi n exist ,

E after concrete is placed.

u lu G 6.4.3 Ma % 4c=1 Splices - The Inspector shall ensure that splicing of bars are made only at locations shown on the drawings. Mechad cal

5 splices (Cadwald) will be inspected in accordance with QCIP-9,

~ and the Inspector shall ensure that all mechanical splices have been accepted prior to placement of concrete.

E E

g G 6.5 Embedded Items 7:

3 a. The Inspector shall ensure that anchor bolts, drains, pipe sleeves, piping, conduit, viring, flashing, manhole cover framas, sumps, G instruments and other embedded items are supported and firmly braced or tied before concrete is placed. Preparation of contact surfaces

8 depends on whether or not bond with concrete is required in l g, accordance with drawings and specifications. ,

1 m l

l

[

G 6.5.1 The Field Engineer shan verify that the size, quantity, location.

and elevation setting of embedded items have been checked and are acceptable.

g G 6.5.2 Piping shan be installed complete with welded and mechanical connections made in conformance with applicable codes, specifi-

< cations, and drawing requirements.

s s 6.5.3 Electrical conduit and grounding shan as specified in the drawings.

I G 6.5.4 Anchor bolts shan be set as required by applicable drawings.

G 6.5.5 Embedded plates and sleeves shan be instaned as required by applicable drawings. .

G 6.5.6 Waterstop shan be instaned in accordance with drawing require-meats.

e 4

- - - . - . . - . . - - - - - . . ~ , . - - - , _ , ., . . . _ . ,-m_--_-,-..v-,----m,-, - - _ r._,._---.-. ,---.-% ,-%..-__-_y

' ISSUEt, G l . ERASCO SERVICES INCORPORATED . No. QCIP-6 A

. W AT. .'ORD STEAM ELECTRIC STATION - IT No 3 PAGE: 4 0F 4 4

6.6 Documentation .

l

- 6.6.1 Quality Control Documentation - A document titled Concrete '

'-- Preplacement Checklist Record, Form No. QCIP-6-1, shall be I i

i provided by the Quality Control Civil Supervisor. This card shall be maintained near the placement to provide ~a constant i

status check for cencrete placement preparations and is a l Quality Control document; it shall be signed by the Quality l Control Civil Supervisor when he is satisfied that concrete i placement may proceed. But, if placement is not made within i

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the Quality Control Civil Supervisor must again j satisfy himself that the Quality Control features for that place-i m ment have been maintained and must again sign the card.

1 6.6.2 A Concrete Preplacement Inspection Checklist Form No. QCIP-6-2, shall be completed by the QC Inspector.. Acceptance of applicable i 5

,i E items shall be indicated by initials and dates. Items which are u applicable but wnich were not inspected shall be identified by g notation "Not Inspected" in the Remarks column.

E 6.6.3 The Inspector shall report inspection discrepancies in accordance j with ASP-III-11 to the Quality Control Civil Supervisor.

] , 7.0 ATTAQIDENTS  !

i u 7.1 Form No. QCD-6-1, Concrete Preplacement Checklist Record g

W G 7.2 Form No. QCIP-6-2, Concrete Preplacement Inspection Checklist 5a '

t 8.0 INSFECTICW AND TESTING DESIGNATION -

8 G 8.1 The inspection activities required by this procedure shall be performed I8 on a 100% basis by Ebasco Quality control, under the direction of the Senior QC Supervisor.

g .

i

=

i I

l i  !

l l

l l

l -

4 E

I i . .

,O =

  • - WA.4RFORD STEAM ELECTRIC STATICN

. 1980 - 1165 .W INSTALLATION - 1: NIT No. 3

^

CONCR"tTE PRIPLACE! INT CHECKLIST RECORD I

I.ocation:

I Elevations to Placement No.

Detailed

Description:

l i .

T j .

1 . . a. .

l ,

CONTRACTCR INSPECTOR l

4 IM . .

Time Date Inc. Tina Date Inc.

l SeMblase/Greencut/Youndstion Treatmane .

Forms (Line and Gesde) '

4 Blockouts, Keys, Waterstop, etc. .

1 mainforcine Steel .

I

  • l Anchor 3elts. Embedded Steel I

l Y1=ctrical t o Hachanie:1 .

I Final Clean-up i

Emmarks:

i

! s Approved for Placing Time Date

! Contractor's Representative.

Approved for Placing Tina Data Ibasco's Q.C. Representative 4

l (see Reverse Side for Instructions) ,

j QCIF-6-1 (11-29-75) . .

l .

l

- . . _ . , , . _ _ _ - - . . _ . _ . , , _ _ , , - ,-,_-_.-.,,,m.,...w_,w..v

.m

'...' . s s l

. Location - Le.scription as to location (3 dvd 3, St=ucture, Area, etc.) l l

J.levation - Indicate eleva ion at start a=d elevation a: fi=1sh grade

. Placement No. - Self Izplanatory i

. Detailed Description - Give detailed des =ription. Use any info:mation that would best describe the placenant.

Itau (Contractor) - This space is provided for the Contractor's Construction l

! i- . _ : tative to dad d =1, time and date. "Jais sis =1fies that construe:1on is complete and that this portion is ready for final inspection.

. Item (Inspec't'or) - This space is provided for the contractor's QC Inspector to 4=4+4=1, time and date. "Q1s signifies that this portion has been inspected and found to be acceptable. If Contractor does

, net have a QA/QC program, this inspection will be perfoz=ed by

,  : Ibesco's QC.

. . e .

Bemerks - Inter.any remarks pertinent to the placement -

dpprovedforPlacing-Musthavetherequiredsignaturesasindicated7:torto

', -plaeament of concrete

. L i denaral Note - Zach space must be completed. If not applicabla, insert 3/A. If no z===rh=, insert nona. .

t

  • . g .

. L 1

9 . &

O . e. o

. .ao eee e , , , g

. . . . .. .,. e. .

o . '

  • . *j.

. se .

,. y . , .* * . r .. .

e . .. . . .. e .. .

j . . 4 .. .

I 3

. b 9

e. .*=ae a se - e eens , a e e.* *= en .p. . em .se .*
  • eems se + w am e, e.9 .Oe em ee

. - - , --- --,a- , - - -- . 7 .,__ .. - -. - ,-_. . _.__---.-~,-, _.-.-- _ - -

. e. ,. A

rAccoment tin.

+

, WF~'9 FORD STEAM ELECTRIC STATION

.. - - -' 1980 - 1165 MW INSTALLATION - UNIT NL 3

. \ CONCRETE PREPLACEMENT INSPECTION CHECELIST ITEM DESCRI? TION LOCATION , ELEVATION TO DRA*4ING NUMBER REv . , SPECIFICATION NO. REV. )

l NOMENCLATURE ACCEPTED N/A REMARKS l INI. DATE l 6.1 EXCAVATION AND FOUNDATION

.1 Location, Dimension,, Elevation, Piles (if any)

.2 Soil Base Preparation, Number of Piles (if any) /[, -

6.2 CONC 2ZTE SURFACES

.1 Surface 1 reparation, Level, Wet [

.2 Placement Arts Clean ,

6.3 FORMS

.1 Line and Grade, Bracing. r I

Rigidity, Blockouts

.2 Form Material,Tia, Forn 01.1. Blockouts,Rods, ChamfersJoints,d an '

Fillets, Tis Wiras 6.4 RIBAR

.1 Crade, Size, Location, Lap Splices, Covnrage ,

/[

.2 Men'b== 4 em i S'plices 1

6.5 EN!EDDEDIIIMS

.1 "4ocation YJantion [ ((

.2 Piping (( [

.3 E1.ctrie.1 Conduit, aroundins

///

.4 Anchor Bolts ,

.5 Emba'dded Places, Sleeves

[ ((

.6 Waterstop A //

. t - zusFECTom z.-ytxLDEFCIN111

,, FotM No. QCIP-6-2 (4-1 _ . 137['