..y.. ' ;
1
.h,-
. ". 'i[,.,, ;,* ,l
~
EBASdD SERVICES INCORPORATETL s
i s
WATERFORD STEAM EI.ECTRIC STATION - UNIT NO 3 PROCEDURE FOR:
Concrete Preplacement Inspectica PROC. NO. OcTP -4 ISSUE
SUMMARY
Ew h
ISSUE /DATE PREPARED APPROVED RDfARKS 5
(A 14 A/1-25-74 J F Gregory "B" Draft d
~
Update of QC 4.0-4 8/22/75 u
, y, S
B / 9 75 C. Satte le J. O. Booth 5
so "C" DRAFT
- ovard, Ranumbered forms and revised h
10-28-75 form " Concrete Preplacement Checklist Record".
E k
)0- I M.
~
C/11-29-75 F. Howard J. O. Booth Revised form " Concrete Preplace
,,et _ _
ment Inspection Checklist" g
"D" Draft F. Howard To delete "the integrity of" 1-14-76 in Section 6.3.2.1.
Revised Form No. QCIP-6-2.
?
f hU.WN D/1-21-76 F. How d J. O. Booth Changed " evaluate" to " inspect' in Par. 6.3.2.1.
g S
"E" DRAFT F. Howard Revised Form No. QCIP-6-2.
4 2-12-76 y
/4 SSM E/3-16-76 F. Howard 7 J. O. Booth IM, "F" Draft F. Howard Revised paragraph 2.2, 5.1.1, 10-13-76 6.3.2.1 Added Section 8.0 f,
id E
a a
F. Howr W. C. Criggs
[%
,fjE
'#k F/11-5-76 T
3 G
W 8506220130 850222
[
[
ggt hDE
- 55 PDR j
g,gni t
FRE% of NORW j
m N
FORM.. ASP-IIIf1-3. (10-13-75)
ACT REQUEST
~
M -45'5" c.[ y.Iy -
o IBASCO serif 1CES INCORPORAT1r0 WATERFORD STEAM ELECTRIC STATION - UNIT NO 3 PROCEDURE FOR:
Concrete Preplacement Inspection PROCEDURE lRDIBER:
QCIP-6 o
ISSUE
SUMMARY
f" B
Di
. REMARKS ISSUE /DATE PREPa_nen APPROVED m>
Y s-23 '7 "G" Draft Revised Section 6.0 and Form E
3-22-77 S. A. Kalat QCIP-6-2.
D. $ - -
J A.ko'tsk 142-72 W.C.Grigga[,f--
G/4-11-77 S. A. Kalac x
s E
a E
I 8
tn S.
m I
E E
I e
l PonM NO. ASP-III-1-3 (10-13-75) -
'I38UE:.G l
ESASCO SCRVICES INCORPORATED NO. QCIP-6 i
m i
. WAT /ORD STEAM ELECTRIC STATION -
IT NO 3 PAGE: 1 OF 4 l
g, l
1.0 PURPOSE 1.1 This procedure is intended to be instructions for those Quality Control inspection functions which are required before placement of concrete to ensure that a quality product is obtained.
2.0 SCOPE 2.1 This procedure covers the inspection and check-off of the condition of the excavation, existing concrete surfaces against which concrete will be placed, forms, placing of reinforcing steel, and placing of embedded items prior to final clearance for concrete placement.
i m
4 h
2.2 The procedure includes those inspections required for release of
- Pl***"**** "h** ***h*' fi*-lev 81 P acement inspection or l
5 placement Designated Inspection is performed by nasco.
w m
y
3.0 REFERENCES
I 3.1 Ebasco Specifications LOU 1564.472 - Concrete Masonry g
}
3.2 n asco Speceifications LOU 1564.473 - Concrete Rainforcing Steel, Furnishing, Fabrication and Delivery l
z u,
3.3 nasco QCIP Control of Concrete Materials and Mixes 5
3.4 nasco QCIP Receiving Inspection, Storage and Testing of Concrete i
g Rainf,orcing Steel 3
v j
3.5 nasco QCIP Inspection of Concrete Reinforcing Steel Machanical Splices (Cadwelds) 3.6 ACI Manual of Concreta Inspection 8
1 4.0 DEFINITIONS I
E.
l f.
4.1 None a
5.0 RESPONSIBILITT I
5.1 The Quality Control Civil Supervisor shall be responsible for implementing g
4 4
the requirements of this procedure.
E 5.1.1 Es shall assign Civil Inspectors to perform concrete preplacement inspection activities as defined in this procedure.
1 5.1.2 Re shall be responsible for reviewing test reports for acceptance.
5.1.3 Es shall be responsible for assuring that the inspection results are properly recorded.
5.1.4 He shall ensure that there are no incomplete discrepancy or l
nonconformance reports pertaining to the area being prepared for j
placement of concrete.
+
i
---..-v
,-----------.w--a n-------.-,
n.-,--~,-,,-
...,,,-----~~-w,.-
~---~ - --=-~--
' ISSUE:
G l
ERASCO. SERVICES INCORPORATED NO. QCIF-6 a
n
. WAT. JORD STEAM ELECTRIC STATION -
IT NO 3 PAGE: 2 OF 4 4,
i 5.1.5 He shall prepara Fora QCIF-6-2, Concrete Preplacement Inspection I
Checklist. In the preparation of this form, he shall indicate which items are not applicable and which items are to be completed by the QC Inspector and/or the Field Engineer.
4 5.2 The Quality Control Civil Engineer shall be responsible to provide
)
technical assistance to the Quality Control Civil Supervisor.
l 5.3 The Quality Control Civil Inspector reports to the Quality control Civil Supervisor and is responsible for the inspection of civil items of -
this procedure.
5.3.1 The Quality Control Civil Inspector shall coordinate with the k
Field F.ngineer and with inspectors of other disciplines whereas j
the work is of a specialized nature.
1 I
5.4 The Quality Control Mechanical Inspector shall be responsible for the W
inspection of mechanical items of this procedure.
B t
i 5.5 The Quality Control Welding Inspector shall be responsible for the O
inspection of mechanical splices in reinforcing steel and for the 1
inspection of welds on embedded pipe.
u 5.6 The Quality Control Electrical Inspector shall be responsible for the l
S inspection of electrical items of this procedure.
5.7 The Field Engineer shall be responsible for checking line and grade.
1 6.0 PROCEDURE i
a I
E 6.1 Excavation and Foundation G
6.1.1 The Field Engineer shall ensure that the location, subgrade g
elevation, and dissensions of the excavation and/or foundation i
are as required by drawings. He shall also verify the location
}
{
and cut-off elevation of all piles in the foundation.
a G
6.1.2 The QC Civil Inspector shall ensure that the surface preparation, including any soil compaction tests, is in accordance with I
g applicable drawhss and specifications. He shall also verify the number of piles in the foundation, if any.
$i g
G 6.2 Concrete Surfaces l
G 6.2.1 The'QC Civil Inspector shall ensure that the underlying concrete surfaces are suitably cleaned and prepared in accordance with applicable specifications, that the surfaces are approximately level, and have been wet for a minimum of two hours prior to piscing fresh concrrM*. sad that standing water has been removed.
G 6.2.2 The QC Civil Inspector shall ensure the placement surface is clean of any loose asterial or debris that is detrimental to the concrete.
G 6.3 Forms
+
em
-e-
+
f
--,.,w
.--n--
,.e
--,,e-
, - -we w. -.
e-,,--
,.a
-w-
ISSUE G
l.
EBASCO SERVICES INCORPORATED NO. QCIP-6
. WAI.10RD STEAM ELECTRIC STATION -
IT NO 3 PAGE: 3 OF 4 9
G 6.3.1 The Fie.1d Engineer shan ensure that the line and grade of the forms are correct, forms are adequately braced, form panels are properly secured to provide rigidity, and that any blockouts are the correct size and at the correct location and elevation.
I l
G 6.3.2 The QC Civil Inspector shan ensure that the form material and tie rods shan be of the type required by specification, the form i
j joints shall be smooth, tight, and unyielding, chamfers and fillets are in place where required, any blockouts are of the l
correct dimension, and no tie wires win be showing on exposed surfaces or joints.
mi G
6.4 Rabar G
6.4.1 The Field Engineer shan be responsible for rebar location, g
quantity, and spacing.
G 6.4.2 The QC Civil Inspector shan ensure that the rebar is of the I
na g
correct grade and size, has correct spacing, has lap splices of correct length, and that adequate concrete cover wi n exist E
after concrete is placed.
ul G
6.4.3 Ma % 4c=1 Splices - The Inspector shall ensure that splicing of bars are made only at locations shown on the drawings. Mechad cal u
5 splices (Cadwald) will be inspected in accordance with QCIP-9, and the Inspector shall ensure that all mechanical splices have
~
E been accepted prior to placement of concrete.
Eg G
6.5 Embedded Items 7:
The Inspector shall ensure that anchor bolts, drains, pipe sleeves, 3
a.
piping, conduit, viring, flashing, manhole cover framas, sumps, G
instruments and other embedded items are supported and firmly braced or tied before concrete is placed. Preparation of contact surfaces 8
depends on whether or not bond with concrete is required in l
g, accordance with drawings and specifications.
1 m
l
[
G 6.5.1 The Field Engineer shan verify that the size, quantity, location.
and elevation setting of embedded items have been checked and l
are acceptable.
G 6.5.2 Piping shan be installed complete with welded and mechanical g
connections made in conformance with applicable codes, specifi-cations, and drawing requirements.
s s 6.5.3 Electrical conduit and grounding shan as specified in the drawings.
I G
6.5.4 Anchor bolts shan be set as required by applicable drawings.
G 6.5.5 Embedded plates and sleeves shan be instaned as required by applicable drawings.
G 6.5.6 Waterstop shan be instaned in accordance with drawing require-meats.
e 4
-.. - - - - -.. ~
,-m_--_-,-..v-,----m,-, - - _
-c--- ~
r._,._---.-.
,-%..-__-_y
ISSUEt, G l
ERASCO SERVICES INCORPORATED No. QCIP-6 A
. W AT..'ORD STEAM ELECTRIC STATION -
IT No 3 PAGE: 4 0F 4 4
6.6 Documentation 6.6.1 Quality Control Documentation - A document titled Concrete l
Preplacement Checklist Record, Form No. QCIP-6-1, shall be i
i provided by the Quality Control Civil Supervisor. This card shall be maintained near the placement to provide ~a constant status check for cencrete placement preparations and is a i
l Quality Control document; it shall be signed by the Quality l
Control Civil Supervisor when he is satisfied that concrete i
placement may proceed. But, if placement is not made within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the Quality Control Civil Supervisor must again i
j satisfy himself that the Quality Control features for that place-ment have been maintained and must again sign the card.
i m
1 6.6.2 A Concrete Preplacement Inspection Checklist Form No. QCIP-6-2, i
5 shall be completed by the QC Inspector.. Acceptance of applicable
,i E
items shall be indicated by initials and dates. Items which are applicable but wnich were not inspected shall be identified by u
g notation "Not Inspected" in the Remarks column.
E 6.6.3 The Inspector shall report inspection discrepancies in accordance j
with ASP-III-11 to the Quality Control Civil Supervisor.
]
7.0 ATTAQIDENTS i
u 7.1 Form No. QCD-6-1, Concrete Preplacement Checklist Record g
W G
7.2 Form No. QCIP-6-2, Concrete Preplacement Inspection Checklist 5
8.0 INSFECTICW AND TESTING DESIGNATION t
a 8
G 8.1 The inspection activities required by this procedure shall be performed I
on a 100% basis by Ebasco Quality control, under the direction of the Senior QC Supervisor.
8 g
=
i i
I l
i l
l l
l l
4 E
___e--4---~.-,--,,-.-w-,..-.o--.,_~.
,o.
i
=
,O WA.4RFORD STEAM ELECTRIC STATICN 1980 - 1165.W INSTALLATION - 1: NIT No. 3 CONCR"tTE PRIPLACE! INT CHECKLIST RECORD
^
I.ocation:
I Elevations to Placement No.
Detailed
Description:
l i
T j
1 a.
l l
CONTRACTCR INSPECTOR IM Time Date Inc.
Tina Date Inc.
4 l
SeMblase/Greencut/Youndstion Treatmane Forms (Line and Gesde)
Blockouts, Keys, Waterstop, etc.
4 1
mainforcine Steel I
l Anchor 3elts. Embedded Steel I
l Y1=ctrical t
o Hachanie:1 I
Final Clean-up i
Emmarks:
i s
Time Date Approved for Placing Contractor's Representative.
Approved for Placing Tina Data Ibasco's Q.C. Representative 4
l (see Reverse Side for Instructions) j QCIF-6-1 (11-29-75) l l
_._.,...,_~.._,_%-.,_
,%._,_w__,
_~.--,._,_,_%,
,-,_-_.-.,,,m.,...w_,w..v
.m s
s
. Location - Le.scription as to location (3 dvd 3, St=ucture, Area, etc.)
l J.levation - Indicate eleva ion at start a=d elevation a: fi=1sh grade
. Placement No. - Self Izplanatory i
. Detailed Description - Give detailed des =ription. Use any info:mation that would best describe the placenant.
Itau (Contractor)
- This space is provided for the Contractor's Construction l
i-. _ : tative to dad d =1, time and date. "Jais sis =1fies that construe:1on is complete and that this portion is ready for final inspection.
. Item (Inspec't'or) - This space is provided for the contractor's QC Inspector to 4=4+4=1, time and date. "Q1s signifies that this portion has been inspected and found to be acceptable. If Contractor does
, net have a QA/QC program, this inspection will be perfoz=ed by
, : Ibesco's QC.
e Bemerks - Inter.any remarks pertinent to the placement dpprovedforPlacing-Musthavetherequiredsignaturesasindicated7:torto
-plaeament of concrete L
denaral Note - Zach space must be completed. If not applicabla, insert 3/A. If no i
z===rh=, insert nona.
t g
L 1
9 O
e.
o
.ao eee e
g e.
o
- j.
se
,. y.,
r...
e e
. 4..
j I
3 b
9 e.
.*=ae a
se -
e eens, a e
e.*
- = en
.p.
. em.se.*
- eems se + w am e,
e.9
.Oe em ee
--,a-7
.,__.. - -. -,-_.. _.__---.-~,-, _.-.-- _
e.
A
rAccoment tin.
WF~'9 FORD STEAM ELECTRIC STATION
+
1980 - 1165 MW INSTALLATION - UNIT NL 3
\\ CONCRETE PREPLACEMENT INSPECTION CHECELIST ITEM DESCRI? TION LOCATION,
ELEVATION TO DRA*4ING NUMBER REv.,
SPECIFICATION NO.
REV.
NOMENCLATURE ACCEPTED N/A REMARKS l
INI.
DATE 6.1 EXCAVATION AND FOUNDATION
.1 Location, Dimension,, Elevation, Piles (if any)
.2 Soil Base Preparation, Number of
/[, -
Piles (if any) 6.2 CONC 2ZTE SURFACES
.1 Surface 1 reparation, Level, Wet
[
.2 Placement Arts Clean 6.3 FORMS
.1 Line and Grade, Bracing.
r I
Rigidity, Blockouts Form Material,Tia, Rods, Joints,d
.2 Forn 01.1. Blockouts, Chamfers an Fillets, Tis Wiras 6.4 RIBAR
/[
.1 Crade, Size, Location, Lap Splices, Covnrage
.2 Men'b== 4 em i S'plices 1
6.5 EN!EDDEDIIIMS
.1 "4ocation YJantion
[ ((
.2 Piping
[ [ [
/ / /
.3 E1.ctrie.1 Conduit, aroundins
.4 Anchor Bolts
.5 Emba'dded Places, Sleeves
[ ((
A//
.6 Waterstop t - zusFECTom
_. 137['
(4-1 z.-ytxLDEFCIN111 FotM No. QCIP-6-2 f