Text
?
- : -. :..... : = --
4 Procedure No.
U-SITP-16 J. A. JONES CONSTRUCTION COMPANY SITE INSPECTION AND TEST PROCEDURE FOR INSPECTION OF CONCRETE MUD SLAB PLACING, CURING, FINISHING AND REPAIR WATERFORD SES UNIT NO. 3 CONTRACT NO. W3-NY-4 ENGINEERING CONSTRUCTION QUALITY ASSURANCE REV.
DATE REVIEWED BY DATE REVIEWED BY DATE
- APPROVED BY DATE YWm /8/ll7s-90)$dd ioW/W O
/*l'&.s oj W _*a dxAr r
I I
FREtuom9,fhT ACT.RE
'UN I
8506220121 850222 PDR FDIA 7e CARDE84-455 PDR O
O
s J. A. JONES CONSTRUCTION COMPANY PAGE 10F2 SITE INSPECTION AND TEST PROCEDURE:
PROCEDURE NO.
U-SITP-16 REV. NO.0 TITLE: INSPECTION OF CONCRETE MUD. SLAB PLACING, CURING, DATE: 10/14/75 -
FINISHING AND REPAIR.
PROJECT TITLE:
WA'IERFORD UNIT # 3
1.0 Purpose
To specify the serveillance and inspection activities that will will be performed by J. A. Jones Quality Assurtnce personnel to assure that the Concrete Mud Slab is installed correctly.
- 2. 0 Scope:
This procedure covers the Plteing, Curing, Finishing and Repair of the Concrete Mud Mat for Waterford SES Unit No. 3, Phase I Concrete Construction.
3.0 Refercnces
3.1 Ebasco Specification No. LOU-1564-472, latese revision
" Concrete Placement, Curing and Finishing, as applicable.
3.2 J. A..Iones Construction Work Procedure No. W-WP-16, " Mud Slab Placing, Curing, Finishing and Repair".
4.0 Responsibilities
oDweLr
- 4.1 Ebeoes is responsible for furnishing all materials, receiving inspection, procedure approval, testing and documentation of such test as required by 4.1 to support J. A. Jones in the performance of the work.
4' 2 J. A. Jones is rdirsponsible -for forming, placing, curing, finishing and visual inspection of the Concrete Mud Slab in accordance with " Approved for Construction" drawings and specifications.
5.0 Definitions
None
6.0 Inspection
6.1 TheassignedQualityVerificationInspector(s) shah.1asa minimum perform the following inspections.
e O
f
i J. A. JONES CONSTRUCTION COMPANY PAGE 2 0F 2 I
SITE INSPECTION AND TEST PROCEDURE:
PROCEDURE NO.
W-SITP-16 REV. NO. o TITLE: INSPECTION OF CONCRETE MUD SLAB PLACING, CURING, DATE: 10/14/75*
FINISHING AND REPAIR.
PROJECT TITLE:
WATERFORD UNIT # 3 CONTPJLCT NO. W3-NY-4 6.1.1 Assure that the Engineer (Ebesco) has accepted the the placement of the clam shell filter blanket.
6.1.2 Assure proper that concrete is discharged from the mixer withIn 60 minutes or 300 revolutions of drum which ever occurs first. The time must not exceed 1% hours in any case.
6.1.3 Assure that concrete is placed in accordance with reference 3.2.
t m
6.1.4 Assure that mud slab thickness is nominally 2"' thick.
x 6.1.5 Assure that.the mud slab elevation is within the tolerances specified on the " Approved for Construction" drawings (i % inch).
6.1.6 Assure proper curing of mud slab.
7.0 Records and Documentation:
The assigned Quality Assurance Inspector (s) shall perform the inspections listed in paragraph 6.0 and record the information on Attachment No. 8.1 " Mud Slab Inspection Report", Form No.
W-SITP-16.1, 8'. 0 Attachments:
8'.1 Hud Slab Inspectilon Report (Form No. W-SITP-16.1).
5
+
e i
G
s' a.,*
J. A. JONES CONSTRUCTION COMPANY WA'IERFORD UNIT NO. 3 MUD SLAB INSPECTION REPORT Report No:
Date:
Project No:
Quality Verification Inspector:
Placement Area / Location:
Area / Location Released By Engineer (Ebasco): Yes No Date:
Concrete Delivery Acceptable: Yes No Ticket No:
Consnents:
Concrete Placement Acceptable: Yes No Comments:
Sieb Thickness Acceptable: Yes No Conenents/Results:
Slab Elevation Acceptable: Yes No Coauments/Results:
Slab Curing Acceptable: Yes No Comuments:
Other Consnents or Remarks:
Form No. W-SITP-16.1
....