~.'; g P.2ASco SERVICES NCORFORATD .
~
g
. WA"iGRD STEA! ELECTRIC STATION - UNIT NO 3 I t
PROCEDURE FOR: Concrete .Preplacecient Inspection PROC. NO. OcTP -6 ISSUE
SUMMARY
..h .
E sa ISSUE /DATE PREPARED APPROVED -
RDfARKS I
A/1-25-74 J F Gregory .
f:y' k' ' h g ~
"B" Draft Update of QC 4.0-4 o 8/22/75 , y, S B/9-12-75 c. Satte #ield J. O. Booth
=
p -
( u E
I8 ,
i
= N G -
H x
. . SERV)Ce'
<c::ae:<a CCC' "EnT 00iiiEL 6 E 6 g -
w n. : .
e E ONUMENT .C'4*,lTABLE AND RETdRNABLE (NN""
r _
l I
J l
8506220114 850222 PDR FOIA CARDE84-455 PDR l
. ' P ;
9 .
h, ;3 I L V s FORM No. E-1 (3-3-72) . FREEDOM O.F INFORMe.iiON ,
, ACT REQUEST 2 - - . . _ _ . 7_ ~.~__.____.T ..__ _. .I84-Y_f( ..
. C.[Q & _
1
~ l
, t j
,. 'j , . .
EBASCO SERVICES INCORPolt D NO.
OCIP-6
. ISSUE:
D . WATERFORD STEN! ELECTRIC STATION - UNIT NO 3 PACE: 1 OF 4 l 1.0 PURPOSE This procedure is intended to be instructions for those quality control inspection functions which are required before placement of concrete to ensure that a quality product is obtained. .
': . 0 SCOPE 4
This procedure covers the inspection and check-off of the condition of the excavation, existing concrete surfaces against which concrete will be placed, forms, placing of reinforcing steel and placing of embedded items ni prior to final clearance for concrete placement and ordering concrete'.
I
3.0 REFERENCES
E E, 3.1 Ebasco' Specifications LOU 1564.472 - Concrete Masonry.
ma-5 3.2 Ebasco S,ecifications t0U 1364.473 - Concrete Reint<rcing Steet, Furnishing, Fabrication and Delivery E
3.3 Ebasco QCIP-4'- Concrete Materials and Mixes
, 3.4 Ebasco QCIP Receiving Inspection, Storage and Testing of Reinforcing
- o Steel a
$ 3.5- Ebasco QCIP Inspectioft of Concrete Reinforcing Steel Mechanical Splices (Cadwelds).
u .
{ 4.0 DEFINITIONS m
4.1 Inspector - In this procedure the " Inspector" shall mean the person '
I-g responsible to the Quality Control Civil. Supervisor and who sha11 ensure that the points outlined in this procedure are followed to en: obtain a quality product.
g .'
w 4.2 Specifications - Any specifications which are included with the Contract m:
w or on the construction drawing and form part of the contract.
E 4.3 Drawings - Drawings in this procedure shall mean Design Drawings.
l S"
, 4 5.0 RESPONSIBILITf l
5.1 The Quality Control Civil Supervisor shall be responsible for the checking and recording of the inspection results in this procedure.
5.2 Ihe Quality Control Civil Supervisor or his designee shall be
- responsible for re riewing tests and tesc reports for acceptance.
5.3 The Inspector shall be responsible to the Quality Control Civil Supervisor for implementing this procedure by inspection of the work as performed.
9 e
o FORM NO. E-2. (12-12-74)_ _ . __ ,,, ,, _,. __
j 9
_y , ._ __m ._.. _ . _ _.__._ _ ,_m_, __ _ . _ _ , _ _
. - _ --= - - - -- . - .. . . - .. -- .... _ - - _ _
e Y - ,'B EBASCO SERVICES INCORPolG"'ED
. m. ,
. NO. QCIP-6 ISSUEt ~ . ._JERFORD STEAM ELECTRIC STATION - UNIT NO 3 PACE: . , O F t.
l 6.0 PROCEDURE l
6.1 Excavation and Foundation 6.1.1 General Surface Inspection - The Inspector shall ensure that all
- surfaces upon or against which concrete will beiplaced have
! . been prepared by suitably shaping and thoroughly cleaning,
. washing and unwatering..
6.1.2 Earth Surfaces - The Inspector shall verify that all earth surfaces upon which or against which concrete is to be placed h are prepared in accordance with the Specifications and Drawings.
l b 6.1.3 Concrete Surfaces - The inspector shall verify that the final ,
i "i
-pr'epared results are in accordance with the Specifications j and Drawings.
l g 6.1.4 Bonding Materials - Where use of an epoxy bonding compound has
- been approved in accordance with the contract, the Inspector shall 1 verify that the material and the method of use are as approved.
1 o' -
nr 6.1.5 Underwater Placement - The Inspector shall verify that place-g ment of all concrete placed under water its performed according y! to the Specifications and Drawings and any prior directives 1 .
as w or conditions imposed by*Ebasco.
I j
3 6.2 Forma .
> g- ~
l
- 6.2.1 General Fona Inspection - The Inspector shall verify that the survey party has checked the forms and that they are built true to i
g slopes, the Spec ifications. lines and dimensions as called for on Drawings and in ed 6.2.2 Bracing and Rigidity - The Inspector shall verify that forms E'
" are braced to meet the requirements of the Specifications and i
Drawings. '
5 i ,
g .. 6.2.3 Form Surfaces - The Inspector shall ensure that form surfaces '
o in general, form faces for concrete surfaces which will be
- g' exposed at the completion of the project and form joints are j according to the Specifications and Drawings, i
, 6.2.4 Form Ties - The Inspector shall ensure that all tie rods used
- for supporting forms and the method of removal of the exposed parts are in acco,rdance with the Specifications and Drawings.
6.2.5 Chaufers, Fillets and Edging - The Inspector shall ensure that~ all i
corners and angles exposed in the finished structure are formed according to the Specifications and .'2rawings.
a 4
9 4
S FoaN NO. E-2 -(12-12-74) -
_i
-w,- --,-,----e- ,
.--,-,-,m,-,-,,,-----.-----w-w---- , -, . - - , ---,---wsr. - - - , , - - r w-- --r--s - - - - - - - - - -
- 4 i
4 , ', ; 4 I, . . .
EBASCO SERVICES INCORlW""ED .
NO. OCIP-6
. ISSUE:
s 4 ,
,..aTERFORD STEM 1 ELECTRIC STATION - UNIT NO 3 PAGE:3- OF t.
6.2.6 Construction Joints - The Inspector shall ensure that vertical y and horizontal construction joints, on faces which will be
! exposed at the completion of the project are created I e according to the Specifications and Drawings.
6.2.7 Re-used Forms - The Inspector shall ensure the re used forms s are prepared or discarded according to the Specifications and Drawings. l 6.2.8 Form 011 - The Inspector shall insure that forms left in place
- M from a previous placement of concrete are prepared with form oil in accordance with the Specifications an.d Drawings.
- i ,
6.2.9 Cleanouc Provisions - The Inspector shall insure that all
' l foreign material is removed and clean-out holes are closed sa; es as required in the Specifications. and Drawings.
l 6.3 Reinforcement i
B 6.3.1 Ihe Inspector shall ensure that reinforcing is checked for size's bending, spacing and location, according to the g Specifications and Drawings.
1 5 6.3.2 The Inspector shall ensure that no welding or tacking was '
j l permitted on reinforcing steel. Chairs or supports fabricated ,
y- by welding together extra reinforcing material or structural steel are acceptable, i
j g w
6.3.3 The Inspector shall verify that reinforcing steel is free of loose scaly rust, objectionable coatings and loose or weak t
dried mortar. '
g 6.3.4 The Inspector shall ensurd that splicing o.! bars are made h', only at locations as shown on Drawings. Mechanica1 's plices
! e.
(Cadwelds) will be inspected in accordance with Procedure as QCIF-9, but Concrete Pre-Placement Inspection should insure L
- that these splices have been made in all places where they are shown on the Drawings and that they have been accepted
{ by the Quality Control Civil Supervisor. .
l 4 6.3.5 The Inspector shall ensure that all reinforcing steel is j
j l accurately located with respect to the forms and firmly held
- in place before and during the placing of concrete as shown on the Drsvings. r 6.4 Imbedded Items 6.4.1 The Inspector shall ensure that anchor bolts, inserts, pipe sleeves, pipes, conduits, ~ wiring, flashing, manhole -
csver frames, instruments and all other embedded items are fixed firmly before concrete is placed. Preparation of contact surfaces depend upon whether or not bond with concrete is
' ' desired. Embedded items shall not be permir.ted to affect ,
' the position of reinforcing steel except as shown on the '
Drawings.
") !
9 PORM NO. E-2 (12-12-74) s o
,---,,e - . _ , , , _ , , ,, - _ -. , ,.,.w , , . , , - . _ - - . - _ .
~ - - - - _ - - _ s . .-. -
. . . . . ~ . - _ - . . _ _ - . - _ - . . - . . - - . .. - -- _. . -.-. _. . ._ -
. y ;
.n . EBASCO SERVICES INCORP01U 2 N0. QCIP-6
. ~ ISSUE:
. v.nTERFORD STEMI ELECTRIC STATION'- UNIT NO 3 PACE: 4 OF 4 4
6.4.2 The Inspector shall ensure that all waterstop is fimly i attached for proper embedment and location.
6.5 Expansion. Joints General Inspection - The Inspector shall ensure that iexpansion and contraction joints are installed accceding to the: Drawings and Specifications. -
s 6.6 Documentation i
! g" 6.6 1 ' Quality Control Documentation - A document titled, Concrete j 2-g Preplacement Checklist Record (QC-34) shall be provided by g the Quality Control Civil Supervisor. This card shall be g maintained near the placement by the Contractor to provide
} a constant stat.us check for concrete placement preparations I and is a Quality Control document; it shall be signed by the Quality Control Civil Supervisor or his designee when he j g is satisfied that concrete placement may proceed, but if placement is not made within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the Quality Control u Civil Supervisor or his designee must again satisfy himself g that the quality control features for that placement have ,
w been maintained and must again sign the card.
4 5; 6.6.2 A concrete Preplacement Inspection Checklist, QC-76 shall ut be prepared by the Q.C. Inspector. This concrete preplacement' h checklist shall then be filed for future reference.
- g. -
! 6.6.3 The Inspector shall report inspection discrepancies on the
, Discrepancy Notice, Form No. QC-16, in accordance with ASP-III-11 8 to the Quality Control Civil . Supervisor.
,' 7.0 ATTACitSNTS .
an ,
i' *
- 7.1 Fora QC-34, Concrete Preplacement Checklist Record
! E Fora QC-76, concrete Preplacement Inspection g- Qiecklis t, pages 1, 2 and 3 er s
- , m Form QC-16, Natice of Non'-Conforming Material / Equipment at Site
! N. -
5 1 .
4 e
FORM NO. E-2 (12-12-74)
.a .__ __ ._ . _ _ . _ i
- - , . - w-, -
y -,-9 , ,-,~s_--%-.- ._ , , . . , - , ~ _ _ s.
m_-.m. _ - - - _ , . , , - . . . . - , , - , - - . , . .
l ,
F1ACEIENT HO.
..........._............_.m,mm...,u '. \
IDCATION Noe Dimensions, Remarks, Flaa or Sketch Inspector's' Etc No Signature Date *
- 1. ECAVATION & P"" TION 1.1 Condition of haea approved 1 . i i '-
1.2 Dimensional location of excavation
- approved 1.3 Elevation of principle base area ,
. [
- f 1.4 Elevation of pile cuc off .
1.5 kumber of piles
. 1.6 Incatica of pile group approved 1,7 Underlying concrete properly i
. s' carified j j
' s
/
'A
,! 2. FORMS r
w ,
2.1 Dimenstens of Placement 2.2 Elevation of top at Placement .
. 2.3 Form Aligreent 2.4 Are snapties with wt.terstop required 2.5 Blockouts approved for location and ~ '
elevation - i Notes Fill all spaces Use "NA" where ites is not applicabit. .
t QC-76 Page 3 Rev. (9-15-75) 4
~- . . - . . . - - _ . _ . _ . . _ . . - . ._ ... - . . . _ ~ . _ = _ _ . - _ . . - .. . . - . . . . - . . - _ . . .. .- - . ~ _ ~ . - . - . . . _ . - - , . - .
, - a i .-
Nos Dimensions, Flaa or Sketch Iaspector's 2.0 tones (Cont'd) Romants Etc No ,
signature Date l
2.6 Blockouts approved for dimensions '
i 2.7 Dirt and waste cleaned from inside of foss i 2.8 Cleanout openings closed -
3.0 RUtFORCitC '.
5 Numbers and size of bars are according . p l 3.1 to plan i
. i 3.2 Properly tied (not welded or " tacked") *
. i
. 3.3 Clearance from forms approved . !
3.4 Cover over top of reinforcing approved . i j
3.5 Splices are correct length s
'll f
7 /
j \
. 3.6 Indicate number of mechanical splicos .
l , .
3 . 3.7 Indicate trade of reinforcing steet .. g l Steel checked for mud, grease, oil or ,
3.8 loose scaly rust /
l l ,
4.0 staEBDED ITEMS j g 4.1 Indicate sizes of waterstop required l 4.2 Waterstop properly installed & supported I Notet Fill all spaces - use "HA" where item is notapplicable .
4 QC-76 Page 2 Scy. (9-15 -75) l 1
't. .
Isos - Dimensions, Flaa or Sketch - Inspector's 4.0 EinEDDED ITDe$ (Cont'd) Remarks, Etc 18e Signature Date s
4.3 Floor drata piping 4.4 Pressure Piping I
4.5 Electrical conduit u
4.6 Ground wire .
! 4.7 Anchor Bolts i '
4.8 habedded Flates ,
4.9 Pipe Sleeves t , e 4.10 Constructies Piping Femetrations 4
4.11 Expansion or Contractica Joints or de. ices
, l
- alose Fill all spaces - use "lE" where Steer is not applicable.
, V
, * ,r .e r.i r n.e _ t. _
5 .
1
. l
. I t
.ec-76 Pase 1 Rev. (s-15-75)
, r--4 -
'- ~
WATERFORD SES - UNIT 3 CONCRETE PRE-PLACDIENT CHECKLIST RECORD 4
Location:
Elevation: to ' Pour No."
Detailed
Description:
3 l,
) _ ITEM CONSTRUCTION INSPECTOR l Dnee Date Sandblas e/Creencut/ Foundation Treatment.
Forms (Line and Grade)
Blockouts, Keys, Waterstop, etc.
, Rainforcing Steel Anchor Bolts, Embedded Steel i
Electrical -
i Mechanical Fin 41 Clean-up Special Instructions:
, Approved for Placing Time Date Q. C. Representative
, 'QC-34 (1-15-73) Rev. 9-5-74 3
e N' g
I .