i <-

b Procedure No. W-SITP-12 J. A. JONES CONSTRUCT 10N COMPANY SITE INSPECTION AND TEST PROCEDURE .

FOR BACKFILL AND COMPACTION INSPECTION WATERFORD SES UNIT NO. 3 CONTRACT NO. W3-NY-4 j ENG INEERING CONSTRUCTION QUALITY ASSURANCE REV. DATE REVIEWED BY DATE REVIEWED BY DATE APPROVED BY DATE 0 /6/5 76 aff _ _ *, , 3),f)p g WWmj 3/s~hg

/ &4 [.&'f it/pgfyg

/ 3-/b-7/c a f f ;.s 2//cha AnfA $l M4 (DWC 1l w.h c.,

S Y6f% Wh_*- __ W6/76 fw1 hhbl u 6bl 3 '//20/7C t1/f& Wzo/7& Ym 24/7/- M 0b +'/1 oht.

'l bl15l7b b0YfMd].rh; &l)S/7f fff)f,ll)dy 7f (z ; x :.fr.q u, t // fg ;;p.

6 7/'l/7th 48 M 7/7/6 [e 7 4 d A m b ,Y/ 7/9 /7(.

l 6 9l3176 d$ -b Y)fNG Y fw/ '

h4 Ud h k 6. b GI1/70 3ETIITID l T/ C010 curis w/o commIS I '

2 EJECTED FREEDOM OF INFORMATION ggo qugp ACT REQUEST 37 --L e i#so IV-4Cf p4TE:  ! 8 ~/ 7-7I c./(ses ,

96 e50222

  • kSS

o .

J. A. J0NES CONSTRUCTION COMPANY PAGE 10F 4 SITE INSPECTION AND TEST PROCEDURE: PROCEDURE NO.

W-SITP-12 REV. NO. 6 TITLE: BACKFILL AND COMPACTION INSPECTION DATE: 8/3/76 PROJECT TITLE: WATERFORD SES UNIT NO. 3 CONTRACT NO. W3-NY-4 1.0 PURPOSE 4

To specify the inspection and surveillance activities that will be per-formed by J. A. Jones Construction Rutlity Assurance / Quality Verification personnel to assure that backfill is p! aced and compacted in accordance with approved drawings, specifications and procedures.

2.0 SCOPE This procedure governs the placing and compaction of backfill material for Waterford SES Unit No. 3, Phase I Concrete Construction.

3.0 DEFINITIONS 3.1 Class "A" fill shall be either sand containing no more than twelve (12) percent material passing a number 200 selve or Pleistocene clay excavated from the plant island excavation. Clam shell used as g4 surface material of construction roads may be" contained within either the sand or clay, a6 3.2 Class "B" fill shall be selected sand, silt, clam shell, clay, or some combination of these materials capable of practical compaction.

3.3 Location of Class "A" and Class "B" fili shall be as shown on Ebasco Drawing No. LOU 1564.G497 501, " General B.ckfill Plan and Sections".

4.0 REFERENCES

4 4.1 J. A. Jones Construction Work Procedure, W-WP-12, "Backfilling and Compa ct ion".

4.2 Ebasco Services, Inc. Specification No. LOU-1564.482, " Filter and Backfill". ,,

4.3 Ebasco Drawing No. LOU 1564-G-490, " Nuclear Plant Island Structure -

Construction Sequence."

5.0 RESPONSIBILITIES 5.l Ebasco Services, Inc. is responsible for the furnishing of all backfill material and for all testing of backfill material and compacted backfill.

ese m 5

- _ _ . , , m_ . , . - _ . _ ._ . - . . , _ _ _ , . ,

6 J. A. JuSES CONSTRUCTiGN COMPANY PAGE 2 Oi 4 S1TE INSPECTION AND TEST PROCEDURE: PROCEDURE NO.

W-SITP-12 REV. NO. 6 TITLE: BACKFILL AND COMPACTION INSPECTION DATE: 8/3/76 PROJECT TITLE: WATERFORD SES UNIT NO. 3 CONTRACT NO. W3-NY-4 5.2 J. A. Jones is responsible for the proper placing and compaction of backfill in accordance with approved drawings, specifications, and p rocedures .

6.0 INSPECTION The assigned Quality Verification Inspector (s) shall perform surveillance inspection as required to assure that the requi rements listed.below are ful fi l l ed.

6.1 Material has been detennined to be suitable by Ebasco and released to J. A. Jones.

6.2 Backfilling is accomplished in the proper sequence in accordance with Ebasco Drawing No. LOU-1564-G490.

6.3 Base to receive backfill has been properly prepared and compacted to the density required by Ebasco.

g,gl 6.4 Sand and clam shell for Class "A" fill is spread and layers not exceeding 15 inches prior to compaction.

leveled in 6.5 Clay for Class "A" backfill and material selected from the excavation for Class "B" backfill is placed in layers not exceeding ten inches prior to compaction.

6.6 Fill material i s deposited uniformly over entire area being filled to a particular stage or level.

6.7 When required, fill material shall be disc-harrowed after spreading l and before compaction to blend and aerate the material into a tex- --

L ture that can be consolidated into a homogeneous miss by the com-paction operations. e. <

6.8 Surface of each lift is kept reasonable smooth' and f ree of ridges or groves which would adversely affect proper compaci ton of subsequent lifts.

l 6.9 Hauling equipment uses paths dif ferent from each other in order to aio compaction of the entire area and to avoid overcompaction of any given area.

l l

i e em- em. ** e e e a gm +-ee e a e*, e. e . eem e e new -

h r

l .

~

i. J. A. JONES CONSTRUCTION COMPANY PAGE 3 0F 4 a

SITE INSPECTION AND TEST PROCEDURE: PROCEDURE NO.

W-SITP-12 REV. 50. 6 TITLE: BACKFILL AND COMPACTION INSPECTION DATE: 8/3/76

. ?ROJECT TITLE: WATERFORD SES UNIT NO. 3 CONTRACT NO. W3-NY-4 6.10 f f area to receive fill is an original excavation, or compacted more than two days previously, surface shall be cleaned of all loose debris and improperly compacted material and cut to fresh B-6 material in addition, area shall then be proof rolled and accepted before subsequent backfilling.

6.11 When two sections of fill join, fill placed first must have its slope shaved a minimum of three feet to expose undisturbed com-pacted material .

6.12 Compaction is achieved with proper equipment operation and proper speed.

6.13 Compaction is reasonable uniform within any one layer over entire area.

2 6.14 All layers are compacted to full width.

6.15 In restricted areas', fill does not contain material greater than six inches in depth.

6.17 Reasonable care is taken to protect waterproofing membrane boards.

6.18 Backfill placed against waterproofing membrane boards do not contain any particle greater than i inch in size.

6.19 No fill is placed during heavy rain or on top of or into a pool of water.

i 6.20 Material testing is properly performed and does not unduly affect progress of work. .

6.21 Material has been compacted until the,specified density is obtained and verified by in-place, density testing. _

6.22 Surface of fill areas to be sloped to effect drainage away from building and into site drainage pattern. Low areas to be pumped l if required, t

! 6.23 Where fill is placed against naturally existing material on slopes, g(-6 the slope shall be cut a minimum of 6 inches to remove surface vegetation, desiccated material, rain gullies, and all other i

discontinuities, i

l

J. A. JONES CONSTRUCTION CO.MPANY PAGE 4 0F 4 SITE INSPECTICN AND TEST PROCEDURE: PROCEDURE NO.

W-SITP-12 REV. NO. 6 TITLE: BACKFILL AND COMPACTION INSPECTION DATE: 8/3/76 PROJECT TITLE: WATERFORD SES UNIT NO. 3 CONTRACT NO. W3-NY-4 l 7.0 DOCUMENTATION The ass Igned- Quality Veri fication Inspector (s). documents his surveillance activities by filling out the Daily Backfill inspection Report (Attach-ment A). This report shall be filled out for each inspector for each shif t and fill location when inspection is performed.

8.0 ATTACHMENTS 8.1 Daily Backfill inspection Report I

e#

i ,

i l

i l

l

W-SITF .z Attachment A

, J. A. JONES CONST1UCT10N COMPANY WATERFORD SES UNIT NO. 3 DAILY BACKFILL INSPECTION REPORT 4

Q.V. Inspector Date

.i

1. Fill Placement Area / Location 4
2. Verify Engineer's release for placement and canpaction:

Ebasco Representative 3 Materials released by Engineer:

Ebasco Representative

4. Spreading and compaction equipment satisfactory: Yes- No 5 Base to receive fill properly prepared and compacted: Yes No
6. Backfilling done in proper sequence: Yes No 7 Fill material properly placed and spread: Yes No
8. Fill mar.erial disc-harrowed, if necessary: Yes No 9 Surface of each lift reasonably smooth and free of ridges or grooves: Yes no
10. Hauling equipment using different paths: Yes No
11. Surface properly treated: Yes No
12. Fill junctions properly treated: Yes No 13 Layers compacted to full width: Yes No
14. Fill material not greater than 3 inches in size in restricted areas: Yes No 15 Fill material lifts not greater than 6 inches in depth in restricted areas: Yes No
16. Waterproofing membrane protected during backfilling operation: Yes No
17. Backfill placed against waterproofing membrane contains no particles larger than i inch:

Yes No

18. No fill p. laced during heavy rain or on top of or into standing water: Yes No 19 Material testing is properly performed and does not unduly a'ffect progress of work:

. Yes No .

j 20. Comments:

.~

l l

- .-.m_.._. --_ . , , , , _ . . - _ - . , , _ - . .

i

. INSTRUCTION FOR COMPLETING DAILY BACKFILL INiPECTION REPORT

1. Area / Location shall be recorded as coordinates from centerline of Reactor Vessel.
2. Verify Engineer's Release for placement and compaction; have Engineer's representative initial report for this item.

3 Verify Engineer's Release of materials; have Engineer's representative initial report for this item.

4. Items 4-19 inclus ive are self-explanatory and reflect requirements of this procedure J. A. Jones Construction W rk o Procedure W-WP-12, and Ebasco Specification LOV-1564.482.

5 If comments are required or further explanation of an item is needed, the comments are to be entered in the space provided (Item 20 ). Any comment or explanation should be preceded by the item number, e.g. Item 18 - light rain during fill operations, item -

19 - testing operations slowing down compaction due 'to malfunction of test equipment.

Additional sheets may be used, if required.

6. In the event that a "No" is checked for any one of items 2-19 inclusive, a "Stop Work Order" will be issued and the following information recorded under item 19:

(1) Stop Work Order Number (2) Date issued I

(3) Individual notified (Name and title)

(4) Date deficiency corrected (5) Date Stop Work Order rescinded i

l