Category:CORRESPONDENCE-LETTERS
MONTHYEARML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20112E8911996-05-24024 May 1996 FOIA Request to Inspect & Copy Original OL Issued by Aec/Nrc for Util & EPP Issued as App B to Plant OL SNRC-2192, Forwards Both Copies,Signed by Util President Cv Giacomazzo, of Amend 7 to Indemnity Agreement B-87.Util Returning Copies Because Effective Date Left Blank1995-05-15015 May 1995 Forwards Both Copies,Signed by Util President Cv Giacomazzo, of Amend 7 to Indemnity Agreement B-87.Util Returning Copies Because Effective Date Left Blank ML20082B9131995-03-13013 March 1995 Submits Corrected Page for Insertion Into Final Rept Re Confirmatory Survey of RB & Phase 4 Systems at Plant ML20081A9321995-03-0707 March 1995 Forwards Final Rept Orise 95/B-81, Confirmatory Survey of Reactor Bldg & Phase 4 Sys Shoreham Nuclear Power Station Brookhaven,Ny ML20081A6531995-03-0707 March 1995 Forwards Final Rept Orise 95/B-80, Confirmatory Survey of Radwaste Bldg,Suppression Pool,Phase 2 Phase 3 Sys,Shoreham Nuclear Power Station,Brookhaven,Ny ML20081A6841995-02-21021 February 1995 Forwards Final Rept Confirmatory Survey of Radwaste Bldg, Suppression Pool,Phase 2 & Phase 3 Sys,Shoreham Nuclear Power Station,Brookhaven,Ny ML20081B5801995-02-21021 February 1995 Forwards Final Rept Confirmatory Survey of Reactor Bldg & Phase 4 Sys Shoreham Nuclear Power Station Brookhaven,Ny ML20081A7001995-01-30030 January 1995 Forwards Rev 1 to Draft Rept Confirmatory Survey of Radwaste Bldg,Suppression Pool,Phase 2 & Phase 3 Sys, Shoreham Nuclear Power Station,Brookhaven,Ny ML20081A7111995-01-30030 January 1995 Forwards Rev 1 to Draft Rept Confirmatory Survey of Reactor Bldg & Phase 4 Sys,Shoreham Nuclear Power Station, Brookhaven,Ny SNRC-2189, Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program,Annual Radiological Environ Operating Rept, Jan-June 19941995-01-20020 January 1995 Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program,Annual Radiological Environ Operating Rept, Jan-June 1994 SNRC-2188, Responds to NRC Request for Addl Info Re Certain Elevated Levels Found During Phase 4 Confirmatory Survey1995-01-20020 January 1995 Responds to NRC Request for Addl Info Re Certain Elevated Levels Found During Phase 4 Confirmatory Survey SNRC-2187, Forwards Snps Annual Man-Rem Rept, Including Individuals for Whom Personnel Monitoring Provided During CY94,per 10CFR20.407(a) & (B).Rept Also Includes Individuals Identified in 10CFR20.202(a),who Require Monioring1995-01-11011 January 1995 Forwards Snps Annual Man-Rem Rept, Including Individuals for Whom Personnel Monitoring Provided During CY94,per 10CFR20.407(a) & (B).Rept Also Includes Individuals Identified in 10CFR20.202(a),who Require Monioring SNRC-2182, Forwards Final Annual Radioactive Effluent Release Rept for Cy 1994, Including Last Revised Copies of ODCM & Pcp.Rept Prepared for Closeout Purposes as Part of Completion of Plant Decommissioning1994-11-0101 November 1994 Forwards Final Annual Radioactive Effluent Release Rept for Cy 1994, Including Last Revised Copies of ODCM & Pcp.Rept Prepared for Closeout Purposes as Part of Completion of Plant Decommissioning ML20077L3331994-10-25025 October 1994 Forwards Revised Proposed Confirmatory Survey Plan for Reactor Bldg Shoreham Nuclear Power Station Brookhaven,Ny ML20076K3881994-10-20020 October 1994 Forwards Proposed Confirmatory Survey Plan for Reactor Bldg, Shoreham Nuclear Power Station,Brookhaven,Ny,For Review & Comment ML20077M8351994-10-20020 October 1994 Forwards Draft Rept, Confirmatory Survey of Radwaste Bldg, Suppression Pool & Phase 2 Systems,Shoreham Nuclear Power Station,Brookhaven,Ny SNRC-2184, Forwards Shoreham Decommissioning Project Termination Survey Final Rept Phase 4. Portions Withheld1994-10-12012 October 1994 Forwards Shoreham Decommissioning Project Termination Survey Final Rept Phase 4. Portions Withheld SNRC-2185, Summarizes Results from Revised Exposure Pathway Analysis Using Corrected Dcf for External Exposure for Cs-137.Rev 1 to Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl1994-10-0404 October 1994 Summarizes Results from Revised Exposure Pathway Analysis Using Corrected Dcf for External Exposure for Cs-137.Rev 1 to Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl ML20076F9251994-09-26026 September 1994 Forwards Final Rept Orise 94/I-80, Confirmatory Survey of Turbine Bldg,Site Grounds & Site Exteriors Shoreham Nuclear Power Station Brookhaven,Ny SNRC-2183, Forwards Amend 6 to Indemnity Agreement B-871994-09-23023 September 1994 Forwards Amend 6 to Indemnity Agreement B-87 SNRC-2181, Notifies of Equipment Changes to Shoreham Facility Which Have Occurred Subsequent to Rept on Phase I Final Survey Status,Provided in Util .Equipment Changes Described in Encl Table 11994-09-14014 September 1994 Notifies of Equipment Changes to Shoreham Facility Which Have Occurred Subsequent to Rept on Phase I Final Survey Status,Provided in Util .Equipment Changes Described in Encl Table 1 SNRC-2180, Forwards 940829 Memo Entitled, Technical Evaluation of Dusting from Concrete Blocks, Addressing Issue Discussed in Insp Rept 50-332/94-021994-09-0101 September 1994 Forwards 940829 Memo Entitled, Technical Evaluation of Dusting from Concrete Blocks, Addressing Issue Discussed in Insp Rept 50-332/94-02 SNRC-2179, Proposes That Release Criterion for Soil Be Applied to Certain Other Bulk Matls Which Will Remain at Plant Upon Completion of Decommissioning.Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl1994-09-0101 September 1994 Proposes That Release Criterion for Soil Be Applied to Certain Other Bulk Matls Which Will Remain at Plant Upon Completion of Decommissioning.Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl SNRC-2178, Forwards Proprietary Response to NRC Concerns Re Survey Instruments Used for Termination Survey.Extensive Discussion Provided in Interest of Rapidly Bringing Outstanding Concerns to Close.Response Withheld (Ref 10CFR2.790(a)(4))1994-08-17017 August 1994 Forwards Proprietary Response to NRC Concerns Re Survey Instruments Used for Termination Survey.Extensive Discussion Provided in Interest of Rapidly Bringing Outstanding Concerns to Close.Response Withheld (Ref 10CFR2.790(a)(4)) ML20072P1591994-08-17017 August 1994 Forwards Revised, Confirmatory Survey Plan for Radwaste Bldg & Suppression Pool for Plant SNRC-2176, Informs of near-term Completion of Decommissioning of Shoreham Nuclear Power Station & Hereby Respectfully Requests Support in Achieving Timely Termination of Facility possession-only License NPF-821994-08-0404 August 1994 Informs of near-term Completion of Decommissioning of Shoreham Nuclear Power Station & Hereby Respectfully Requests Support in Achieving Timely Termination of Facility possession-only License NPF-82 SNRC-2177, Forwards Rev 3 to Shoreham Decommissioning Project Termination Survey Plan. Portions of Rept Withheld1994-08-0404 August 1994 Forwards Rev 3 to Shoreham Decommissioning Project Termination Survey Plan. Portions of Rept Withheld ML20071L8741994-07-29029 July 1994 Forwards Confirmatory Survey Plan for Radwaste Building & Suppression Pool for Review & Comment SNRC-2175, Provides Notification of Survey Location Changes to Shoreham Facility Which Have Occurred Subsequent to Repts on Phases 1,2 & 3 Final Survey Status Provided in Refs 1,2 & 3 Respectively1994-07-18018 July 1994 Provides Notification of Survey Location Changes to Shoreham Facility Which Have Occurred Subsequent to Repts on Phases 1,2 & 3 Final Survey Status Provided in Refs 1,2 & 3 Respectively SNRC-2173, Forwards Termination Survey Final Rept Phase 3. Proprietary Pages to Rept Also Encl.Proprietary Pages Withheld (Ref 10CFR2.790)1994-06-14014 June 1994 Forwards Termination Survey Final Rept Phase 3. Proprietary Pages to Rept Also Encl.Proprietary Pages Withheld (Ref 10CFR2.790) SNRC-2172, Certifies That All SNM as Irradiated Fuel Permanently Removed from Site & That Decommissioning/Decontamination Work on Biological Shield Wall Complete,In Accordance W/Nrc Approving Amend 11 to Pol NPF-821994-06-0707 June 1994 Certifies That All SNM as Irradiated Fuel Permanently Removed from Site & That Decommissioning/Decontamination Work on Biological Shield Wall Complete,In Accordance W/Nrc Approving Amend 11 to Pol NPF-82 SNRC-2171, Submits Resolution of Items Identified by NRC Region I Project Inspector,Pertaining to Planned Final Draindown & Discharge of Spent Fuel Storage Pool,Following Complete Removal of Irradiated Fuel1994-06-0202 June 1994 Submits Resolution of Items Identified by NRC Region I Project Inspector,Pertaining to Planned Final Draindown & Discharge of Spent Fuel Storage Pool,Following Complete Removal of Irradiated Fuel SNRC-2170, Requests Approval of Proposed Change to Shoreham Decommissioning Plan for Addl Remedial Decontamination of Shoreham Spent Fuel Storage Pool Beyond That Originally Specified in Decommissioning Plan1994-05-20020 May 1994 Requests Approval of Proposed Change to Shoreham Decommissioning Plan for Addl Remedial Decontamination of Shoreham Spent Fuel Storage Pool Beyond That Originally Specified in Decommissioning Plan SNRC-2168, Notification to NRC of Transfer of Device Containing 30 Uci Cs-137 Source.Device Transferred to JW Merkel,Terra Analytics,Inc1994-05-13013 May 1994 Notification to NRC of Transfer of Device Containing 30 Uci Cs-137 Source.Device Transferred to JW Merkel,Terra Analytics,Inc SNRC-2169, Advises of Listed Clarification to Util Re Resignation of Jc Brons from Position of Executive Vice President of Shoreham Decommissioning Project1994-05-11011 May 1994 Advises of Listed Clarification to Util Re Resignation of Jc Brons from Position of Executive Vice President of Shoreham Decommissioning Project ML20029E1731994-05-11011 May 1994 Informs That Based on Recent Discussions Between Officials, Licensee Decided to Retain Organizational Position at Least Until Fuel Removed from Site ML20029D1991994-04-29029 April 1994 Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program Annual Radiological Environ Operating Rept Jan-Dec 1993. ML20029D2571994-04-28028 April 1994 Advises That Jc Brons Resigned to Pursue Employment W/ Another Util Co,Effective 940429 ML20029C7111994-04-22022 April 1994 Submits Technical Info on Biological Shield Wall Blocks to Be Surveyed SNRC-2163, Provides Notification of Equipment Changes to Facility Which Have Occurred Subsequent to Report on Phase I Final Survey Status Provided in Util1994-04-21021 April 1994 Provides Notification of Equipment Changes to Facility Which Have Occurred Subsequent to Report on Phase I Final Survey Status Provided in Util ML20065M3701994-04-20020 April 1994 Responds to NRC Verbal Request for Info Re Estimated Cost for Decommissioning SNRC-2161, Forwards 1994 Internal Cash Flow Projection for Shoreham Nuclear Power Station1994-03-30030 March 1994 Forwards 1994 Internal Cash Flow Projection for Shoreham Nuclear Power Station SNRC-2160, Forwards Financial Info Required by 10CFR50.71(b)1994-03-30030 March 1994 Forwards Financial Info Required by 10CFR50.71(b) SNRC-2148, Forwards Info Supporting Licensee Proposed Amend,Submitted on 941104.Specifically,info Supports Estimates & Conclusions Re Small Quantity of Remaining Radioactive Matl & Low Radiological Significance of Potential Accident Releases1994-03-0808 March 1994 Forwards Info Supporting Licensee Proposed Amend,Submitted on 941104.Specifically,info Supports Estimates & Conclusions Re Small Quantity of Remaining Radioactive Matl & Low Radiological Significance of Potential Accident Releases 1999-10-01
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20112E8911996-05-24024 May 1996 FOIA Request to Inspect & Copy Original OL Issued by Aec/Nrc for Util & EPP Issued as App B to Plant OL SNRC-2192, Forwards Both Copies,Signed by Util President Cv Giacomazzo, of Amend 7 to Indemnity Agreement B-87.Util Returning Copies Because Effective Date Left Blank1995-05-15015 May 1995 Forwards Both Copies,Signed by Util President Cv Giacomazzo, of Amend 7 to Indemnity Agreement B-87.Util Returning Copies Because Effective Date Left Blank ML20082B9131995-03-13013 March 1995 Submits Corrected Page for Insertion Into Final Rept Re Confirmatory Survey of RB & Phase 4 Systems at Plant ML20081A9321995-03-0707 March 1995 Forwards Final Rept Orise 95/B-81, Confirmatory Survey of Reactor Bldg & Phase 4 Sys Shoreham Nuclear Power Station Brookhaven,Ny ML20081A6531995-03-0707 March 1995 Forwards Final Rept Orise 95/B-80, Confirmatory Survey of Radwaste Bldg,Suppression Pool,Phase 2 Phase 3 Sys,Shoreham Nuclear Power Station,Brookhaven,Ny ML20081B5801995-02-21021 February 1995 Forwards Final Rept Confirmatory Survey of Reactor Bldg & Phase 4 Sys Shoreham Nuclear Power Station Brookhaven,Ny ML20081A6841995-02-21021 February 1995 Forwards Final Rept Confirmatory Survey of Radwaste Bldg, Suppression Pool,Phase 2 & Phase 3 Sys,Shoreham Nuclear Power Station,Brookhaven,Ny ML20081A7111995-01-30030 January 1995 Forwards Rev 1 to Draft Rept Confirmatory Survey of Reactor Bldg & Phase 4 Sys,Shoreham Nuclear Power Station, Brookhaven,Ny ML20081A7001995-01-30030 January 1995 Forwards Rev 1 to Draft Rept Confirmatory Survey of Radwaste Bldg,Suppression Pool,Phase 2 & Phase 3 Sys, Shoreham Nuclear Power Station,Brookhaven,Ny SNRC-2188, Responds to NRC Request for Addl Info Re Certain Elevated Levels Found During Phase 4 Confirmatory Survey1995-01-20020 January 1995 Responds to NRC Request for Addl Info Re Certain Elevated Levels Found During Phase 4 Confirmatory Survey SNRC-2189, Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program,Annual Radiological Environ Operating Rept, Jan-June 19941995-01-20020 January 1995 Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program,Annual Radiological Environ Operating Rept, Jan-June 1994 SNRC-2187, Forwards Snps Annual Man-Rem Rept, Including Individuals for Whom Personnel Monitoring Provided During CY94,per 10CFR20.407(a) & (B).Rept Also Includes Individuals Identified in 10CFR20.202(a),who Require Monioring1995-01-11011 January 1995 Forwards Snps Annual Man-Rem Rept, Including Individuals for Whom Personnel Monitoring Provided During CY94,per 10CFR20.407(a) & (B).Rept Also Includes Individuals Identified in 10CFR20.202(a),who Require Monioring SNRC-2182, Forwards Final Annual Radioactive Effluent Release Rept for Cy 1994, Including Last Revised Copies of ODCM & Pcp.Rept Prepared for Closeout Purposes as Part of Completion of Plant Decommissioning1994-11-0101 November 1994 Forwards Final Annual Radioactive Effluent Release Rept for Cy 1994, Including Last Revised Copies of ODCM & Pcp.Rept Prepared for Closeout Purposes as Part of Completion of Plant Decommissioning ML20077L3331994-10-25025 October 1994 Forwards Revised Proposed Confirmatory Survey Plan for Reactor Bldg Shoreham Nuclear Power Station Brookhaven,Ny ML20077M8351994-10-20020 October 1994 Forwards Draft Rept, Confirmatory Survey of Radwaste Bldg, Suppression Pool & Phase 2 Systems,Shoreham Nuclear Power Station,Brookhaven,Ny ML20076K3881994-10-20020 October 1994 Forwards Proposed Confirmatory Survey Plan for Reactor Bldg, Shoreham Nuclear Power Station,Brookhaven,Ny,For Review & Comment SNRC-2184, Forwards Shoreham Decommissioning Project Termination Survey Final Rept Phase 4. Portions Withheld1994-10-12012 October 1994 Forwards Shoreham Decommissioning Project Termination Survey Final Rept Phase 4. Portions Withheld SNRC-2185, Summarizes Results from Revised Exposure Pathway Analysis Using Corrected Dcf for External Exposure for Cs-137.Rev 1 to Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl1994-10-0404 October 1994 Summarizes Results from Revised Exposure Pathway Analysis Using Corrected Dcf for External Exposure for Cs-137.Rev 1 to Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl ML20076F9251994-09-26026 September 1994 Forwards Final Rept Orise 94/I-80, Confirmatory Survey of Turbine Bldg,Site Grounds & Site Exteriors Shoreham Nuclear Power Station Brookhaven,Ny SNRC-2183, Forwards Amend 6 to Indemnity Agreement B-871994-09-23023 September 1994 Forwards Amend 6 to Indemnity Agreement B-87 SNRC-2181, Notifies of Equipment Changes to Shoreham Facility Which Have Occurred Subsequent to Rept on Phase I Final Survey Status,Provided in Util .Equipment Changes Described in Encl Table 11994-09-14014 September 1994 Notifies of Equipment Changes to Shoreham Facility Which Have Occurred Subsequent to Rept on Phase I Final Survey Status,Provided in Util .Equipment Changes Described in Encl Table 1 SNRC-2180, Forwards 940829 Memo Entitled, Technical Evaluation of Dusting from Concrete Blocks, Addressing Issue Discussed in Insp Rept 50-332/94-021994-09-0101 September 1994 Forwards 940829 Memo Entitled, Technical Evaluation of Dusting from Concrete Blocks, Addressing Issue Discussed in Insp Rept 50-332/94-02 SNRC-2179, Proposes That Release Criterion for Soil Be Applied to Certain Other Bulk Matls Which Will Remain at Plant Upon Completion of Decommissioning.Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl1994-09-0101 September 1994 Proposes That Release Criterion for Soil Be Applied to Certain Other Bulk Matls Which Will Remain at Plant Upon Completion of Decommissioning.Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl ML20072P1591994-08-17017 August 1994 Forwards Revised, Confirmatory Survey Plan for Radwaste Bldg & Suppression Pool for Plant SNRC-2178, Forwards Proprietary Response to NRC Concerns Re Survey Instruments Used for Termination Survey.Extensive Discussion Provided in Interest of Rapidly Bringing Outstanding Concerns to Close.Response Withheld (Ref 10CFR2.790(a)(4))1994-08-17017 August 1994 Forwards Proprietary Response to NRC Concerns Re Survey Instruments Used for Termination Survey.Extensive Discussion Provided in Interest of Rapidly Bringing Outstanding Concerns to Close.Response Withheld (Ref 10CFR2.790(a)(4)) SNRC-2176, Informs of near-term Completion of Decommissioning of Shoreham Nuclear Power Station & Hereby Respectfully Requests Support in Achieving Timely Termination of Facility possession-only License NPF-821994-08-0404 August 1994 Informs of near-term Completion of Decommissioning of Shoreham Nuclear Power Station & Hereby Respectfully Requests Support in Achieving Timely Termination of Facility possession-only License NPF-82 SNRC-2177, Forwards Rev 3 to Shoreham Decommissioning Project Termination Survey Plan. Portions of Rept Withheld1994-08-0404 August 1994 Forwards Rev 3 to Shoreham Decommissioning Project Termination Survey Plan. Portions of Rept Withheld ML20071L8741994-07-29029 July 1994 Forwards Confirmatory Survey Plan for Radwaste Building & Suppression Pool for Review & Comment SNRC-2175, Provides Notification of Survey Location Changes to Shoreham Facility Which Have Occurred Subsequent to Repts on Phases 1,2 & 3 Final Survey Status Provided in Refs 1,2 & 3 Respectively1994-07-18018 July 1994 Provides Notification of Survey Location Changes to Shoreham Facility Which Have Occurred Subsequent to Repts on Phases 1,2 & 3 Final Survey Status Provided in Refs 1,2 & 3 Respectively SNRC-2173, Forwards Termination Survey Final Rept Phase 3. Proprietary Pages to Rept Also Encl.Proprietary Pages Withheld (Ref 10CFR2.790)1994-06-14014 June 1994 Forwards Termination Survey Final Rept Phase 3. Proprietary Pages to Rept Also Encl.Proprietary Pages Withheld (Ref 10CFR2.790) SNRC-2172, Certifies That All SNM as Irradiated Fuel Permanently Removed from Site & That Decommissioning/Decontamination Work on Biological Shield Wall Complete,In Accordance W/Nrc Approving Amend 11 to Pol NPF-821994-06-0707 June 1994 Certifies That All SNM as Irradiated Fuel Permanently Removed from Site & That Decommissioning/Decontamination Work on Biological Shield Wall Complete,In Accordance W/Nrc Approving Amend 11 to Pol NPF-82 SNRC-2171, Submits Resolution of Items Identified by NRC Region I Project Inspector,Pertaining to Planned Final Draindown & Discharge of Spent Fuel Storage Pool,Following Complete Removal of Irradiated Fuel1994-06-0202 June 1994 Submits Resolution of Items Identified by NRC Region I Project Inspector,Pertaining to Planned Final Draindown & Discharge of Spent Fuel Storage Pool,Following Complete Removal of Irradiated Fuel SNRC-2170, Requests Approval of Proposed Change to Shoreham Decommissioning Plan for Addl Remedial Decontamination of Shoreham Spent Fuel Storage Pool Beyond That Originally Specified in Decommissioning Plan1994-05-20020 May 1994 Requests Approval of Proposed Change to Shoreham Decommissioning Plan for Addl Remedial Decontamination of Shoreham Spent Fuel Storage Pool Beyond That Originally Specified in Decommissioning Plan SNRC-2168, Notification to NRC of Transfer of Device Containing 30 Uci Cs-137 Source.Device Transferred to JW Merkel,Terra Analytics,Inc1994-05-13013 May 1994 Notification to NRC of Transfer of Device Containing 30 Uci Cs-137 Source.Device Transferred to JW Merkel,Terra Analytics,Inc SNRC-2169, Advises of Listed Clarification to Util Re Resignation of Jc Brons from Position of Executive Vice President of Shoreham Decommissioning Project1994-05-11011 May 1994 Advises of Listed Clarification to Util Re Resignation of Jc Brons from Position of Executive Vice President of Shoreham Decommissioning Project ML20029E1731994-05-11011 May 1994 Informs That Based on Recent Discussions Between Officials, Licensee Decided to Retain Organizational Position at Least Until Fuel Removed from Site ML20029D1991994-04-29029 April 1994 Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program Annual Radiological Environ Operating Rept Jan-Dec 1993. ML20029D2571994-04-28028 April 1994 Advises That Jc Brons Resigned to Pursue Employment W/ Another Util Co,Effective 940429 ML20029C7111994-04-22022 April 1994 Submits Technical Info on Biological Shield Wall Blocks to Be Surveyed SNRC-2163, Provides Notification of Equipment Changes to Facility Which Have Occurred Subsequent to Report on Phase I Final Survey Status Provided in Util1994-04-21021 April 1994 Provides Notification of Equipment Changes to Facility Which Have Occurred Subsequent to Report on Phase I Final Survey Status Provided in Util ML20065M3701994-04-20020 April 1994 Responds to NRC Verbal Request for Info Re Estimated Cost for Decommissioning SNRC-2160, Forwards Financial Info Required by 10CFR50.71(b)1994-03-30030 March 1994 Forwards Financial Info Required by 10CFR50.71(b) SNRC-2161, Forwards 1994 Internal Cash Flow Projection for Shoreham Nuclear Power Station1994-03-30030 March 1994 Forwards 1994 Internal Cash Flow Projection for Shoreham Nuclear Power Station SNRC-2148, Forwards Info Supporting Licensee Proposed Amend,Submitted on 941104.Specifically,info Supports Estimates & Conclusions Re Small Quantity of Remaining Radioactive Matl & Low Radiological Significance of Potential Accident Releases1994-03-0808 March 1994 Forwards Info Supporting Licensee Proposed Amend,Submitted on 941104.Specifically,info Supports Estimates & Conclusions Re Small Quantity of Remaining Radioactive Matl & Low Radiological Significance of Potential Accident Releases SNRC-2145, Provides Comments Prepared by Util on Draft NUREG/CR-5849, Manual for Conducting Radiological Surveys in Support of License Termination1994-03-0808 March 1994 Provides Comments Prepared by Util on Draft NUREG/CR-5849, Manual for Conducting Radiological Surveys in Support of License Termination SNRC-2157, Forwards 1993 Rept of Personnel & Man-Rem by Work & Job Function. 1993 Personnel Exposures Extremely Low as Majority of Radioactivity Removed from Site1994-02-28028 February 1994 Forwards 1993 Rept of Personnel & Man-Rem by Work & Job Function. 1993 Personnel Exposures Extremely Low as Majority of Radioactivity Removed from Site SNRC-2158, Submits Notification of Pending Change to Decommissioning Plan Submitted 901229.Safety Evaluation for Change Encl1994-02-28028 February 1994 Submits Notification of Pending Change to Decommissioning Plan Submitted 901229.Safety Evaluation for Change Encl SNRC-2156, Forwards Annual Radioactive Effluent Release Rept for 1993. Latest Revised Copies of Offsite Dose Calculation Manual & Process Control Program Also Encl as Apps to Rept1994-02-25025 February 1994 Forwards Annual Radioactive Effluent Release Rept for 1993. Latest Revised Copies of Offsite Dose Calculation Manual & Process Control Program Also Encl as Apps to Rept ML20067C9271994-02-22022 February 1994 Forwards Fitness for Duty Program Performance Data for Period of Jul-Dec 1993 SNRC-2144, Forwards Vols 1-4 to Shoreham Decommissioning Project Termination Survey Final Rept. Twenty Proprietary Pages of Rept Withheld (Ref 10CFR2.790)1994-02-0404 February 1994 Forwards Vols 1-4 to Shoreham Decommissioning Project Termination Survey Final Rept. Twenty Proprietary Pages of Rept Withheld (Ref 10CFR2.790) 1996-05-24
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059L1841990-09-20020 September 1990 Informs of Promotion of Jg Wynne to Position of Facility Operations Div Manager,Effective 900827 SNRC-1753, Forwards Rev 5 to Security Training & Qualification Plan.Rev Withheld1990-09-18018 September 1990 Forwards Rev 5 to Security Training & Qualification Plan.Rev Withheld SNRC-1758, Informs That W Uhl Resigned from Util on 900831 & No Longer Needs to Maintain Senior Reactor Operator License 44311990-09-18018 September 1990 Informs That W Uhl Resigned from Util on 900831 & No Longer Needs to Maintain Senior Reactor Operator License 4431 SNRC-1755, Forwards Rev 5 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21)1990-09-13013 September 1990 Forwards Rev 5 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21) SNRC-1754, Requests That Annual License Fee for FY91 Be Held in Abeyance Pending Disposition of 900105 Amend Request1990-09-0707 September 1990 Requests That Annual License Fee for FY91 Be Held in Abeyance Pending Disposition of 900105 Amend Request SNRC-1752, Forwards Revised Tech Specs Re Defueled Status of Plant,Per Agreements Reached W/Nrc at 900802 Meeting1990-08-30030 August 1990 Forwards Revised Tech Specs Re Defueled Status of Plant,Per Agreements Reached W/Nrc at 900802 Meeting SNRC-1747, Forwards Semiannual Radioactive Release Rept for First & Second Quarters 1990 & Revised ODCM1990-08-23023 August 1990 Forwards Semiannual Radioactive Release Rept for First & Second Quarters 1990 & Revised ODCM ML20056B5041990-08-21021 August 1990 Forwards Application for Amend to License NPF-82,consisting of License Change Application 8,modifying Tech Specs by Deleting Independent Safety Engineering Group & Associated Controls SNRC-1750, Amends Util 900810 Request for Interim Relief from Tech Spec Limiting Condition for Operation 3.7.1.2.b.3 Associated W/ Plant Svc Water sys-shutdown.Requests That Relief Be Granted Starting 900817 & Ending 9009081990-08-15015 August 1990 Amends Util 900810 Request for Interim Relief from Tech Spec Limiting Condition for Operation 3.7.1.2.b.3 Associated W/ Plant Svc Water sys-shutdown.Requests That Relief Be Granted Starting 900817 & Ending 900908 PM-90-110, Forwards fitness-for-duty Program Performance Data for Jan-June 1990,per 10CFR26.71(d)1990-08-13013 August 1990 Forwards fitness-for-duty Program Performance Data for Jan-June 1990,per 10CFR26.71(d) SNRC-1744, Forwards Rev 1 to, Environ Qualification Rept for Class 1E Equipment for Shoreham Nuclear Power Station Unit 1 Lilco. Provides Technical Justification for Rev1990-08-10010 August 1990 Forwards Rev 1 to, Environ Qualification Rept for Class 1E Equipment for Shoreham Nuclear Power Station Unit 1 Lilco. Provides Technical Justification for Rev SNRC-1743, Advises That Util Eliminated Positions of Outage & Mod Div Manager & Outage Engineer.Safety Significance of Changes Evaluated.No Impact Exist Because Util Contractually Prohibited from Operating Facility1990-08-10010 August 1990 Advises That Util Eliminated Positions of Outage & Mod Div Manager & Outage Engineer.Safety Significance of Changes Evaluated.No Impact Exist Because Util Contractually Prohibited from Operating Facility SNRC-1746, Requests Interim Relief from Limiting Condition for Operation 3.7.1.2.b.3 Re Tech Spec for Plant Svc Water Sys - Shutdown1990-08-10010 August 1990 Requests Interim Relief from Limiting Condition for Operation 3.7.1.2.b.3 Re Tech Spec for Plant Svc Water Sys - Shutdown SNRC-1738, Responds to NRC Re Violations Noted in ORAT Insp Rept 50-322/89-80 Re Failure to Address IE Info Notice 86-002.Rev to Environ Qualification Operability Code & Intent of Eear 87-017 Provides Sufficient Bases1990-07-24024 July 1990 Responds to NRC Re Violations Noted in ORAT Insp Rept 50-322/89-80 Re Failure to Address IE Info Notice 86-002.Rev to Environ Qualification Operability Code & Intent of Eear 87-017 Provides Sufficient Bases SNRC-1737, Forwards License Change Application 7 Requesting Amend to License NPF-82,conforming to Guidance of Generic Ltr 88-12 Re Fire Protection Requirements1990-07-20020 July 1990 Forwards License Change Application 7 Requesting Amend to License NPF-82,conforming to Guidance of Generic Ltr 88-12 Re Fire Protection Requirements SNRC-1732, Responds to Generic Ltr 90-03 Re Relaxation of NRC Position in Generic Ltr 83-28,Item 2.2,Part 2 Re Vendor Interface for safety-related Components1990-07-18018 July 1990 Responds to Generic Ltr 90-03 Re Relaxation of NRC Position in Generic Ltr 83-28,Item 2.2,Part 2 Re Vendor Interface for safety-related Components ML20044A9131990-07-0606 July 1990 Forwards Util Response to NRC Bulletin 90-001 Re Loss of fill-oil in Transmitters Mfg by Rosemount.No Model 1153 Series B Transmitters Installed at Plant SNRC-1735, Submits Organization Changes for WE Steiger & Jd Leonard Effective 9007091990-07-0303 July 1990 Submits Organization Changes for WE Steiger & Jd Leonard Effective 900709 SNRC-1733, Submits QC Div 1990 Staffing Rept,Per Sc Contention 13(d) Settlement Agreement.Actual Manhour Requirements for QC Under Projection Reported for Previous 2 Yrs1990-06-28028 June 1990 Submits QC Div 1990 Staffing Rept,Per Sc Contention 13(d) Settlement Agreement.Actual Manhour Requirements for QC Under Projection Reported for Previous 2 Yrs ML20044A3641990-06-28028 June 1990 Forwards Joint Application for Amend to License NPF-82, Designating Long Island Power Authority as Plant Licensee Upon or After NRC Amends License to Nonoperating Status ML20043F4741990-06-11011 June 1990 Requests Approval of Decommissioning Funding Method Set Forth in Encl Site Cooperation & Reimbursement Agreement Between Lilco & Long Island Power Authority ML20043D5761990-06-0505 June 1990 Requests Interim Relief from Action Requirements of Tech Specs 3.3.7.9,3.7.7.2,3.7.7.3 & 3.7.8 Re Establishing & Maintaining Continuous Fire Watches &/Or Hourly Fire Watch Patrols ML20043C3081990-05-30030 May 1990 Requests Interim Relief from Requirements of License Condition 2.C.(13),pending Dispostion of Util 891215 Request for Exemption from 10CFR50.54 & Amend to License.Condition Concerns Quarterly Emergency Plan Drills ML20043A9721990-05-18018 May 1990 Advises That,Effective 900501,LJ Calone & Ja Notaro Will No Longer Need to Maintain Senior Operator Licenses PM-90-072, Forwards Listed Lers,Updating Original Repts for Corrective Actions Deferred Due to State of Ny - Lilco Shoreham Settlement Agreement1990-05-16016 May 1990 Forwards Listed Lers,Updating Original Repts for Corrective Actions Deferred Due to State of Ny - Lilco Shoreham Settlement Agreement ML20042H0091990-05-14014 May 1990 Forwards Completed Questionnaire for Each Applicable Type of Operational Insp,Audit or Evaluation as Identified,Per Generic Ltr 90-01 ML20042E8241990-04-27027 April 1990 Responds to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Box Bow. Licensee Will Not Use Channel Boxes for Second Bundle Lifetime,Therefore,Bulletin Does Not Apply to Facility ML20042E2001990-04-17017 April 1990 Advises That H Carter,M Herlihy,J Reid,J Dunlap & a Burritt Resigned from Util & No Longer Need to Maintain Operator Licenses ML20012F5391990-04-0606 April 1990 Discusses Layup Implementation Program & Site Characterization Program for Plant.Util Intends to Remove Neutron Instrumentation & Other Selected Reactor Pressure Vessel Internals in Order to Obtain More Accurate Profile ML20012F0011990-04-0606 April 1990 Forwards Rev 19 to Security Plan.Rev Withheld (Ref 10CFR73.21) ML20012E2821990-03-28028 March 1990 Requests Interim Relief from Requirement That Util Conduct FEMA-graded Exercise of Util Offsite Emergency Response Plan by End of 1990 & That NRC-graded Exercise Be Deferred Pending Review of Proposed Defueled Emergency Plan ML20012E2771990-03-27027 March 1990 Forwards 1990 Internal Cash Flow Projection for Facility,Per 10CFR140.21 ML20012D2071990-03-22022 March 1990 Notifies That Listed Employees No Longer Need to Maintain Listed Senior Reactor & Reactor Operators Licenses ML20012C7781990-03-16016 March 1990 Requests Interim Relief from Certain Requirements Re Emergency Diesel Generators for Plant,Pending Disposition of Util Outstanding Request in 900105 Ltr to Amend License to Create Defueled Facility OL ML20012C6441990-03-15015 March 1990 Forwards 10CFR50.59 Rept for Jan-Dec 1989 & Discusses Rept Format.Title 10CFR50.59 Requires That Rept List Changes Which Did Not Involve Unreviewed Safety Question & Completed During Reporting Period ML20012C7571990-03-15015 March 1990 Forwards Request for limited-scope Exemption from fitness- for-duty Requirements of 10CFR26.Util Also Requests That Exemption Be Granted & Remain in Effect Until NRC Approves Final Disposition of OL ML20012C2271990-03-13013 March 1990 Requests Interim Relief from Primary Containment Leak Rate Testing Requirements of 10CFR50.54(o) & App J,III.D.1-3 Pending NRC Disposition of Lilco 891208 Request for Exemption from Same Requirements ML20012B5111990-03-0707 March 1990 Advises That F Sauerbrun No Longer Needs to Maintain NRC Senior Operator License 10602 Due to Resigning from Position on 900216 ML20011F3841990-02-27027 February 1990 Forwards Semiannual Radioactive Effluent Release Rept,Third & Fourth Quarters of 1989. Rept Includes Info for Each Type of Solid Waste Shipped Offsite During Period & Meteorological & Dose Assessment Data for Entire Yr ML20006G1631990-02-27027 February 1990 Forwards Annual Ltr of Certification of Util Local Offsite Radiological Emergency Response Plan for Facility.Requests That Ltr Be Transmitted to FEMA for Review.Info Covers Emergency Equipment Inventory Sys & Training ML20012A9571990-02-27027 February 1990 Responds to Generic Ltr 89-19 Re Resolution of USI A-47 on Safety Implications of Control Sys & Generic Ltr 89-21.USIs A-45,A-46,A-47,A-48 & A-49 Completed.Status of USI A-47 Changed from Evaluating to No Changes Necessary ML20006F4671990-02-20020 February 1990 Forwards Application for Amend to License NPF-82,revising Tech Specs to Conform to Generic Ltr 89-01, Implementation of Programmatic Controls for Radiological Effluent Tech Specs in Administrative Controls Section.... ML20006C2431990-01-31031 January 1990 Informs of Resignation of J Johnson & Expiration of Reactor Operator License 10480,effective on 900101 ML20011E0961990-01-30030 January 1990 Responds to Generic Ltr 89-10, Safety-Related Motor- Operated Valve Testing & Surveillance. Util Intends to Indefinitely Defer Implementation of Generic Ltr Recommendations & Requirements for Plant ML20005G9231990-01-22022 January 1990 Forwards Rev 4 to Security Training & Qualification Plan.Rev Withheld ML20006A2671990-01-18018 January 1990 Responds to Generic Ltr 89-13 Re Svc Water Sys Problems Affecting safety-related Equipment.Action on Generic Ltr Deferred,Based on Defueled Condition of Reactor.Chlorination Sys Operated to Preclude Biofouling ML20005G2251990-01-12012 January 1990 Reaffirms Commitment Not to Place Nuclear Fuel Back Into Facility Reactor W/O Prior NRC Approval & Advises of Preliminary Steps Taken to Lower Ongoing Costs ML20005F8241990-01-0808 January 1990 Notifies of Termination of Employment of G Good & G Bobka as Licensed Reactor Operators ML20005F1631990-01-0505 January 1990 Forwards Application for Amend to License NPF-82,creating Defueled Facility Ol.Justification for Amend Provided in Encl Rept, Shoreman Nuclear Power Station Defueled Sar. ML20005E6021990-01-0505 January 1990 Forwards Rev to Physical Security Plan Re Fuel Storage in Spent Fuel Pool to Reflect Defueled Facility Ol.Rev Withheld (Ref 10CFR73.21(jj)) 1990-09-07
[Table view] |
Text
f a .
LONG ISLAND LIGHTING COM PANY mE,f ,LF,,C ,,O,f
, SHOREHAM NUCLEAR POWER STATION P.O. SOX 618. NORTH COUNTRY ROAD e WADING RIVER, N.Y.11792 SNRC-564 May 15, 1981 O
Mr. H. R. Denton, Director Lf / >f /'
Office of Nuclear Reactor Regulation "s ,
U.S. Nuclear Regulatory Commission fig,I Washington, D.C. 20555 ' b ,
I'IAV b 1 % !Qlbgk EQUIPMENT DYNAMIC QUALIFICATION s SER OUTSTANDING ISSUE NO. 8 SHOREHAM NUCLEAR POWER STATION - UNIT 1 (D '
DOCKET NO. 50-322 gA m(/// -
REFERENCE:
NRC Seismic Qualification Review Team (SQRT)
Site Visit April 6-10, 1981
Dear Mr. Denton:
Submitted hercuith are six copies of our response to the requests for supplemental and confirmatory information made by the NRC Seismic Qualification Review Team (SQRT) at the exit interview of the referenced visit. This response in-cludes the five attachments listed below.
Attachment I Responses to NRC SQRT requests for additional general information - dated May 14, 1981 Attachment II Responses to NRC SQRT requests for additional information concerning their selected equipment items - dated May 14, 1981 i
e6 to? , .
L A
Mr. H. R. Denton May 15, 1981 Page two Attachment III - dated May 13, 1981 Title page, Qualification Summary of Equipment (.SQRT form) and Qualification Summary and Evaluation for each selected item Attachment IV - dated May 13, 1981 Requalification Plan and Equipment Lists at Qualification Level Attachment V - dated May 13, 1981 Supplemental Technical Data Four copies of this submittal are being forwarded directly to Dr. Morris Reich at Brookhaven National Laboratory, in accordance with Mr. R. L. Tedesco's letter to LILCO dated January 28, 1981, We believe that the material contained in these attachments (and the supplements promised in the Attachment I response to request (3), and the Attachment II response concerning equipment item 4) provides a complete response to the NRC SQRT requests for addi-tional information pertaining to the dynamic qualification of Shoreham equipment. It is our belief that the site review held in April 1981 and supplemented by this submittel and the commitments made in Attachment I provides an acceptable basis for the NRC SQRT closure on the issue of dynamic qualification of Shoreham equipment.
Verystruly yours, f, % OTh&
h/J. P. Novarro Project / Manager Shoreham Nuclear Power Station JFE:mp Enclosures cc: Dr. Morris Reich J. Higgins t
i
s 'I l
4 l
~
ATTACHMENT I MAY 14, 1981 RESPONSES TO NRC SQRT REQUESTS FOR ADDITIONAL GENERAL INFORMATION e
t
-, , , ,-,-e,-, , --- .. . - - - o- -
(1) Provide a statement regarding any equipment which appeared on previously submitted equipment qualification lists and which is no longer regarded as safety-related.
RESPONSE
Audit Item 21 (BOP), 1Hil*PNL-SMP, was deleted from the list because it serves no safety function. It is merely a monitor and has no effect on any required equipment.
(2) Provide a statement concerning.the meaning and revision of " hot standby" and." cold, shutdown" categories for equipment items.
Submit any equipment list pages showing revisions in this classifi-cation.
RES PONSE:
For the purposes of SQRT equipment classification, the following defini-tions are used to determine the appropriate functional requirements.
These definitions essentially correlate to . those outlined in Table 1.1, page 1-7 of the GE Standard Technical Specifications.
- 1. Hot Standby - Hot standby conditions as defined for the purposes of SQRT equipment classification represent the case where the reactor is subcritical but is not being placed in a forced cooldown. For conservatism, the reactor is considered isolated from the main con-denser and RCIC is used to supply high pressure makeup. The reactor remains at a pressure and temperature near operational conditions and no abnormal operational conditions are assumed. In general, achieving and maintaining this condition requires only control rod insertion and high pressure makeup with RHR suppression pool cooling as required.
- 2. Cold Shutdown - Cold shutdown conditions represent achieving and maintaining RPV canditions below which the RHR system can be opera-tad in the normal shutdown cooling mode. Systems required are those necessary to achieve this mode and to maintain it for as long as necessary. The single failure assumed for this event is the blue emergency bus causing a loss of normal shutdown capability via the loss of one RHR/RPV suction valve. For this condition, manual ADS operation and CS or LPCI circulation / core and suppression pool cooling methods will achieve and maintain cold shutdown conditions.
Equipment safety function has been reviewed for consistency with these definitions and incorporated into the equipment lists provided in Attachment IV.
2
O (3) Provide a statement of the general position and a copy of the standard for support of tubing and flexible lines.
RESPONSE
Tubing A question was raised during the SQRT review of certain seismically qualified instruments regarding the installation of associated instru-mentation tubing. Such tubing is beyond the intended scope of the SQRT a review, but was addressed on the basis that its failure could prevent functioning of the instrument itself. In response to the expressed concern, however, following is car position on the installation of instrument tubing.
The basic standard for the installation of tubing and instrumentation is Stone & Webster Engineering Mechanics Technical Guideline No. 16A (EMTG-16A) , dated December 20, 1976, modified for Shoreham plant unique loadings based on Project calculations. This document is proprietary but was available at the site for review by the SQRT reviewers and is, therefore, not submitted at this time.
The specific concern raised regarding tubing installation was for the adequacy of tubing not supported near bends. As described at that time, project calculations have been performed using computer models of tubing systems having configurations representative of plant installations.
These dynamic analyses have demonstrated the conservatism of the instal-lation standards, and specifically, the design adequacy of configurations of the type addressed by the SQRT reviewers. A summary of the calculations and a copy of the computer analysis for one example configuration will be provided by May 27, 1981.
Small Bore Piping The basic standard for the installation of small boro (2 in. and under) piping is Stone & Webster Engineering Mechanics Technical Guideline No. 5A !
(EMTG-5A) , dated December 15, 1976, modified for Shoreham plant unique loadings based on project calculations. This document is' proprietary but was available at the site for review by the SQRT reviewers and is, there- I fore, not submitted at this time.
The specific concern raised relating to small bore piping was with regard to the qualification of valves with eccentric masses (e.g., MOVs, ADVs) mounted on these lines. Such valves are dynamically qualified to accelera-tion levels required by the design specifications. For valves with eccentric masses mounted on lines outside of the primary containment, where hydro-dynamic loads are less severe or not applicable, the design acceleration values based on a conservative estimate of seismic loads alone have been maintained. For such valves mounted on lines inside of the primary contain-ment, design accelerations to which the valves must be qualified have been l increased to reflect the additional effects of hydrodynamic loads. l t
3
.~.'
The adequacy of the prescribed design accelerations will be confirmed by dynamic analysis of the as-built piping configuration for valves with extended operators. I 1
-(4) Provide a statement and basis for justification of mounting dis-crepancies between installed and tesced configuration (usually welds instead of bolts).
RES PONSE:
Where mounting of the equipment cannot replicate the tested configuration, an engineering evaluation is made to justify an alternate installation.
This engineering evaluation would, for example, justify the use of a welded connection for a panel where a bolted connection has been used for qualitication testing. The process for identifying and resolving this concern is the Engineering and Design Coordination Report (E&DCR) system as outlined in the Stone & Webster Quality Assurance Manual.
Final confirmation that the installed mounting is compatible with the qualified mounting is based on physical inspection.
(5) Provide confirmation of the limiting acceleration (g) values for the as-built configuration for the selected BOP valves - IB31*A0V082, 1 Ell *PCV003A, IP41*MOV036A,1E51*RV14 5, and IE51*RV149.
RESPONSE
Confirmation of the limiting acceleration (g) values for the as-built configuration of all valves listed above will be provided after their as-built piping review program is completed.
(6) Provide completed "four-page" SQRT forms for the selected items.
The blank form was provided as an attachment to Mr. R. L. Tedesco's letter to LILCO dated January 28, 1981.
RES PONSE:
Attachment III of this submittal contains four-page SQRT forms completed for the selected equipment items.
(7)- Provide completed "four-page" SQRT forms for the equipment not designated as "F" in Reference 1.
RES PONSE:
A four-page SQRT form for the safety-related equipment items listed in Attachment IV will be provided after their qualification status is designated "F" (qualification complete) .
(8) Provide a description of any equipment hardware modifications required for qualification of the items not designated as "F" in Reference 1.
4
O
.,. n.
i
RESPONSE
A description of any equipment hardware modifications required for qualifica-tion will be provided after completion of the requalification plan given in Attachment IV for items not currently complete.
(9) Provide a title page identifying equipment and showing review sign-offs for each audited' equipment item designated as "F", unless the page was seen during the visit.
8
RESPONSE
Title pages identifying the equipment and containing appropriate review signoffs are provided in Attachment III,for the audited equipment items.
(10) Provide a title page identifying equipment and showing review sign-offs for all equipment not designated as "F", after they become nyn,
RESPONSE
A title page identifying the equipment and containing appropriate review sign-offs for equipment items listed in Attachment IV will be prepared to indicate the successful completion of the qualification evaluation process.
After the equipment dynamic qualification status is designated "F" (qualifi-cation complete), the title pages will be provided as requested for any selected equipment items.
(11) Provide a summary of the hydrodynamic loads consideration for each audited equipment item designated as "F", unless the summary was seen during the visit.
RESPONSE
A summary of the hydrodynamic loads consideration for all audited equipment items is included in Attachment III. Also contained therein, as noted in (6) and (9) above, are the four-page SQRT forms and the title pages respec-tively.
(12) Provide a summary of the hydrodynamic loads consideration for all equipment not designated as "F" in Reference 1.
RESPONSE
A summary of the hydrodynamic loads consideration for the equipment items listed in Attachment IV will be prepared as part of the qualification evalua-tion process. After the dynamic qualification status is designated "F" (qualification complete), the summaries will be available upon request for '
any selected equipment items.
Reference 1 cited in requests (7), (8) and (12) is the equipment lists sub-mitted to the MEC by LILCO letter SNRC-550 dated March 27, 1981.
5 I
.* y.
ATTACHMENT II MAY 14, 1981 RESPONSES TO liRC SQRT REQUESTS FOR ADDITIONAL INFORMATION CONCERNING THEIR SELECTED EQUIPMENT ITEMS l
l l
1 1 s
- - - - , , ,g--e *e v +y,,.=a --,,
Item 1: iHil*PNL-613 (HilP613) a) Provide the revision of a report.
b) Revise the SQRT form.
RES PONSE:
a) Revision i dated May 6,1981 of General Electric Report DRF No. A00-992 summarizing the qualification of control room and local panels is provided in Attachment V behind Tabs 1 and 2 respectively.
b) The SQRT form has been revised as requested during the review at the Site, and included under Tab 1 of Attachment III.
Item 2: 1H21*PNL-10 (H21P010) a) Revise the SQRT form, particularly to show welding description.
RES PONSE a) The SQRT form has been revised as requested during the review at the Site, and is submitted under Tab 2 of Attachment III.
Item 3: 1H21*PNL-36 (H21P036) a) Revise the SQRT form.
RESPONSE
a) The SQRT forms has been revised as requested during the review at the Site, and is submitted under Tab 3 of Attachment III.
Item 4: IC61*PT006 (C61N006) a) Provide a calculation of support frame frequency by Stone & Webster.
RESPONSE
a) Testing of this pressure transmitter showed that its malfunction level of acculeration is well above the acceleration level required for Shoreham service until the input signal reaches 40 Hz, at which t
point the malfunction limit dropped to .26 g's as compared with the floor amplified response spectrum value of .4 g's at 40 Hz. A dynamic modal analysis was conducted to determine the support frame frequency and the response of this stand with instruments attached, Results demonstrate a fundamental frequency sufficiently low to result in modal accelerations less than 0.26g above 40 Hz, which establishes e to' combined seismic and th5t this pressure transmitter is qualifi'd hydrodynamic loads. The supporting calculation will be provided by May 27, 1981.
2
w Item 8: IC41*P-024 (C41C001).
a) Revise the SQRT form to clarify that hydrodynamic loads were considered.
RESPONSE
a) The SQRT form has been revised as requested during the review at the Site, and submitted under Tab 8 of Attachment III.
Item 10: 1R24*MCC1123 a
a) Provide operability evidence for the electrical devices.
RESPONSE
a) No additional details of the testing other than presently included in the test report reviewed at the Site are available from the vendor.
As shown in the vendor's test report, FA and KA breakers, HO and DO type relays and control stations, and size 1 through size 4 Type S starters were monitored during the test to determine the electrical continuity (contact chatter) and to detect any spurious operation.
The test demonstrated that the electrical function of the 480 Volt Motor Control Center was not compromised by exposure to seismic and hydrodynamic loads.
Item 12: IT48*RC-002 a) Explain how nozzle loads were considered in the qualification.
b) Provide a record of how the hydrodynamic loads were considered.
c) Confirm status of NRC acceptance that the T-quencher SRV load is bounded by the ramshead SRV load in the frequency range of interest in equipment qualification.
d) Provide operability evidence for attached accessories after the dynamic test.
el Revise the SQRT form, particularly to note the frequencies of the several components.
RESPONSE
a) Nozzle loads are negligible because the input and output piping is attached using flexible couplings.
b) A record of how the hydrodynamic loads were considered is provided for the audited equipment in Qualification Sanaary and Evaluation sheets under each Tab of Attachment III. For the Hydrogen Recombiner, this record is under Tab 12.
3 i
/
i
-.,.e --......-.m.,..m.. . .- , --,,-. ,,,,,----.+~.,.--- 4..m,-,,_.,m ~-. ~ -, - . . = . . . - - - - , . , . ... .
\
J .a c) In 1979, the NRC questioned the adequacy of the SRV ramshead load ,
definition for the qualification of " low frequency" components.
The question arose due to the fact that the ramshead ARS were exceeded by the T-quencher ARS at frequencies lower than approxi-mately 7 Hz. Justification that the effects of ramshead SRV loads
'on Shoreham equipment bound those resulting from a T-quencher discharge has been submitted to the NRC (LILCO letter SNRC-438 dated October 23, 1979). In addition, for equipment items such as 1T48*RC-002, which has a minimum natural frequency of 14 Hz, the adequacy of the ramshead load definition was never questioned in the frequency range of interest, d) No additional information on the operability testing 'of these accessories is available. The tests demonstrated that the structural integrity of the hydrogen recombiner was adequate to survive a faulted event. The "Barton" pressure transmitters functioned correctly both before and after the seismic test series. The pressure transmitters were monitored electrically during testing.
Thus, the abililty of these accessories to perform their required safety function under combined seismic and hydrodynamic loads is demonstrated .
e) The SQRT form has been revised as requested during the review at the Site, and submitted under Tab 12 of Attachemnt III. However, frequencies of the various accessories are not included since the scan test was instrumented to measure'only frequencies associated with the modes of the main frame. For qualification by multi-frequency testing, determination of the fundamental frequency (Fo) is required to establish the frequency range over which the TRS must envelop the RRS, i.e. , from Fo to the ZPA asymptote. The frequency of accessories provides no information pertaining to acceptance criteria and is therefore not measured in a multifrequency test.
Item 13: IT48*PNL-68 a) Revise the SQRT form, particularly to note welds instead of bolts.
RESPONSE
a) The SQRT form has been revised as requested during the review at the Site, and is submitted under Tab 13 of Attachment III. Field mounting by welding instead of bolting has been noted.
i 4
l
t .s Item 14: 1T46*L/UO59 (in 1H21*PNL-060) a) Provide more detailed test data for the L/U (logic unit).
b) Revise the SQRT form, particularly to indicate g level.
RESPONSE
a) More detailed test data for this Logic Unit was obtained from the
. vendor and provided for NRC review under Tab 14 of Attachment V.
b) The SQRT form has been revised as requested during the review at the Site, and submitted under Tab 14 of Attachment III. .
Item 16: IP41*MOV026 a) Revise the SQRT form, particularly the "PSAS" abbreviation.
RESPONSE
a) The SQRT form has been revised as requested during the review at the Site, and is submitted under Tab 16 of Attachment III. The PSAS entry has been changed to read " Piping Analysis."
Item 17: IB31*A0V082 a) Revise _the SQRT form.
b) Provide a calculation of the frequency.
c) Confirm the maximum acceleration of the valve for the as-built configuration, considering the hydrodynamic loads and the flexibility of the pipe.
l d) Provide operability evidence for the valve operator.
I e) Provide the maximum acceleration for the associated valve inside l the primary containment (1B31*A0V081).
f) Provide a schedule for installing the pipe support whf?h had not yet been installed and confirm the adequacy of the support.
RES PONSE:
a) The SQRT form has been revissJ as requested during the review at t the Site, and is submitted unJer Tab 17 of Attachment III. >
b) The frequency analysis of the operator has been revised using the model changes requested by the NRC, and is provided under Tag 17 of Attachment V. Results show that the operator frequency is 63 Hz.
5
r -
c) Pipe stress analyses' based on design configurations for the audited item 1B31*A0V082 in the secondary containment and for an identical valve 1B31*A0V081 in the primary containment have been conducted on these 3/4 in. lines, using the revised model of this operator referenced in (b) above. Results were as listed below:
Horizontal-g's Verticaj~g's 1B31*A0V082 0.6 0.6 IB31*A0V081 1.0 2. 5 Confirmation of the limiting acceleration (g) valves for the as-built configurations will be provided after their as-built piping review is completed, d) No additional information on the operability testing of this actuator is available. As shown in the vendor's report, the relative displacement between actuator stem and valve frame is 4.7 mils. Since the clearance provided is 131 mils, operability is assured for a combined seismic and hydrodynamic environment.
a) See response (c) above. ,
f) Installation of supports for small bore piping is not performed on a precise schedule known far in advance. Completion of the as-built piping review program will assure installation of required supports.
Item 18: 1E11*PCV003A a) Provide a calculation of the frequency.
b) Confirm the maximum acceleration of the valve.
c) Consider the effect of hydrodynamic loads in light of the possible revised frequency.
d) Provide operability evidence for the valve, e) Revise the E]RT form.
f) Provide information concerning the support of instrument lines (see exit interview request for statement and standard for small tubing).
l RES PONSE:
a) The frequency analysis of the operator has been revised using the model changes requested by the NRC, and is provided under Tab 18 of l Attachment V. Results show that the operator frequency is 33 Hz.
i
(
6
~
b) A pipe stress analysis based on the design configuration has been conducted ,
on this J' in. line, using the revised model of this operator referenced l in (a) 3. Results show 2.9 horizontal and 3.0 g's vertical accelera- l tions I at the operator center-of-gravity from combined seismic and hydrodynamic load. Confirmation of the limiting acceleration (g) values (
for the as-built configuration will be provided after their as-built piping review is completed, as indicated in Item 5 of Attachment I. !
c) The vendor designed this operator to 3.0 g's. horizontal and vertical accelerations acting at the center of gravity of the operator with a 1.3 minimum factor of safety on stress. Since these accelerations including the' factor of safety are above the required accelerations noted in (b) above, the adequacy of the actuator to withstand combined seismic
' and hydrodynamic loads is established.
d) No additional information of operability testing of,this actuator is f available. As shown in the vendor's report, the relative displacement between actuator stem and valve frame is 28 mils. Since the clearance b provided is.111 mils, operability is assured for a combined seismic and hydrodynamic environment.
e) The SQRT. form has been revised as requested during the review at the Site, and is submitted under Tab le of Attachment III.
e
' f) Information concerning the support of instrument lines is provided in Item (3) of Attachment I.
Item 19: 1R23*T-102 !
a) Provide the mounting configuration (which could not be inspected during '
the visit due to the integrated flush activities) .
b) Revise the SQRT form, particularly to note the frequencies of the ;
several components. ,
l' RESPONSES ,
a) Transformer 1R23*T-103 has been deenergized and its mounting has been 7 inspected. Its mounting is described on the SQRT form and considered !
in the summary and evaluation under Tab 19 of Attachment III. The mounting of T-101 and T-102, is assumed to be the same and will be con-firmed when access is possible. ;
b) The SQRT form has been revised as requested during the review at the Site [
inc;.vding the frequency range, and is submitted under Tab 19 of Attachment &
III. As discussed in Item 12(e), the frequency of any components is not measured in a multi-frequency test. i r
h 8
7 .
1 N +r - n . .+- r .,n ,,emw,,--aw,.,wn,,,,,,.e.e, ,,,,r.~e .g+.m, ,m.,,.,,.,, ,,,,,.,,,.._.png , , , , , , , , ,_ , , , , _ . , , , , , _ , , , , , ,
. .~
Item 20: 1M50*PNL-04 a) Revise the SQRT form, particularly to indicate the weight and the frequency range.
RESPONSE
a) The SQRT form has been revised as requested during the review at the Site, including the weight and the frequency range covered by the test, and is submitted under Tab 20 of Attachment III.
Item 21: 1H11-PNL-SNP This item was dropped because it is not safety-related.
Additional Item 2: IB21*PS020 (B21N015) a) Provide information by Stone & Webster concerning the support of small tubing.
RESPONSE
l a) This information is provided in Item (3) of Attachment I.
Additional Item 5: IC11*LS095 (C11N013) a) Provide an evaluation of the safety significance of contact chatter.
RESPONSE
a) The test results for this pipe-mounted level switch show malfunction (onset of chatter) limits of 1.3 g's horizontal and vertical for frequencies below 30 Hz and .4 g's for frequencies above 3011z.
The pipe stress analysis gives accelerations including all modal contributions equal to 1.0 g's horizontal and .8 g's vertical, as shown by an SRSS of modal accelerations. The contribution above 30 Hz is less than .lg . Hence, this evaluation demonstrates that the level switch can withstand the Shoreham dynamic environment from combined seismic and hydrodynamic loads, without reaching unacceptable chatter.
Additional Items 6 and 7: 1E51*RV145 and 1E51*RV149 a) Revise SQRT form, particularly to indicate the natural frequency of the internal components.
l b) Either confirm that no chatter occurs or provide an evaluation of
- the safety significance of chatter.
l c) Correct the drawing to show the actual set pressure. ,
8
= _ . .. . . -. -- - .-
= . .. _ -
1 -
RESPONSE: ,
a)- The SQRT form has been revised as requested during the review at the site, and submitted under Tab.A6 of Attachment III. Based on the frequency analysis under Tab A6 of Attachment V, a note has been added to the SQRT form stating that the frequency of the spring is considerably higher (307 vs 68 Hz) than the valve fre-quency, and that steam released by chatter (unlikely in view of the high frequency of the spring) has no impact on safety.
b) Although chatter of these relief valves is unlikely because the
-spring is quite stiff (307 Hz), its occurrence would.have no impact on safety, since the discharge is to the drainage system.
c) The drawings has been revised to call out the correct set pressure for both relief valves.
Additional Item 8: 1T46*AOD040 a) Provide a record of how the hydrodynamic loads were considered.
b) Clarify the f aquency (40 Hz, not 60 Hz).
3 c) Modify the input g level due to the frequency modification.
d) Provide operatility evidence for the limit switch. i e) Provide operability evidence in the SQRT form for the actuator. ,
RESPONSE
a) A record of how hydrodynamic loads were considered is provided in I. the Qualification Summary and Evaluation submitted under Tab A8 of Attachment III.
b) Review of the vendor's calculation shows that the correct fundamental frequency of the damper is 40 Hz, which is reflected in the SQRT form submitted under Tab A8 of Attachment III.
c) The input g-level has been modified to reflect the frequency change.
The modified g level in combination with a multi-mode factor of 1. 5 ;
1s accommodated by the 3.2 minimum factor of safety shown in the vendor's stress report, as noted in the SQRT form. ,.
t
=
l 9
_ _ _ _ ._ _ _ ._, _ .~. _ .. . _ , _ , _ , . _ - , _ , _ . . _ _ . _ _ . _ _ . ~ . . _ . _ . _ . _ _ _ , _ .
3 l
s - . .
I l
d) Operability monitoring and results for this limit switch are contained in the Table II Summary, Item No. 19 of the vendor's test report.
A copy of this Table is provided under Tab A8 of Attachment V, showing that the limit switch performed its function to established requirements.
e) The SQRT form has been revised to acknowledge operability evidence for the actuator, and is provided under Tab A8 of Attachment III.
Since the limit switch of (d) above and the actuator were tested as e unit, the results of the testing are summarized on one page (page ,
3 of the form) which is used for qualification by test. A copy of the operability monitoring results for both limit switch and actuator is provided under Tab A8 of Attachment V (Test Items No. 19 and 17, respectively).
Additional Item 9: 1T46* MODO 34 a) provide a record of how the hydrodynamic loads were considered.
b) Provide operability evidence in the SQRT form for the actuator.
c) Revisc the stress calculation to reflect transmissibility, including a factor of 1.5.
d) Provide a stress calculation for the hold-down bolts to the bonnet, including a factor of 1.5.
e) Provide operability evidence for the limit switch.
RESPONSE
a) A record of how hydrodynamic loads were considered is provided in the Qualification Summary and Evaluation contained under Tab A9 of Attachment III.
b) Operability evidence for the actuator has been acknowledged in the SQRT form, and is summarized under Tab A9 of Attachment III in the Qualification Summary and Evaluation, c) The effects of transmissibility were evaluated based on the frequency analysis described below instead of a stress analysis.
Since the actuator is mounted on a horizontal frame of considerable extension from its attachments to the reactor building wall, a frequency analysis was carried out to determine the transmissibility effects at the actuator base. As shown in this analysis, provided under Tab A9 of Attachment V, the frequency is 24 Hz. From the spectra supplied with the SQRT form and using a multi-mode factor of 1.5, this frequency corresponds to input accelerations required at the actuator base of 2.0 g's horizontal and 1.5 g's vertical, which are well below the test levels.
10
, . . . - . . -. ....-...-.-.- - . . . . . - ~ . . . . . .. _ - . .
s .
d) It is concluded based on the considerations presented in (c) above, that the adequacy of hold-down bolts to withstand combined seismic and hydrodynamic loads was. demonstrated by test, and therefore a stress calculation is not required.
e) Excerpts from the vendor's test report are provided under Tab A8 of Attachment V, demonstrating that the limit swite.h performed its function to established requirements (same switch sa used in Item A8).
l l
I 11