MONTHYEARML20212J0501999-09-21021 September 1999 Safety Evaluation Re Licensee Implementation Program to Resolve USI A-46 at Plant,Per GL 87-02,Suppl 1 ML20210L8661999-08-0202 August 1999 Safety Evaluation Accepting License 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20195K1481999-06-16016 June 1999 Safety Evaluation Authorizing Relief Request RV-23A for Duration of Current 10 Yr IST Interval on Basis That Compliance with Code Requirements Would Result in Hardship Without Compensating Increase in Level of Quality & Safety ML20205Q5291999-04-16016 April 1999 SER Concluding That Quad Cities Nuclear Power Station,Unit 1,can Be Safely Operated for Next Fuel Cycle with Weld O2BS-F4 in Current Condition Because Structural Integrity of Weld Will Be Maintained ML20205J6011999-04-0707 April 1999 Safety Evaluation Accepting Proposed Merger of Calenergy Co, Inc & Midamerican Holdings Co for Quad Cities Nuclear Power Station,Units 1 & 2 ML20196D9651998-11-30030 November 1998 Safety Evaluation Supporting Relief Requests CR-21 & CR-24, Respectively.Relief Request CR-23,proposed Alternative May Be Authorized,Per 10CFR50.55a & Relief Request CR-22 Was Withdrawn by Licensee ML20196A9761998-11-20020 November 1998 Safety Evaluation Re Licensee 180-day Response to GL 95-07, Thermal Binding of Safety-Related Power-operated Gate Valves ML20151T2711998-09-0404 September 1998 Safety Evaluation Accepting Licensee Response to NRC Bulletin 95-002 ML20216F0221998-03-0606 March 1998 Safety Evaluation Accepting Request Re Temporary Use of Current Procedure for Containment Repair & Replacement Activities at Plant ML20197B9171997-07-23023 July 1997 Safety Evaluation Re Concrete Expansion Anchor Safety Factors for High Energy Line Break Restraints ML20141E5091997-05-16016 May 1997 Safety Evaluation Supporting TR EMF-96-051(P), Application of Anfb Critical Power Correlation to Coresident GE Fuel for Plant,Unit 2 Cycle 15 ML20137G6071997-03-13013 March 1997 Safety Evaluation Supporting Proposed Changes to TS & Bases Ceco ML20134H7601997-02-0707 February 1997 Safety Evaluation Approving Rev 65c of Ceco QA TR CE-1-A ML20149F4151994-08-0404 August 1994 Safety Evaluation Concluding That Unit 1 Can Be Safely Operated During Next Operating Cycle (Cycle 14) ML20058L2711993-12-0808 December 1993 Safety Evaluation Finding Overlay Repair of Weld 02C-F7 Acceptable & in Conformance W/Gl 88-01.Plant May Be Returned to Safe Operation ML20056C4601993-06-17017 June 1993 Safety Evaluation Accepting Proposed Repair of Weld in Recirculation Piping Sys for One Cycle of Operation ML20128F9731993-02-10010 February 1993 Safety Evaluation Granting Licensee 910930 Request Not to Perform Code Exam on 100% of Attachment Welds on Stabilizer Brackets to Reactor Vessel Under 10CFR50.55(a)(3)(ii) ML20055F9221990-07-17017 July 1990 Safety Evaluation Supporting Util Responses to NRC Bulletin 88-010 Re Molded Case Circuit Breaker Replacement ML20248J2431989-10-0303 October 1989 Safety Evaluation Accepting Util 880122,0601,0714 & 0816 Submittals Re Insp Results,Mitigation,Flaw Evaluations & Overlay Repairs of Welds Susceptible to IGSCC to Support Operation of Unit 2,for Another 18-month Fuel Cycle ML20246K1611989-08-24024 August 1989 Revised SER Supporting Amends 112 & 108 to Licenses DPR-29 & DPR-30,respectively,changing Setpoints of Main Steam Line Radiation Monitors & Correcting Typos in Tech Specs ML20248B8911989-06-0606 June 1989 Safety Evaluation Concluding That IGSCC Insp Scope for Class 1 Piping Meets NRC Requirements & Guidelines of Generic Ltr 84-11 ML20151X3431988-08-16016 August 1988 SER Accepting Basis & Findings That Util post-accident Monitoring Instrumentation Meets Guidelines of Reg Guide 1.97 Except for Variable Neutron Flux Instrumentation ML20151M6901988-07-21021 July 1988 Revised Safety Evaluation Supporting Exemption Requests from Regulatory Requirements of 10CFR50,App R,Section Iii.G ML20195E2091988-06-0909 June 1988 Safeguards Evaluation Rept Supporting Amends 108 & 103 to Licenses DPR-29 & DPR-30,respectively ML20151U1201988-04-20020 April 1988 Revised Safety Evaluation Accepting Util Interim Compensatory Measures & Request for Exemption from 10CFR50, App R,Section Iii.G Requirement Re Hot Shutdown Repair for Fire Event in Plant ML20149M5301987-12-11011 December 1987 Marked-up Safety Evaluation Supporting Request for Exemptions from App R ML20236W4851987-12-0101 December 1987 Safety Evaluation Accepting Proposed Approaches for Resolving fire-related Concerns,Including Spurious Operations,High Impedance Faults & Electrical Isolation Deficiency.Granting of Exemption Requests Recommended ML20235S8541987-10-0202 October 1987 Safety Evaluation Supporting Interim Approval of Rev 3 to Process Control Program for Plant ML20237H7061987-08-19019 August 1987 SER Supporting Util Response to Item 2.1 (Part 1) of Generic Ltr 83-28 Re Equipment Classification.Licensee Statements Confirm Program Exists for Identifying,Classifying & Treating Components as safety-related.Program Acceptable ML20236H1341987-07-27027 July 1987 Safety Evaluation Re Acceptance of Updated Rev 11 to Offsite Dose Calculation Manual ML20205H1351987-03-23023 March 1987 Safety Evaluation Re Insps for & Repairs of Igscc.Facility Can Be Safely Operated for One 18-month Fuel Cycle in Present Configuration ML20214X1111986-11-26026 November 1986 Safety Evaluation Supporting Util Analytical Methods Used to Evaluate Stresses of Critical Components for Vacuum Breaker Integrity Re Mark I Containment Program ML20214Q3851986-11-17017 November 1986 Safety Evaluation Re Insp & Repair of Reactor Coolant Piping Sys ML20141D2291986-03-31031 March 1986 Safety Evaluation Granting Util Request for Relief from Certain Requirements of Section XI of ASME Code Re Inservice Insp for Second 10-yr Interval ML20141P0491986-03-13013 March 1986 Safety Evaluation Supporting Licensee 831105 & 851219 Responses to Generic Ltr 83-28,Item 1.2, Post-Trip Review (Data & Info Capability) ML20137A3931986-01-0707 January 1986 Safety Evaluation Supporting Reactor Coolant Piping Sys IGSCC Insp & Repair Per Generic Ltr 84-11 & Return to Operation for 18-month Cycle ML20133F0291985-07-30030 July 1985 Safety Evaluation Accepting Util 831105 & 850605 Responses to Generic Ltr 83-28,Item 1.1 Re post-trip Review (Program Description & Procedure) ML20126F4561985-05-31031 May 1985 Safety Evaluation Supporting Util Response to Generic Ltr 83-28,Items 3.1.1,3.1.2,3.2.1,3.2.2 & 4.5.1 Re post-maint Testing Verification ML20062B8351982-07-28028 July 1982 Safety Evaluation Supporting Plant Compliance W/Esf Reset Controls Per NRC Criteria ML20126C3461980-03-20020 March 1980 Safety Evaluation Supporting Amend 51 to License DPR-30 ML20235D0971966-12-30030 December 1966 Safety Evaluation Supporting Util 660531 Proposal to Const & Operate Single Cycle BWR of 2,255 Mwt 1999-09-21
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data SVP-99-204, Monthly Operating Repts for Sept 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212J0501999-09-21021 September 1999 Safety Evaluation Re Licensee Implementation Program to Resolve USI A-46 at Plant,Per GL 87-02,Suppl 1 SVP-99-179, Monthly Operating Repts for Aug 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20210L8661999-08-0202 August 1999 Safety Evaluation Accepting License 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs SVP-99-155, Monthly Operating Repts for July 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With SVP-99-148, Monthly Operating Repts for June 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20195K1481999-06-16016 June 1999 Safety Evaluation Authorizing Relief Request RV-23A for Duration of Current 10 Yr IST Interval on Basis That Compliance with Code Requirements Would Result in Hardship Without Compensating Increase in Level of Quality & Safety SVP-99-123, Monthly Operating Repts for May 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations SVP-99-104, Monthly Operating Repts for Apr 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With SVP-99-102, Summary Rept of Changes,Tests & Experiments Completed, Covering Period 990201-0430. with1999-04-30030 April 1999 Summary Rept of Changes,Tests & Experiments Completed, Covering Period 990201-0430. with ML20205Q5291999-04-16016 April 1999 SER Concluding That Quad Cities Nuclear Power Station,Unit 1,can Be Safely Operated for Next Fuel Cycle with Weld O2BS-F4 in Current Condition Because Structural Integrity of Weld Will Be Maintained ML20205J6011999-04-0707 April 1999 Safety Evaluation Accepting Proposed Merger of Calenergy Co, Inc & Midamerican Holdings Co for Quad Cities Nuclear Power Station,Units 1 & 2 SVP-99-071, Monthly Operating Repts for Mar 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20205C5671999-03-19019 March 1999 Simulator Four-Yr Certification Rept ML20207D2341999-03-0101 March 1999 Post Outage (90 Day) Summary Rept, for ISI Exams & Repair/Replacement Activities Conducted 981207-1205 ML20204B1571999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Quad Cities,Units 1 & 2.With SVP-99-021, Quarterly Summary SER of Changes,Tests & Experiments Completed, Covering Period of 981101-990131,IAW 10CFR50.59 & 10CFR50.71(e).With1999-01-31031 January 1999 Quarterly Summary SER of Changes,Tests & Experiments Completed, Covering Period of 981101-990131,IAW 10CFR50.59 & 10CFR50.71(e).With ML20205D1311998-12-31031 December 1998 1998 Decommissioning Funding Status Rept for Yr Ending 981231 for Quad Cities Nuclear Power Station,Units 1 & 2 ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with SVP-99-007, Monthly Operating Repts for Dec 1998 for Quad Cities Nuclear Power Station,Units 1 & 2,IAW GL 97-02 & TS 6.9.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Quad Cities Nuclear Power Station,Units 1 & 2,IAW GL 97-02 & TS 6.9.With ML20196C8391998-11-30030 November 1998 Rev 0 to GE-NE-B13-01980-030-2, Assessment of Crack Growth Rates Applicable to Induction Heating Stress Improvement (IHSI) Recirculation Piping in Quad Cities Unit 1 SVP-98-364, Monthly Operating Repts for Nov 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20196G1241998-11-30030 November 1998 COLR for Quad Cities Unit 1 Cycle 16 ML20196D9651998-11-30030 November 1998 Safety Evaluation Supporting Relief Requests CR-21 & CR-24, Respectively.Relief Request CR-23,proposed Alternative May Be Authorized,Per 10CFR50.55a & Relief Request CR-22 Was Withdrawn by Licensee ML20196C8731998-11-30030 November 1998 Rev 0 to GE-NE-B13-01980-30-1, Fracture Mechanics Evaluation on Observed Indications at Two Welds in Recirculation Piping of Quad Cities,Unit 1 Station ML20196A9761998-11-20020 November 1998 Safety Evaluation Re Licensee 180-day Response to GL 95-07, Thermal Binding of Safety-Related Power-operated Gate Valves ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB SVP-98-346, Monthly Operating Repts for Oct 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With SVP-98-358, Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period on 980716-1031.With1998-10-31031 October 1998 Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period on 980716-1031.With SVP-98-326, Monthly Operating Repts for Sept 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Quad Cities Nuclear Power Station,Units 1 & 2.With ML20153D0191998-09-18018 September 1998 Part 21 Rept Re Defect in Gap Conductance Analyses for co- Resident BWR Fuel.Initially Reported on 980917.Corrective Analyses Performed Demonstrating That Current Operating Limits Bounding from BOC to Cycle Exposure of 8 Gwd/Mtu ML20153C6771998-09-17017 September 1998 Part 21 Rept Re Defect Relative to MCPR Operating Limits as Impacted by Gap Conductance of co-resident BWR Fuel at Facilities.Operating Limit for LaSalle Unit 2 & Quad Cities Unit 2 Will Be Revised as Listed ML20151T2711998-09-0404 September 1998 Safety Evaluation Accepting Licensee Response to NRC Bulletin 95-002 ML20151Y7261998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Quad Cities Nuclear Power Station ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept ML20151Y7301998-07-31031 July 1998 Revised MOR for Jul 1998 for Quad Cities Nuclear Power Station,Units 1 & 2 ML20237A6251998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Quad Cities Nuclear Power Station,Unit 1 & 2 SVP-98-328, Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period of 971001-980715,per 10CFR50.59 & 10CFR50.71(e).With1998-07-15015 July 1998 Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period of 971001-980715,per 10CFR50.59 & 10CFR50.71(e).With SVP-98-249, Monthly Operating Repts for June 1998 for Quad Cities Nuclear Power Station,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Quad Cities Nuclear Power Station,Units 1 & 2 SVP-98-215, Monthly Operating Repts for May 1998 for Quad Cities Nuclear Power Station Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Quad Cities Nuclear Power Station Units 1 & 2 ML20247N6281998-05-19019 May 1998 Rev 2 to COLR for Quad Cities Unit 2 Cycle 15 ML20216C0561998-04-30030 April 1998 Safe Shutdown Rept for Quad Cities Station,Units 1 & 2, Vols 1 & 2.W/22 Oversize Figures SVP-98-176, Monthly Operating Repts for Apr 1998 for Quad Cities Nuclear Power Station,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Quad Cities Nuclear Power Station,Units 1 & 2 ML20217D0281998-04-22022 April 1998 Part 21 Rept Re Additive Constants Used in MCPR Determination for Siemens ATRIUM-9B Fuel by Core Monitoring Sys Were Found to Be non-conservative.SPC Personnel Notified All Customers w/ATRIUM-9B Lead Test Assemblies ML20217G3951998-04-0808 April 1998 TS 3/4.8.F Snubber Functional Testing Scope Quad Cities Unit 2 TS (Safety-Related) Snubber Population 129 Snubbers SVP-98-128, Monthly Operating Repts for Mar 1998 for Quad Cities Nuclear Station Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Quad Cities Nuclear Station Units 1 & 2 1999-09-30
[Table view] |
Text
.O~
e arc ,
,,.. ..og UNITED STATES
, yl 3er g NUCLEAR REGULATORY COMMISSION r, '
WASHING TON, D. C. 20555
' l
% .v.../
SAFETY EVALUATION BY THE OFFICE . NUCLEAR REACTOR REGULATION SUPPORTING AMENDMENT NO. 51 TO FACILITY OPERATING LICENSE NO, DPR-30 COMMONWEALTH EDISON COMPANY 1 AND -
IOWA-ILLINOIS GAS AND ELECTRIC COMPANY QUAD CITIES STATION, UNIT NO. 2 DOCKET NO. 50-265 Introduction By letter dated August 30,1979 (Reference 1), and supplemented by Reference 2 and Reference 9, Commonwealth Edison (CE), the licensee, proposed amendments to Quad Cities Station Unit 2 (QC-2) License and Appendix A, Technical Specifications. CE has proposed these amendments to support its review of future reloads for QC-2 under the provisions of 10 CFR 50.59.
Our approval is only for the proposed amendment and does not constitute approval of CE's future reloads under the provisions of 10 CFR 50.59.
Evaluation Safety Limit Critical Power Ratio (SLMCPR[
This change provides SLMCPRs in the Technical Specifications for all currently approved core loadings. With retrofit 8x8 fuel in the core the SLMCPR limit is specified as 1.07. Without retrofit 8x8 fuel the SLMCPR limit is 1.06.
These limits have previously been found acceptable for this use in Reference 4 and on this basis the proposed change is acceptable.
Rod Drop Accident (RDA) Design Limit The RDA design limit has been modified from 1.3%a maximum rod worth to 280 cal /gm peak fuel enthalpy rise. The 280 cal /gm design limit is acceptable per Standard Review Plan NUREG-75/087. Also, the power level below which the rod worth minimizer is required was increased from 10% to 20% of rated.
This is conservative by comparison to the previous specification and is
) consistent with reactor safety analyses. 1 l
h
- r 800s32o 4
{
Maximum Average Planar Linear Heat Generation Rate (MAPLHGR)
New MAPLHGR curves from Reference 6 have been proposed. This employed methodology accepted for OC-2 in Reference 7. The only change to Reference 6 from that previously accepted is to incorporate prepressurized fuel in the analyses.
This addition was performed in compliance with our guidelines in our acceptance of prepressurized fuel application (Reference 8). Therefore, the use of Reference 6 continues to be acceptable for QC-2 and the addition of Reference 6 MAPLHGR curves to the Technical Specification is also acceptable.
Linear Heat Generation Rate (LHGR) Power Spiking Penalty The LHGR power spiking penalty for 8x8 fuel has been incorporated in the safety analyses by the reduction of the LHGR limit an equivalent amount. This change has been generically accepted by our Reference 5 letter.
Power Peaking The next proposed change is to go from a total peaking factor fonnulation to a ratio of the fraction of limiting power density to fraction of rated power formulation for the local power peaking adjustment of neutron flux reactor protective system logic. This change in formulation has previously been approved for other BWRs, e.g., Reference 3. These two formulations are identical in their resul.ts but the proposed formulation eliminates the need for different limits for different fuel t.ypes. Also the pro vides for increasing the Average Power Range Monitor (APRM) posedofchange pro-gains instead a reduction in setpoints. This results in the same protective function.
Safety / Relief Valve (SRV) Setpoint A reduction in the SRV safety function setpoint has been proposed. The SRV relief function setpoint was reduced to preclude multiple relief valves discharges. The proposed change would reduce the SRV safety function setpoint to the same value for consistency. The licensee plans to use this setpoint in future analyses. This reduction is conservative with respect to reactor vessel pressure relief function. It is also a small reduction =15 psi, so that there is no significant increase in valve demand, and, thus, probability of failure.
Water Level Setpoints The current Technical Specifications have water level setpoints referenced to the top of the active fuel. Different active fuel lengths, as is the case for the 8x8 and 8x8R fuels, may confuse the specification and surveillance requirements. Therefore, the licensee has proposed to define the top of the active fuel as 360 5/16" above reactor vessel zero and the reactor low water level scram and ECCS initiation setpoints at 143 7/8" and 83 7/8" above the top of the active fuel, respectively. These definitions and setpoints are conservative values compared to those used in the reactor safety analyses.
o .
-S-These findings are based on current acceotable fuel assemcly designs and any application of other designs would require specific justification of water level setooints.
The reactor low water level scram setting had been established as 144 inches above the top of the core. With the licensee's agreement, we have modified the trip setpoint to be greater than 144 inches to assure that the scram occurs at or before the value assumed in reactor safety analyses.
Overcressure Protection Margin to Safety Valve Setcoints The first procosed cnange is to delete the portien of the license restricticn that requires reactor power level restrictions to maintcin pressure margin to safety valve (SV) set points during the worst case cressurization transient.
This restriction was imposed by the licensee to avoid an extensive outage in the event of SV discharge to the drywell. Our criteria for overpressurization protection (Standard Review Plan 5.2.2, NUREG-79/087) has been that "for the design basis normal operational transients, relief valve capacity must be sufficient to limit the pressure so as to prevent SV discharge directly to the containment," and, "for the nost severe abnormal operational transient, with reactor scram, the SV capacity should be sufficient to limit the pressure to less than 110% of the reactor coolant pressure boundary design pressure."
These criteria are satisfied by the proposed change.
Further, we do not consider the SV discharge to the drywell a safety concern, since all safety systems are to be qualified for LOCA environment which is more severe than the possible SV discharge. We have also reviewed BWR pressure relief systems operating experience (NUREG-0462) and have found that operating experience with SVs has been essentially failure free.
Coastdown Feedwater Heater Restrictions In response to our concern on the potential for power operation outside the bounds of the transient analyses for coastdown operation, the licensee has proposed that the license restriction include a requirement to perform a safety evaluation if off-normal feedwater heater operation is needed (Reference 2). This requirement satisfies our concern.
Tycograonical Corrections and Clarification of Bases The remaining changes fall into the category of typographical corrections and clarification of bases and do not, as such, represent a significant safety Concern.
Environmental Considerations We have determined that the amendment does not authorize a change in effluent types or total amounts nor an increase in power level and will not result in any significant environmental impact. Having made this determination, we have further concluded that the amendment involves an action which is insigni-ficant from the standpoint of environmental impact, and pursuant to 10 CFR Section 51.5(d)(4) that an environmental impact statement, or negative declaration and environmental impact appraisal need not be prepared in connection with the issuance of the amendment.
. 5 Conclusion We have concluded, based on the considerations discussed above, that: (1) because the amendment does not involve a significant increase in the probability or consequences of accidents previously considered and does not involve a signi-ficant decrease in a safety margin, the amendment does not involve a significant hazards consideration, (2) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, and (3) such activities will be conducted in compliance with the Commission's regulations and the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Dated: March 20, 1980 l
. s l
References
- 1. Letter from Cordell Reed (CECO), to the Director of Nuclear Reactor Regulation (USNRC) dated August 30, 19/9.
- 2. Letter from D. Louis Peoples (CECO), to Director of Nuclear Reactor Regulation (USNRC) dated October 24, 1979.
- 3. Letter from T. A. Ippolito (USNRC) to G. T. Berry (Power Authority of the State of New York), dated November 22, 1978.
- 4. Letter from D. G. Eisenhut (USNRC) to R. Gridley (General Electric, GE) dated May 12, 1978.
- 5. Letter from D. G. Eisenhut (USNRC) to R. Gridley (GE) dated June 9, 1978.
- 6. " Loss-of-Coolant Accident Analysis Report for Dresden Units 2,3 and Quad Cities Units 1, 2 Nuclear Power Stations," NED0-24164 A, dated April 1979.
- 7. Memorandum from R. L. Baer to D. L. Ziemann " Evaluation of Quad Cities Unit 2 for Cycle 4 Operation," dated February 21, 1978.
- 8. Letter from T. A. Ippolito (USNRC) to R. Gridley (GE), dated April 16, 1979.
- 9. Letter from D. L. Peoples (CECO) to Director, NRR, dated March 7,1980.
-n w