Safety Evaluation Authorizing Util to Continue Current Test Method for Interim Period,Based on Util Plans to Develop & Implement Use of non-intrusive Testing Techniques for Check Valves Following 1993 Unit 2 Refueling OutageML20126C122 |
Person / Time |
---|
Site: |
North Anna |
---|
Issue date: |
12/04/1992 |
---|
From: |
Office of Nuclear Reactor Regulation |
---|
To: |
|
---|
Shared Package |
---|
ML20126C109 |
List: |
---|
References |
---|
NUDOCS 9212220379 |
Download: ML20126C122 (5) |
|
|
---|
Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198H5541997-12-29029 December 1997 SER Accepting Request for Approval of ASME Case N-498,rev 1, as an Alternative to Required Hydrostatic Pressure Test for Plant,Unit 2 ML20197K1541997-12-18018 December 1997 SER Granting Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 Service Water Piping for North Anna Power Station,Per Util 970919 Submittal ML20199L0501997-11-24024 November 1997 SER Accepting Inservice Insp Program Relief Request NDE-32 ML20199E4971997-11-14014 November 1997 Safety Evaluation Authorizing Proposed Alternative of Licensee Relief Requests NDE-35 & NDE-37,for Plant,Units 1 & 2 During Second 10 Yr Interval ML20217E0701997-09-24024 September 1997 Safety Evaluation Granting Licensee ASME Section XI Relief Request NDE-33 at Plant,Unit 1 ML20217E2411997-09-24024 September 1997 SER Accepting Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 Service Water Piping,Virginia Electric & Power Co,North Anna Power Station,Unit 1 ML20217E1871997-09-24024 September 1997 SER Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 Service Water Piping,Virginia Electric & Power Co,North Anna Power Station,Units 1 & 2 ML20149L2001997-07-29029 July 1997 SER Granting Requests for Relief NDE-33,34 & 35 Re ISI Program,Per 10CFR50.55a(g)(6)(i) ML20149F1321997-07-17017 July 1997 Safety Evaluation Supporting Amends 205 & 186 to Licenses NPF-4 & NPF-7,respectively ML20148H1971997-06-0404 June 1997 Safety Evaluation Granting Licensee Relief Request NDE-31 Related to Inservice Insp Program ML20140F4811997-04-30030 April 1997 Safety Evaluation Accepting Licensee 951207 Proposed Alternative in Request for Relief SPT-16 Re Second 10-yr Interval Inservice Insp Program for Unit 2 ML20133G1561997-01-10010 January 1997 Safety Evaluation Accepting Second 10-year Relief Requests for Relief Numbers NDE-27,NDE-28 & NDE-29 ML20133G1911997-01-10010 January 1997 Safety Evaluation Accepting Second 10-year Interval Inservice Insp Plan Relief Request NDE-30 ML20138G1931996-10-16016 October 1996 SER Accepting Second 10-year Interval Inservice Insp Plan Request for Relief SPT-14,rev 1 Virginia Electric & Power Co North Anna Power Station,Unit 2 ML20128P1701996-10-10010 October 1996 Safety Evaluation Supporting Second 10-year Interval Inservice Insp Program Plan Requests for Relief NDE-23 Through NDE-30 for Plant Unit 2 ML20128F5981996-10-0101 October 1996 Safety Evaluation Authorizing Licensee Proposed Alternative to Examine Terminal End Welds on Lower Regenerative Heat Exchanger sub-vessels,per 10CFR50.55a(a)(3)(ii) ML20059M1181993-11-15015 November 1993 SER Accepting Category 3 Qualification in Lieu of Category 2 for Pressure Monitoring Instrumentation ML20057C0401993-09-17017 September 1993 Safety Evaluation Re Inservice Testting Program Requests for Relief ML20126C1221992-12-0404 December 1992 Safety Evaluation Authorizing Util to Continue Current Test Method for Interim Period,Based on Util Plans to Develop & Implement Use of non-intrusive Testing Techniques for Check Valves Following 1993 Unit 2 Refueling Outage ML20125B7251992-12-0303 December 1992 Safety Evaluation Granting Temporary Exemptions from Requirements of GDC-2 & 10CFR50.49 for Phase 1,stage 1 of Svc Water Sys Restoration Project ML20062C4441990-10-18018 October 1990 SER Re Station Blackout.Plant Does Not Conform W/Station Blackout Rule ML20247C2091989-09-0707 September 1989 Safety Evaluation Accepting Util 890512 Response to IE Bulletin 80-11, Masonry Wall Design ML20245J8401989-06-28028 June 1989 Safety Evaluation Supporting Restart of Unit 1 & Util 890528 Response to NRC Bulletin 89-001, Failure of Westinghouse Mechanical Steam Generator Tube Plugs ML20195J0061988-11-29029 November 1988 Safety Evaluation Supporting Licensee Responses to NRC Bulletin 88-002, Rapidly Propagating Fatigue Cracks in Steam Generator Tubes, Subj to Util Adopting Addl Administrative Controls ML20207F1391988-08-12012 August 1988 Safety Evaluation Supporting Util Responses to IE Bulletin 80-11, Masonry Wall Design, W/Exception of One Open Item ML20196G9081988-03-0404 March 1988 SER Re Util 831104 & 850208 Responses to Generic Ltr 83-28, Item 2.2.1, Equipment Classification (Program for All Safety-Related Components. Responses Acceptable ML20149J9301988-02-18018 February 1988 Safety Evaluation Re Relief Request 6 of Inservice Testing Program for Pumps & Valves ML20154E8221987-12-11011 December 1987 Safety Evaluation Supporting Util Identification of Major Causal Factors Leading to 870715 Tube Rupture Event & Adequacy of Diagnostic & Corrective Measures Implemented in Order to Preclude Similar Events ML20237B5981987-12-11011 December 1987 Safety Evaluation Accepting Util 870915 & 0925 Responses to Steam Generator Tube Rupture on 870715.Util Has Adequately Demonstrated That Primary Failure Mechanism Leading to Event Caused by flow-induced Vibration ML20236F4971987-10-23023 October 1987 Safety Evaluation Re Util 870925 Request for Approval of Steam Generator Downcomer Flow Resistance Plate Mods & Increase in Calculated Offsite Dose Per 10CFR50.59.Mods Acceptable ML20235U8811987-07-13013 July 1987 Safety Evaluation Supporting Request for Relief from Certain Exam & Hydrostatic Test Requirements of ASME Code ML20213G8081987-05-11011 May 1987 SER Re Util 850208 Response to Generic Ltr 83-28,Item 2.1 (Part 2), Vendor Interface Programs (Reactor Trip Sys Components. Program Acceptable ML20212K5111987-02-27027 February 1987 SER Accepting Licensee 831104 Response to Generic Ltr 83-28, Item 4.5.2, Reactor Trip Sys Reliability,On-Line Testing ML20207Q0651987-01-0909 January 1987 Safety Evaluation Denying Util 850401 Request to Reduce Number of Thimbles Required for Monthly Surveillance Flux Mapping ML20215D0811986-09-30030 September 1986 Safety Evaluation Granting Util 860613 Request for Relief from Inservice Hydrostatic Test Requirements for Svc Water Spray Sys 1999-09-08
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
4
![o d uay'o Igo UNITED STATES NUCLEAR REGULATORY COMMISSION
{ .j W ASHING TON, D. C. 20555
\...../ SAFETY EVALVATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO THE INSERVICE TESTING PROGRAM RE0 VESTS FOR RELIEF NORTH ANNA POWER STATIONS UNITS 1 AND 2
@CKET NUMBERS 50-338 AND 50-339
1.0 INTRODUCTION
The Code of Federal Regulations,10 CFR 50.55a, requires that inservice testing (IST) of certain ASME Code Class 1, 2, and 3 pumps ed valves be performed in accordance with Section XI of the ASME Boiler nu Pressure Vessel Code and applicable Addenda, except where specific written relief has been requested by the licensee and granted by the Commission pursuant to 10 CFR 50.55a(f)(6)(i) or where the alternative has been authorized pursuant to 50.55a(a)(3)(1) or (a)(3)(ii). In requesting relief, the licensee must demonstrate that: (1) the proposed alternatives provide an acceptable level of quality and safety; (2) compliance would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety; or (3) conformance is impractical for its facility. The NRC guidance contained in Generic letter (GL) 89-04, " Guidance on Developing Acceptable IST Programs," provided alternatives to the Code requirements determined to be acceptable to the staff.
10 CFR 50.55a authorizes the Commission to grant relief from or approve alternatives to ASME Code requirements upon making the necessary findings.
The NRC staff's findings with respect to granting or not granting the relief requested or authorizing the proposed alternatives as part of the licensee's IST program are contained in this Safety Evaluation (SE).
This SE covers Relief Requests V-72 and V-73 for North Anna Power Station, Units i and 2, respectively, as described in Virginia Electric and Power Company's (the licensee) letter dated February 21, 1992. The licensee's program is based on the requirements of the 1983 Edition of the ASME Section XI Code through the Summer of 1983 Addenda. The licensee is requesting interim relief from the Code requirements for testing the main steam line stop check valves in order to have time to develop appropriate closure verification test methods. Similar relief has been requested for the Surry Units-1 and 2 main steam line stop check valves. The licensee intends to evaluate one or more non-intrusive test methods during the next Surry Unit 2 refuelirg outage.
The methods chosen for closure verification of these valves will be used on both the Surry and the North Anna units during subsequent cold shutdowns.
2.0 RElli F RE0 VESTS V-72 AND V-73 The licensee requested interim relief from ASME Code Section XI, IWV-3520
" Tests for Check Valves," requirements for exercising valves during plant operation at least once every 3 months to the closed position. The valves in l
9212220379 921204 PDR P
ADOCK 05000338 PDR .
Relief Requests V-72 and V-73 are non-return main steam line stop check valves. The valves involved are 1-MS-NRV-101 A, B and C for Unit I and 2-MS- l NRV-201 A, B and C for Unit 2. j 2.1 BASIS FOR INTERIM REllEF l l
The licensee currently exercises and verifies these stop check valves closed by driving the valve stem down onto the disk using the valve motor operator, after the main steam system has been isolated, during plant cold shutdown.
The licensee justified cold shutdown testing because full- or part-stroke exercising of these valves quarterly at power could result in a turbine or-reactor trip.
The licensee considered the current method a valid ASME Code closure test for stop check valves based on the staff response to Question #25, conveyed in_ the
" Minutes of the Public Meeting on Generic Letter 89-04," issued on October 25, 1989. However, based on the supplement to the minutes issued on September 26, 1991, which clarified the response to Question #25 with regards to closure verification of stop check valves, the licensee finds the test method is not adequate. Condition "C" of the supplement states, "If prompt closue of these valves on cessation or reversal of flow is required to accomplish a safety-related function, closure must be verified by reverse flow testing or such other positive means as acoustic monitoring or radiography."
The licensee considers reverse flow testing is not practical at power or during cold shutdown. The stop check valve is needed during cold shutdown to ensure double valve isolation of the secondary plant piping from the steam ,
source.
2.2 ALTERNATE INTERIM TESTING The licensee proposes to develop, test and evaluate one or more non-intrusive methods during the 1993 Surry Unit 2 refueling outage. The methods involve application-during the cold shutdown process. The most practical method tested will be selected and implemented at both North Anna units during subsequent cold shutdowns.
During the interim, prior to implementing the new test methods,_ the licensee proposes to continue the current test method every cold shutdown at the North Anna Power Station, Units 1 and 2. The licensee states that the current test of driving the stem onto the disk is adequate to demonstrate the disk is seated in the closed position and free movement of the disk is demonstrated when steam flow is established, at full power, and the disk travels from the seat to the full-open position.
2.3 EVALUATION The main steam non-return valves 1-MS-NRV-101 A, B and C and 2-MS-NRV-201 A, B and C have a safety-related function to prevent reverse flow and limit blowdown to a single steam generator during a postulated steam line break.
i*
l The licensee has requested interim relief from ASME Code Section XI, IWV-3520, " Tests for Check Valves," requirements for verifying valve closure every three months during plant operation.
The licensee currently exercises these stop check valves to the cli sed position during cold shutdown by driving the stem down onto the disi using the valve motor operator. Exercising these valves during plant cold shutdown is justified because closing these valves quarterly during power operations could result in a turbine or reactor trip.
Based on th'e supplement response to Question #25 in "The Minutes of the Public Meeting Held on Generic letter 89-04," issued on September 26, 1991, the licensee must verify closure by reverse flow testing or such other positive means as acoustic monitoring or radiography.
The licensee has requested an interim period to evaluate in-house and vendor non-intrusive test methods capabilities, develop procedures and implement a test program for application during the cold shutdown process. The licensee will test one or more methods during the Surry Power Station Unit 2, 1993 refueling outage and implement the most practical test method, at the North Anna Power Station Units 1 and 2, following the refueling outage of Surry Unit 2. In the interim, the licensee proposed to proceed with the current test method to demonstrate valve closure while free movement of the disk is demonstrated by its travel from the seat to the full-open position with steam flow during ascension to full power.
It would be impractical to exercise these valves full- or part-stroke during power operations because it could cause a turbine or reactor trip. The licensee proposes to develop and determine the practicality of using a non-intrusive method of closure verification testing during the process leading to cold shutdown.
The licensee needs time to develop an adequate test method to verify closure of these valves on cessation or reversal of flow for compliance with Code requirements and NRC guidance. The licensee's proposed interim test to continue the current method to demonstrate valve closure by driving the stem down onto the disk and free movement of the disk demonstrated by travel of the disk from the clued to open position during ascension to full power steam flow provides an acceptable level of quality and safety for an interim period.
2.4 CONCLUSION
S Based on (1) the licensee's plans to develop and implement the use of non-intrusive testing techniques for these valves, (2) consideration of the time involved to develop and implement a non-intrusive monitoring alternative test, and (3) the alternative test method providing an acceptable level of quality and safety for an interim period, the alternative for the licensee to
continue' the current test method for an interim period is authorized pursuant- i to 10 CFR 50.55a(a)(3)(1) provided the licensee implements a non-intrusive test method for these valves following the 1993 Surry Unit 2 refueling outage.
Principal Contributor: F. Grubelich Date: December 4, 1992