ML20117P993
Text
JAN I 1 1990 Docket Hos. 50-317 DISTRIBUTION and 50-318 PDI-l Rdg Docket file SMcNeil i
CVogan JLinville MEMORANDUM FOR: Robert A. Capra, Director SRXB Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation FROM:
Scott Alexander McNeil, Project Manager Project Directorate I-1 Division of Reactor Projects 1/II Office of Nuclear Reactor Regulation
SUBJECT:
CONTROL ELEMENT ASSEMBLY CENTER FINGER i
CRACKING AT CALVERT CLIFFS 1 AND 2 (TAC NO. 66457) following determination that control element assemblies (CEAs) were experiencing center finger cracking at Calvert Cliffs 1 and 2, the NRC staff requested that the licensee submit a description of its CEA examination program, examination results and an analysir of observed cracks.
This information was submitted by BG&E on October 2, 1987 and was subsequently modified on April 6, 1988. This information was approved for withholding from public disclosure on April 27, 1988.
The Reactor System Branch (SRXB) was requested by PDI-1 to review the licensee's submittals to ensure that no concerns of safety significance were presented. SRXB was not required to provide a Safety Evaluction Report.
On March 7, 1988, SRXB completed its review of the licensee's submittals and determined that 1) the licensee's methodology for assessing the cracking phenomena was acceptable and 2) that this CEA cracking did not currently present any concerns of safety significance.
_8(
Scott Alexander McNeil, Project Manager Project Directorate I-1 Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulation
- PDI-l
- PDI-1
___:..__.....__: ___. g/ bah :
1E :CVog g :SMcNeil l//ff90
'E :
0 OFFICIAL RECORD COPY Document Name:
CONTROL ELEMENT ASSEMBLY
@ >" 3 % m e.
h /u
@g xA e
i 9-cu w