MONTHYEARML20262H5581973-12-14014 December 1973 Details:1,2,17 & 21 Thru 27,32,33 & 34. Sheet 2 of 3 Project stage: Other ML20262H5551973-12-14014 December 1973 Watertight Door Assy. Sheet 1 of 3 Project stage: Other ML20262H5611973-12-14014 December 1973 Details:3,13,19,24,28,35 & 36. Sheet 3 of 3 Project stage: Other ML20262H5671975-06-18018 June 1975 4 Ft X 8 Ft Opening Lhrb Door & Frame Assembly. Sheet 1 of 3 Project stage: Other ML20262H5711975-06-18018 June 1975 Details 2,3,4 & 5. Sheet 3 of 3 Project stage: Other ML20262H5691975-06-18018 June 1975 Details 1 & 6. Sheet 2 of 3 Project stage: Other ML20038A9581981-11-12012 November 1981 Requests Extension of Schedule for Emergency Lighting Installation Until 811204.Class II Fee Encl Project stage: Other ML20039B8431981-12-0707 December 1981 Exemption Granting Extension of Completion Date of Emergency Lighting Installation from 811117 to 1204 Project stage: Other ML20049J3291982-03-0303 March 1982 Requests Extension to 820701 for Submitting Design Info Re Implementation Schedule of 10CFR50.48 & Encl 2 of NRC Project stage: Other ML20052F4801982-05-0303 May 1982 Exemption from Fire Protection Rule Schedular Requirements of 10CFR50.48(c).Exemption Subj to Listed Conditions. Clarification of Generic Ltr 81-12 & Criteria for Evaluating Exemption Requests Encl Project stage: Approval ML20054E5071982-06-0202 June 1982 Requests Verification of Exemption of Station Battery Room water-tight Doors from Having 3-h Fire Rating Project stage: Other ML20054L8131982-07-0101 July 1982 Forwards Supplemental Responses to 10CFR50.48 & App R to 10CFR50 & Engineering Planning & Mgt,Inc Rept, DC Essential Cabinet Analysis, Per NRC 810220 Request (Generic Ltr 81-12) Project stage: Supplement ML20262H5631982-08-20020 August 1982 Installation of PR2905-4 3 Ft 9 & 1/2 Inches X 7 Ft 1/2 Inch Door & Frame Assy. Sheet 1 of 1.No Revision Date Project stage: Other ML20265A8161982-09-22022 September 1982 Edwin I Hatch Nuclear Plant - 1 & 2 Fire Protection Piping River Intake Structure Project stage: Other ML20070V7991983-02-14014 February 1983 Requests Meeting on or After 830329 W/Nrr to Appeal for Reconsideration of NRC Proposed Denial of App R Exemption Request.Addl Info Forthcoming to Clarify 820701 Submittal Project stage: Meeting ML20073S1721983-04-28028 April 1983 Clarifies Requests for Exemptions from 10CFR50.48 & App R Requirements in Response to NRC Request at 830330 Meeting. Rev to 820701 Response to Be Submitted by 830530 Project stage: Meeting ML20023D7611983-05-27027 May 1983 Forwards Revised Response to 820701 Requests for Exemption from 10CFR50.48 & App R Requirements,Per 830330 Request.Rev Reflects Compliance w/10CFR50.48 & App R Requirements & Responds to 830120 Draft SER Concerns Project stage: Draft Other ML20024A3861983-06-14014 June 1983 Forwards Addl Info to Justify 820701 10CFR50.48 & App R Schedule Exemption Requests Discussed at 830330 Meeting. Plan Being Developed to Complete Maint & Design Changes. W/Two Oversize Drawings.Aperture Cards Available in PDR Project stage: Meeting ML20263B9301983-08-18018 August 1983 Appendix R Fire Protection Modifications - CPM Schedule. Sheet 2 of 5 Project stage: Other ML20263B9271983-11-0707 November 1983 Appendix R Fire Protection Modifications - CPM Schedule. Sheet 3 of 5 Project stage: Other ML20263B9251983-11-0707 November 1983 Appendix R Fire Protection Modifications - CPM Schedule. Sheet 4 of 5 Project stage: Other ML20263B9321983-11-14014 November 1983 Appendix R Fire Protection Modifications - CPM Schedule. Sheet 1 of 5 Project stage: Other ML20082D3421983-11-16016 November 1983 Forwards Addl Info Justifying Three Requests for Exemption from 10CFR50.48 & App R as Discussed in 830330 Meeting.Rev to 820701 Response Will Be Submitted by 831130 Project stage: Meeting ML20082J7831983-11-30030 November 1983 Forwards Replacement Pages to Re Clarification of App R Exemption Requests,Reflecting Revised Sections of 820701 Response to 10CFR50.48 Project stage: Other ML20083D7541983-12-20020 December 1983 Forwards Revised Pages for Insertion Into 830701 Request for Exemption from 10CFR50.48 & 10CFR50,App R Requirements Re Sprinkler Head/Nozzle & Detector Placement Project stage: Request ML20083D7721983-12-21021 December 1983 Forwards Payment of Fee Required for Review of 810319 Submittal on Safe Alternate Shutdown & Request for Schedular Exemption from Installation of Emergency Lighting Project stage: Request ML17255A6241984-01-16016 January 1984 Forwards App R Alternative Shutdown Sys. New Shutdown Approach Provides Fewer Mods & Allows Phased Implementation as Opposed to Installation of Required Dedicated Shutdown Sys Project stage: Request ML20079P7121984-01-24024 January 1984 Submits Info Documenting Addl Considerations of Projected Phased Improvement in Fire Protection & Mitigating Factors for Areas Unmodified During Extended Implementation Period. Tentative Completion Dates for App R Mods Encl Project stage: Other ML17255A6941984-02-29029 February 1984 Summary of 840222 Meeting W/Util & Bechtel Re Proposed App R Exemption Requests & Alternative Shutdown Sys.Meeting Agenda & List of Attendees Encl Project stage: Meeting ML20084L4461984-04-18018 April 1984 Safety Evaluation Supporting Util 820701 Requests for Exemption from Requirements of App R to 10CFR50 & Approval of Deviations from Several NFPA Codes Per Installation & Maint of Fire Protection Sys Project stage: Approval ML20084L4301984-04-18018 April 1984 Exemption from Requirements of App R to 10CFR50 Re Licensee Alternate Fire Protection Configuration for East Corridor, Control & Turbine Bldgs & Condensate Pump Area Project stage: Approval ML17254A7601984-05-10010 May 1984 Exemption from Schedular Requirements of 10CFR50.48(c)(4) to Extend Implementation of Alternative Shutdown Sys Until Startup from 1986 Refueling Outage Project stage: Approval ML20091B7331984-05-25025 May 1984 Notifies of Commitment to Meet on fire-area-by-fire-area Basis,Either Item 1 or 2 & 3 for Period of Time from Expiration of 10CFR50.48 Schedule Allowance Until Area Complies W/Paragraphs III.G.2 & III.G.3 of 10CFR50,App R Project stage: Other ML20197G5581984-06-0808 June 1984 Requests Addl Info on App R Implementation,Needed to Respond to 840525 Request for Schedular Exemption.Proposed Schedules Appear Acceptable Project stage: Approval ML20096F8121984-09-0404 September 1984 Requests Notification of Determination Re Acceptability of Kaowool as Fire Barrier Project stage: Other ML20096F8381984-09-0404 September 1984 Forwards Proposed Specific Compensatory Measures to Support 840525 Requested 10CFR50.48 Schedular Exemptions for nonoutage-related App R Mods,Per 840608 Request Project stage: Other ML20093E4111984-10-0202 October 1984 Proposes Establishment of Roving Fire Watch to Pass Through Listed Sections of Control & Reactor Bldgs as Compensatory Measures to Support Schedular Extension of App R Mods Project stage: Other ML20265A8261984-10-0404 October 1984 As Built Isometrics for Intake Structure Pumps Project stage: Other ML20265A8211984-10-0404 October 1984 Intake Structure Pumps Project stage: Other ML20106D3531984-10-19019 October 1984 Requests Exemption from 10CFR50.48(c) to Allow Extension Until 861130 of Implementation Schedule for Listed App R Related Mods Which Can Be Implemented During Nonoutage Period Project stage: Other ML20107F1811984-10-26026 October 1984 Provides Basis for Request for Exemption from 10CFR50.48 Requirements Re Implementation of non-outage Related 10CFR50,App R Mods.Fire Protection Enhancement Program Cannot Be Implemented within Expected Time Frame Project stage: Request ML20101E3731984-12-20020 December 1984 Submits Specific Info Re Compensatory Measures for nonoutage-related App R Mods Not Completed within 10CFR50.48 Time Frame,In Support of 841002 Request for Extension of Schedule to Complete Listed Mods Project stage: Request ML20215F7371984-12-26026 December 1984 Rev 1 to Administrative Control Procedure 40AC-FPX01-0, Fire Protection Program. Portions of Procedures 34AB-OPS-056-1S & 34AB-OPS-056-2S Encl Project stage: Other ML20114C0021985-01-10010 January 1985 Environ Assessment & Finding of No Significant Impact Re Util 840904 Request for Schedular Deferment from 10CFR50, App R,Section Iii.G for Fire Protection Equipment Used for Safe Shutdown to 861130.EIS Unwarranted Project stage: Approval ML20114B8481985-01-16016 January 1985 Exemption from Requirements of 10CFR50.48(c) to Extend Deadline for Completion of Fire Protection Mods Not Requiring Plant Shutdown Until 861130 Project stage: Approval ML20114B4181985-01-17017 January 1985 Responds to 850116 Order & Provides Rev to Interim Mitigation Factors for Nonoutage Related App R Mods,Per 850117 Telcon Project stage: Other ML20116E8261985-04-16016 April 1985 Requests Extension Until 861130 to Implementation Schedule for outage-related Fire Protection Mods,Per 10CFR50,App R Requirements.List of outage-related Items to Annunciator Room & Reactor & Control Bldg Encl Project stage: Other ML20117L4581985-05-0707 May 1985 Notice of Issuance of Environ Assessment & Finding of No Significant Impact Re 850416 Request for Schedular Exemption from 10CFR50.48 Requirements Project stage: Approval ML20128B9011985-05-10010 May 1985 Informs of Completion of Review of 850404 Request for Relief from ASME Section XI Code for Leak Testing Msivs.Request Acceptable.Safety Evaluation Encl Project stage: Approval ML20128B9601985-05-10010 May 1985 Safety Evaluation Supporting Relief for 16 MSIVs from 1980 Edition of ASME Section XI Code Requiring Increased Frequency of Leak Rate Testing Based on Leak Rate Trending of 6-inch & Larger Valves Project stage: Approval 1983-08-18
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
~
1 7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION ENVIRONMENTAL ASSESSMENT AND FINDING OF N0 SIGNIFICANT IMPACT GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON, GEORGIA DOCKETS NOS. 50-321 and 50-366 The U.S. Nuclear Regulatory Commission (the Connission) is considering issuance of an exemption from the requirements of 10 CFR 50.48(c) to the Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and the City of Dalton, Georgia (the licensees), for the Edwin I. Hatch Nuclear Plant, Units 1 and 2 located in Appling County, Georgia.
ENVIRONMENTAL ASSESSMENT Identification of Proposed Action: The exemption would grant the licensees a schedular deferment from the provisions of Appendix R,Section III.G, fire protection of the equipment used for safe shutdown capability, from startup following the refueling outage scheduled to commence in the fall of 1985 for Hatch Unit I and startup following the refueling outage that commenced on April 5, 1985 for Hatch Unit 2 to November 30, 1986 for both Units. The exemption is responsive to the licensees' application for exemption dated April 16, 1985.
The Need for the Proposed Action: Appendix R,Section III.G. requires a licensee authorized to operate a nuclear power reactor to provide fire protection for equipment used for safe shutdown. The schedular requirements of Section 10 CFR 50.48(c) call for the implementation of modifications for which a plant shutdown is required before startup following the first 8505160259 850507 PDR ADOCK 05000321:
P PDR ;;
)
7590-01.
refueling outage that comerices'180 days or more after the date of NRC approval of the modifications requiring approval.
For Hatch Units 1 and 2, this 180-day period started on April 18, 1984. The deadlines for these modifications were therefore startup following the refueling outage scheduled to comence in the fall of 1985 for Hatch Unit 1 and startup following the refueling outage that comenced on April 5,1985 for Hatch Unit 2.
In a submittal dated April 16, 1985, the licensees requested that the implementation schedules for the proposed fire protection modification in certain areas at Hatch Units 1 and 2, requiring plant shutdown for installation, be extended to November 30, 1986.
The magnitude of the program associated with the fire protection modifications and with an equipment qualification program and other improvement programs with which the fire protection work must interface does not allow the 10 CFR 50.48(c) schedule reouirements to be met. As an alternative to implementation of the required modifications before startup following the refueling outages discussed above, the licensees have proposed interim compensatory fire protection' measures to be instituted until the modifications have been completed. These measures are being evaluated by the Comission's staff.
Environmental Impacts of the Proposed Action: By using reasonable interim compensatory measures, the proposed exemption will provide a degree of fire protection such that there is no significant increase in the risk of fire at
~
e
's 7590-01.
'this facility. Consequently, the probability of fires has not been increased and the post-fire radiological releases will not be greater than previously determined nor does the proposed exemption otherwise affect radiological plant effluents. Therefore, the Commission concludes that there are no significant radiological environmental impacts associated with this proposed exemption.
With regard to potential nonradiological impacts, the proposed exemption involves features located entirely within the restricted area as defined in 10 CFR Part 20.
It does not affect nonradiological plant effluents and has no.other environmental impact. Therefore, the Commission concludes that there are no significant nonradiological environmental impacts associated with the proposed exemption.
Alternative Use of Resources: This action does not involve the use of resources not considered previoutly in connection with the Final Environmental Statements (FES) relating to this facility, FES for Hatch Units 1 and 2, USAEC (October 1972) and FES for Hatch Unit 2, NUREG-0417 (March 1978).
Agencies and Persons Consulted: The Commission's staff reviewed the licensees' request and did not consult other agencies or persons.
FINDING 0F NO SIGNIFICANT IMPACT
~The' Commission has determined not to prepare an environmental impact statement for the proposed exemption.
i
^
5 6
~
7590-01
^
xx Basdd upon the~ foregoing environmental assessment, the Commission concludes-that the proposed action will not have a significant effect on the quality of the human. environment.
.Forlu'rther'detailswithrespecttothisaction,seetheapplicationfor exemption dated-April 16, 1985 which is available for public inspection at th'e Commission's Public Document Room, 1717 H Street, N.W., Washington, D.C.,
' and'at the Appling County Public Library, 301 City Hall Drive, Baxley,
- Georgia.
Dated at Bethesda, Maryland, this FOR THE NUCLEAR REGULATORY COMMISSION MM Gus C. Lainas, Assistant Director for Operating Reactors Division of Licensing
.. _ = -
V G
~
l w,,.
W.K'4g UNITED STATES
,[p g
NUCLEAR REGULATORY COMMISSION j
g WASHINGTON, D.C. 20066 3
I May 7 1985 g
f.
DOCKET No.
50-321 and 50-366
/
~
i
- j MEMORANDUM FOR:
Docketing and Service Branch Office of the Secretary of the Commission
[
E i a
FROM:
Office of Nuclear Reactor Regulation
[,
SUBJECT:
EDWIN HATCH NUCLEAR PLANT, UNITS NOS.1 & 2 g
=
EE; One signed original of the Federal Register Notice identified below is enclosed for your transmittal to the Office of the Federal g
Register for publication. Additional conformed copies ( 6
) of tiie Notide are enclosed for your use.
U Notice of Receipt of Application for Construction Permit (s) and Operating License (s).
5
\\
Notice of Receipt of Partial Application for Construction Permit (s) and Facility License (s): Time for Submission of Views 2I on Antitrust Matters.
C Notice of Consideration of issuance of Amendment to Facility Operating License.
f',
b Notice of Receipt of Application for Facility License (s); Notice of Availability of Applicant's Environmental Report;and i
l Notice of Consideration of issuance of Facility License (s) and Notice of Opportunity for Hearing.
l>
_1 Notice cf Availability of NRC Draft / Final Environmental Statement.
i O Notice of Limited Work Authorization, O Notice of Availability of Safety Evaluation Report.
i Notice of issuance of Construction Permit (s).
j Notice of issuance of Facility Operatin;; License (s) or Amendment (s),
a a
y Order.
I B
w C Exemption.
2:
Notice of Granting of Relief.
j 3 Other:
Environmental Assessment and Finding of No significant Imnact
[
=
s
]
R E
s E
Division of Licensing. ORBf4
_L r
Office of Nuclear Reactor Regulation f
Enclosure:
p As stated o-
>...0RBp}:DL
,,i ed- >..... k.....
?
f= >.. 5k.Lk.3.k..
qf y.
OFFICIAL RECORD COPY pl s
, i. _,r
- - - - _ _.