Requests Extension Until 861130 to Implementation Schedule for outage-related Fire Protection Mods,Per 10CFR50,App R Requirements.List of outage-related Items to Annunciator Room & Reactor & Control Bldg Encl
ML20116E826
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/16/1985
From: Gucwa L
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
1570N, NED-85-308, TAC-57415, TAC-57416, NUDOCS 8504300442
Download: ML20116E826 (7)


Text

_.. - _ _ _ -

Georg:a Power Company 333 Piedmont Avenue Attanta, Georgia 30'08 $ '.

Telephone 404 5266526 Maihng Miress:

Post Off:ce Box'4545 Atlanta, Georg:a 30302 h

Georgia Power L T. Cucwa the sournem electnc system Manager Nuclear Engineenng and Chief Naclear Engtneer NED-85-308 1570N April 16, 1985 Director of M1 clear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U.S. M1 clear Regulatory Comnission Washington, D.C.

20555 NRC DOCKEIS 50-321, 50-366 OPERATIl0 LICENSES DPR-57, NPF-5 EIMIN I. HATCH NUCLEAR PIANP UNITS 1, 2 SCHEDULAR EXEMPTION REQUEST FOR OUTAGE-RELA'IED APPENDIX R BODIFICATIONS Gentlemen:

R1ralant to 10 CFR 50.12 (a), Georgia Power Company (GPC) hereby albmits a reglest for extension in inplementation schedsle to November 30, 1986, for outage-related modifications associated' with ccepliance with 10.TR 50 Appendix R.

The fire protection modifications for Plant Hatch reglired by Appendix R are identified in Reference 1.

References 2 through -7 discuss the Appendix R inplementation sched11e and schedilar exenptions for non-outage related modifications previously granted and transmitted by your letter dated Jaruary 16, 1985.

As part of this reglest for schedilar exemption for Hatch Units 1 and 2, GPC proposes conpensatory meaalres for the work which may not be completed per the sched21e reg 11 red by 10 CFR 50. 48 (c).

aistification for a' corrpletion date.of November 30, 1986, has been given in References. 5 ard 6 and discussed with members of. the NRC staff in meetings and telephone conversations.

Paragraph c(3) of 10 CFR 50.48 reglires in part.that cutage-related modifications be conpleted in the first refueling autage that starts 180

' days after the effective date of the albject nile. Beca2se the schedular ll 8504300442 850416 f(y)

PDR ADOCK 05000321 -

.F PDR k

i u

?.

GeorgiaPowerA j

Director of Maclear Reactor Regulation

U.S. M1 clear Regulatory Commission Washington, D.C.

20555-April 16, ' 1985 Page 2 i

provisions of 10 GR 50.48 were tolled until April 18, 1984, the catages after which the-fire protection modifications are required to be-cmpleted are the Unit -l refueling outage planned for the fall of 1985 and the alrrent Unit 2 refueling outage. to this letter lists those items, on a fire area-by-fire area basis, which may not be completed by the. ends of these outages.

This is becaise many cutage-related, itens involve some work which does not realire an altage, hat which nust follow work performed daring an-outage, and becalse the resources which can be applied effectively daring an outage are limited.

%e items listed in Attachment 1 may not correspond exactly with

- the modifications given. in Reference 1.

%is is die partially to other plant charges, alch as _ ATIS installation, which have changed the mmbering scheme, and routes of certain raceways and circuits.

Also,
reanalysis of the plant design and detail design work have established revised modifications and have - shown that some ciralits. which were proposed for modification already meet the reglirements of Appendix R and, therefore, reglire no modification.

These revised details of implementation do not alter the general approach used nor the conchisions drawn by Reference 1.

An amendment-to Reference 1 is currently in the review stage and will be-isaled in the near future.

Since the upcoming revision is a more alrrent reflection of the realired nodifications, the detailed listing of the' exenption items is based upon this revision.

Measures proposed to coupensate for the incouplete items in each fire area _are also specified in Attachment 1.

Reference 2 identified capensatory meaatres which GPC conmitted to meet on a fire area-by-fire area - basis for the period of time from expiration of _the 10 GR 50.48 schedile allowance until the specific fire area is in conpliance with Appendix - R as modified by the - exstptions granted by the NRC.

%e -

capensatory measures proposed in Attachment 1 are in accordance with Reference 2.

In References 4 and 7,

GPC proposeo a roving fire watch as conpensation for an extension in the implementation schedile of Appendix R modifications for four areas of-Plant Hatch. This same fire watch will be modified, as nece_ssary, to -include any additional areas specified in.

%e modified -fire watch will conmence as a conpensatory meaalre at' the:end of the 10 GR 50.48 schedile coupletion date.for the

!GeorgiaPower d Director of M1 clear Reactor Regulation U.S. N.1 clear Regulatory Comnission Washirgton, D.C.

20555 April 16, 1985 Page 3 affected fire area and will be contirued until the modifications are completed for the area.

'Ibe connon area will be inchided at the end of

' the carrent Unit 2 refueling outage.

With this albnittal, GPC realests that our proposed inplementation schedile for all items be mcxlified to provide for exenption from the schedilar reglirements of 10 GR 50.48 for the autage-related work listed in Attachnent 1.

The staffs of GPC an3 its conalltants are available for additional disalssion of this exenption reglest, should the NRC so desire.

Sha11d you have any glestions in this regard, please contact this office.

Sincerely yours,

/ N&*

L. T. G1 cwa JAF/PDG/mb Attachm: sit xc:

J. T. Beckham, Jr.

H. C. Nix, Jr.

J. N. Grace (NRC-Region II)

Senior Resident Inspector 1

References (1)

"Edwin I. Hatch Nuclear Plant Unit 1 and Unit 2, Response to 10 CFR 50.48 and Appendix R", July 1, 1932, (amendment to be issued tentatively Summer 1985).

(2)

GPC letter NED-84-265, "10 CFR 50.48 and Appendix R Implementation Schedule," dated May 25, 1984 from L. T. Gucwa to Director, Nuclear Reactor Regulation (NRC).

(3)

GPC letter NED-84-444, " Schedular Exemptions for Non-Outage-Related Appendix R Modifications," dated September 4, 1984, from L. T. Gucwa to Director, Nuclear Reactor Regulation (NRC).

(4)

GPC letter NED-84-518, " Interim Compensation for Schedular Extension for Non-Outage-Related Appendix R Mocifications," dated October 2, 1984, from L. T. Gucwa to Director, Nuclear Reactor Regulation (NRC).

(5)

GPC letter NED-84-523, " Schedular Exemptions for Non-Dutage-Related Appendix R Modifications," dated October 19, 1984, from L. T. Gucwa to Director, Nuclear Reactor Regulation (NRC).

(6)

GPC letter NED-84-558, " Basis for Request for Exemption to 10 CFR 50.48", dated October 26, 1984, from L. T. Gucwa to Director, Nuclear Reactor Regulation (NRC).

(7)

GPC letter NED-84-553, " Revision of Interim Compensation for Schedular Extension for Non-Outage-Related Appendix R Modifications," dated December 20, 1984, from L. T. Gucwa to Director, Nuclear Reactor Regulation (NRC).

I I

I u

y Y,

v 1

w w-42

.c

.p

-ATTACHENT 1 HATCH APPENDIX R EXEMPTION REQlEST

-OUTAGE-RELAILU ITEMS-

~

4.1.3. LAnnunciator Room-Unit'1

.o.. Reroute power circuits for 821-N027, B21-R605, B21-N0268, B21-R6048, E41-N602A,_and E41-N610A~

Concensatory Measure 1 o-The roving fire watch tours this area at least once per twenty minutes.-

'4'.1.5 &

p 4.1.6

Reactor Buildina North and South of Column Line R7-Unit 1 o

Wrapping of circuits for 1-h protection l

_ o Rerouting of. circuits

- o

. Addition of detection systems o

Draft curtainsz l

o Suppression system for hatchways,-130 foot elevation, 185 foot elevation, and torus room.

o.

Detection system for sprinklered areas of torus-room Wrap ~ circuits' listed in~ paragraphs 4.1.5.3 and 4.1.6.3 of'the o

Appendix R submittal as requiring protection with 1-h barrier-

?

r' material:

k

?o Wrap all safe-shutdown related circuits within area of water z curtain

+

a

- o Reroute ADS-from single penetration L_

MI '

Compensatory Measures-

@o

'W o

'.The roving fire ~ watch tours elevations 130 ft. and 158 ft.

k currently.

jp

.o The' roving fire watch will be expanded to' include a route along

Q the~ catwalk below elevation'130 ft.*

u3dh 4.2.1

' Control-Buildina Annunciator Room-Unit 2

  • M' '

bif o

Reroute Circuit EAE813M05

",; ' G w

e R.,

Compensatory Measure w.

pg a.

x-

.o The roving fire watch ' tours this area at least once per twenty -

2) minutes.~

x

.w

  • Sprinker' system installed; to be made operational prior to end of

' l, l1985 outage. -If completed as planned,- fire watch will not be imple-y t

mented.

iW h

fLTG/ April 16,'1985~

.E

4.2.3 Control f;uilding Switchgtar Hallway-Unit 2 o

Reroute circuits RE50lM15, PME706M01, NWX718M01, EEE718M01, BCE702M01, EAE70lM01, EBE70lM01, EEE70lM01, and EEE703M01 o

Install two new distribution ecbinets in a separate area from the de switchgear ballway Compensatory Measure The roving fire watch tours this area at least once per twenty-o minutes.

4.2.6 Reactor Building North of Column Line R19-Unit 2 o

Relocate circuits for 2821-N027, control and power for valve 2E41-F002, EDE703C01, EDE703C02, HPCI Div. I circuits, and cables for 2E51-F007 o

Protect raceways with a 1-h barrier o

Install suppression system for 185 foot elevation,130 foot elevation, and 87 foot elevation o

Install detection system on 87 foot elevation Waterproof, install partition, suppression system and detection o

for 2C82-F001A&B o

Remove power at valves 2T48-F026 and F027 Separation of S/RV circuits by installation of Low-Low set relief o

valve logic Compensatory Measures o

The roving fire watch tours elevations 130 ft. and 158 ft.

currently.

o

-The roving fire watch will be expanded to include a route along the catwalk below elevation 130 ft.*

4.2.7 Reactor Building South of Column Line R19-Unit 2 o

Rercute circuits o

Reroute and wrap power and control circuits of 2E51-F007 o

Protect raceways with 1-h barrier o

Water curtain system Sprinkler system for elevation 185 ft. north of column line R19 o

I Compensatory Measure The roving fire watch tours elevations 130 ft. and 158 ft.

o currently.

  • Sprinker system to be installed and made operational prior to end of 1985 outage.

If completed as planned, fire watch will not be imple-mented.

LTG/ April 16,_1985

. t-4.3.4 East' Cableway-Common o

Lock open 2T48-F026 Compensatory Measure o.

This area'is already fully sprinkJered.

.~

I p

I; i-P l

r 1

i i

LTG/ April 16, 1985 i

. +,