Requests Addl Info on App R Implementation,Needed to Respond to 840525 Request for Schedular Exemption.Proposed Schedules Appear Acceptable
ML20197G558
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/08/1984
From: Rivenbark G
Office of Nuclear Reactor Regulation
To: Beckham J
GEORGIA POWER CO.
References
TAC-43754, TAC-43755, TAC-47143, TAC-48071, TAC-48072, TAC-48748, TAC-48749, TAC-54802, TAC-54803, NUDOCS 8406150318
Download: ML20197G558 (3)


Text

,-

Juu 8 Ok Dockets Nos. 50-321 D_ISIRI and 50-366 p cket Fi Gray File iGC euR TWambach L PDR ORB #4 Rdg Mr. J. T. Beckham, Jr.

DEisenhut Vice President, Nuclear Generation OELD Georgia Power Company EJordan P. O. Box 4545 JNGrace Atlanta, Georgia. 30302 ACRS-10 RIngram

Dear Mr. Beckham:

GRivenbark

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION ON APPENDIX R IMPLEMENTATION SCHEDULE FOR HATCH 1 AND 2 Tais letter responds to your request for a schedular exemption dated-May 25, 1984. We find that your letter lacks the specificity needed to grant the request. - In order to assure adequate fire protection, we must consider the specific modifications which will be delayed, the

-period of the delay (whether outage related or not) and the compensatory measures for each of these.

If manpower constraints are a problem, we suggest that you first address the affected modifications not requiring an outage. This would help ensure that we complete the exemption review for these items before October, 1984.

In general, the proposed schedules appear acceptable if we can reach agreement on the compensatory measures.

The foregoing is consistent with discussions held over the telephone on June 6,1984 between Mr. Burns (GPC), Mr. Wambach (NRC) and Mr. Kadambi (NRC).

We will proceed with further consideration of your request after we receive the additional information.

Sincerely, O c b/Y tt-tk hr b George W. Rivenbark, Acting Chief Operating Reactors Branch #4 Division of Licensing cc: See next page kPL.

hY f

ORB #4:DL ORB #5:DL ORB'#4 :DL PKadambi tcf TWambach GRivenbark 6/s/84 6/f//84 6/7/84 8406150318 840608 PDR ADOCK 05000321 F

PDR

. Hatch 1/2 50-321/366 Geofjia Power Company cc w/ enclosure (s):

Mr. James P. O'Reilly, Regional Administrator G. F. Trowbridge, Esq.

U. S. Nuclear Regulatory Commission Shaw, Pittman, Potts and Trowbridge Region II 53 bi g on 20036 la a, Geor a Ruble A. Thomas Vice President P. O. Box 2625 Southern Company Services. Inc.

Bimingham, Alabama 35202

/

Ozen Batum Charles H. Badger Southern Company Services, Inc.

Office of Planning and Budget Post Office Box 2625 Room 610 Bimingham, Alabama 35202 270 Washington Street, S.W.

Atlanta, Georgia 30334 Appling County Commissioners County Courthouse Baxley, Georgia 31513 J. Leonard Ledbetter, Commissioner Department of Natural Resources 6

Mr. L. T. Gucwa 270 Washington. Street, N.W.

Georgia Power Company Atlanta, Georgia 30334 Engineering Department

~P. O. Box 4545 Atlanta, Georgia 30302 Mr. H. C. Nix, Jr. General Manager Edwin I. Hatch Nuclear Plant Georgia Power Company P. O. Box 442 Baxley_ Georgia 31513 Regional Radiation Representative EPA Region IV 345 Courtland Street, N.E.

Atlanta, Georgia 30308 I

i l

Resident Ihspector l

U. S. fluclear Regulatory Commission Route 1, P. O. Box 279 i

Baxley, Georgia 31513 9

~.

a f

UNITED STATES y

g NUCLEAR REGULATORY COMMISSION E

WASHINGTON, D. C. 20555 k*****

June 8, 1984 Dockets Nos. 50-321 and 50-366 Mr. J. T. Beckha, Jr.

Vice President, Nuclear Generation Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302

Dear Mr. Beckham:

REQUESTFORADDITIONALINFR@ TION 0!APPENDIXR

SUBJECT:

IMPLEMENTATION SCHEDULE FOR H TCH AND 2 This letter responds to your request for chedular exemption dated May 25, 1984. We find that your letter c s the specificity needed to grant the request.

In order to assu.

ad ate fire protection, we must consider the specific modifica ions wh ch will be delayed, the period of the delay (whether outage r lated or nbt) and the compensatory measures for each of these.

If manp wer constrairits are a problem, we suggest that you first address the ffected modifichtions not requiring an outage. This would help ensure th t we complete the\\ exemption review for these items before October, 1984.

In general, the proposed schedules appear acceptable if we can reach agre nt on the compensatcry measures.

The foregoing is consistent w hdiscussionsheldoverthhtelephoneon June 5,1984 between Mr. Bur s (GPC), Mr. Wambach (NRC) and Mr. Kadambi (NRC).

s We will proceed with furthe consideration of your request af er we receive the additional informatio.

i Sincerely, sq 4./

pe" eorge Rivenbark, Acting Chief

/

Operating Reactors Branch #4 Division of Licensing cc: See next page l

l l

4