MONTHYEARML20091B7331984-05-25025 May 1984 Notifies of Commitment to Meet on fire-area-by-fire-area Basis,Either Item 1 or 2 & 3 for Period of Time from Expiration of 10CFR50.48 Schedule Allowance Until Area Complies W/Paragraphs III.G.2 & III.G.3 of 10CFR50,App R Project stage: Other ML20096F8381984-09-0404 September 1984 Forwards Proposed Specific Compensatory Measures to Support 840525 Requested 10CFR50.48 Schedular Exemptions for nonoutage-related App R Mods,Per 840608 Request Project stage: Other ML20093E4111984-10-0202 October 1984 Proposes Establishment of Roving Fire Watch to Pass Through Listed Sections of Control & Reactor Bldgs as Compensatory Measures to Support Schedular Extension of App R Mods Project stage: Other ML20106D3531984-10-19019 October 1984 Requests Exemption from 10CFR50.48(c) to Allow Extension Until 861130 of Implementation Schedule for Listed App R Related Mods Which Can Be Implemented During Nonoutage Period Project stage: Other ML20107F1811984-10-26026 October 1984 Provides Basis for Request for Exemption from 10CFR50.48 Requirements Re Implementation of non-outage Related 10CFR50,App R Mods.Fire Protection Enhancement Program Cannot Be Implemented within Expected Time Frame Project stage: Request ML20101E3731984-12-20020 December 1984 Submits Specific Info Re Compensatory Measures for nonoutage-related App R Mods Not Completed within 10CFR50.48 Time Frame,In Support of 841002 Request for Extension of Schedule to Complete Listed Mods Project stage: Request ML20114B8481985-01-16016 January 1985 Exemption from Requirements of 10CFR50.48(c) to Extend Deadline for Completion of Fire Protection Mods Not Requiring Plant Shutdown Until 861130 Project stage: Approval ML20100N1961985-04-0404 April 1985 Requests Relief from Requirements of IWV-3427(b) of ASME Code Section XI Re Future Testing of 16 Msivs.Util Proposes That Valves Be Tested Each Refueling Outage Using Parameters Per Tech Specs Project stage: Other ML20116E8261985-04-16016 April 1985 Requests Extension Until 861130 to Implementation Schedule for outage-related Fire Protection Mods,Per 10CFR50,App R Requirements.List of outage-related Items to Annunciator Room & Reactor & Control Bldg Encl Project stage: Other ML20117L4581985-05-0707 May 1985 Notice of Issuance of Environ Assessment & Finding of No Significant Impact Re 850416 Request for Schedular Exemption from 10CFR50.48 Requirements Project stage: Approval ML20128B9601985-05-10010 May 1985 Safety Evaluation Supporting Relief for 16 MSIVs from 1980 Edition of ASME Section XI Code Requiring Increased Frequency of Leak Rate Testing Based on Leak Rate Trending of 6-inch & Larger Valves Project stage: Approval ML20128B9011985-05-10010 May 1985 Informs of Completion of Review of 850404 Request for Relief from ASME Section XI Code for Leak Testing Msivs.Request Acceptable.Safety Evaluation Encl Project stage: Approval ML20128H9751985-05-14014 May 1985 Exemption to Schedular Requirements of 10CFR50.48,extending Deadline Until 861130 for Installation of Mods to Fire Protection Sys Project stage: Approval 1984-09-04
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
__
May 10,1985 Dockets Nos. 50-321 DISTRIBUTION and 50-366 6
JPartlow NRC PDR ACRS-10 L PDR RIngram ORB #4 Rdg GRivenbark Mr. J. T. Beckham, Jr.
HThompson Gray File Vice President - Nuclear Generation OELD EJordan Georgia Power Company BGrimes JPage P. O. Box 4545 Atlanta, Georgia 30302
Dear Mr. Beckham:
We have completed our review of your April 4,1985 request for relief from the American Society of Mechanical EngineersSection XI Code with respect to leak testing the Hatch Unit 1 and 2 Main Steam Isolation Valves. As indicated in the enclosed Safety Evaluation, we grant the requested relief.
We have determined pursuant to 10 CFR Part 50.55a(g)(6)(i), that the granting of this relief is authorized by law and will not endanger life or property or the common defense and security and is othentise in the public interest.
In making this determination, we have given due consideration to the burden that could result if these requirements were imposed on your facility.
Sincerely,
."ELG1SiiL sic;w yy EU F. 570%s./
John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing
Enclosure:
Safety Evaluation cc w/ enclosure:
See next page r
ll.9 ORB #4:0 -
ORB
- DL 0
ML QEl.
RIngram GRi nbark;cr J
^*I 5/h/85 5/(/85 5/ /8 5/rl/85 8505280100 050510 PDR ADOCK 05000321 P
PDR
Hatch 1/2 50-321 and 50-366 Georgia Power Company ccw/ enclosure (s):
G. F. Trowbridge, Esq.
Regional Radiation Representative Shaw, Pittman, Potts and Trowbridge EPA Region IV 1800 M Street, N. W.
345 Courtland Street. M. E.
Washington, D. C.
20036 Atlanta, Georgia 30308 Ruble A. Thomas Resident Inspector Vice President U. S. Nuclear Regulatory Comission P. O. Box 2625 Route 1, P. O. Box 279 Southern Company Services, Inc.
Baxley, Georgia 31513 Birmingham, Alabama 35202 Dr. J. Nelson Grace, Regional Louis B. Long Administrator Southern Company Services, Inc.
U. S. Nuclear Regulatory Commission P. O. Pox 2625 Region II Birmingham, Alabama 35202 101 Marietta Street, Suite 2900 Atlanta, Georgia 30303 Chairman Appling County Commissioners County Courthouse Charles H. Badger Raxley, Georgia 31513 Office of Planning and Rudget Room 610 270 Washington Street, S. W.
Mr. L. T. Gucwa Atlanta, Georgia 30334 Georgia Power Company Engineering Department
- 0. Box 4545 J. Leonard Ledbetter, Comissioner Atlanta, Georgia 30302 Department of Natural Resources 270 Washington Street, N. W.
Atlanta, Georgia 30334 Mr. H. C. Nix,ilr. General Manager Edwin I. Hatch Nuclear Plant Georgia Power Company P. 0. Box 442 Baxley, Georgia 31513 l
i r 5.k ;- ;c
,j
.~
i: