MONTHYEARNPL-99-0564, Forwards Response to NRC Request During 990720 Meeting,To Provide Addl Details to Several Questions Re Amend Currently Under Review by Staff Pertaining to CR Habitability1999-10-19019 October 1999 Forwards Response to NRC Request During 990720 Meeting,To Provide Addl Details to Several Questions Re Amend Currently Under Review by Staff Pertaining to CR Habitability ML20217A5911999-09-30030 September 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities.Plant Issues Matrix Encl 05000266/LER-1999-007, Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in Italics1999-09-30030 September 1999 Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in Italics ML20212J7431999-09-30030 September 1999 Forwards Insp Repts 50-266/99-15 & 50-301/99-15 on 990830- 0903.No Violations Noted.Inspectors Concluded That Util Licensed Operator Requalification Training Program Satisfactorily Implemented NPL-99-0555, Discusses Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Calculation That Provides Evaluation of New Surveillance Data for Assessing Integrity of Unit 1 Reactor Vessel1999-09-29029 September 1999 Discusses Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Calculation That Provides Evaluation of New Surveillance Data for Assessing Integrity of Unit 1 Reactor Vessel ML20212K7651999-09-29029 September 1999 Forwards Insp Repts 50-266/99-13 & 50-301/99-13 on 990714-0830.No Violations Noted.Operators Responded Well to Problems with Unit 1 Instrument Air Leak & Unit 2 Turbine Governor Valve Position Fluctuation ML20212D5771999-09-15015 September 1999 Discusses Review of Response to GL 88-20,suppl 4,requesting All Licensees to Perform Ipeee.Ser,Ter & Supplemental TER Encl ML20211Q6451999-09-0808 September 1999 Forwards Operator Licensing Exam Repts 50-266/99-301OL & 50-301/99-301OL for Exams Conducted on 990726-0802 at Point Beach Npp.All Nine Applicants Passed All Sections of Exam ML20211Q4171999-09-0606 September 1999 Responds to VA Kaminskas by Informing That NRC Tentatively Scheduled Initial Licensing Exam for Operator License Applicants During Weeks of 001016 & 23.Validation of Exam Will Occur at Station During Wk of 000925 05000266/LER-1999-004, Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer Pump1999-09-0202 September 1999 Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer Pump ML20211K5261999-08-31031 August 1999 Forwards Insp Repts 50-266/99-14 & 50-301/99-14 on 990726- 30.Areas Examined within Secutity Program Identified in Rept.No Violations Noted ML20211F6941999-08-27027 August 1999 Provides Individual Exam Results for Applicants That Took Initial License Exam in July & August of 1999.Completed ES-501-2,copy of Each Individual License,Ol Exam Rept, ES-303-1,ES-303-2 & ES-401-8 Encl.Without Encl NPL-99-0473, Informs of Change Being Made to Plan Third 10-year Interval ISI Long Term Plan.Change Extends Interval from Current End Date of 001130 to 020831,due to Operating Cycle Being Increased from 12 to 18 Months1999-08-27027 August 1999 Informs of Change Being Made to Plan Third 10-year Interval ISI Long Term Plan.Change Extends Interval from Current End Date of 001130 to 020831,due to Operating Cycle Being Increased from 12 to 18 Months ML20211E8791999-08-24024 August 1999 Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, for Point Beach Nuclear Power Plant,Units 1 & 2.Licensees Provided Requested Info & Responses Required by GL 96-01 ML20211F1501999-08-24024 August 1999 Submits Summary of Meeting Held on 990729,in Region III Office with Util Re Proposed Revs to Plant Emergency Action Level Criteria Used in Classifying Emergencies & Results of Recent Improvement Initiatives in Emergency Preparedness 05000266/LER-1999-006, Forwards LER 99-006-00 Which Describes Discovery That Postulated Fire in Central Zone of Primary Auxiliary Bldg Could Result in Spurious Operation of Pressurizer Porv. New Commitments within Rept Are Indicated in Italics1999-08-19019 August 1999 Forwards LER 99-006-00 Which Describes Discovery That Postulated Fire in Central Zone of Primary Auxiliary Bldg Could Result in Spurious Operation of Pressurizer Porv. New Commitments within Rept Are Indicated in Italics NPL-99-0477, Forwards Revised Procedures to Point Beach Nuclear Plant Epips.Revised Procedures Dtd 990723,should Be Filed in NRC Copies of Manual IAW Attached Instructions1999-08-18018 August 1999 Forwards Revised Procedures to Point Beach Nuclear Plant Epips.Revised Procedures Dtd 990723,should Be Filed in NRC Copies of Manual IAW Attached Instructions NPL-99-0426, Requests Relief from Section II of ASME B&PV Code, Nuclear Vessels, 1965 Edition,No Addenda.Detailed Info Attached1999-08-16016 August 1999 Requests Relief from Section II of ASME B&PV Code, Nuclear Vessels, 1965 Edition,No Addenda.Detailed Info Attached ML20210L9141999-08-0404 August 1999 Informs That Versions of Info Re WCAP-14787,submitted in 990622 Application for Amend,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20210K5221999-08-0404 August 1999 Discusses Point Beach Nuclear Plant,Units 1 & 2 Response to Request for Info in GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity NPL-99-0436, Forwards fitness-for-duty Performance Data for six-month Period Ending 9906301999-08-0202 August 1999 Forwards fitness-for-duty Performance Data for six-month Period Ending 990630 ML20210G6011999-07-30030 July 1999 Discusses 990415 Complaint OSHA Received from Employee of Wisconsin Electric Power Co Alleging That Employee Received Lower Performance Appraisal for 1998 Because Employee Raised Safety Concerns While Performing Duties at Point Beach NPL-99-0406, Provides Response to NRC GL 99-02, Lab Testing of Nuclear- Grade Activated Charcoal1999-07-29029 July 1999 Provides Response to NRC GL 99-02, Lab Testing of Nuclear- Grade Activated Charcoal ML20210H0211999-07-28028 July 1999 Forwards Insp Repts 50-266/99-09 & 50-301/99-09 on 990528-0713.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20210G2441999-07-26026 July 1999 Discusses 990714 Meeting with PRA Staff to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA Staff NPL-99-0408, Forwards Pbnps,Units 1 & 2 Plant Simulation Four-Yr Rept, IAW 10CFR55.45(b)(5)(ii).Rept Describes Certification Program Tests Conducted from 1996-1999,identifies Test Discrepancies Still Outstanding & Schedules for 2000-20031999-07-15015 July 1999 Forwards Pbnps,Units 1 & 2 Plant Simulation Four-Yr Rept, IAW 10CFR55.45(b)(5)(ii).Rept Describes Certification Program Tests Conducted from 1996-1999,identifies Test Discrepancies Still Outstanding & Schedules for 2000-2003 ML20209H5471999-07-14014 July 1999 Forwards Insp Repts 50-266/99-12 & 50-301/99-12 on 990614-18.One Violation Noted,But Being Treated as non-cited violation.Long-term MOV Program Not Sufficiently Established to close-out NRC Review of Program,Per GL 89-10 NPL-99-0395, Forwards Partial Response to NRC 990512 RAI Re TS Change 204 Re Control Room Habitability.Meeting Is Planned with NRC to Discuss Issues Related to Control Room & Primary Auxiliary Bldg Ventilation Sys Modifications1999-07-12012 July 1999 Forwards Partial Response to NRC 990512 RAI Re TS Change 204 Re Control Room Habitability.Meeting Is Planned with NRC to Discuss Issues Related to Control Room & Primary Auxiliary Bldg Ventilation Sys Modifications NPL-99-0390, Projects Listed Major near-term License Amend Requests That Could Be Expected to Impact Staff Resources Into Fiscal Years 2000 & 2001,in Response to Administrative Ltr 99-021999-07-0808 July 1999 Projects Listed Major near-term License Amend Requests That Could Be Expected to Impact Staff Resources Into Fiscal Years 2000 & 2001,in Response to Administrative Ltr 99-02 NPL-99-0388, Forwards MORs for June 1999 & Revised MORs for May 1999 for Pbnps,Units 1 & 21999-07-0707 July 1999 Forwards MORs for June 1999 & Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0381, Submits Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl1999-06-30030 June 1999 Submits Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML20196J4161999-06-30030 June 1999 Discusses Relief Requests Submitted by Wisconsin Electric on 980930 for Pump & Valve Inservice Testing Program,Rev 5. Safety Evaluation Authorizing Relief Requests VRR-01,VRR-02, PRR-01 & ROJ-16 Encl NPL-99-0379, Documents Telcon with Hg Ashar of NRC Re Licensee Intentions & Basis for Reselection of Control Tendons in Pbnps Containment Structures.Plants Are Currently Completing 28th Year Tendon Surveillance During Summer of 19991999-06-29029 June 1999 Documents Telcon with Hg Ashar of NRC Re Licensee Intentions & Basis for Reselection of Control Tendons in Pbnps Containment Structures.Plants Are Currently Completing 28th Year Tendon Surveillance During Summer of 1999 NPL-99-0376, Forwards Errata to Pbnp 1998 Annual Monitoring Rept, Originally Submitted by Ltr Dtd 990427.List of Corrections, Provided1999-06-28028 June 1999 Forwards Errata to Pbnp 1998 Annual Monitoring Rept, Originally Submitted by Ltr Dtd 990427.List of Corrections, Provided NPL-99-0353, Forwards June 1999 Rev to FSAR for Point Beach Nuclear Plant,Units 1 & 2, IAW Requirements of 10CFR50.71(e).Each Package Contains Revised FSAR Pages That Are to Be Inserted IAW Instructions1999-06-23023 June 1999 Forwards June 1999 Rev to FSAR for Point Beach Nuclear Plant,Units 1 & 2, IAW Requirements of 10CFR50.71(e).Each Package Contains Revised FSAR Pages That Are to Be Inserted IAW Instructions ML20196D4931999-06-18018 June 1999 Forwards Insp Repts 50-266/99-08 & 50-301/99-08 on 990411- 0527.No Violations Noted.Operator Crew Response to Equipment Induced Challenges Generally Good.Handling of Steam Plume in Unit 1 Turbine Bldg Particularly Good ML20195J9471999-06-16016 June 1999 Discusses Ltr from NRC ,re Arrangements Made to Finalized Initial Licensed Operator Exam to Be Administered at Point Beach Nuclear Plant During Week of 990726 ML20196A2931999-06-16016 June 1999 Ack Receipt of Transmitting Changes to Listed Sections of Point Beach Nuclear Plant Security Plan & ISFSI Security Plan,Submitted IAW 10CFR50.54(p).No NRC Approval Is Required Since Changes Do Not Decrease Effectiveness ML20195J9251999-06-14014 June 1999 Discusses 990610 Telcon Between Wp Walker & D Mcneil Re Arrangements for NRC to Inspect Licensed Operator Requalification Program at Point Beach Nuclear Power Plant for Week of 990816 05000266/LER-1999-005, Forwards LER 99-005-00,re Failure of Shell of 4B FW Heater Which Resulted in Significant Steam Leak & Manual Trip. New Commitments within Rept Are Indicated in Italics1999-06-11011 June 1999 Forwards LER 99-005-00,re Failure of Shell of 4B FW Heater Which Resulted in Significant Steam Leak & Manual Trip. New Commitments within Rept Are Indicated in Italics NPL-99-0336, Forwards Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1, IAW ASME Section Xi,Subsection IWA-62301999-06-10010 June 1999 Forwards Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1, IAW ASME Section Xi,Subsection IWA-6230 NPL-99-0330, Forwards Revs to Pbnp Security Plan Sections 2.1,2.4,3.1, Figures A,D & T & Pbnp ISFSI Security Plan Section 2.0, Dtd 990604.Plans Withheld1999-06-0404 June 1999 Forwards Revs to Pbnp Security Plan Sections 2.1,2.4,3.1, Figures A,D & T & Pbnp ISFSI Security Plan Section 2.0, Dtd 990604.Plans Withheld 05000301/LER-1999-003, Forwards LER 99-003-00 for Point Beach Nuclear Plant,Unit 2. Rept Is Provided in Accordance with 10CFR50.73(a)(2)(i)(B), as Any Operation or Condition Prohibited by Plant Tech Specs1999-05-28028 May 1999 Forwards LER 99-003-00 for Point Beach Nuclear Plant,Unit 2. Rept Is Provided in Accordance with 10CFR50.73(a)(2)(i)(B), as Any Operation or Condition Prohibited by Plant Tech Specs NPL-99-0319, Provides Main Control Board Wiring Separation Project Status Update Rept for Pbnps,Units 1 & 21999-05-28028 May 1999 Provides Main Control Board Wiring Separation Project Status Update Rept for Pbnps,Units 1 & 2 ML20206T3691999-05-17017 May 1999 Ltr Contract,Task Order 242 Entitled, Review Point Beach 1 & 2 Conversion of Current TS for Electrical Power Systems to Improved TS Based on Standard TS, Under Contract NRC-03-95-026 ML20206N5561999-05-13013 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Cm Craig Will Be Section Chief for Point Beach Npp.Organization Chart Encl ML20206P2551999-05-12012 May 1999 Forwards Handout Provided to NRC by Wisconsin Electric at 990504 Meeting Which Discussed Several Recent Operational Issues & Results of Recent Improvement Initiatives in Engineering ML20206N5331999-05-12012 May 1999 Forwards RAI Re & Suppl by Oral Presentation During 980604 Meeting,Requesting Amend for Plant,Units 1 & 2 to Revise TSs 15.3.12 & 15.4.11 ML20196F3211999-05-11011 May 1999 Requests Proprietary WCAP-14787, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt-NSSS Power), Be Withheld from Public Disclosure ML20206K0391999-05-0707 May 1999 Forwards Insp Repts 50-266/99-06 & 50-301/99-06 on 990223- 0410.Ten Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARNPL-99-0564, Forwards Response to NRC Request During 990720 Meeting,To Provide Addl Details to Several Questions Re Amend Currently Under Review by Staff Pertaining to CR Habitability1999-10-19019 October 1999 Forwards Response to NRC Request During 990720 Meeting,To Provide Addl Details to Several Questions Re Amend Currently Under Review by Staff Pertaining to CR Habitability 05000266/LER-1999-007, Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in Italics1999-09-30030 September 1999 Forwards LER 99-007-00 for Point Beach Nuclear Plant,Unit 1. Condition Would Be Outside App R Design Basis for Plant.New Commitments within Rept Indicated in Italics NPL-99-0555, Discusses Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Calculation That Provides Evaluation of New Surveillance Data for Assessing Integrity of Unit 1 Reactor Vessel1999-09-29029 September 1999 Discusses Rev 1,suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Calculation That Provides Evaluation of New Surveillance Data for Assessing Integrity of Unit 1 Reactor Vessel 05000266/LER-1999-004, Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer Pump1999-09-0202 September 1999 Forwards LER 99-004-01,re Fuel Oil Transfer Pump Cable in AFW Pump Room Being Outside App R Design Basis.Suppl to LER Provides Corrective Actions to Address Concerns Re Fire Disrupting Electrical Power to Fuel Oil Transfer Pump NPL-99-0473, Informs of Change Being Made to Plan Third 10-year Interval ISI Long Term Plan.Change Extends Interval from Current End Date of 001130 to 020831,due to Operating Cycle Being Increased from 12 to 18 Months1999-08-27027 August 1999 Informs of Change Being Made to Plan Third 10-year Interval ISI Long Term Plan.Change Extends Interval from Current End Date of 001130 to 020831,due to Operating Cycle Being Increased from 12 to 18 Months 05000266/LER-1999-006, Forwards LER 99-006-00 Which Describes Discovery That Postulated Fire in Central Zone of Primary Auxiliary Bldg Could Result in Spurious Operation of Pressurizer Porv. New Commitments within Rept Are Indicated in Italics1999-08-19019 August 1999 Forwards LER 99-006-00 Which Describes Discovery That Postulated Fire in Central Zone of Primary Auxiliary Bldg Could Result in Spurious Operation of Pressurizer Porv. New Commitments within Rept Are Indicated in Italics NPL-99-0477, Forwards Revised Procedures to Point Beach Nuclear Plant Epips.Revised Procedures Dtd 990723,should Be Filed in NRC Copies of Manual IAW Attached Instructions1999-08-18018 August 1999 Forwards Revised Procedures to Point Beach Nuclear Plant Epips.Revised Procedures Dtd 990723,should Be Filed in NRC Copies of Manual IAW Attached Instructions NPL-99-0426, Requests Relief from Section II of ASME B&PV Code, Nuclear Vessels, 1965 Edition,No Addenda.Detailed Info Attached1999-08-16016 August 1999 Requests Relief from Section II of ASME B&PV Code, Nuclear Vessels, 1965 Edition,No Addenda.Detailed Info Attached NPL-99-0436, Forwards fitness-for-duty Performance Data for six-month Period Ending 9906301999-08-0202 August 1999 Forwards fitness-for-duty Performance Data for six-month Period Ending 990630 NPL-99-0406, Provides Response to NRC GL 99-02, Lab Testing of Nuclear- Grade Activated Charcoal1999-07-29029 July 1999 Provides Response to NRC GL 99-02, Lab Testing of Nuclear- Grade Activated Charcoal NPL-99-0408, Forwards Pbnps,Units 1 & 2 Plant Simulation Four-Yr Rept, IAW 10CFR55.45(b)(5)(ii).Rept Describes Certification Program Tests Conducted from 1996-1999,identifies Test Discrepancies Still Outstanding & Schedules for 2000-20031999-07-15015 July 1999 Forwards Pbnps,Units 1 & 2 Plant Simulation Four-Yr Rept, IAW 10CFR55.45(b)(5)(ii).Rept Describes Certification Program Tests Conducted from 1996-1999,identifies Test Discrepancies Still Outstanding & Schedules for 2000-2003 NPL-99-0395, Forwards Partial Response to NRC 990512 RAI Re TS Change 204 Re Control Room Habitability.Meeting Is Planned with NRC to Discuss Issues Related to Control Room & Primary Auxiliary Bldg Ventilation Sys Modifications1999-07-12012 July 1999 Forwards Partial Response to NRC 990512 RAI Re TS Change 204 Re Control Room Habitability.Meeting Is Planned with NRC to Discuss Issues Related to Control Room & Primary Auxiliary Bldg Ventilation Sys Modifications NPL-99-0390, Projects Listed Major near-term License Amend Requests That Could Be Expected to Impact Staff Resources Into Fiscal Years 2000 & 2001,in Response to Administrative Ltr 99-021999-07-0808 July 1999 Projects Listed Major near-term License Amend Requests That Could Be Expected to Impact Staff Resources Into Fiscal Years 2000 & 2001,in Response to Administrative Ltr 99-02 NPL-99-0388, Forwards MORs for June 1999 & Revised MORs for May 1999 for Pbnps,Units 1 & 21999-07-0707 July 1999 Forwards MORs for June 1999 & Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0381, Submits Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl1999-06-30030 June 1999 Submits Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl NPL-99-0379, Documents Telcon with Hg Ashar of NRC Re Licensee Intentions & Basis for Reselection of Control Tendons in Pbnps Containment Structures.Plants Are Currently Completing 28th Year Tendon Surveillance During Summer of 19991999-06-29029 June 1999 Documents Telcon with Hg Ashar of NRC Re Licensee Intentions & Basis for Reselection of Control Tendons in Pbnps Containment Structures.Plants Are Currently Completing 28th Year Tendon Surveillance During Summer of 1999 NPL-99-0376, Forwards Errata to Pbnp 1998 Annual Monitoring Rept, Originally Submitted by Ltr Dtd 990427.List of Corrections, Provided1999-06-28028 June 1999 Forwards Errata to Pbnp 1998 Annual Monitoring Rept, Originally Submitted by Ltr Dtd 990427.List of Corrections, Provided NPL-99-0353, Forwards June 1999 Rev to FSAR for Point Beach Nuclear Plant,Units 1 & 2, IAW Requirements of 10CFR50.71(e).Each Package Contains Revised FSAR Pages That Are to Be Inserted IAW Instructions1999-06-23023 June 1999 Forwards June 1999 Rev to FSAR for Point Beach Nuclear Plant,Units 1 & 2, IAW Requirements of 10CFR50.71(e).Each Package Contains Revised FSAR Pages That Are to Be Inserted IAW Instructions 05000266/LER-1999-005, Forwards LER 99-005-00,re Failure of Shell of 4B FW Heater Which Resulted in Significant Steam Leak & Manual Trip. New Commitments within Rept Are Indicated in Italics1999-06-11011 June 1999 Forwards LER 99-005-00,re Failure of Shell of 4B FW Heater Which Resulted in Significant Steam Leak & Manual Trip. New Commitments within Rept Are Indicated in Italics NPL-99-0336, Forwards Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1, IAW ASME Section Xi,Subsection IWA-62301999-06-10010 June 1999 Forwards Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1, IAW ASME Section Xi,Subsection IWA-6230 NPL-99-0330, Forwards Revs to Pbnp Security Plan Sections 2.1,2.4,3.1, Figures A,D & T & Pbnp ISFSI Security Plan Section 2.0, Dtd 990604.Plans Withheld1999-06-0404 June 1999 Forwards Revs to Pbnp Security Plan Sections 2.1,2.4,3.1, Figures A,D & T & Pbnp ISFSI Security Plan Section 2.0, Dtd 990604.Plans Withheld NPL-99-0319, Provides Main Control Board Wiring Separation Project Status Update Rept for Pbnps,Units 1 & 21999-05-28028 May 1999 Provides Main Control Board Wiring Separation Project Status Update Rept for Pbnps,Units 1 & 2 05000301/LER-1999-003, Forwards LER 99-003-00 for Point Beach Nuclear Plant,Unit 2. Rept Is Provided in Accordance with 10CFR50.73(a)(2)(i)(B), as Any Operation or Condition Prohibited by Plant Tech Specs1999-05-28028 May 1999 Forwards LER 99-003-00 for Point Beach Nuclear Plant,Unit 2. Rept Is Provided in Accordance with 10CFR50.73(a)(2)(i)(B), as Any Operation or Condition Prohibited by Plant Tech Specs ML20196F3211999-05-11011 May 1999 Requests Proprietary WCAP-14787, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt-NSSS Power), Be Withheld from Public Disclosure NPL-99-0242, Submits Commitment Schedule Update,Per GL 95-07 Re Pressure Locking & Thermal Binding of safety-related power-operated Gate Valves.Unit 1 Block Valve Replacement Will Be Performed During Upcoming 1999 U1R25 Outage1999-04-27027 April 1999 Submits Commitment Schedule Update,Per GL 95-07 Re Pressure Locking & Thermal Binding of safety-related power-operated Gate Valves.Unit 1 Block Valve Replacement Will Be Performed During Upcoming 1999 U1R25 Outage NPL-99-0246, Forwards 1998 Annual Monitoring Rept, for Pbnps Units 1 & 2.Revised ODCM & Environ Manual Are Encl1999-04-27027 April 1999 Forwards 1998 Annual Monitoring Rept, for Pbnps Units 1 & 2.Revised ODCM & Environ Manual Are Encl ML20206C2361999-04-22022 April 1999 Forwards 1998 Annual Rept to Stockholders of Wepc Which Includes Certified Financial Statements,Per 10CFR50.71 NPL-99-0230, Submits Clarification of Which Portions of OMa-1988 Parts 6 & 10 Are Being Utilized at Pbnp for IST Program Implementation & Cold SD & RO Justifications,Per 990218 Telcon with NRC1999-04-19019 April 1999 Submits Clarification of Which Portions of OMa-1988 Parts 6 & 10 Are Being Utilized at Pbnp for IST Program Implementation & Cold SD & RO Justifications,Per 990218 Telcon with NRC 05000301/LER-1999-002, Forwards LER 99-002-00 Re Discovery That Cable Necessary to Provide Plant Parameter Required to Be Monitored for App R Safe SD Location Was Not Routed Independent of Appropriate Fire Zone.Commitments in Rept Indicated in Italic1999-04-16016 April 1999 Forwards LER 99-002-00 Re Discovery That Cable Necessary to Provide Plant Parameter Required to Be Monitored for App R Safe SD Location Was Not Routed Independent of Appropriate Fire Zone.Commitments in Rept Indicated in Italics NPL-99-0219, Provides Final Notification of Change to Commitments Documented in LER 266/97-022-00 Re Electrical Short Circuits During CR Fire1999-04-15015 April 1999 Provides Final Notification of Change to Commitments Documented in LER 266/97-022-00 Re Electrical Short Circuits During CR Fire 05000266/LER-1999-001, Forwards LER 99-001-01,describing Discovery That Common Min Recirculation Flow Line Return to RWST for Safety Injection & Containment Spray Pumps Was Partially Frozen & Would Not Pass Flow.New Commitments Indicated in Italics i1999-04-0808 April 1999 Forwards LER 99-001-01,describing Discovery That Common Min Recirculation Flow Line Return to RWST for Safety Injection & Containment Spray Pumps Was Partially Frozen & Would Not Pass Flow.New Commitments Indicated in Italics in Rept NPL-99-0174, Confirms Completion of Requested Actions in Accordance with Required Response of GL 96-01 for Unit 2.Confirmation of Completion for Unit 1 Was Provided in Ltr Npl 98-0591,dtd 9807141999-03-30030 March 1999 Confirms Completion of Requested Actions in Accordance with Required Response of GL 96-01 for Unit 2.Confirmation of Completion for Unit 1 Was Provided in Ltr Npl 98-0591,dtd 980714 ML20206B8231999-03-30030 March 1999 Forwards Final Exercise Rept for Biennial Radiological Emergency Preparedness Exercise Conducted on 981103 for Point Beach Power Plant.One Deficiency Identified for Manitowoc County.County Corrected Deficiency Immediately NPL-99-0177, Forwards Decommissioning Funding Status Info for Pbnp,Units 1 & 2,per 10CFR50.751999-03-30030 March 1999 Forwards Decommissioning Funding Status Info for Pbnp,Units 1 & 2,per 10CFR50.75 05000301/LER-1999-001, Forwards LER 99-001-00,re Loss of Safeguards Electrical Bus During Refueling Surveillance Testing Which Resulted in Temporary Unavailability of One Train of Decay Heat Removal. Commitments Made by Util Are Identified in Italics1999-03-10010 March 1999 Forwards LER 99-001-00,re Loss of Safeguards Electrical Bus During Refueling Surveillance Testing Which Resulted in Temporary Unavailability of One Train of Decay Heat Removal. Commitments Made by Util Are Identified in Italics NPL-99-0122, Forwards Relief Requests RR-1-19 & RR-2-25,requesting Relief from Section XI of ASME B&PV Code, Rules for Inservice Exam of NPP Components, 1986 Edition,No Addenda.Requirements for Relief Apply to Third ten-yr ISI Interval for Units 1 &1999-03-0303 March 1999 Forwards Relief Requests RR-1-19 & RR-2-25,requesting Relief from Section XI of ASME B&PV Code, Rules for Inservice Exam of NPP Components, 1986 Edition,No Addenda.Requirements for Relief Apply to Third ten-yr ISI Interval for Units 1 & 2 NPL-99-0111, Informs NRC That IAW Provisions of ASME Boiler & Pressure Code,Section Xi,Paragraphs IWA-2430(d) & IWA-2430(e),WEPC Has Extended Third 10 Yr Interval for Pressure Testing Program at Pbnp,Unit 1 by 21 Months1999-03-0303 March 1999 Informs NRC That IAW Provisions of ASME Boiler & Pressure Code,Section Xi,Paragraphs IWA-2430(d) & IWA-2430(e),WEPC Has Extended Third 10 Yr Interval for Pressure Testing Program at Pbnp,Unit 1 by 21 Months NPL-99-0116, Forwards Proprietary & non-proprietary Revised Point Beach Nuclear Plant Emergency Plan IAW 10CFR50.54(q).Proprietary Plan Withheld1999-03-0101 March 1999 Forwards Proprietary & non-proprietary Revised Point Beach Nuclear Plant Emergency Plan IAW 10CFR50.54(q).Proprietary Plan Withheld NPL-99-0115, Forwards Proprietary & non-proprietary Revised EPIPs to Point Beach Nuclear Plant,Units 1 & 21999-03-0101 March 1999 Forwards Proprietary & non-proprietary Revised EPIPs to Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0114, Provides Results of Wepcs Insp,Replacement & Mechanical Testing of Reactor Internals Baffle Former Bolts During Recent Point Beach Refueling Outage1999-02-25025 February 1999 Provides Results of Wepcs Insp,Replacement & Mechanical Testing of Reactor Internals Baffle Former Bolts During Recent Point Beach Refueling Outage NPL-99-0086, Documents Commitment Change Which Is to Discontinue Actions Contained in Util Ltr Dtd 970613,after NRC Approval of LAR & Lower Containment Leak Rate Limit Is Implemented. Change Is Acceptable IAW Applicable Plant Procedure1999-02-24024 February 1999 Documents Commitment Change Which Is to Discontinue Actions Contained in Util Ltr Dtd 970613,after NRC Approval of LAR & Lower Containment Leak Rate Limit Is Implemented. Change Is Acceptable IAW Applicable Plant Procedure NPL-99-0101, Forwards Proprietary & non-proprietary Version of Rev 20 to EPIP 3.2, Emergency Response Organization Notification & Revised Index.Proprietary Info Withheld1999-02-19019 February 1999 Forwards Proprietary & non-proprietary Version of Rev 20 to EPIP 3.2, Emergency Response Organization Notification & Revised Index.Proprietary Info Withheld ML20203F7301999-02-10010 February 1999 Forwards Revs to Security Plan Sections 1.2,1.3,1.4,2.1,2.5, 2,6,2.8,6.1,6.4,6.5,B-3.0,B-4.0,B-5.0 & Figure R Dtd 990210. Evaluation & Description of Plan Revs Also Encl to Assist in NRC Review.Encls Withheld NPL-99-0067, Submits 30 Day Rept of Changes & Errors Discovered in ECCS Evaluation Models for Pbnp,Unit 21999-02-0202 February 1999 Submits 30 Day Rept of Changes & Errors Discovered in ECCS Evaluation Models for Pbnp,Unit 2 NPL-99-0064, Forwards Revised TS Bases Page 15.4.4,correcting References to Pbnp FSAR Re Reactor Containment Design.Changes Are Administrative Only & Do Not Alter Facility or Operation,As Described in FSAR or Any TS Requirement1999-02-0202 February 1999 Forwards Revised TS Bases Page 15.4.4,correcting References to Pbnp FSAR Re Reactor Containment Design.Changes Are Administrative Only & Do Not Alter Facility or Operation,As Described in FSAR or Any TS Requirement NPL-98-1032, Forwards Revs to Pbnp Security Plan Sections 1.1,1.2,2.1, 2.6,2.8,6.1 & 6.4 & Revs to Pbnp ISFSI Security Plan Sections 1.0 & 7.0,per 10CFR50.54(p).Encl Withheld1999-01-27027 January 1999 Forwards Revs to Pbnp Security Plan Sections 1.1,1.2,2.1, 2.6,2.8,6.1 & 6.4 & Revs to Pbnp ISFSI Security Plan Sections 1.0 & 7.0,per 10CFR50.54(p).Encl Withheld 05000266/LER-1998-029, Forwards LER 98-029-00,describing Discovery of Isolation of Autostart Feature for Svc Water Pumps from Unit 2,safeguards Buses During Modifications1999-01-26026 January 1999 Forwards LER 98-029-00,describing Discovery of Isolation of Autostart Feature for Svc Water Pumps from Unit 2,safeguards Buses During Modifications NPL-99-0031, Informs That Wepc Reviewed Contents of NEI to NRC & Have Verified Info Provided in Ltr Pertaining to WOG Member Plants Is Applicable to Pbnp.Attachment Responds to NRC Questions by Ref to Info in 981211 NEI Ltr1999-01-15015 January 1999 Informs That Wepc Reviewed Contents of NEI to NRC & Have Verified Info Provided in Ltr Pertaining to WOG Member Plants Is Applicable to Pbnp.Attachment Responds to NRC Questions by Ref to Info in 981211 NEI Ltr NPL-99-0004, Provides Status Update on Program Activities & Schedule for Final Resolution of Items Re Verification of Seismic Piping Class Interfaces for Point Beach Nuclear Plant,Units 1 & 21999-01-11011 January 1999 Provides Status Update on Program Activities & Schedule for Final Resolution of Items Re Verification of Seismic Piping Class Interfaces for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0012, Forwards Proprietary & Nonproprietary Revs to Epips. Proprietary Version of EPIPs Withheld1999-01-0808 January 1999 Forwards Proprietary & Nonproprietary Revs to Epips. Proprietary Version of EPIPs Withheld 1999-09-30
[Table view] |
Text
Wisconsin Electnc POWER COMPANY 231 W MicNgort PO Box 2046. Milwaukee WI 53201-2046 (414)221 2345 VPNPD-96-065 September 9,1996 Document Control Desk US NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington, DC 20555 Gentlemen:
DOCKET 50-266 AND 50-301 DETAILED OPERABILITY EVALUATION OF THE SERVICE WATER SYSTEM WITH RESPECT TO POST-ACCIDENT BOILING IN CONTAINMENT FAN COOLERS EOINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 As reported in Licensee Event Report (LER) 266/30196-005-00 on August 30,1996, we have determined that I the containment fan coolers (CFCs) in both units are potentially susceptible to senice water (SW) boiling in the cooling coils during a design basis loss of coolant accident (LOCA) with a concurrent loss of offsite power l
(LOOP) and the normal sequencing of safety-related equipment. The transient in question was identified in Westinghouse Nuclear Safety Advisory Letter NSAL 96-003.
ta discuned in the LER and in previous meetings with Region 3 and others of the NRC staff, we hereby submit oui detailed operability evaluation of the Senice Water System with respect to the potential for boiling in the containment fan coolers. This evaluation confirms the operability determinations of previous evaluations of the transient, in that the CFCs and SW System are operable under these conditions. The evaluation also includes a schedule for final corrective action.
If you require additional information, please contact us.
1 Sincerely, 5
ll Bob Link Vice President gJy Nuclear Power GDA 9609120268 960909 PDR ADOCK 05000266 P PDR
~ ~ ~ ' ' '
Attachments cc: NRC Resident Inspector, NRC Regional Administrator AsubsMhn ofliluvnshLkudwitathn l J
VPNPD-96-065 Attachment A Summary Evaluation Page 1 of 8 !
4 CONDITION DESCRIPTION l Our research has indicated that original design and licensing reviews demonstrated that SW System boiling would not occur in the containment fan coolers under steady-state conditions. 1 Specifically, the PBNP FSAR has described the capability of containment fan coolers to perform their function without raising the exit temperature of service water to the boiling point.
Therefore, the potential effects of service water boiling in this region were not reviewed during the original design and licensing of the Point Beach Nuclear Plant. Currently, a transient condition has been postulated whereby boiling may occur in the containment fan coolers.
l Westinghouse Nuclear Safety Advisory Letter NSAL 96-003, " Containment Fan Cooler Operation During a Design Basis Accident" identifies the potential for steam flashing in the containment fan coolers (CFCs) during a design basis accident. The issue was presented in context of a typical CFC that was supplied by a closed loop component cooling water (CCW) l system. Wisconsin Electric reviewed the applicability of this issue to the Point Beach l configuration, and en August 1,1996, determined that the transient described in NSAL 96-003 did apply (Refer to LER 266/30196-005). It was determined that the containment fan coolers (CFCs) in both units were potentially susceptible to service water flashing in the cooling coils during a design basis loss of coolant accident (LOCA) with a concurrent loss of offsite power l (LOOP) and the delayed sequencing of safety-related equipment.
The transient condition occurs when the SW pump flow coasts down much quicker than the CFC air f'ow. Until SW flow is re-established, hot and moist air is drawn over the cooler coils and raises the temperature of the resident service water. Simultaneously, the resident liquid will be l removed by the downstream vacuum caused by the static hydraulic head (elevation) of the coolers. This latter phenomenon is called " column separation" and is characteristic of the Point Beach SW System design. The service water remaining in the coils will be quickly heated into water vapor. The resulting vapor pressure will help evacuate the downstream piping ofliquid.
At this point, restoration of service water flow could result in a waterhammer and potentially challenge the operability of the CFCs and the Service Water System.
The scenario may be summarized as follows:
- 1) LOCA and LOOP occur concurrently.
- 2) SW Pumps trip due to LOOP and coastdown quickly.
- 3) Containment Fans trip due to LOOP and coastdown to 1/4 full speed in about 3 minutes and to a full stop in 33 minutes under normal density conditions. (Undec the post-accident density conditions, one would expect this coastdown time to be much less).
- 4) Emergency Diesels energize the bus at 10 seconds into event.
- 5) First " block" of service water pumps start at 25 seconds into event.
VPNPD-96-065 Attachment A Summary Evaluation Page 2 of 8
- 6) Second " block" of service water pumps start at 30 seconds into event.
Based on the above sequence, the containment coils could be exposed to post-accident environment conditions for a period of 25-30 seconds without service water flow. If one assumes a completely homogenous environment in containment for this initial period of time, the coils would condense a saturated steam mixture with a temperature ranging from 220
- F at 14 seconds into the event. Using a simplified transient heat transfer analysis, we determined a coil full of 75
- F service water would quickly (within 10 seconds) reach a saturated state when exposed to these conditions.
Summarv - Evaluation of the Condition We contracted the services of two consultants, Fauske & Associates, Inc. and Sargent & Lundy, to evaluate this potential transient with respect to the Point Beach containment fan cooler configuration. Our initial operability assessment used the qualitative engineering judgment of these consultants as a basis for determining the system to be operable. This information was communicated to the NRC during previous conferences. Subsequent to the initial operability determination, both of our consultants and our own staff have done a substantial amount of additional evaluation to bound the waterhammer analysis and to demonstrate through theoretical and experimental analysis that the bounding analysis is conservative.
Based on the work of these consultants, we have concluded that the Point Beach containment fan cooler system will withstand the postulated transient and continue to be operable, as our original operability assessment had determined. The important functions that ensure SW system operability under this condition include containment heat removal, service water pressure boundary, and containment pressure boundanj. Both consultant reports are included for review with appropriate supporting attachments.
Summary of the Bounding Analysis Sargent & Lundy (S & L) focused their work on determining the bounding waterhammer load and piping stress analysis. Using conservative assumptions and input, their analysis demonstrates that the bounding waterhammer loading would result in pipe stresses that exceed design allowables, but do not exceed interim operability criteria. The S & L report includes the thermal-hydraulic analysis, pipe stress analysis, and a time-response analysis. These analyses are attached to this document, and summarized below:
- 1. The Thermal-Ilydraulic Analysis (THA) used conservative, bounding assumptions to determine the magnitude of boiling and the resultant waterhammer loads imposed by the transient. The thermal-hydraulic analysis also provided the basis for determining the potential SW flow restrictions caused by two-phase flow. These restrictions may delay the refill of containment fan coolers and challenge their capability to remove their design basis heat load within the time constraints of the design basis accident.
VPNPD-96-065 Attachment A Summary Evaluation Page 3 of 8
, Conservatively, the THA assumed a homogeneous containment atmosphere and the containment temperature profile in FSAR Section 14.3.4 to derive the external temperature imposed on the CFC. Many other conservative assumptions are made, and include consideration of voiding and steam condensation to accelerate any potential water slug.
No credit was taken for SW flow to the two lower CFCs in a unit, and no credit was taken for cushioning of the water slug by the presence of air released from the fluid during vaporization (i.e., column separation).
The THA considered several possible waterhammer scenarios occurring at several different locations in the SW System. Detailed description of these scenarios is provided in the attachment. For calculation of waterhammer pressure, NUREG-5220 was used. The analysis determined that the waterhammer peak overpressures for the steam generation portion of the transient are bounded by those for the refill portian of the transient. The
- calculated maximum fill velocity for the refill portion of the transient was 6 ff/sec. Refer to
- Attachment B.
- 2. Stress Analyses. Hydraulic transient time-histories were developed for evaluation of the piping and supports. A peak overpressure was also conservatively calculated (1,050 psig for the 8-inch lines and 1,370 psig for the 2-1/2-inch lines) for the purposes of hoop stress evaluation. Conservatively, the stress analyses assumed a Safe Shutdown Earthquake (SSE) to occur coincidentally with the waterhammer event. The calculated stresses were related to i
the code allowable values and the interim operability criteria described by our commitments
- to IE Bulletin 79-14. Interim operability criteria are based on ASME Section III Appendix F limits. l Preliminary analyses indicated that pipe support stresses and piping stresses at several locations would exceed code allowable values. Therefore, iterative analyses were conducted to ensure that the interim operability criteria were met. In accordance with the interim operability guidelines, the supports in the system that exceeded interim operability criteria as a result of water-hammer loads were assumed to fail. The piping analyses were simplified and bounded by running the analyses without supports in the model to determine whether the pipe stresses would meet interim operability criteria.
4
- As described in the attached analysis, the maximum combined pipe stresses calculated for this event (the refill transient) do not exceed interim operability criteria. In addition, the attached analysis determines that the hydraulic loads on the CFC cooling coils were found to be acceptable. Refer to Attachment B.
2
- 3. A Time-Response Analysis of the transient was conducted to determine the capability of the
- containment fan coolers and SW System to remove their design basis heat load within the time constraints of the design basis accident. As described in the FSAR, the containment integrity analysis assumes the CFC system heat removal function starts at 60 seconds into the accident.
I l VPNPD-96-065 l
Summary Evaluation Attachment A )
{. Page 4 of 8 j The time-response analysis concluded that adequate liquid flow to the containment fan j coolers would be established within about 36 seconds, which satisfies the 60-second
)
i assumption. At this time, the transient is ended. Refer to Attachment B. >
4 i Summary of the Theoretical /Exnerimental Analysis l Fauske and Associates, Inc. (FAI) focused their efforts on demonstrating, through theoretical
! evaluation and experimentation, a more realistic estimate of the waterhammer loads. Using j industry literature from expens in the field of thermal-hydraulic analysis, FAI has demonstrated that the bounding analysis discussed above is conservative with respect to what theoretical and j experimental data would predict. In addition to their theoretical work, FAI conducted an i experimental scaled model of the thermal-hydraulic configuration similar to the Point Beach
! containment fan cooler configuration. The results of the experiment indicate that waterhammer l loading would be minimal compared to the bounding analysis results.
Refer to Attachment C for detailed discussion of this analysis.
POTENTIAL ADVERSE EFFECTS I
As discussed previously, there are two adverse effects created by the postulated CFC transient; l
- (1) voiding and two-phase conditions in the SW System could delay containment heat removal l functions, and (2) waterhammer could stress piping and piping supports beyond their design allowable limits.
i l
! 1. Potential Delav in Performino Containment Heat Removal Functions i a
i j Voiding in the SW lines could delay the heat removal function of the containment fan cooler.
The containment fan cooler and SW pipe would have to refill with liquid after pump-start, and
! initial flowrates may be limited by the passage of steam through the downstream throttle valves.
! These flow restrictions could impede restoration of SW flow to the containment coolers and I delay their capability to remove the necessary design basis heat load within the time i' requirements of the FSAR (60 seconds), i I l
- The time response analysis determined expected flow rates to the CFCs based on the calculated CFC downstream back pressure and found that once three pumps are running, the flow rate to the i CFCs will exceed the minimum required flow for design heat removal performance. Since a i minimum of three service water pumps are expected to be operating within 36 seconds, the design heat removal performance will meet the FSAR criteria.
1
- 2. Potential for Pinino and Suonort Stresses to Exceed Code Allowables 4
) i
< Analysis of the PBNP configuration during this transient has resulted in the conclusion that the ]
j hydraulic forces generated in the service water circuits of the containment fan coolers are not i sufficient to damage the pressure boundary integrity of the containment fan coolers. Therefore, I i waterhammer-induced pressure boundary failure and its consequential effects are not considered i
i l
. _ . . - - . - . - ~ . - - . - - - - - . - . - - - - - - - --- - --- =-
l
( t i VPNPD-96-065 Attachment A l Summary Evaluation Page 5 of 8
(
j credible. As discussed previously, analyses show that pipe stresses are within the Point Beach l interim operability stress limits.
- COMPENSATORY MEASURES i
I l 'Although evaluations conclude that the design basis accident will not result in a break of the i SW pressure boundary, PBNP procedures, guidelines, and training provide additional assurance
[ that the unlikely failure of the service water pressure boundary will be identified and remedied.
1 Existing alarms and monitors will prompt the appropriate operator action to isolate any such SW
) leak. Radiation release monitoring and alarm is provided in the service water effluent, and j procedures prompt containment fan cooler isolation if necessary (Reference Alarm Response f
Book (ARB) IC20-C2-1,2C20-C2-9, RMSASRB CI-lRE-216, and RMSASRB CI-2RE-216).
i In addition, a SW containment fan cooler low-flow alarm would prompt appropriate corrective i action if waterhammer caused a significant leak in the containment cooler (Reference ARB col-l B2-3 and C2-9). No additional procedural guidance for this contingency is necessary.
a The potential safety risk of this event scenario will be minimized by limiting the time period until final corrective action is taken. A period of 14 raonths has been determined to pose an insignificant increase in safety risk, yet should allow sufficient time to prepare for safe and ;
orderly design changes, if necessary.
1 I
Pursuant to GL 91-18, we have reviewed the operability of the existing condition. Operability evaluations have determined that the stresses on the safety-related piping and supports may exceed code allowables, but operability will be assured based on the interim operability criteria (based on ASME Section III Appendix F values). These criteria permit operation for an interim l period only.
Even though analyses show that the SW System pressure boundary remains functional during the transient, we have conducted a probabilistic safety assessment (PSA) analysis to evaluate the effects and risk impact ifit was assumed that this waterhammer scenario caused a SW pipe
~ failure l
VPNPD-96-065 Attachment A Summary Evaluation Page 6 of 8 inside containment. This PSA analysis used industry methods documented in EPRI TR-105396, "PSA Applications Guide", to determine the risk impact on the plant if this condition were to exist for 14 months (through Fall 1997). Refer to Attachment D for details.
The PSA analysis conservatively included evalua* ion of any event-initiator that could result in elevated containment temperature conditions. It was assumed that combining these initiators with a LOOP would result in a waterhammer. These initiating events included steamline breaks inside containment, LOCAs of all sizes, and Anticipated Transients Without Scram (ATWS).
Many of these initiators have very mild containment conditions during the first minute of the transient, and any postulated waterhammer effect would be limited.
The PSA analysis calculated that, following a postulated waterhammer transient and SW ,
failure, if the operators failed to isolate the SW leak inside containment, the overall PBNP Damage Frequency (CDF) and Large Early Release Frequency (LERF) would increase by 6.5E-8/yr. When this change in frequency is extended over the proposed 14-month interim period, the resulting change in Core Damage Probability (CDP) and Large Early Release Probability (LERP) were calculated to be 7.6E-8. Because the CDP is less than the PSA Applications Guide value of 1E-6, the acceptance of the waterhammer scenario my be considered "non-risk significant" and the change may be justified without the need for additional mitigating actions or analysis. Similarly, the LERP value is below the 1E-7 threshold and confirms that the scenario may be considered "non-risk significant".
Based on the nature of this transient phenomenon, the extremely low probability of the postulated sequence of events, and the expected complexity of modifications to minimize the potential effects of boiling, we plan to implement permanent corrective measures to both units prior to completion of the Unit 2 refueling outage scheduled for Fall 1997. Based on the proximity to the upcoming Unit 2 outage (scheduled shutdown October 5,1996), insufficient time exists to design and review permanent repairs in Unit 2 this fall. We believe this plan meets the intent of our commitment to interim operability criteria for safety-related piping.
All parameters assumed in the bounding analyses envelop currently observed operating and design limits. Therefore, no additional admini trative restrictions need to be created to ensure the integrity of the bounding analysis during the interim period of this condition.
PROPOSED RESOLUTION Engineering has been studying potential solutions to these transient issues during the develop-ment of the attached analyses. Several possible approaches have been identified, including the following:
. Modifications to the existing supports and piping systems to accept the analyzed loads from the postulated waterhammer event.
- Installation of an uninterruptable power supply on two or more existing service water pumps.
This approach would keep a minimum number of service water pumps running during the time-frame of concern.
VPNPD-%065 Attachment A Summary Evaluation Page 7 of 8 i l
e Installation of two additional service water pumps with fast starting diesel drivers. The l
timing of the diesels would be such that they provide water pressure to the fan coolers before i boiling begins. I e
Installation of flywheels on two or more service water pumps. This concept would keep the pumps rotating for sufficient time to prevent boiling in the fan coolers, until the service water pumps are loaded onto the emergency diesel generators.
Modification of the containment fan cooler service water discharge motor operated valves logic, such that they stay closed until the service water pumps are loaded onto the emergency diesel generators. We would also need to install an additional valve in the MOV bypass line l
which would close under these conditions as well. Additionally, a source of pressurized water could be installed to keep the fan cooler service water piping pressurized and filled with water during the identified transient conditions.
Each of these solutions presents risks to normal operation of the service water system and to other postulated accident scenarios which must be accurately identified and thoroughly reviewed to assure a responsible resolution. For example, installation of fly wheels could be designed to assure adequate flow is delivered during the first minute of the transient, but in addition, the inertia of restarting them after a minute of coastdown would need to be carefully considered in diesel loading and in service water flow after they restart. In addition to engineering analysis, sufficient time needs to be available to make necessary operating and emergency operating procedure changes, conduct thorough operator training, and to plan and implement all necessary documentation updates for a modification of this significance.
The above risks associated with pursuing these modifications in a short time frame are considered significant. As summarized previously, our PSA analysis has determined that accepting this situation for 14 months is not risk significant. Therefore, we are proposing that appropriate modifications be designed and implemented prior to the completion of the Unit 2 refueling outage in Fall,1997. Appropriate changes to Point Beach Technical Specifications and FSAR will be implemented at that time.
SUMMARY
/ CONCLUSIONS Our analyses conclude that service water boiling may occur in the vicinity of the containment fan coolers oc!ng the postulated design basis accident, however the effects of that boiling would not !
compromise any safety-related function. The magnitude of the potential waterhammer would not cause a loss of service water system pressure boundary integrity, and the effects of cooler voiding would not impair the capability of the containment heat removal system to perform its function within the time limits of the analysis. Theoretical and experimental analyses have confirmed that the bounding analysis is conservative in calculating the magnitude of waterhammer loads. ,
Although the calculated waterhammer loads resulted in piping and support stresses exceeding code allowable values, piping code operability has been validated based on the interim l
operability criteria of ASME Code Section III. These criteria permit operation for an interim period only. Our probabilistic safety assessment for this condition calculated that the
VPNPD-96-065 . Attachment A Summary Evaluation Page 8 of 8 incremental increase in risk of operating 14 months under this postulated condition is not significant.' Therefore, corrective actions have been planned for the scheduled refueling outages in 1997.
Attachments:
B. Sargent & Lundy Report," Operability Assessment for Transient Conditions in the Point Beach Nuclear Plant Service Water System During a Coincident Loss of Coolant Accident and Loss of Offsite Power", dated September 9,1996 C. Fauske & Associates Report FAI/96-75," Evaluation of Possible Water-Hanuner Loads in the Service Water System for DBA Conditions", September,1996 D. PSA Evaluation of Water Hammer in SW Supply to Containment Accident Fan Coolers, i Rev.3 i l