Category:CORRESPONDENCE-LETTERS
MONTHYEARNOC-AE-000675, Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested1999-10-21021 October 1999 Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested NOC-AE-000680, Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan1999-10-20020 October 1999 Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan NOC-AE-000683, Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii)1999-10-19019 October 1999 Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii) ML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds 05000498/LER-1999-008, Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER1999-10-12012 October 1999 Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule1999-10-12012 October 1999 Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future1999-10-0707 October 1999 Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future NOC-AE-000610, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i) NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i) ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls 05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment1999-09-30030 September 1999 Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error NOC-AE-000664, Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr1999-09-30030 September 1999 Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr1999-09-28028 September 1999 Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 NOC-AE-000633, Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 19971999-09-21021 September 1999 Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997 NOC-AE-000634, Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl1999-09-21021 September 1999 Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl NOC-AE-000649, Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P1999-09-21021 September 1999 Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P 05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-09-20020 September 1999 Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER ML20212D9171999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of South Texas Project & Identified No Areas in Which Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through Mar 2000 & Historical Listing of Plant Issues,Encl ML20216F5471999-09-15015 September 1999 Discusses 990914 Meeting Conducted at Region Iv.Meeting Was Requested by Staff to Introduce New Management Organization to Region IV & to Discuss General Plant Performance & Mgt Challenges IR 05000498/19990121999-09-14014 September 1999 Forwards Insp Repts 50-498/99-12 & 50-499/99-12 on 990816-19.Three Violations Occurred & Being Treated as Ncvs. Areas Examined During Insp Included Portions of Access Authorization & Physical Security Programs 05000498/LER-1999-007, Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER1999-09-13013 September 1999 Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER ML20211P8201999-09-0909 September 1999 Forwards SE Authorizing 990224 Submittal of First 10-year Interval ISI Program Plan - Relief Request RR-ENG-24,from ASME Section XI Code,Table IWC-2500-1 NOC-AE-000638, Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6)1999-09-0909 September 1999 Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6) ML20211P7671999-09-0909 September 1999 Forwards SER Authorizing Licensee 990517 Alternative Proposed in Relief Request RR-ENG-2-8 to Code Case N-491-2 for Second 10-year Insp Interval of South Texas Project, Units 1 & 2,pursuant to 10CFR50.55a(a)(3)(i) ML20211P7871999-09-0909 September 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Program Plan Request for Relief RR-ENG-31 IR 05000498/19990141999-09-0303 September 1999 Forwards Insp Repts 50-498/99-14 & 50-499/99-14 on 990627-0807.Apparent Violations Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy NOC-AE-000562, Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i)1999-08-31031 August 1999 Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i) ML20212A4351999-08-27027 August 1999 Discusses Investigation Rept OI-4-1999-009 Re Activites at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination Complaint. Allegation Not Substantiated.No Further Action Planned NOC-AE-000617, Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d)1999-08-26026 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d) ML20211J2511999-08-26026 August 1999 Discusses Proposed TS Change on Replacement SG Water Level Trip Setpoint for Plant,Units 1 & 2 NOC-AE-000585, Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-4811999-08-25025 August 1999 Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-481 ML20211F4421999-08-24024 August 1999 Forwards SE Authorizing Licensee 990513 Request for Relief RR-ENG-2-13,seeking Relief from ASME B&PV Code Section Xi,Exam Vessel shell-to-flange Welds for Second ISI Intervals ML20211F5031999-08-23023 August 1999 Forwards SE Authorizing Licensee 990315 Request for Relief RR-ENG-30,seeking Relief from ASME B&PV Code,Section Xi,Nde Requirements Applicable to Stp,Unit 2 SG Welds ML20212A4391999-08-17017 August 1999 Discusses Investigation Rept OI-4-1999-023 Re Activities at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination for Initiating Condition Report to Document Unauthorized Work Practices ML20210U1271999-08-16016 August 1999 Forwards Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607-10.No Violations Noted.Corrective Action Program Was Reviewed ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams NOC-AE-000603, Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6)1999-07-29029 July 1999 Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6) NOC-AE-000470, Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl1999-07-28028 July 1999 Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl NOC-AE-000599, Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr1999-07-28028 July 1999 Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr NOC-AE-000589, Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/20001999-07-26026 July 1999 Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/2000 ML20210F3851999-07-26026 July 1999 Forwards Exam Repts 50-498/99-301 & 50-499/99-301 on 990706- 15.Exam Included Evaluation of 9 Applicants for SO Licenses & 8 Applicants for RO Licenses 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARNOC-AE-000675, Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested1999-10-21021 October 1999 Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested NOC-AE-000680, Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan1999-10-20020 October 1999 Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan NOC-AE-000683, Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii)1999-10-19019 October 1999 Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii) NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule1999-10-12012 October 1999 Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule 05000498/LER-1999-008, Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER1999-10-12012 October 1999 Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future1999-10-0707 October 1999 Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future NOC-AE-000610, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i) NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i) 05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment1999-09-30030 September 1999 Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment NOC-AE-000664, Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr1999-09-30030 September 1999 Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr1999-09-28028 September 1999 Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr NOC-AE-000633, Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 19971999-09-21021 September 1999 Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997 NOC-AE-000634, Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl1999-09-21021 September 1999 Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl NOC-AE-000649, Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P1999-09-21021 September 1999 Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P 05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-09-20020 September 1999 Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER 05000498/LER-1999-007, Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER1999-09-13013 September 1999 Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER NOC-AE-000638, Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6)1999-09-0909 September 1999 Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6) NOC-AE-000562, Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i)1999-08-31031 August 1999 Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i) NOC-AE-000617, Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d)1999-08-26026 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d) NOC-AE-000585, Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-4811999-08-25025 August 1999 Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-481 NOC-AE-000603, Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6)1999-07-29029 July 1999 Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6) NOC-AE-000599, Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr1999-07-28028 July 1999 Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr NOC-AE-000470, Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl1999-07-28028 July 1999 Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl 05000498/LER-1999-006, Forwards LER 99-006-00 Re Automatic Reactor Trip Due to over-temp delta-temp Actuation.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-07-26026 July 1999 Forwards LER 99-006-00 Re Automatic Reactor Trip Due to over-temp delta-temp Actuation.Licensee Commitments Are Listed in Corrective Actions Section of LER NOC-AE-000589, Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/20001999-07-26026 July 1999 Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/2000 NOC-AE-000582, Forwards 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1. Summary Rept Satisfies Reporting Requirements of IWA-6000 of Section XI for Welds & Component Supports1999-07-26026 July 1999 Forwards 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1. Summary Rept Satisfies Reporting Requirements of IWA-6000 of Section XI for Welds & Component Supports NOC-AE-000597, Forwards voltage-based Criteria 90-day Rept for SG Tube Exam Performed Under NRC GL 95-05 During Refueling Outage 1RE08. Rept Contains Info Required by Section 6.b of Attachment 2 to GL 95-051999-07-23023 July 1999 Forwards voltage-based Criteria 90-day Rept for SG Tube Exam Performed Under NRC GL 95-05 During Refueling Outage 1RE08. Rept Contains Info Required by Section 6.b of Attachment 2 to GL 95-05 NOC-AE-000598, Forwards Four Copies of 1RE08 Refueling Outage ISI Summary Rept for Steam Generator Tubing1999-07-23023 July 1999 Forwards Four Copies of 1RE08 Refueling Outage ISI Summary Rept for Steam Generator Tubing NOC-AE-00586, Forwards Results of Control Rod Testing,In Response to NRC Bulletin 96-01, Control Rod Insertion Problems, Dtd 960308.Core Map Provided to Assist in Understanding Test Data1999-07-21021 July 1999 Forwards Results of Control Rod Testing,In Response to NRC Bulletin 96-01, Control Rod Insertion Problems, Dtd 960308.Core Map Provided to Assist in Understanding Test Data NOC-AE-000595, Forwards Chapters 1.0 & 16.0 to Operations QA Plan for South Texas Project.Rev Is Strictly Administrative & All Content Was Previously Submitted to NRC on 990503 & 9906151999-07-21021 July 1999 Forwards Chapters 1.0 & 16.0 to Operations QA Plan for South Texas Project.Rev Is Strictly Administrative & All Content Was Previously Submitted to NRC on 990503 & 990615 NOC-AE-000518, Requests Exemption from Various Special Treatment Requirements of 10CFR50,as Described in Encls to Ltr.Stp Believes That Pilot Application Will Assist NRC in Development & Implementation of risk-informed 10CFR501999-07-13013 July 1999 Requests Exemption from Various Special Treatment Requirements of 10CFR50,as Described in Encls to Ltr.Stp Believes That Pilot Application Will Assist NRC in Development & Implementation of risk-informed 10CFR50 NOC-AE-000536, Submits Request for Exemption from Requirements of 10CFR50.34(b)(11),10CFR50,App A,Gdc 2 & 10CFR100,App a, Section VI(a)(3) Re Maint of Seismic Instrumentation.Revised Page to Procedure OERP01-ZV-IN01 Included1999-07-13013 July 1999 Submits Request for Exemption from Requirements of 10CFR50.34(b)(11),10CFR50,App A,Gdc 2 & 10CFR100,App a, Section VI(a)(3) Re Maint of Seismic Instrumentation.Revised Page to Procedure OERP01-ZV-IN01 Included NOC-AE-000580, Forwards Response to NRC 990415 RAI Re Implementation of Commitments Related to GL 89-10, Safety-Related MOV Testing & Surveillance & GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs1999-07-13013 July 1999 Forwards Response to NRC 990415 RAI Re Implementation of Commitments Related to GL 89-10, Safety-Related MOV Testing & Surveillance & GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs NOC-AE-000574, Forwards ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests Performed Between 971004 & Completion of Eighth RO on 9904281999-07-0606 July 1999 Forwards ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests Performed Between 971004 & Completion of Eighth RO on 990428 NOC-AE-000557, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of App III,III-3410 for Second ISI Interval.Proposed Alternatives for Ultrasonic Exam of Piping Sys Welds,Attached1999-07-0606 July 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of App III,III-3410 for Second ISI Interval.Proposed Alternatives for Ultrasonic Exam of Piping Sys Welds,Attached NOC-AE-000498, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements Applicable to SG Main Steam Nozzle inside- Radius Sections.Attachment Includes Discussion of Basis & Justification for Request & Implementation Schedule1999-07-0606 July 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements Applicable to SG Main Steam Nozzle inside- Radius Sections.Attachment Includes Discussion of Basis & Justification for Request & Implementation Schedule NOC-AE-000573, Requests Relief from Requirements of ASME Section XI Code Case N-498,exempting Isolated Class 1 Reactor Vessel Head Vent Atmospheric Vent Piping & Valve from Being Tested at Full RCS Pressure1999-07-0606 July 1999 Requests Relief from Requirements of ASME Section XI Code Case N-498,exempting Isolated Class 1 Reactor Vessel Head Vent Atmospheric Vent Piping & Valve from Being Tested at Full RCS Pressure NOC-AE-000541, Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Systems at Npps. Readiness Disclosure for STP, Encl1999-06-29029 June 1999 Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Systems at Npps. Readiness Disclosure for STP, Encl NOC-AE-000571, Forwards Final Operating Exam Matls for STP Exam Scheduled for 990705.Revised Operating Exam Outline & post-validation Change Summary Has Been Included.Without Encls1999-06-24024 June 1999 Forwards Final Operating Exam Matls for STP Exam Scheduled for 990705.Revised Operating Exam Outline & post-validation Change Summary Has Been Included.Without Encls NOC-AE-000512, Responds to NRC 981201 Telcon Re Jco 93-0004,per Revised MSLB Analysis1999-06-23023 June 1999 Responds to NRC 981201 Telcon Re Jco 93-0004,per Revised MSLB Analysis NOC-AE-000560, Forwards LER 99-S02-00,re Failure to Maintain Positive Control of Vital Area Security Key.Licensee Commitments Are Found in Corrective Action Section of LER1999-06-23023 June 1999 Forwards LER 99-S02-00,re Failure to Maintain Positive Control of Vital Area Security Key.Licensee Commitments Are Found in Corrective Action Section of LER 05000498/LER-1999-005, Forwards LER 99-005-00,re Failure to Meet Requirements of TS Surveillance 3.7.1.2 Action B for Auxiliary FW Sys.Only Commitments Contained in Ltr Are Located in Corrective Action Section of LER1999-06-17017 June 1999 Forwards LER 99-005-00,re Failure to Meet Requirements of TS Surveillance 3.7.1.2 Action B for Auxiliary FW Sys.Only Commitments Contained in Ltr Are Located in Corrective Action Section of LER NOC-AE-000565, Forwards Amended Pages for Insertion Into South Texas Project Nuclear Operating Co Previously Submitted Response to NRC Rai.New Pages Include Expanded Answer to Question 4.b1999-06-16016 June 1999 Forwards Amended Pages for Insertion Into South Texas Project Nuclear Operating Co Previously Submitted Response to NRC Rai.New Pages Include Expanded Answer to Question 4.b NOC-AE-000548, Forwards Response to RAI Re Proposed Amends on Replacement SG Water Level Trip Setpoint Differences for Stp,Units 1 & 2.Nothing Contained in Response Should Be Considered Commitment Unless So Specified in Separate Correspondence1999-06-16016 June 1999 Forwards Response to RAI Re Proposed Amends on Replacement SG Water Level Trip Setpoint Differences for Stp,Units 1 & 2.Nothing Contained in Response Should Be Considered Commitment Unless So Specified in Separate Correspondence NOC-AE-000561, Forwards Change QA-042 to Operations QAP, Rev 13, Reflecting Current Organizational Alignment for STP & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months1999-06-15015 June 1999 Forwards Change QA-042 to Operations QAP, Rev 13, Reflecting Current Organizational Alignment for STP & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months NOC-AE-0559, Forwards STP Commitment Change Summary Rept for Period 981209-990610.Rept Lists Each Commitment for Which Change Was Made During Reporting Period & Provides Basis for Each Change1999-06-15015 June 1999 Forwards STP Commitment Change Summary Rept for Period 981209-990610.Rept Lists Each Commitment for Which Change Was Made During Reporting Period & Provides Basis for Each Change NOC-AE-000499, Forwards Relief Request RR-ENG-2-3,proposing to Perform Alternative Ultrasonic Examination from Outside Surface of Skirt Attachment Weld as Described in Encl,In Lieu of Surface Examination from Inside Pressurizer Skirt1999-06-0909 June 1999 Forwards Relief Request RR-ENG-2-3,proposing to Perform Alternative Ultrasonic Examination from Outside Surface of Skirt Attachment Weld as Described in Encl,In Lieu of Surface Examination from Inside Pressurizer Skirt NOC-AE-000502, Forwards Relief Request RR-ENG-2-6,proposing That Boroscopic VT-1 Visual Examination Be Allowed as Alternative to Section XI Surface Examination of Pump Casing Welds,Or Portions of Welds within Pits1999-06-0909 June 1999 Forwards Relief Request RR-ENG-2-6,proposing That Boroscopic VT-1 Visual Examination Be Allowed as Alternative to Section XI Surface Examination of Pump Casing Welds,Or Portions of Welds within Pits NOC-AE-000500, Forwards Relief Request RR-ENG-2-4,proposing to Perform Alternative Ultrasonic Examination from Outside & End Surfaces of Reactor Vessel Closure Head Nuts,As Described in Encl in Lieu of Surface Examination of Threaded Region1999-06-0909 June 1999 Forwards Relief Request RR-ENG-2-4,proposing to Perform Alternative Ultrasonic Examination from Outside & End Surfaces of Reactor Vessel Closure Head Nuts,As Described in Encl in Lieu of Surface Examination of Threaded Region NOC-AE-000545, Forwards Response to NRC 990416 RAI Re Util Proposed Amend on Operator Action for Small Break Loca, .Draft EOP Re Small Break Loca,Encl to Aid Discussion of Proposed Amend1999-05-31031 May 1999 Forwards Response to NRC 990416 RAI Re Util Proposed Amend on Operator Action for Small Break Loca, .Draft EOP Re Small Break Loca,Encl to Aid Discussion of Proposed Amend 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARST-HL-AE-3578, Forwards 1RE02 Inservice Insp Summary Rept for Welds & Component Supports..., Describing Exams Performed During Period of 900329-0621,per 1983 Edition of ASME Code,Section XI & Summer 1983 Addenda1990-09-20020 September 1990 Forwards 1RE02 Inservice Insp Summary Rept for Welds & Component Supports..., Describing Exams Performed During Period of 900329-0621,per 1983 Edition of ASME Code,Section XI & Summer 1983 Addenda ST-HL-AE-3577, Responds to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule1990-09-18018 September 1990 Responds to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule ST-HL-AE-3567, Requests NRC Review of Proposed Rev to Schedule for Inservice Insp Exam of Class 1,Category B-D Vessel Nozzles1990-09-14014 September 1990 Requests NRC Review of Proposed Rev to Schedule for Inservice Insp Exam of Class 1,Category B-D Vessel Nozzles ST-HL-AE-3570, Forwards Rev 5 to, South Texas Project Unit 1 Pump & Valve Inservice Test Plan1990-09-14014 September 1990 Forwards Rev 5 to, South Texas Project Unit 1 Pump & Valve Inservice Test Plan ST-HL-AE-3553, Forwards WCAP-12629, Analysis of Capsule U from South Texas Unit 1 Reactor Vessel Radiation Surveillance Program. Pressure-temp Curves Currently in Use in Facility Tech Specs Are More Conservative than Presented in App a of Rept1990-09-10010 September 1990 Forwards WCAP-12629, Analysis of Capsule U from South Texas Unit 1 Reactor Vessel Radiation Surveillance Program. Pressure-temp Curves Currently in Use in Facility Tech Specs Are More Conservative than Presented in App a of Rept ST-HL-AE-3565, Forwards Rev 8 to Operations QA Plan. Plan Revised in Order to Include More Detailed Criteria of Chapter 17.2 of Updated Fsar.Approval Requested1990-09-10010 September 1990 Forwards Rev 8 to Operations QA Plan. Plan Revised in Order to Include More Detailed Criteria of Chapter 17.2 of Updated Fsar.Approval Requested ST-HL-AE-3546, Forwards Corrected Semiannual Radioactive Effluent Release Rept for Second Half of 19891990-08-28028 August 1990 Forwards Corrected Semiannual Radioactive Effluent Release Rept for Second Half of 1989 ST-HL-AE-3550, Forwards Semiannual fitness-for-duty Program Performance Rept for Jan-June 1990,per 10CFR26.71(d)1990-08-28028 August 1990 Forwards Semiannual fitness-for-duty Program Performance Rept for Jan-June 1990,per 10CFR26.71(d) ST-HL-AE-3540, Provides Schedule Under Which Facility Turbine Components Inspected for Functional Integrity.Required Insp Intervals Calculated to Maintain Probability of Missile Generation for Each Low Pressure Rotor1990-08-28028 August 1990 Provides Schedule Under Which Facility Turbine Components Inspected for Functional Integrity.Required Insp Intervals Calculated to Maintain Probability of Missile Generation for Each Low Pressure Rotor ST-HL-AE-3551, Forwards Responses to NRC 900807 Request for Addl Info Re Probabilistic Safety Assessment Human Reliability Analysis. Paper on Quantification of Human Error Rates Using slim-based Approach Encl1990-08-26026 August 1990 Forwards Responses to NRC 900807 Request for Addl Info Re Probabilistic Safety Assessment Human Reliability Analysis. Paper on Quantification of Human Error Rates Using slim-based Approach Encl ML20043H6191990-06-21021 June 1990 Forwards 1989 Annual Financial Repts for Licensees for Plant ML20043H5971990-06-19019 June 1990 Forwards Responses to Open Items Resulting from Sandia Draft Rept on Probabilistic Safety Assessment.Dominant Sequence Model Encl,Per NRC Reviewers Request ML20043H7781990-06-18018 June 1990 Forwards Rev 1 to SER Commitment Status for Plant,Per NUREG-0781.List of Action Items Completed But Not Incorporated Into Sser & List of Items for Actions Not Completed Also Encl ML20043F6261990-06-11011 June 1990 Forwards Rev 0 to Unit 1 Cycle 3 Core Operating Limits Rept. ML20043F3191990-06-0404 June 1990 Responds to NRC 900504 Ltr Re Violations Noted in Insp Repts 50-498/90-01 & 50-499/90-01.Corrective Actions:Compressed Gas Cylinders Removed from Power Block & Nashua 357 Tape Returned to Nuclear Purchasing Matl Mgt Co ML20043D3241990-06-0101 June 1990 Forwards Rev 10 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21) ML20043B1651990-05-21021 May 1990 Advises That Qualified Display Processing Sys on Line Parameter Update Mod Will Be Completed During Next Refueling Outages,Per 900312 Ltr ML20043A9951990-05-16016 May 1990 Discusses Actions Taken Re Prompt Notification Sys.Util Found Autodialer Sys Offer Acceptable Alternative to Replacing Majority of Tone Alert Radios ML20043H6531990-05-16016 May 1990 Forwards Plant Owner Draft Decommissioning Certificate & Util & City Public Svc Board of San Antonio Decommissioning Master Trust Agreements for South Texas Project ML20043A6081990-05-16016 May 1990 Forwards Rev 16 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) ML20043A8641990-05-14014 May 1990 Clarifies Operation of Telephone Autodialer Sys,As Part of Prompt Notification Sys.Autodialer Sys,As Currently Configured,Can Autodial & Deliver Prerecorded Message to Residents at Rate of Approx 20 Calls Per Minute ML20043A3271990-05-10010 May 1990 Forwards Endorsements 7 & 6 to Maelu Certificates M-113 & M-116,respectively & Endorsement 6 to Nelia Certificates N-113 & N-116 ML20042G8641990-05-0909 May 1990 Comments on SALP Repts 50-498/90-06 & 50-499/90-06 for Jan 1989 to Jan 1990.Util Working on Areas Identified During SALP Rept & Mgt Meeting on 900425 ML20042F9571990-05-0707 May 1990 Responds to NRC 900405 Ltr Re Violations Noted in Insp Repts 50-498/90-05 & 50-499/90-05.Corrective Actions:Surveillances of Emergency Response Equipment in Technical Support Ctrs Performed to Ensure That Emergency Requirements Satisfied ML20042F1171990-05-0101 May 1990 Submits Special Rept Re Evaluation of third-yr Containment Tendon Surveillance.Tendons Which Had Voids Have Been Filled & No Evidence of Grease Leakage from Sheathing Exists ML20042F3631990-04-30030 April 1990 Provides Summary of Expected Sequence of Events for Updates to Prompt Notification Sys ML20042E6361990-04-20020 April 1990 Forwards Revised Organization Chart,Correcting Postion Titles Reflected in 900326 Submittal ML20042E5421990-04-12012 April 1990 Responds to 900316 Notice of Violation for Insp Repts 50-498/90-08 & 50-499/90-08.Violation Addressed in LER 90-003 Re Failure to Perform Tech Spec Required Surveillance Due to Deficient Procedure ML20042E1591990-04-0505 April 1990 Provides Listed Guidelines for Development of Operating Procedures Re Ac Power Restoration to Respond to Station Blackout Event,Per 10CFR50.63, Loss of All AC Power. ML20012F2881990-04-0202 April 1990 Provides Rept of Nuclear Insurance Protection,Per 10CFR50.54(w)(2).NEIL-II Decontamination Liability & Excess Property Policy Increased Effective 891115 ML20012F2831990-04-0202 April 1990 Informs of Deferral of Facility Mods to Install Permanent RHR Pump Motor Current Indication.Mod Will Be Completed Before Next Reduced RCS Inventory Conditions on Unit ML20012D8731990-03-19019 March 1990 Forwards Revised Correspondence Distribution List of Designated Recipients ML20012C6121990-03-16016 March 1990 Forwards NRC Regulatory Impact Survey Questionnaire Sheets in Response to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey. Brief Summary Table of Questionnaire Data Also Encl ML20012C6171990-03-16016 March 1990 Forwards Status of Actions Committed to Re NRC Bulletin 88-004 in Response to G Dick Request ML20012C2811990-03-12012 March 1990 Forwards Suppl 3 to Qualified Display Processing Sys (Qdps) Verification & Validation Process Final Rept & Summary of Qualified Display Processing Sys (Qdps) Recurring Component Failure Data. ML20012C0641990-03-12012 March 1990 Forwards Rev 15 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) ML20012B7651990-03-0909 March 1990 Responds to Generic Ltr 88-17, Loss of Dhr. Util Will Revise Appropriate Procedures to Require Entering Reduced Inventory Operation at 3 Ft Below Reactor Vessel Flange ML20042D6701990-03-0808 March 1990 Responds to NRC Generic Ltr 89-19, Resolution of USI A-47,Safety Implication of Control Sys in LWR Nuclear Power Plants. Plant Design Meets Criteria of Generic Ltr 89-19 for Automatic Steam Generator Overfill Protection ML20012A1291990-03-0101 March 1990 Forwards Responses to Questions Raised by Sandia During Review of Plant PRA Covering Steam Generator Dryout ML20012A3001990-02-28028 February 1990 Forwards Nonproprietary & Proprietary Rev 1,Suppl 2 to WCAP-12087 & WCAP-12067, Reconciliation of Fatigue Crack Growth Results for South Texas Project Unit 1 Surge..., Per NRC Bulletin 88-011.WCAP-12067 Withheld (Ref 10CFR2.790) ML20011F1921990-02-22022 February 1990 Responds to NRC 900123 Ltr Re Violations Noted in Insp Repts 50-498/89-47 & 50-499/89-47.Corrective Actions:Heat Trace Circuit Temp Controllers Calibr & Analog Indication Checked & Found within Tolerance on All But Three Channels ML20011E9061990-02-16016 February 1990 Responds to NRC IE Bulletin 89-003, Potential Loss of Required Shutdown Margin During Refueling Operations. Util Concluded That Sufficient Precautions Will Be in Place to Ensure Against Loss of Required Shutdown Margin ML20006D9121990-02-0707 February 1990 Forwards Updated Schedule of Responses to NRC Generic Ltrs 83-28,88-17,88-20,89-05,89-06,89-07,89-08,89-10,89-12,89-13, 89-17,89-19 & 89-21 & Bulletins 88-001,88-008,88-010,88-011, 89-001,89-002,89-003,88-008,Suppl 1 & 88-010,Suppl 1 ML20011E8251990-02-0505 February 1990 Requests Consideration of Scenario Manual for 900404 Graded Emergency Preparedness Exercise as Proprietary Info Until After Graded Exercise ML20006B8801990-01-31031 January 1990 Forwards Comparison of Instrusion Detection Sys Proposed for Various Physical Security Upgrade.Encl Withheld (10CFR73.21) ML20011E1831990-01-30030 January 1990 Requests Approval of Schedular Exemption from 10CFR50,App J, Type C Local Leak Rate Testing Requirements by 900301,based on Interval Between Completion of Unit 1 First Refueling Outage & Second Refueling Outage Start of Only 6 Months ML20011E1361990-01-29029 January 1990 Responds to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Three Bays of Essential Cooling Water Intake Structure Will Be Inspected Once Every 18 Months for Macroscopic Biological Fouling Organisms ML20006A9791990-01-26026 January 1990 Provides Addl Info Re Surge Line Stratification at Facility, Per NRC Bulletin 88-011.W/exception of One Heatup Cycle, Stratification Observed in Surge Line Determined to Be within Bounds of WCAP-12067,Rev 1 ML20006A7981990-01-26026 January 1990 Forwards Response to Violations Noted in Insp Repts 50-498/89-39 & 50-499/89-39.Response Withheld ML20006B3551990-01-23023 January 1990 Forwards Rev 4 to Pump & Valve Inservice Test Plan. Rev Includes Addition of Component Cooling Water Valves FV-0864,FV-0862 & FV-0863 & Containment Sys Valves FV-1025, FV-1026,FV-1027 & FV-1028 1990-09-20
[Table view] |
Text
P ZWe The Light E f Houston Lighting & Power P.O. Ilox 1700 flouston, Texas 77001 (713) 228-9211
- July 30, 1984 ST-HL-AE-1073 File No: G3.3/C10.9.2
Mr. J. T. Collins Director, Region IV gig -p g U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 ,
'h Arlington, Texas 76102
Dear Mr. Collins:
South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Third Revised Response to NRC IE Bulletin 79-02 Houston Lighting & Power Company is revising the response to IE Bulletin No. 79-02 which was transmitted to the NRC by letter dated December 4, 1981.
This submittal completely supercedes previous responses. The revised position, as attached, has been prepared to reflect changes in the design of the South Texas Project that affect expansion anchor bolts. Also provided is further clarification of the adequacy of the design and installation of the anchor bolts for assuring the operability of Seismic Category I systems.
If you have any questions, please contact Mr. Michael E. Powell at (713) 993-1328.
Very truly yours,
. pYa# r.
l Executive ice President PLW/na
Attachment:
Third Revised Response to NRC IE Bulletin 79-02 D
B409070081 84073 gor anom osooo4,0e PDR a {c W2B/L003PW/u /l
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMISSION
'In'the Matter 9 6
Houston Lighting & Power' 6 Docket Nos. 50-498 Company, et al., 5 50-499 5
South Texas Project 5 Units 1 and 2 9 AFFIDAVIT G. W. Oprea, Jr., being duly sworn, hereby deposes and says that he is an Executive Vice President of Houston Lighting & Power Company; that he is duly authorized to sign and file with the Nuclear Regulatory Commission the attached Third Revised Response to NRC IE Bulletin 79-02; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge and belief.
Exe resident STATE OF TEXAS 6 9
COUNTY OF HARRIS. 6 Subscribed and sworn to before me, a Notary Public in and for Harris yng,,Texasthis day of ,1984.
)?bdf N%,
y
2 ohf\h,it s ' s
Nr /J 5 c '.. J Notary Public in and for 'the
%,,'1;',[/ E l =:o i State of Texas
* 1 ; &
My connission expires:
G71dG W2B/ LOO 3PW/u
July 30, 1984 Houston Lighting & Power Company ST-HL-AE-1073 File No: G3.3/C10.9.2 Page 2 cc: .
Darrell G. Eisenhut, Director Brian E. Berwick, Esquire Division of Licensing _
Assistant Attorney General for Office of Nuclear Reactor Regulation the State of Texas U.S Nuclear Regulatory Commission P. O. Box 12548, Capitol Station-Washington, DC 20555 Austin, TX 78711 Victor'Nerses,-Project Manager Lanny Sinkin U.S. Nuclear Regulatory Commission Citizens Concerned About Nuclear Power 7920 Norfolk Avenue 114 W. 7th, Suite 220 Bethesda, MD 20016 Austin, TX 78701 D. P. Tomlinson Robert G. Perlis, Esquire Resident Inspector / South Texas Project Hear'ng Attorney c/o U.S. -Nuclear Regulatory Commission Office of the Executive Legal Director P. O. Box 910 U.S. Nuclear Regulatory Commission Bay City, TX 77414 Washington, DC 20555 M. D. Schwarz,-Jr., Esquire Charles Bechhoefer, Esquire Baker & Botts Chairman, Atomic Safety & Licensing Board One' Shell Plaza - U.S. Nuclear Regulatory Commission
-Houston, TX 77002. Washington, DC 20555 J. R. Newman, Esquire Dr. James C. Lamb, III Newman & Holtzinger, P.C. 313 Woodhaven Road 1025 Connecticut Avenue, N.W. Chapel Hill, NC 27514 Washington, DC 20036 Judge Ernest E. Hill Director, Office of Inspection Hill Associates and Enforcement 210 Montego Drive U.S. Nuclear Regulatory Commission Danville, CA 94526 Washington, DC 20555 William S. Jordan, III, Esquire E. R.. Brooks /R. L. Range Harmon & Weiss Central Power & Light Company ,1725 I Street, N.W. ,
P. O. Box 2121 Suite 506 Corpus-Christi, TX~ 78403 Washington, DC 20006 H. L. Peterson/G. Pokorny Citizens for Equitable Utilities, Inc.
City of Austin c/o Ms. Peggy Buchorn P. O. Box 1088 Route 1, Box 1684 Austin, TX 78767 Brazoria, TX 77422 J.'B. Poston/A. vonRosenberg City Public Service Board P. O. Box 1771 San Antonio, TX 78296 Revised 04/03/84
^
- ST-HL-AE-1073 Attachment Page 1 of 7 ;
I South Texas Project i Units 1 & 2 Docket Nos. STN 50-498, STN 50-499
' Third Revised Response to NRC IE Bulletin 79-02 LHouston Lighting & Power _ Company (HL&P) has previously responded to IE Bulletin 79-02-for the South Texas Project (STP). The following response
-supercedes all'of these previous submittals. This revised response describes the design of the expansion anchor bolts in Seismic Category I systems used
.on STP.
The changes made in this response from the earlier submittals reflect the design methods employed by Bechtel, which replaced Brown & Root at architect /
engineer.for_the STP. Bechtel has reviewed the design and installation of expansion anchor bolts as documented by Brown & Root specifications and procedures, and has found them to satisfy Bechtel's requirements.
STP uses- two types of expansion anchor bolts for permanent plant installations. Wedge-type (Hilti kwik-bolt) expansion anchor bolts have been dis _ cussed in previous responses to the Bulletin; this revised response provides further discussion regarding how these anchor bolts are currently used at STP. Ductile-type (Drillco maxi-bolts) have not been discussed previously; use of these anchor bolts has only recently been initiated at STP.
The revised response includes the design and installation criteria to be followed when ductile-type expansion anchor bolts are used.
^
The anchorage system for ductile-type expansion anchor bolts differs substantially from that of other types of expansion anchor bolts.
. Ductile-type expansion anchor bolts are secured by expansion into an undercut hole of larger diameter provided at the base of the hole drilled for the shaft of the anchor bolt. Because of this positive mechanical anchorage system, HL&P does not consider the concerns addressed by the Bulletin to be applicable to ductile-type expansion anchor bolts. However, ductile-type expansion anchor bolts are included in the following discussion to clarify how they are used on STP.
-1. Baseplate Flexibility Analyses of baseplates for pipe supports and miscellaneous supports which utilize expansion anchors are performed either by computer or manual calculations.
a) The computer program used is CDC, CE035, BASEPLATE 2. Using finite element analysis, the program considers the flexibility of the plate interacting with the stiffness of the expansion anchors and the bearing concrete under the plate. This method includes the effects of prying action in calculating expansion anchor tensions.
b) The manual method of calculation of expansion anchor tensions due to externally applied moments considers the flexibility of the W2B/L003PW/u L . . _ .
ST-HL-AE-1073 Attachment Page 2 of 7 plate by prescribing that the tension / compression couple resulting from the applied moment be defined as follows:
- 1. The tension resultant is located at the centroid of the bolt group in tension.
11.. The compression resultant is located under the compressive edge of the member which is attached to and delivers the
-external moment to the plate.
The bolt tension for wedge-type expansion anchors (which is conservatively calculated considering the flexibility of the plate as described above) is multiplied by a factor of 1.3 in order to recognize prying action, where applicable. This multiplier is selectively applied for certain combinations of low plate thickness together with larger spacing between the expansion anchors and the
. edge of the member attached to the plate. The value of the multiplier, as well as the parameters under which it is to be used, were developed from a parametric analytical study utilizing the BASEPLATE 2 program. There is no reliance on the rigidity of the plate that is otherwise implied b, methods where the compression resultant is considered to be located at the extreme edge of the plate or at'the centroid of bolts in the compression side. This approach for the limited incorporation of prying action in
~
expansion anchors is consistent with the conclusions established in References (1) and (2) and replaces the AISC formulation for A490 bolts submitted under Item 1(b) of Reference (3).
The AISC formulation is applicable to highly pretensioned bolts joining homogeneous steel plies with nearly linear elastic behavior, as opposed to the expansion anchors having low pretension subject to relaxation and which undergo nonlinear behavior related to the varying axial stiffness of the bolt anchorage and the nonuniform compressive contact against the concrete.
The bolt tension for ductile-type expansion anchors is multiplied by a factor of 1.3 regardless of plate thickness except for abnormal or fruited loads.
- 2. Factor of Safety The factors of safety for concrete expansion anchor bolts are as
.follows:
a) For wedge-type anchor bolts, the specified allowable design loads in tension and shear have a minimum factor of safety of 4.0 with respect to the corresponding ultimate load capacities determined from static load tests in concrete. The ultimate loads considered are those determined either by independent testing laboratories (as reported by the supplier) or those determined from sita-specific testing, whichever results in lower ultimate loads.
diceve-type anchor bolts are not used on STP.
W2B/L003PW/u
- -ST-HL-AE-1073 Attachment Page 3 of 7
.b) Shell-type expansion anchor bolts are not currently used for pennanent ~ installations at STP, However, should shell-type expansion anchor bolts be used in such applications, a factor of safety of at-least 5.0 will be csed.
c). Ductile-type.expansio, anchor bolts are used in some applications ;
on the South Texas Project. Comprehensive tests have proven that these anchor bolts develop the full ductility and tensile strength of the bolt metal without concrete failure.
In certaii) ductile-type expansion anchor bolt applications, reduced embedment depth and/or spacing and edge distance allowed by specification results in a calculated concrete ultimate load capacity that is lower than the steel bolt material ultimate ;1oad capacity. The value of the ultimate concrete capacity is conservatively based on the ACI 349-80 calculation, rather than on test results, because test results do not indicate concrete and/or anchor bolt failure. The. ultimate load capacities detennined by tests only indicate the bolt metal strength,.and do not er.able definition of the higher loads corresponding to concrete and/or anchorage failure. The anchor design will be governed by the limitations of the concrete when the concrete ultimate load capacity is lower-than the steel rod ultimate load capacity.
Otherwise, the steel rod material governs the design.
The specified allowable loads in tension and in shear have factors of safety as follows:
- 1) F.S. > 4.0 with respect to ultimate load capacity of concrete can.uTiited in accordance with ACI 349-80 (Reference (5)) for f'c = 4000 psi.
ii) F.S. > 3.0 with respect to the specified minimum ultimate strenFh of the bolt material, Fu = 125 ksi. This factor of safety is consistent with the AISC specification (Reference (6)).
The allowable loads for ductile-type anchors are subject to increase for abnormal, fruited, or extreme environmental loading combinations..
s The effects of shear / tension interaction, minimt.m edge distance, and proper bolt spacing are considered in the support design as follows:
_ Shear / Tension Interaction _ - For cases where the allowable design loads are based on ultimate loads governed by concrete and/or anchorage capacities, the interaction equation is:
T b applied +
applied < 1. 0 Tallowabib Sallowab1h Z
i
?B/ LOO 3PW/u
._ _ _ _ . _ _ _ . _ . . _ . . - _ . . - . . . . _ . _ - . _ _ _ _ _ _ . _ _ . ~ . _ -
. ST-HL-AE-1073-Attachment Page 4 of 7 Tallowable andballowable are the specified allowable design loads in pure tension and shear, respectively.
The relationsnip giv'en above is prescribed for all wedge-type expansion anchor bolts and for the cases of ductile-type expansion anchor bolts where the calculated ultimate concrete capacity is lower than the steel ,
bolt ultimate load.
For cases of ductile-type anchor bolts where the allowable design loads are based on ultimate loads governed by the steel bolt ultimate strength .the following relationship is used:
![Sapplied\5/3 < 1.0
((Tappliedf5/3 allowable) allowable /
This equation is conservative with respect to the tension / shear interaction provisions allowed and reccamended for steel bolts by the AISC specification. This relationship is not used when the ultimate capacity is governed by concrete and/or anchorage failure.
Minimum Edge Distance -- The minimum concrete edge distance (i.e., the shortest distance to the edge of the concrete from the center-line of the expansion anchor bolt) is 6D or 6 inches, whichever is greater, where D is the bolt diameter in inches.
Bolt Spacing - The. minimum spacing between two expansion anchor bolts is normally 12D, or at least twice the embedment length if the embedment is less than 6D in depth. Closer bolt spacing is permitted, but the allowable bolt capacity must be reduced proportionally down to 50%
capacity at one-half the minimum spacing.
- 3. Design Requirements for Cyclic Loading Safety-related piping systems are analyzed for dynamic loads such as seismic loadings, water hammer, steam hamer, safety relief valve discharge, etc. Equivalent static pipe support design loads are then determined for the above load conditions as applicable.
In accordance with the test program for wedge-type anchor bolts (References (1),(2),and(4)),thedynamicloadcapacitiesofsuch expansion anchor bolts have been determined to be about the same as
. their corresponding static load capacities. Therefore, the minimum factor of safety given in Section 2 above is considered adequate for the design of wedge-type expansion anchor bolts that may be subjected to l dynamic loads.~ However, as an additional precaution, the allowable loads anchorsforare wedge-type expansion subject to shock anchors are 01 continuous vibrationreduced by(50% when theexcludin loads). ,
The factors of safety given in Section 2 are considered adequate for the '
design of ductile-type expansion anchor bolts that may be subjected to dynamic loads.
W28/ LOO 3PW/u l
. _ . _ -. - _ _ _ . ~ _ _ _ _ . _ _ _
7 q
- ST-HL-AE-1073 Attachment -l Page 5 of 7 l
1
- 4. Verification of Design Requirements !
- a. -Cyclic loads have been considered as described in the response in Section 3. However, additional preloading due to the presence of cyclic' loads is not required. No additional torque / tension has to be provided other than that which is required for setting the anchor bolt. This statement is substantiated by the conclusions established in References (1) and (2).
- b. Each anchor bolt is provided with a special marking that indicates its length. This special marking is permanently stamped on the top end of the bolt so that it can be read when the bolt is in place.
Astatictestingprogram(Reference (7))ofwedge-typeexpansionanchor bolts was conducted to confirm the manufacturer's published ultinate capacity values or to establish new ultimate capacity values, whichever results in lower ultimate loads.
Ductile-type expansion anchor bolts have been tested by independent laboratories to verify the ultimate load capacities.
The allowable design loads for wedge-type expansion anchor bolts installed in grout have been re-examined relative to the allowable design loads in concrete. Even though the tested ultimate load capacity of these expansion anchor bolts installed in grout is lower than the corresponding ultimate load capacity of expansion anchor bolts installed in concrete, the reduced ultimate capacity-in grout remains sufficiently high to maintain the required factor of safety with respect to the allcwable design loads as presently specified for udge-type expansion anchor bolts in concrete. Therefore, the allowable design loads for wedge-type expansion anchor bolts are the same when the anchor bolts are installed in grout or concrete.
Ductile-type expansion anchor bolts may also be used in grout. The factors of safety discussed in Section 2 are maintained for ductile-type expansion anchor bolts in grout. Based upon the anchorage system and review of a limited amount of comparative test data, the capacities are the same for grout and concrete installations.
- 5. Expansion Anchor Bolts in Concrete Block (Masonry) Walls Expansion anchor bolts are not used in concrete block (masonry) walls to attach piping supports in Seismic Category I systems.
- 6. Structural Steel Shapes .
Structural steel shapes are not used instead of baseplates when expansion anchor bolts are used with pipe supports in Seismic Category I systems. The only exception to this requirement is one detail used in a limited number of cases to support small bore pipe, as shown in Figure 1.
W28/L003PW/u
- . 2.'
\
- .. ST-HL-AE-1073 Attachment Page 6 of 7
References:
(1) Sumary Report; Static, Dynamic and Relaxation Testing of Expansion Anchors in response to NRC IE Bulletin 79-02, dated July 20, 1981; submitted to the NRC by Comer. wealth Edison. .
(2) Summary Report; Generic response to NRC IE Bulletin 79-02, Base Plate / Concrete Expansion Anchor Bolts, dated August 30, 1979;
. submitted to the NRC by Utility Owners Group, response by Teledyne Engineering Services as Technical Report 3501-1.
(3) HL&P to NRC letter ST-HL-AE-747, dated December 4,1981,
Subject:
Docket Nos. STN 50-498, STN 50-499, NRC IE Bulletin 79-02; Second
. Response Revision.
(4) Drilled-In Expansion Bolts Under Static and Alternating Load, A Report prepared for Hanford Engineering Development Laboratory, Richland, Washington, by Bechtel Power Corporation, San Francisco, California, Report No. BR-5853-C-4, January 1975.
.(5) Code Requirements for Nuclear Safety-Related Concrete Structures (ACI 349-80), Reported by ACI Committee 349; Appendix B.
-(6) 'AISC Specification for the Design, Fabrication and Erection of Structural Steel for Buildings, effective November 1,1978.
(7) Test Report; Tension, Shear and Relaxation Testing of Expansion Anchors at the South Texas Project, Bay City, Texas for Brown &
Root, Inc., WJE No. 81052Q Second Issue May 19, 1981; TPNS No.
A700XR1376 BWJ.
l W28/ LOO 3PW/u l
. - J. . , , ,
4
, f ST-HL-AE-1073
. Attachment Page'7 of 7 Pages Pine Sleeve I 6" 0.D.
L PIPE _
Leh*
, +
' L l \N ./ l- l 1 0 --
F, ]
N
- \ 31/16" DIA. BOLE FOR 5/8" D h
g" EILTI BOLTS 3 (MDi. EMBED 3")
1-1/s" Mnt.
m.
~
.c:
g . 5" m,
N #~#
E E E A MAX. V m, s MAX. l fLli) -
fLSS) (Ll5) ,
950 1070 -
l 30TES:1)LoadsP.PV g and Pgmay act simultannusly.
- 2) Use this detatt only when end of pipe sleeve is flush j with concreta. l FIGURE 1 W28/ LOO 3PW/a