Responds to NRC Telcon Request for Addl Info Re 911129 License Change Request 91-09 to License NPF-57,allowing one- Time Extension of Containment Integrated Leak Rate Test Interval to Max of 56 Months
ML20092A310
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 01/31/1992
From: Labruna S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20092A315 List:
References
LCR-91-09, LCR-91-9, NLR-N92005, NUDOCS 9202100055
Download: ML20092A310 (3)


Text

_

--f - , -. ,,s.,. - _ . - _ . _ - _ . - - _ .

o m

, i i u s !'

f, -

g ,

4 Pubbe Survice i g -1' tintoc and Go

j ,_ Company  !

D c Ctanley LaBruna PuNe Serm Lkdoc and Gas Cornpany P o. Dou 236. Hanuos D'dge, tu 08036 609 339 1200 I vu hma.+ N.uw orvus  !

JAN 31 1992 j NLR-N92005 l LCR 91-09  !

United States Nuclear Regulatory Commission l

- Document Control Desk  ;

Washington, DC 20555 Gentlement LICENSE AMENDMENT APPLICATION - REVISION 1 i ONE TIME EXTENS70N-OF CONTAINMENT LEAK RATE TEST INTERVAL  ;

FACILITY OPERATING LICENSE NPF-57 {

HOPE CREEK GENERATING STATION

~

DOCKET NO. 50-354 i

By a" letter-dated November 29, 1991 (NLR-N91156), Public Service Electric and Gas Company (PSE&G) submitted an application to -

amend Appendix A of-Facility Operating License No. NPF-57 in accordance with 10-CFR 50.90. The proposed change will allow a one-time extension of the containment integrated leak rate test (ILRT)' interval.

Based upon telephone conversations with Mr. S. Dembek, USNRC  !

Licensing Project Manager for Hope Creek, PSE&G is hereby  ;

revising that amendment request. This revision rewords the proposed Technical Specification. changes such that: 1) a maximum

  • time limit is specified for the one-time test interval extension, and 2) - performance of the second containment ILRT is not tied to, nor-required to be completed during, the fifth refueling outage. >

It was explained in the November 29, 1991 submittal-that, based upon the current operating schedule, the proposed change would result in-a 52 or-53 month interval between the first and second-lILRTs. In order to specify a maximum time limit, it is necessary  ;

to allow for unforeseen scheduling contingencies such as prolonged '

L forced' outages. It-was determined that three months represents a L= reasonable and realistic-value to accomplish this purpose.

l ^Therefore,-this revision proposes an extension of the second ILRT ,

l interval to a maximum-of 56 months.

r~~,

h 9202100055 920131 PDR ADOCK05000g4 P

Document Control Desk 2 JAN 31 192 HLR-N92005 The Technical Specification changes that voro originally proposed referenced the fifth refueling outage thereby inferring a ,

requirement that the second ILRT be performed during the fif th refueling outage. In order to provide the flexibility of performing the second ILRT prior to the fif th refueling outage due to unforescon scheduling contingenclos as described above, the reference to the fifth refueling outage has boon doloted.

The changes to the November 29, 1991 submittal that are contained i in this revision are limited to those described above. Noither the intent nor the content of the reason / justification for the proposed changos or the significant hazards consideration ovaluation are altered. Attachment 1 of this submittal contains the revised marked up Technical Specification pages that reficct thel changes proposed by this revision.

Should you have any questions or comments on this submittal, please do not hesitato to contact us.

Sincoroly, y/h. d'Wm l

Attachment Affidavit  ;

C Mr. S. Dembok USNRC Licensing Project Manager

-Mr. T. Johnson ,

USNRC Senior Resident Inspector

-Mr. T. Martin Administrator - USNRC Region I Mr. Kent Tosch, Chief -Now Jersey Department of Environmental Protection ,

Division of Environmental Quality Bureau of Nuclear Engineering CN 415 '

Trenton, NJ 08625 l

l-1-

e Hof NLR-N92 005 LCR 91-09 STATE OF NEW JERSEY )

) SS.

COUNTY OF SALEM )

S. LaBruna, being duly sworn according to law deposes and says:

I am Vice President - Nuclear Operations of Public Servico Electric and Gas company, and as such, I find the mattors not forth on our letter dated JAN 31 1992 , concerning the Hope Creek Generating Station, are true to the best of my l knowledge, information and belief.