Response to Suppl to Ucs Petition for Show Cause Order Re Emergency Feedwater Sys.Ucs Supplemental Petition Should Be Denied as Unnecessary & W/O Basis.Certificate of Svc Encl
ML20091P959
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 06/11/1984
From: Baxter T
GENERAL PUBLIC UTILITIES CORP., SHAW, PITTMAN, POTTS & TROWBRIDGE
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8406130234
Download: ML20091P959 (37)


Text

@/O .

i DOLKETEP U$NRC

'8;4 JB112 PS:02 June 11, 1984 t,Fri:E v: Stat 00CKLilNGA SEFW UNITED STATE b AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE DIRECTOR OF NUCLEAR REACTOR REGULATION In the Matter of )

)

GPU NUCLEAR CORPORATION ) Docket No. 50-289

) (10 CFR 2.206)

(Three Mile Island Nuclear )

Station, Unit No. 1) )

LICENSEE'S RESPONSE TO SUPPLEMENT TO UNION OF CONCERNED SCIENTISTS' PETITION FOR SHOW CAUSE CONCERNING TMI-1 EMERGENCY FEEDWATER SYSTEM I. INTRODUCTION The Union of Concerned Scientists (UCS) filed with the Com-mission on January 20, 1984, a ". . . Petition for Show Cause Concerning TMI-1 Emergency Feedwater System." The Commission re-ferred the UCS Petition to the Office of Nuclear Reactor Regula-tion for treatment as a request for action pursuant to 10 C.F.R. 5 2.206. On February 24, 1984, Licensee filed with the Director of NRR its ". . . Response to Union of Concerned Scientists' Pe-tition for Show Cause Concerning TMI-1 Emergency Feedwater System."1/

1/ Licencee's response included a "GPU Nuclear Technical Re-sponse to Union of Concerned Scientists' Petition for Show Cause (Continued Next Page) 8406130234 840611 PDR ADOCK 05000289 G PDR Ds03

e ~

On April 27, 1984, the Director of NRR issued " Interim Di-rector's Decision Under 10 CFR 2.206," DD-84-12, which tenta-tively denied the UCS request as to four of the issues raised in the UCS Petition. The decision does not address the environ-mental qualification of the EFW system or the aggregate effect of the five issues raised by UCS on the reliability of the EFW sys-tem.

On May 9, 1984, UCS filed with the Commission a " Supplement to Union of Concerned Scientists' Petition for Show Cause Con-cerning TMI-1 Emergency Feedwater System." The UCS Supplemental Petition addresses the environmental qualification issue, re-quests that the Commission itself take jurisdiction in the first instance with regard to the Supplement, and seeks the following relief:

1. As a precondition to restart, the staff should be directed to' independently verify that documentation exists and that it is technically sufficient to demonstrate environmental qualification of each and every electrical component in the emergency feedwater system and in every other system required for proper operation of the emer-gency feedwater system.
2. The Office of Investigations shauld be directed to immediately investi-gate whether GPU has made material false statements to NRC in connection with the (Continued)

Concerning TMI-1 Emergency Feedwater System," which was filed under oath pursuant to 10 C.F.R. 5 50.54(f). The response has been amended on March 26, April 26, and May_16 and 31, 1984, to reflect new factual developments.

e .

environmental qualification program.

Because this issue bears directly on GPU's' competence and integrity, the in-vestigation should be completed before a vote on restart.

3. The Office of Inspector and Auditor should be directed to investi-gate and determine whether the NRC staff has provided false ~or misleading infor-mation to the Boards or to the Commis-sion, or has been derelict in its duty in connection with the issue of environ-mental qualification in TMI-1.

The Commission has referred the UCS Supplemental Petition to the Staff for consideration in connection with the UCS Peti-tion. Licensee hereby responds in opposition to the UCS Sup-plemental Petition.2/ The attached Affidavit of Richard F.

Wilson meets the Staff's request that the response be submitted under oath or affirmation pursuant to 10 C.F.R. S 50.54(f).

2/ In a letter of May 29, 1984, from NRC (Eisenhut) to GPU Nuclear (Hukill), the Staff requested that Licensee respond to the matters in the Supplemental Petition connected with items 1 and 2 of the relief requested. Further, in a letter of May 30, 1984, from NRC (Denton) to'UCS-(Weiss), the Staff indicates that the Supplemental Petition has been referred to the. Office of Inspector and Auditor.for any action that office may deem appropriate. Consequently, Licensee has not responded explic-itly here to relief item 3 of the supplemental Petition. Li-censee does point out below, however, that UCS seriously mis _

1 construes the subject Staff letter of April 25, 1984, and that the Supplemental Petition does not recognize the Staff's activ .

ities which follow-up on the audit ~of. March 20-21, 1984.

i 1 .

II. GENERAL UCS ALLEGATIONS The UCS Supplemental Petition is prompted by a letter of

. April 25, 1984 from.the NRC Staff (Stolz) to GPU Nuclear (Hukill), which transmits comments arising from an audit per-formed by the Staff and a consultant on March 20 and 21, 1984, of TMI-1 electrical equipment qualification files. The letter states that the primary purpose of the audit had been to review the environmental qualification documentation relied upon to dem-onstrate qualification of electrical equipment within the scope of-10 C.F.R. 5 50.49 for the emergency feedwater (EFW) system.3/ _

The Staff requested that Licensee provide a detailed submittal addressing its disposition of all commer's pertaining to the EFW system.

Without waiting for Licensee's response to the' audit -- and indeed only three business days after UCS received a copy of this

, Staff letter -- UCS filed the instant Supplemental Petition with the Commission. UCS asks for investigations of Licensee and the Staff to determine whether they have provided false ~or misleading information. UCS begins this campaign to ferret.out the truth with its own misleading distortion of-the Staff's letter of April 25, 1984. UCS states,that the letter ". . . discloses, as UCS alleged, that vital components of the TMI-1 EFW system.are not l

3/ Seven files containing EFW equipment qualification documen-tation were reviewed. One additional file;for equipment not as-l: sociated with the EFW system was reviewed.

environmentally qualified as required by 10 CFR 50.49 and General Design Criterion 4 of Appendix A to 10 CFR Part 50." Supplemen-tal Petition at 1. This is neither what the letter states nor wh'at,can reasonably be concluded from the letter. The letter merely reports on what the Staff viewed to be documentation deficiencies in the files. One must question the competence or truthfulness of a petitioner which somehow converts such comments into a conclusion, attributed to others, that vital components-are not qualified.

The Commission itself has stated that such documentation deficiencies "do not necessarily mean that the equipment is un-qualified" but can be a cause for concern which may require fur-ther case-by-case evaluation. Petition for Emergency and Remedial Action, CLI-80-21, 11 N.R.C. 707, 714 (1980); see also

" Partial Review, Equipment Evaluation Report by the Office of Nu-clear Reactor Regulation," transmitted by letter dated February 25, 1981 from T. M. Novak to H. D. Hukill, at 6. In the case of the equipment for which the recent Staff audit identified docu-

! mentation concerns, Licensee has evaluated the Staff comments,

-taken appropriate corrective actions and responded in writing co the audit letter. See Exhibit A (GPU Nuclear letter 5211-84-2122 l' to NRC, Environmental Qualification Audit, May 31, 1984,-which is incorporated herein by reference and attached hereto). For the one instance where qualification could not be established for re-quired equipment (terminations on the EFW motors), Licensee has committed to install qualified terminations. Id. at'2-2.

l

. ~

i l

In assessing Licensee's compliance, it must be recognized I that licensees of operating reactors have been provided with only vague guidance as to the scope of documentation and degree of de-tail, required to be maintained in the environmental qualification files for each piece of equipment covered by the environmental qualification rule.

IE Bulletin 79-OlB (issued on January 14, 1980) required, inter alia, that, for each item of electrical equipment required to function under postulated accident conditions, licensees " pro-vide written evidence of its environmental qualification ... Pro-vide this in the format of Attachment 3." IE Bulletin 79-OlB at

2. Attachment 3-to the Bulletin is a sample System Component Evaluation Work Sheet ("SCEW sheet"), which sets forth the envi-ronmental parameters to which the item must be-qualified and pro-vides an example of the type of qualification documentation ref-erences required. Licensee adopted the specific SCEW sheet format called for by the Bulletin t.nd prepared such a sheet for the required items of electrical equipment. These SCEW sheets, and revisions thereto, have been submitted to the Staff on~regu-lar intervals. See GPU Nuclear letters L1L-238, dated August 28, 1981;-5211-82-101, dated May 3, 1982; 5211-83-076, dated May'16, 1983. Subsequent issuances.on environmental qualification have-not revised or rescinded the- SCEW sheet requirements cxE IE Bulle-tin 79-OlB. See, e.g., 10 C.F.R. 5 50.49(d), (j)'.

l However, many of'the Staff's comments in the audit letter --

and particularly the generic comments -- are geared towards requiring additional evidence of qualification beyond that called for by the SCEW sheet. See, e.g., Exhibit A at 1-1, 1-2, 2-5 (Item G.2). Further, the extent to which supporting qualifica-tion documentation (i.e., test reports, calculations) was re-quired to be maintained in the separate EQ files was not previ-ously specified and the requirement that such documentation be "auditable" was certainly subject to individual interpretation.

_See DOR Guidelines (Attachment 4 to IE Bulletin 79-01B) at 15

(" Complete and auditable records must be available for qualifica-tion for any of the methods described in Section 5.0 above to be considered valid. These records should describe the qualifica-tion method in sufficient detail to verify that all of the guidelines have been satisfied."); see also 10 C.F.R. S 50.49(j).

Indeed, it was not until the Staff's recent audit that Licensee had a complete understanding of the exact nature and detail of the documentation which the Staff judges to be required to be maintained in the EQ files.4/ Having now been provided with this information, Licensee has taken prompt and appropriate actions to correct the deficiencies noted by-the Staff.

4/ Earlier audits by the Staff's consultant,. Franklin Research Center, did not serve to communicate to Licensee anything more than FRC's final judgments. Until the Staff's audit, there'has

-been no opportunity for Licensee to learn,'with specificity, what the Staff views to be acceptable documentation.

.7 -

'~

a

N These corrective actions, along with responses to specific Staff comments, are documented in Exhibit A and will not be re-peated here.5/ UCS, however, calls into que'stion the truth-fulness of two Licensee statements made to the NRC.

These alle-1 gations are the only identified basis for the UCS request that an investigation be conducted to determine whether Licensee has made material false statements to the NRC in connection with the envi-ronmental qualification program.

The first statement cited is that " Licensee has responded to the outstanding concerns raised in that (Staff and Franklin Re-search Conter] review." See. Supplemental Petition at 8; Licens-ee's Response to Union of Concerned Scientists' Petition for Show Cause Concerning TMI-l Emergency Feedwater System at 17 (February 24, 1984). According to UCS, the Staff's audit letter of April 25, 1984 shows that Licensee has not "done so" because the same deficiencies identified previously still exist. Supplemental Pe-tition at 8. Even if one assumes for the moment that UCS is right about the similarity in deficiencies, that does not call into question Licensee's statement that.it had responded to the concerns. Whether the response was later judged to be adequate is a different question and one which hinges upon opinion and

"/-

S In addition, however, that in none of the eight Licensee disputes the UCS conclusion files audited was the documentation in fact even close to adequate." Supplemental Petition at 2. Given the fact that there are nearly 20 potential deficiency categories

- applicable to each component, the number of deficiencies found belies the UCS claim.

4 judgment. That Licensee had responded, however, is an

- unassailable fact. See Refs. 4 and 24, GPU Nuclear Technical Re-sponse to Union of Concerned Scientists' Petit ion l ar Show Cause Concerning TMI-1 Emergency Feedwater System.

The second Licensee statement cited by UCS refers to the same facts. Licensee stated that it had " documented the resolu-tion of outstanding qualification items in letters to the Staff of February 10 and 22, 1984." See Supplemental Petition at 8; GPU Nuclear Technical Response, supra, at 4. That statement ac-curately reflected Licensee's opinion at the time. The fact that the Staff later disagree'd with our resolution in some cases does not mean that Licensee made a material false statement. As de -

scribed above, what constitutes adequate documentation for!the environmental qualification program is a matter of judgment and interpretation.

, III. SPECIFIC UCS ALLEGATIONS The UCS Supplemental Petition reiterates several of the.

findings on specific items of equipment containedIin the-audit letter. Licensee believes that its-response to the Staff audit letter'(Exhibit A) is also a sufficient response to the issues raised by UCS. However,'in view of UCS' penchant.for reaching- .

unwarranted conclusions from~the historical. record, Licensee

. addresses below those UCS assertions which go beyond the Staff's:

letter of April 25, 1984.

.g_

w

~ .

A. Limitorque Motorized Valve Actuators l

At pages 3 through 5 of the Supplemental Petition, GCS at-tempts to link the Staff comments regarding the lack of documen-r tation in the'EQ file on these spedific motor operators' motor manufacturer, insulation class and current type, to the general comment in the 1982 TER on deficiencies in documentation showing similarity to tested equipment. It is clear, however, that the audit letter does not raise general similarity concerns and, in fact, Licensee had previously established the similarity of these motor operators to the test specimen and documented this fact to .

the Staff. See Ref. 4 to GPU Nuclear Technical Response, supra.

) Thus, UCS' reiteration of the 1982 TER comments on' similarity at page 4 of the Supplemental Petition are totally inapplicable now.

l Further, the information requested by the 1982.TER as to motor manufacturer, insulation class and current type was documented in-a separate file in Licensee's EQ section but, at the time of the March 1984 audit,.had not been entered on the SCEW sheets. The SCEW sheets have now been revised to include this-information.

See Exhibit A at 2-1.

UCS next claims that*the 1982 TER questions regarding the capability of.the operators to withstand the temperatures associ-ated with the main steam line break (MSLB) accident profile are

~

.the same as the second comment'made by the Staff ~at page 2 ofLthe audit. letter. A comparison of the two comments,'however, clearly-shows that theyLaddress different subjects. During the March,

1984 audit, the Staff identified to Licensee an accident scenario (a break in the steam-supply line to the EFW Pump Turbine line) l which it believed would result in a more severe environment than the MSLB profile previously evaluated. On the other hand, the

.TER specifically addressed the MSLB profile. With respect to the MSLB profile question, Licensee performed a thermal lag analysis to show that the operator could withstand the peak temperature and documented the results of this analysis in its February 10, 1984 submittal to the Staff. See Ref. 4 to GPU Nuclear Technical Response, supra. Licensee has also evaluated the temperature

~

profile resulting from the steam supply line to the EFW turbine driven pump postulated accident and determined that the operators are qualified for this environment. See Exhibit A'at 2-1.

In sum, the Supplemental Petition provides no basis upon which to question the qualification of the Limitorque motorized valve operators associated with the TMI-1 EFW system.

B. Westinghouse Pump Motors (EFP-2A/B)

The Supplemental Petition, at 5-6, attempts to imply that Licensee has been, at best, unaggressive in its efforts to quali-fy the Westinghouse motors for-Emergency Feedwater Pump 2 A/B.

To the contrary, Licensee's attempts to obtain adequate documen-tation regarding the qualification of these motors irfsimply in-dicative of the problems inherent in qualifying equipment which-was purchased and installed prior to the implementation of the-

. environmental qualification requirements. Thus, while Licensee believes that outstanding questions regarding the qualification of these motors have been adequately addressed in its response to the Staff's audit letter (Exhibit A at 2-2, 2-3), Licensee here provides a brief summary of the actions taken to qualify these motors.

In its February 25, 1981 preliminary evaluation of Licens-ee's environmental qualification submittals, the Staff, in a brief tabular fashion, noted deficiencies which required addi-tional information and/or corrective action for the EFP-2 A/B mo-tors with respect to issues of qualification time, temperature, pressure, humidity and aging. The cover letter accompanying this preliminary evaluation requested that Licensee review the-identi-fied deficiencies and their ramifications and provide a brief "overall finding regarding safe operation of your facility in the event of restart." February 25, 1981 letter to H. D. Hukill from T. M. Novak, at 1. Licensee responded to this letter, as noted by UCS, on March 12, 1981 with the requested summary statement.

While Licensee's response did not address each particular item ~of equipment,p/ Licensee did undertake an engineering. evaluation of

.the noted deficiencies prior to its March 12, 1981 response.

p/ Nor was such an item-by-item evaluation requested or antici-pated. See February.25, 1981 lett~r at 2: "The purpose of this statement is to provide the NRC with aeeded assurance regarding j the safety of the facility in the event authorization to restart 1

precedes the time at.which you can provide an item-by-item l reevaluation in a detailed documented manner." l l

]

7 9 y " -

With respect to the EFP-2A/B motors, Licensee's determination that TMI-1 could operate safely was based upon the fact that analyses were then underway in an attempt to complete the quali-fication of the motors and were anticipated to be completed prior to restart and, further, that there existed qualified equipment capable of mitigating the failure of these pump motors.

Following the issuance of the 1982 TER which questioned the similarity of the installed motors and insulation systems to those tested, Licensee reviewed test reports and concluded that there was similarity of the installed motors to those tested.

See Ref. 4 to GPU Nuclear Technical Response, supra. Licensee then obtained information orally from the manufacturer which con-firmed similarity, and later requested written confirmation of-the similarity of the insulation system'and information concern-ing the leadwire. As discussed in Licensee's response to the-audit letter, the information received in response from Westinghouse was different from the previous oral communication and led to the performance of additional analyses by Licensee to demonstrate the qualification of the pump motors. Licensee is also replacing, prior to restart, the current-terminations-for the motors (for which qualification could not be demonstrated) with qualified _ terminations. See Exhibit A'at 2-2.

C. 12A Review At pages 7 and 8 of the Supplemental Petition, UCS refers to

= statements made by an employee of Licensee at a March 8, 1984 meeting with the Staff regarding a review of the EQ files per-formed by Licensee's quality assurance organization. UCS then argues that, in light of the deficiencies identified in the Staff's audit letter, the referenced QA review can not be termed

" independent" and provides a basis upon which to question Licens-ee's competence and integrity. Supplemental Petition at 8.

^

First, UCS is mistaken in its assertion that claims were made that the QA review " fully supported GPU's claims of qualifi-cation." Supplemental Petition at 7. As is evident from the transcript excerpt quoted by UCS, no such broad statements were made; rather, as explained by Mr. Maus, the QA assessment was un-dertaken in order to provide independent verification that the required information was contained in the files. Id. at 8.

The QA assessment referred to by Mr. Maus was indeed an "in-dependent" review of the EQ files, performed by a totally.sepa-rate line organization from the EQ technical group (as outlined in the GPU Nuclear Operational Quality Assurance Plan) and, in point of fact, uncovered documentation deficiencies similar to-those identified in the Staff's audit letter. Further,- Mr.

Maus's statements at the March 8, 1984 meeting could not have been meant to convey the substance of the final QA findings since the preliminary discussions of.the QA assessment occurred during the weeks of March 5 and 12, 1984, and.the-final written QA as-(

sessment was not issued until May 16,.1984.

In sum, the fact that a QA assessment was performed of the EQ files provides no basis for questioning Licensee's competence or integrity.

IV. RELIEF REQUESTED BY UCS Licensee submits that the UCS Supplemental Petition repre-sents a nearly hysterical o""rreaction to and distortion of the comments generated from the Staff's audit of March 20'and 21, 1984. For example, UCS asserts that "there is no indication that the staff intends to properly follow-up the results of this audit . . Supplemental Petition at 2. 'In fact, the Staff's letter of April 2S, 1984 requested from Licensee a detailed sub-mittal addressing the disposition of all comments. UCS com-plains, however, that the Staff requested Licensee to respond only to the specific items audited, and that "the staff appar-ently has no plans to go further." Id. at'9. In fact,.there-d were three general comments, in addition to those on specific equipment files, and Licensee's response (Exhibit A) addressed the general comments and, beyond that, program-wide corrective actions undertaken. Further, the Staff conducted supplemental audits on May 7-8 and 24, 1984, and plans a further audit in June. Consequently, the UCS fear of Staff inaction is unfounded.

In fact, in Licensee's view these Staff _ activities fulfill the

- first item of relief requested by UCS -- i.e., that the Staff in-4 dependently verify that documentation exists-(for the EFW and _

required supporting systems) and that the documentation is tech-nically sufficient to demonstrate environmental qualification.

See Supplemental Petition at 10.

No basis exists for the second item of relief sought by UCS

-- i.e., that the Office of Investigations investigate whether Licensee has made material false statements to NRC in connection with the environmental qualification program. As discussed above, the Licensee statements cited by UCS are demonstrably not false. To view it otherwise would be to create a material false statement every time a licensee or an applicant documents a re-sponse to a stated Staff concern (and calls it a response which in the utility's view resolves the concern) and the Staff subse-quently asks for more. This is not akin to saying sirens are in-3 stalled when they are not. Disagreements reflecting technical judgment and opinion, in the face of understandably general reg-ulatory requirements, are an every day facet of regulation. Fur-ther, the cited Licensee statements could not have misled the Staff since additional audits were contemplated to. assess TMI-l compliance with 10 C.F.R. 5 50.49.

~

In. conclusion, the UCS Supplemental Petition should be de-nied'as unnecessary.(Relief Item 1) and'without basis (Relief.

" Item-2) .

I Respectfully submitted, SHAW, PITTMAN, POTTS & TROWBRIDGE

~

Thomas A. . Baxter, P.C.

1800 M Street, N.W.

Washington, D.C. 20036 (202) 822-1090 ,

Counsel for Licensee 4

Dated: June 11, 1984 4

6 d

6 C

e  %

S

Exhibit A l

l OPU Nuclear  !

NuCIMr 100 interpace Parkway Parsippany, New Jersey 07054 201 263-6500 TELEX 136-482 Writer's Direct Dial Number:

May 31, 1984 RFW-0128 5211-84-2122 Office of Nuclear Reactor Regulation Attn: John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 205o5 Sir: ~

Three !!ile Island Nuclear Station, Unit 1 (TMI-1)

Operating License NO. DPR-50 Docket No. 50-289 Environmental Qualification Audit This letter is in response to your letter of April 25, 1984 transmitting NRC staff comments resulting from the audit of GPUN files on March 20 and 21. Our responses to staff comments resulting from the audit on !!ay 7 and 8 are also included. As a result of these audits and further review by GPUN we have taken the following actions to reconfigure and improve the documentation of the environmental qualification of electrical equipment for the EFW and necessary supporting systems:

1.

Files r3adilyhave been restructured identifiable to ensure all relevant documentation is for each component. This restructuring provides improved control, greater assurance of documentation completeness and improved auditability of records.

2.

System Componcnt Evaluation Uorksheets (SCEW) have been updated (and reviewed / approved).

as plant drawings. These sheets will now be subject to the same control For environmental qualification of the remaining plant systems, the following additional 1984: actions are in process and are expected to be completed by June 25, GPU Nuclear is a part of the General Public Utilities System

'~ ~

1. Items 1 and 2 above.
2. Entering all SCEW sheets (including the EFW System) into our computerized configuration control system to assure all portions of the GPUN

, organization have ready access to the latest version of the data.

3. An outside consultant, expert in the field of environmental qualification, has been engaged to review the overall program and provide recommendations as appropriate.

The following enclosures contain our responses to the specific comments in i your April 25 letter and those resulting from the May 7 and 8 audit.

1. Enclosure 1 entitled " Generic Environmental Qualification File Concerns" discusses the resolution of the three general comments provided in your 4/25/84 letter.
2. Enclosure 2 entitled " Specific EFW Environmental Qualification File Concerns" discusses resolution of specific comments on system components. _

In connection with this. formal response we would like to point out that the draf t audit response that we telecopied to the staff, at their request, on May 17, 19 84, does not reflect the official CPUN. response to the staff's audit.

The unsigned draf t response was transmitted for die sole _ purpose of apprising.

4 the staff of our current audit response status. It was not our intent that the staff rely in any way on that draf t in arriving at conclusions with respect to the TMI-l environmental qualification progran.

I15 cerely, 4,

'R.Q.

N%

F.- Wilson Vice President i Technical Functions RFW:JW i Enclosure-i cc: J. Van Vliet

'R. Conte .

4 I

i I

L l

6

'. . _ . . . _ , + - - . + .

__ . - _ . - _ _ _ _ . _ _ _ _ _ - . _ ._ - - . - - . ~ .

Enclosure 1

~

GENERIC ENVIRONENTAL QUALIFICATION FILE CONCERNS The EQ files contain no indication, other than SCEW sheets (some Item 1 of which were in the process of being revised) and some brief handwritten sheets, t3at the documentation has been reviewed by GPU nor that it has been concluded by GPU that the equipment is qualified.

Response: The EQ files have been com[letely restructured for EFW and supporting system components and are similarly being restructured for the balance of system components. These files will contain an index of all documents relevant to qualification of a specific component. The file includes a sign-off by a cognizant engineer confirming documents associated with any changes have been reviewed and found to be acceptable. We will continue to also use the SCEW sheet as the mechanism to communicate changes or The newSCEW information to other portions of the GPUN organization.

sheet format as previously mandated by the NRC will continue to be used except that it will include formal revieWapproval signatures and will be a controlled engineering document consistent with the program established for other engineering documents such as ~

drawings, specifications, etc. All SCEW sheets will be annotated to describe the level of qualification (i.e., D0R Guidelines or NUREG 0588, Category 1 or 2) .

l Item 2 Most of the handwritten material in the files is not signed or dated and shows no indication that the statements /information contained on these sheets has ever been verified by a checker or ap proved.

Response: GPUN has reverified all material in the EQ files for EFW and supporting system components and.is in the process of doing so for-the balance of system components. To the extent there are extraneous documents they are being removed from the files. To the extent there is handwritten material which is relevant, it is i

being signed, dated and approved.

It should be noted, however, that some of these documents referred to, which included status summaries, were speciff ally added to the file temporarily to aid in the NRC audit team's review. These handwritten documents are being purged from the files,

~ Item 3 The files do not specify the required. post-accident operating time j for the equipment nor the duration of time the equipment has been demonstrated to.be qualified. Speaifying duration of accident on Similarly, a SCEW sheet and referencing the FSAR is not~ adequate.

l indicating on a SCEW sheet that qualification has been demonstrated for continuous operation or for the duration of time for which the equipment was-tested is neither correct nor does it document why such a post-accident operating time is acceptable.

[

l 1-1

.v.- .v. + -. e +. .v v .$.. . . - -

y e. -

p e

-, . Response: As part of the reverification process these SCEW sheets for the

-EFW and supporting system components have been revised to clarify the required accident and post-accident operating time for the equipment and the duration of time, both accident and post accident, for which the equipment has been demonstrated to be qualifed. Supporting documentation or references to the same on required operating and qualification duration are also being included in the files. SCEW sheets for the balance of systems components are in the process of being revised with scheduled completion of June 15,1984. Upgrading of these files is.

scheduled for completion in June,1984.

1-2

. _, _ _ _ . - . - . - ._ _ __. . a. . _ . - _ .

- Enclosure 2 Plant Specific Environmental Qualification File Concerns.

A. Limitorque Motorized Valve Actuators i EF-V1A&B, Model SMF000, TER Item No.15 EF-V2A88, Model SMB-0, TER Item No.11 It e'm 1 The file should document the motor manufacturer, insulation class and current type for each actuator to establish applicability of the EQ documentation.

Re sponse: Existing information was used to revise the SCEW sheets to show motor manufacturer, insulation class and current type for each actuator. Additionally all supporting qualification documentation has been reviewed for applicability to all EFW and supporting t system valve actuators. A similar review is in process for all other valve actuators within the scope of the EQ Program.

Item 2 The temperature profile used to evaluate the qualification of the actuators is a time history following a main steam line break for -

i elevation 295 f t. of the Intermediate Building. However, the i temperature profile resulting from a steam supply to EFWP turbine line break appears to be a more severe environment for approximately the first 800 seconds. The file needs to contain justification that' establishes the adequacy of the EQ documentation for demonstrating qualification to this more limiting line break.

Re sponse: The temperature profile resulting from a break _in the steam supply line to the EFW Pump Turbine has been evaluated. This environment does not completely fall within the temperature profile of the test which was conducted for the out-of-containment Limitorque

! operator. It has been concluded, however, by means of a combination of test results, material analysis, operating data and

) analysis of test data, that +':ese operators are qualified.for both the main steam line break and a break in the steam supply line to the EFW Pump Turbine. This is documented in GPUN Calculation C-1101-424-535 0-011 which is contained in the EQ file.

Item 3 GPU should review Equipment Environment Qualification Notice No.

24 of IE Information Notice 83-72, and document the results of

their evaluation of that information in the file. (This comment i
was not provided to GPU during the audit.)

1 Re sponse: GPUN has reviewed IE Notice 83-72 and has concluded that the relevant items are Item 22 (Static-0-Ring) Pressure Switches and

Item 24 (Under-rated terminal blocks on Limitorque operators) .

The Static-0-Ring pressure switches which are used for Main Steam Line Break Detection have been replaced by-qualified devices. '

SCEW sheets and qualification data for those are included in the I i

EQ file. It has been determined that the under-rated terminal blocks referred to in Item 24 had been installed in the Midland

, plant by a service engineer. .We do not have these blocks in F. TMI -1. Copies of the IE Notice and response to it are contained in the EQ files.

i 2-1 1

  • ~

4 B. Westinghouse Pumps EF-P2A&B, Model HP 450, TER Item No. 51 Item 1 The file does not cor.tain information to establish similarity between these motors and the motor lead wires and insulation tested. A March 15, 1984 letter from GPU to Westinghouse requests i the information needed to establish that similarity. A response to this letter should be pursued and placed in the file.

~

t Response: Westinghouse letter GPU-84-503, S. P. Swigart _ to D. K.

. Croneberger, dated May 21, 1984 states that the lead wire insulation is silicone rubber which is identical to that used for the motor tested for LOCA conditions and documented in WCAP-7829.

The letter also concluded that because of design differences in the motors die test data of WCAP-782P is not directly applicable to the THI-l motors.' This latest in ormation is contrary to previous oral communication.

GPUN has concluded, however, by eans of a combination of test results and analysis that the motors are qualified subject to '

redoing terminations as described below.

This conclusion is based on the following:

1. . The motor insu~1ation which is identical (Thermalastic Epoxy) to that used for the aforementioned test has been shown to be able to withstand the high temperature conditions from the LOCA test results of WCAP-7829. This is further substantiated by analysis contained in Westinghouse Report "liotor Insulation 4 Life Analysis Daergency Feedwater Pump tiotors EF-P-2A, EF-P-2B i

Three 1111e Island Nuclear Station", dated -1/81, which is in our files.-

2. The motor insulation has been shown to be able to withstand

~

the moisture conditions due to the steam environment.because i

the insulation system is impervious to moisture. This is

~

i demonstrated by inmersion tests which are documented in i WCAP-8754 in the file. -

3. The integrity of die bearings is demonstrated by a'GPUN analysis contained in the_ file.  !

l All of the above is documented in GPUN Calculation C-1101-424-5350-014 which is contained in the file.

! In addition, Westinghouse is preparing a report based upon additional data and information in their files to further review the integrity _of the motor in a steam environment. This report-will be completed by June 8,1984.

Our review further concluded that the' terminations on the EFW motors have not been documented as qualified for the MSLB environment. Consequently, we_are in the process of redoing the connections with qualified terminations.

2-2 - -

~ ,

~

Item 2 One of the EQ documents in the file, WCAP 7829, states that a motor without a heat exchanger is qualified for short term post-accident operation. The file should document whether the installation in THI-1 includes a heat exchanger and, if not, the adequacy of the EQ documentation for demonstrating qualification of the pumps for the period of time they are required to operate post-accident.

Response: WCAP 7829 irclude's test dafa for motors with and without heat exchangers. The THI-l motors do not include heat exchangers. For applicability of WCAP 7829 test data, see item #1. above and GPUN Calculation C-1101-424-5350-014 which is in the files.

C.. Anaconda (Continental Wire) Cable TER Item 107 (Common Item)

Item 1. The file contains no documentation to establish similarity between the cables tested and those installed. . The files must contain either a letter from the manufacturer that establishes the applicability of the test report, or documentation describing how .

GPU has determined that the installed cable is similar to the specimens tested.

Re sponse: Anaconda letter dated February 15, 19 84, which was not.in'the EQ file at the time of the March,1984 audit, documents their 1

determination of the applicability of their test report to the installed cable (GPU PO 40067). We have rev'iewed the Anaconda letter and concur in their determination. The letter is included

! in our EQ file.

i Item 2. GPU should document in the file an aging calculation, using information from the test report, that establishes a qualified life for the cable.

Re sponse: An aging calculation (GPUN Calculation 1101X-5350-77) is included in the EQ file. This calculation establishes the cable qualification life as being satisfactory for plant life and has been referenced on the revised SCEW sheet.

h D. Kerite Cable TER Item 106 (Connon Item) i Item 1. The file contains' no documentation to establish sfmilarity between the cables tested and those installed. The files must contain either a letter from the manufacturer that establishes the applicability of the test report, or documentation describing how

! GPU has determined that the installed cable is similar to the l

specimens tested.

r 2-3 o

i

, e - ,c,- ,n-g ,,- -e w w - ~

. ~

7 Response: A letter from Kerite, dated 5/16/84, is contained in the EQ file which establishes the a 8/21/81-to THI-1 cable.pplicability This reportofcontains the Kerite Report-dated qualification i' documentation for all plant parameters except submergence, which is addressed in a separate letter. 1

Item 2. GPU should document in the file an aging calculation, using information from the test report, that establishes a qualified life for the cable. .e Response: The aging qualificacion for this ethylene propylene insulated '

' cable is documented on Kerite Confidential-Report-for TMI Cables, dated August 21, 1981. The qualified life' for TMI-1 is shown as 40 years. We have reviewed the basis for aging qualification and concur in the determination. The Kerite Report is contained in

, the EQ files.

E. Square D Diode (MIL S 19500/507)

TER Item 116 (Common Item)

, Item 1. EQ documentation currently in the file is not adequate to -

7 demonstrate qualification. However, these diodes are associated-i

' with ASCO DC solenoid valves and, according to GPU, there are no such valves associated with the EFW system that are required to be environmentally qualified. Therefore, these diodes would 'not be required to be demonstrated qualified. GPU should document the j basis upon which these diodes are exempted from being qualified, i

' and evaluate whether there are any DC solenoid valves and associated diodes in a harsh environment area that are required to be qualified.

Response: These diodes are suppression devices mounted across the coils on

_ ASCO DC solenoid valves. ASCO DC solenoid valves are no longer l used for EFW and supporting system components. For. other i appifcations where these diodes are utilized in the Intermediate Bufiding and qualification is not required, GPUN has evaluated the results of a failed diode. Since the associated valves are normally deenergized, failure of the diode would not cause the valve to change position nor will it adversely affect the power source for the solenoid valves. Therefore, it is concluded that a failed diode will not adversely affect the EFW or supporting systems.

There are ASCO DC solenoid valves for other than EFW and-supporting systems ' requiring qualification, but the relevant environmental parameters do not include the HELB environment.

These valves are qualified for thermal and radiation aging effects. Demonstration of qualification will be contained in the EQ file.

F. States Terminal Block TER Item 110 [Model NT] (Comon Item)'

Item 1.- The file should document the specific equipment associated with

-these terminal blocks, and GPU must determine whether the .IR readings documented in the test report are acceptable for the-appifcation(s) of these terminal blocks.

p .

- - i Response: The IR (insulation resistance) readings documented in the test report were reviewed for acceptabfif ty under the most severe HELB condition. This analysis (Calculation C-1101-424-5350-008, C-1101-700-5350-001 and C-1101-611-5350-001) demonstrates that the a

potential errors associated with terminal block insulation are acceptable under HELB conditions.

G. Foxboro Transmitters FT-791, 779, 782 & 788, Model NE 13DM, TER Item No. (None)

Item 1 The EQ documentation, WLE Test Report 45592-4, states that the end user must address specific accuracy re application and evaluate total loop error.quirements for each GPU must document such..

an evaluation using the demonstrated accuracies from the test report.

! Re sponse:

Error analyses (GPUN Calculation C1101-424-5350-9) were performed i

using the transmitter error documented in WLE Test Report

' 45592-4. Analyses were performed for other affected instruments -

using the data documented in the appropriate test reports. The i

conclusion of these analyses is that the total instrument loop error associated with the Emergency Feedwater System is acceptable. This calculation has been documented in the

appropriate EQ files.

Item 2 Other than SCEW sheets indicating 23.62 years, the file contains no assessment of qualified life by GPU. The file should document GPU's qualified life determination.

Response

i Transmitter service life is developed using data directly from WYLE Report 45592-4 Page IX, Figure 1 " Qualified Life vs. Service I

Temperature". The determination of qualified life for each component and a reference to the aforementioned WYLE Report Figure 1 are reflected on the respective SCEW sheets. The updated SCEW i

sheets are contained in the EQ file.-

Item 3 The transmitters were tested with interfaces as described in the t test reports, e.g., with a Conax electrical conductor seal-assembly with integral electrical junction box, flexible conduit with holes drilled in it, etc. The file should document that the transmitters in TMI-1 are either installed as tested, or-a description of their installation orovided and the applicability of the test report 'to their installed condition justified.

f

, 2-5 l.

. Response: The interfaces for the transmitters at TMI-1 includes a junction box supplied by Foxboro. The installation is in accordawe with the manufacturer's recommendations and ds similar to the test configuration. Foxboro's certification with respect to the qualification of the transmitters to IEEE standards 323-1974, and 344-1975 is contained in the EQ file. GPUN reviewed the Foxboro test documentation against the plant equipment and its installation to ensure similarity to the tested configuration.

The results of this review is also documented in the EQ file.

Item 4. Part of the test sequence is seismic qualification. GPU should document that the seismic testing performed is applicable to THI-1.

I Response: The aforementioned WLE Test Raport, Figure 1, identified the seismic test profile for the qualification of these transmitters.

This test profile envelops the governing TMI-1 seismic response spec tra.

Item 5 On page IX-22 of the test report it is stated that a formal report will be issued to answer anomaly NOA F37. Similarly, on page X-25 it is stated that justification for a test interruption, ancmaly NOA F42, will be provided in the final test report. Until the formal report addressing N0A F37 and the final test report addressing N0A F42 are reviewed by GPU and placed in the file, GPU  ;

should document its evaluation of the anomalies and their effect on the qualification of the transmitters.

tie have reviewed the anomalies identified in WYLE Report 45592-4..

~

Re sponse:

Our evaluation is documented in memorandum dated 8/3/83 contained

^

in the EQ files and referenced on the SCEW sheet. As a result of this evaluation, we will be replacing opened seals after calibration or maintenance word on the transuitters is completed.

H. Foxboro Transmitters (Not associated with EFW System)

RC3A-PT3 & 4, RC38-PT3, Model E11GH, TER Item No. 78 PT-282, 285 & 288, Ibdel EllAM, TER Item No. 79 -

SP6A-PTi&2, SP68-PT182, Model E11Gil, TER Item No. 81 Item 1 The EQ documentation reviewed does not resolve the deficiencies identified in the TER for these transmitters. -However, the SCEW

sheets now reference the WLE Test Report 45592-4, being used by GPU to establish qualification of transmitters FT-791, 779, 782 and 788 (ibdel NE13DM). GPU stated that the WLE Report is referenced only to address aging and qualified life for these Ell' models. In order.to resolve all the deficiencies for these
transnitters, including aging and qualfied life, GPU should determine the applicability of the WLE Report for qualifying these transmitters. Regardless of whether the WYLE Report is , ' ,

used, GPU should document in the file the resolution of the TER F deficiencies. If it is determined that the WYLE Report can be used, the following comments are applicable in addition to those

, above for the Model NE13DH transmitters.

- 2-6 i

. , - ~ _ _ - ~

4 Response: These transmitters are qualified based upon Foxboro Reports

- Q9-6005 and T2-1075. The post accident operating time is

, enveloped by the test duration coverd by Report Q9-6005 which t.

dealt with a high energy line break (318F at 90 psig) for a

( duratign of 26 hours3.009259e-4 days <br />0.00722 hours <br />4.298942e-5 weeks <br />9.893e-6 months <br />. Report T2-1075 qualified transmitters to

2 x 10' rad. This limit bounds the required limit for the TMI-1 t t applications for these transmitters. The service life is based

> upon the analysis provided in B&W Report 77-1127001-00 and GPUN Calculation 1101X-5350-011 which results in a calculated life of 12.8 years at 100T. The SCEW sheets are being updated to reflect the foregoing reports and calculations and will be contained in the EQ file.

WLE Report 45592-4 is applicable to the Foxboro transmitters for Item G but not for transmitters covered by this item.

Item 2 The flie should document that the normal radiation simulated in

the testing is applicable to the THI-l transmitters.

Response: The 40 year backround interated dose for THI-l is 3.5 x 10 4 -

rads. Fo$oro Report T2-1075 qualified the transmitters to a TID of 2 x 10' rad. This limit is consistent with that set forth in the D0R Gaidelines. The SCEW sheet indicates the origin of the

't ,

') _y limit.

/ Itemh On page iii [WYLE Test Report 45592-4] it is stated that

additional testing is being. performed by the manufacturer to extendlthe accident radiation qualification and to confirm the -

h aging analysis for the silicone ca sule 0-rings of transmitters represented by test specimen F-1 ( lodel NEll) . GPU should document whether the testing completed thus far adequately adtesses aging for these transmitters since additional testing

, appears to be necessary. If it is determined that the results of-the additional testing are needed to confirm the' aging analysis, then GPU should review the test results and place them in the file when they'become available.

Response: Wen additional test results are obtained they will be reviewed and placed in the appropriate file. Since WYLE Report 45529-4 ~ is not applicable in the qualification of these transmitters. it will

be evaluated and placed in the file associated with the transmitters identified in Item G.

Itere 4 ' On~ page I-7 it is stated that Foxboro Report No. PER-81-106 provides justification for qualification of untested transmitters-

by similarity to those test
d. Also, page I-171 refers to Foxboro
document"Q0AAC012 for similarity informatio.n. GPU should procure

-these documents, review them, and place them in the file to' address similarity and substantiate the applicability of the WLE.

l  ; Report for thase transmitters,. particularly to Model EllAM..

I' t ! 3 i

Response: .Wahill procure these documents and evaluate them to determine L . applicability to these transmitters and will place them in the

.e appropriate EQ file if applicable.

~_ . _ _

f e

i The following three items are those which were discussed with your staff on May 7 and 8.

J. Concflow I/P Transducer P

TER Item 60 (EF-V30A) (SP-V5A, B)

It e's 1 GPU has a Policy and Procedure !!ancal (EP-031) which provides guidance for review of equipment files, leen used, this procedure would produce SCEW and summary sheets for each equipment item..

The ITT Conoflow I/P transducer file does not contain SCEW or Sunnary Sheets of the GPU service condition parameters.

Response: This transducer was part of the upgrade of the I/P converter recently committed for implementation by June 1,1984. A new SCEW

. sheet has been generated and included in the EQ file. The GPUN conclusion that these devices are qualified is based upon Conoflow Reports 3021, 3419 and GPUN Calculation C-1101-424-5350-010.all of whid are included in the EQ file.

~~

Item 2 GPU has a letter dated 4/30/84 which states an Arrhenius Calculation 0 90*F and 0.79 eV results in a 51 year qualified life.

These calculations were not contained in the file. -

Response: GPUN Calculation No. C-1101-424<5350 010 contains this analysis.

A copy of the calculation is now in:luded in the EQ file.

K. Boston Insulated Wire Cable TER No. (None) (Common Item)

~

Item 1 From the review of the file and its procedure, it becomes clear

  • that GPU has not developed a checklist for the reviewer to review the equipment qualification file..

~

Response: The GPUN Technical Functions Procedure EP-031 entitled Environmental Qualification does not presently require a checklist. A checklist has been developed to ensure file -

i completeness and has been used in the EQ file restructuring and GPUN review of the EQ file. This form will be addressed in a revision to the aforementioned procedure to be issued in June 1984.

l Item 2 -Based on the review of the file it also becomes clear that GPU has not completed the supplementary SCEW sheet giving the status of qualification.

l-l 2-8 u

. - , - - .._,,._~,- .. _.;_.. , _a .a . . . . _ _ _ __

- ~

Response: The SCEW sheet for the BIW cable has been developed and is included in the EQ file. This cable will be included with the Common Items Master List.

It should be noted that this cable is a supporting item for the modification of the flow element provided to measure EFW flow.

The originally installed Controlatron has recently been replaced with an annubar installatioin and qualification of associated components has been appropriately addressed.

Item 3 Based on the GPU procedure the responsibilities for review lies with many different engineering disciplines, however, from the files it was not evident, how these review and comment resolution were documented.

Response: Review and comment resolution is controlled by Technical Functions Procedure EP-008. This procedure applies to reviews of all engineering documentation. It has not been our practice to retain the completed forms although their completion is a prerequisite to approval of the engineering document. -

EP-031 will be revised to clarify what interdisciplinary reviews must be conducted and how they are documented. "111I-1 Equipment and Environments" (TDR-282) provides environmental qualification parameters. This document was subjected to an interdisciplinary review. To the extent this document recuires future revision, it will again be subjected to interdisciplinary reviews.

Item 4 Test report document used for qualification is a summary document. A summary document by itself is not an acceptable way to document qualification. GPU should review the complete test report and place the review results in the file. Also the test report should be available either here at GPU or BIW for the life of the cable.

Re sponse: Qualification testing for this cable is documented by BIW Test

  1. 75A025. Because this cable is subjected to submergence, which was not addressed by the aforementioned test report, Sunnary Report B-915 was.used to establish qualification for submergence.

The applicability of Report B-915 has been confirmed with the Vendor. The test data, upon which Report B-915 was developed will be obtained and reviewed for inclusion in the EQ file. In accordance with EP-031 this record will be maintained for the life of the cable.

Item 5 In accordance with the summary document, submergence test was not done in sequence, however the SCEW sheet states it was sequential. No justification about the acceptability of such test -

on a cable unaged and without LOCA testing is provided in the file.

Re sponse: The submergence test was performed in a sequence appropriate for the accident which will cause flooding (FWLB). The justification for this position has been added to the file..

2-9

~

1 Item 6 Aging consideration should include the condition of the component, e.g., whether the component is energized or deenergized for the normal operating condition. In the case of cables include the heat rise due to the current flowing through the conductors.

Response: This cable was preaged for 168 hours0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br /> at 121*C as part of the IEEE

. 323-1974 test sequence (BIW Report 754025). Using Arrienius

! methodology, this has been determined to be equivalent to 40 years l at 119*F (GPUN Calc C-1101-424-5350-013). Determination of the

! ~ qualified life at the 90*C rating of the cable is not necessary l- _ since these circuits will be carrying small current loads (4-20 ma) which will not cause significant ohmic heating. l Item 7. Figure 7 of the test report shows the LOCA profile extended to 367 days while the description and measurement indicate that the test was discontinued after 161 days. Explain.

Re sponse: GPUN has reviewed the report and determined that the indicated

tabulated test data only extends to 161 days and that the Figure 7

[ duration of 367 days was not covered by the test. Refer to Item

8. which demonstrates that accident time is bounded by the 161 day .

test.

l Iten 8. SCEW sheet for_ the component does not_ provide the required post accident operability requirement and qualification for the parameter.

Re sponse: The duration of the accident conditions for this cable is 7,000 seconds. The required post-accident operating duration is seven days. This duration is bounded by the test duration of 161 days.

The ~ required post. accident operating time and qualification duration are included in the SCEW sheet.

Item 9. Part No. on the SCEW sheet and telephone conversation with the field do not agree.

l Re sponse: BIW cable identification 10836-H002 is the correct part number,-

therefore, the information obtained from the field is correct and the SCEW sheet has been revised accordingly.

L. Anaconda Cable TER (None) -(Common Item)

Note: 'This cable is a-support item for the recently. installed modification for_ the qualified I/P converter. The SCEW sheet and supporting-documentation are now available in the EQ file. (This item will be

-included in the Common Item Master List.

L Item 1. TDR No. 542 - p. 4' of 6,; questions are raised concerning qualification of Kerite Co.

~

r 4.

2 _ _ ,u _ . - .u

Response: The open questions identified in GPUN report TDR 542 resulted from unavailability of the Kerite test reports to the report preparer.

Replacement copies of these test reports have been obtained and are included in the EQ file.

Item 2. What is applicability of Anaconda-Ericsson Reports 80220-2 (11/81) i and 81028-1 (11/81)? _

Response: These reports do not apply to this cable and have been removed from the associated EQ file. Anaconda Report 80282, dated July, 1980, and Franklin Report F-C483-62 are the bases for qualification of this equipment. These reports are included in the EQ file.

Item 3. File contains no specified operating time, no qualification time, and no indication that cable will have to operate submerged.

Re sponse: The required post accident operating time in a steam environment is 7,000 seconds. This duration is enveloped by the 16 day LOCA test. The six month 90 C' water absorption test bounds the .

required duration for operating time submerged of seven days. The required duration and qualification durations are included on the SCEW sheets. An evaluation of the adequacy of the test for the steam environment followed by submergence is included in the file.

Item 4. Wat is exact cable that must be qualified?

Re sponse: Four conductor, #14 wire gauge with FR-EP insulation, shielded, 600V, with Hypalon jacket is the cable installed. We have reviewed the report and concluded it applicable to this* cable configuration.

Item 5. F-C4836-2 states that specimens were passed to the outside'of the test vessel through metal tubes and sealed with epoxy putting compound. How are these cables installed in TMI-1 and why does

. -testing performed demonstrate they are qualified?

Re sponse: The test configuration used epoxy seals on the vessel to complete the pressure boundary for testing purposes only. The test was to qualify the cable including the insulation only. To the extent cable terminations or splices are utilized on the actual

. installation,-qualified connections are used.

! Item 6. F-C4836-1 cables thermally aged'at 150*C-(302'F) for 168 hours0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br /> -

what is qualified life f Response: Aging qualification is documented on attachment AT-1 to FIRL l Technical Report No. F-4836. The qualified life for THI-1 usage is'40 years. The qualification and required durations are on the SCEW sheets. GPUN has reviewed the test report and concurs in its

applicability to TMI-1 for thermal aging.

L 2-11

_1___.__ . - . _ _ -.

4

-Item 7. File contains no discussion of accelerated water absorption test for demonstrating qualification for submergence, e.g., no pre-aging, had not gone through HELB, etc.

Re sponse: Anaconda Data Sheet No. 77087 attached to Anaconda Report No.

80282 addresses submergence. FRC Report F-C4836-2 addresses HELB, LOCA, etc. These are referenced on the SCEW sheet.

w I

l t

i 2-12.

+ .

UNITED STATES OF AMERICA NUCLEAR REGUIATORY Colet2SS10W BEra** TEE DIR."CTOS OF NUM"" REACTOR REGUIATICE l In the Matter of

.- )) Docket No. 50-289 GPU NUCLEAR CORF03ATION )

) (10 C.F.R. 2.206)

(Three Mile. Island Nuclear )

Station, Unit No. 1) )

AFFIDAVIT OF RICEARD F. WILSON Norris County ) _

' as State of New Jersey )

RICEARD F. WIL8CW, being duly sworn according to law, f noses and says as follows:

J. I as Vice President - Technical Functions of 06U Nuclear corporation and as authorised to execute this

~

affidavit.

2. The facts set forth in " Licensee's Response to Supplement to Union of concerned scientists' Fetition or Show l

cause concerning TNI-1 Energency Feedwater system' and in Exhibit A thereto (GPU Nuclear letter 5211-44-2122 from R. F.

Wilson to.J. F. Stola dated May 31, 1984) are true and-correct to the best of my knowledge and belief.

t  % -

l Richard F. Wilson l

l sworn and subscribed before me this _/m - day of June, 1994.

! Wetary FtBlic J

, WETTEM tesco

~ wHowv a m =PC" MM i"' M

~ "" 3,tc w .

  • !,".,*.i .t,

4 June 11, 1984 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

' BEFORE THE DIRECTOR OF NUCLEAR REACTOR REGULATION In the Matter of ) Docket No. 50-289

) (10 C.F.R. 2.206) l GPU NUCLEAR CORPORATION )

)

' ~

(Three Mile Island Nuclear )

Station, Unit No. 1) )

CERTIFICATE OF SERVICE I hereby certify that copies of Licensee's Response to Supplement to Union of Concerned Scientists' Petition for Show Cause Concerning TMI-l Emergency Feedwater System and Affidavit of Richard F. Wilson were served this lith-day of June, 1984 by deposit in the U.S. Mail, first class, postage prepaid, to all those on the attached Service List, except those marked with an asterisk which were served by hand delivery.

n~ -

n Thomas A. Baxter, P.C.

Dated: June 11, 1984

a .

i UNITED STATES OF AMERICA 00tXETEP NUCLEAR REGULATORY COMMISSION USHhC

'84 JN 12 PS:02 In the Matter of )

DphetN

^

METROPOLITAN EDISON COMPANY ) !b0 -289

-) BRANCH (Three Mile Island Nuclear )

Station, Unit No. 1) )

SERVICE LIST Lillian N. Cuoco, Esquire Gary J. Edles, Esquire Office of Executive Legal Director Chairma n, Atomic Safety and Licensing U.S. Nuclear Regulatory Commission Appeal Board Washington, D.C. 20555 U .S . Nuclear Regulatory Commission Washington, D.C. 20555 CMr. James A. Van Vliet Of fice of Nuclear Reactor Dr. John H. Buck Regulation Atomic Safety and Licensing Appeal '

Wcshington, D.C. 20555 Board U.S. Nuclear Regulatory Commission Mr. Harold R. Denton Washington, D.C. 20555 Direc tor Office of Nuclear Reactor Dr. Reginald L. Gotchy Regulation Atomic Safety and Licensing Appeal U.S. Nuclear Regulatory Commission Board Washington, D.C. 20555 U.S. Ncclear Regulatory Commission Washington, D.C. 20555 Chairman Nunzio J. Palladino U.S. Nuclear Regulatory Commission Ivan W. Smith, Esquire Washington, D.C. 20555 Chairman, Atomic Safety and Licensing Appeal Board commissioner Victor Gilinsky U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Washington, D .C. 20555 .

Sheldon J. Wolfe, Altarnate Chairman Commissioner Thomas M. Roberts Atomic Safety and Licensing Board U.S. Nuclear Regulatory ' Commission U.S. Nuclear Regulatory Commission Washington, D.C.' 20555 Washington, D.C. 20555 Commissioner Janes K. Asslestine Mr. Gustave A. Linenberger, Jr.

U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Wnshington, D.C. 20555 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Commissioner Frederick M. Bernthal U.S. Nuclear Regulatory Commissio. Richard J. Rawson, Esquire Washington, D .C. 20555 Office of Executive Legal Director U.S. Nuclear Regulatory Commission Docketing and Service Section Washington, D.C. 20555 Office of the Secretary U.S. Nuclear Regulatory Commission

'W2shington, D.C. 20555 l

l

l Maxine Woelfling, Esquire Marjorie M. Aamodt Assistant Counsel R. D. 5 Department of Environmental Coatesville, PA 19320 Resources 514 Executive House Steven C. Sholly

- Post-Office Box 2357 Union of Concerned Scientists Harrisburg', PA 17120 ' Suite 1101 1346 Cont.ecticut Avenue, N.W.

Ms. Louise Bradford TMI ALERT ANGRY /TMI PIRC 1011 Green Street 1037 Maclay Street Harrisburg, PA 17102 Harrisburg, PA 17103 Ellyn R. Weiss, Esquire Chauncey Kepford Harmon, Weiss & Jordan Judith Johnsrud 2001 S Street, N.W., Suite 430 ECNP Washington, D.C. 20009 433 Orlando Avenue State College, PA 16801 John A. Levin, Esquire- _

Assistant Counsel Pennsylvania Public Utility Commission Post Office' Box 3265 Harrisburg, PA 17120 j

0

,