NOV 2 31982 Government Accountability Project Institute for Policy Studies ATIN: Ms. Billie P. Carde Director Citizens Clinic for Accountable Government 1901 Que Street, N. W.
W..shington, D. C. 20009
Dear Ms. Carde:
This is in reply to your October 5, 1982 letter concerning the Midland Nuclear Power Plant construction site. I suspect that our letters crossed in the mail and that my October 12, 1982 letter to you may already have responded to some of your questions and co:sents. I would also note that the Supplemental Safety Evaluation Report on Midland was issued in early October, and it essentially approves the licensee's remedial soils program.
Two points made in your letter, however, need a specific response -
the issue of "open meetings" on Midland project matters and the assessment of the adequacy of the Midland quality assurance program.
First, the open mestings. It is my basic position that meetings with the licensee concerning SALP findings and the adequacy of the quality assurance program be held in public. I have not " discarded" that position, as you suggest. I would note that Connaission policy does not dictate that all meetings conducted by the staff be open; it is my practice, however, that most meetings be public.
The meetings with the Chairman of Consumers Power Company were, I believe, valid exceptions to my basic "open meetings" policy. The purpose of the meetings was to seek top management involvement in the Midland project - and to assure that Messrs. Selby and Cook were fully aware of the scope of NRC concerns about the quality assurance program at Midland. Frankly, such a meeting could not be effective with a large number of attendees. I therefore restricted the attendance of my own staff, as well as additional licensee representatives and members of the public. In my view, the regulatory interests of the NRC and the interests of the public were best served by this meeting format.
I 1
8406020225 940517 PDR F01A RICE 84-96 PDR
e t
2-gg3 Billie P. Garde The second issue in your letter that I want to address is the quality assurance program. By now, you may have seen the Region III testimony i
for the Midland hearing. If not, I am enclosing the QA-related testimony (excluding the somewhat lengthy enclosures).
i The point I want to make is that quality assurance is not a static program.
Construction continues at Midland, and I must assure that there is an adequate quality assurance program to cover that work. If I become i
convinced that the quality assurance system is incapable of monitoring i
construction, clearly I would move to stop construction until the quality l
assurance system reaches acceptable competence, i
Over the years there have been lapses in the quality assurance program -
not of sufficient seriousness for the NRC to halt all construction, but We at the NRC must still requiring some modification in the program.
continue to review the quality assurance activities and to require changes when needed.
The Our concern at this point is the implorantatior of the QA program.
basic program is considered adequate. C,ontrary to your assertion, we have not turned away from the issue of implementation. That remains in focus in our inspection activities and our meetings with the licenses.
I hope this discussion addresses your concerns and interests with the Midland project.
Sincerely, t
b James G. Keppler l
Regional Administrator Enclosure As stated l
I 1
I l
i l
P a
v
-,-e-.,,, -,, -,, - - - -
-.,,.,,,-,y
-n..e
~,,-,, - ~ -
.,e.- -,,
j
(
l l
~
10/29/82 j
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of l
CONSUMERS POWER COMPANY Docket Hos. 50-329 OM & OL 50-330 OM & OL (Midland Plant, Units 1 and 2)
TESTIMONY OF JAMES G. KEPPLER WITH RESPECT TO QUALITY ASSURANCE Q.1 Please state your name and position.
A.1 My name is James G. Keppler. I am the Regional Administrator of the NRC's Region III office. My professional qualifications have been praviously submitted in this proceeding.
Q.2 Please state the purpose of your testimony.
A.2 In my testimony to the Board in July 1981, I testifie'd on the more significant quality assurance problems that had been experienced in connection with the Midland project and the corrective actions taken by Consumers Power Company and in contractors.
I' stated that, while many significant quality assurance deficiencies have been identified, it was
~
our conclusion that the problems experienced were not indicative of a breakdown in the implementation of the overall quality assurance program.
I also noted that while deficiencies have, occurred which should have been identified earlier, the licensee's QA program had been effective in the ultimate identification and subsequent correction of these' deficiencies.
Furthermore, I discussed the results of Region III's special quality i
/
gcv) t'Y ' -..*"$
k, gi I'
8**
a
"*I
- A 3
k 5:
Er f
assurance inspection of May 18-22, 1981, which reflected favorably on the effectiveness of the Midland Project Quality Assurance Department, which was implemented in August 1980. The thrust of my testimony was-that I had confidence that the licenseee's QA program both for the remedial soils work and for the remainder of construction would be implemented -
effectively.
It was not until April 1982 that I was made aware of additional problems with the effectiveness of implementation of the QA program. The problems came to rny attention as a result of the April 1982 meeting between NRC and Consumers Power Company to discuss the Systematic Assessment of Licensee Perforrance (SALP) report for Midland and the discussions held within the Staff in preparation for that meeting. The SALP report addressed the Midland site activities for the period July 1, 1980 through June 30, 1981. During this period, the soils work activities were rated Category III, the lowest acceptable rating given by the SALP review process.
Curing the April 1982 public meeting on the SALP findings, Mr. Ronald J. Cook, NRC Senior Resident Inspector at Midland, stated that as of that date he would rate Consumers Power Company soils work Category III, the same rating as it received for the SALP period. Ha had similar comments on other work activities. Based on my July 1981 testimony, I expected Consumers Power Company would be rated a Category I or II in the soils area, as weil as other areas, by April 1982.,and I was certain that sqy July 1981 testimony had left that impression with the Board.
4 4
'~
.3-On the bacis of the above, I decided it was appropriate to supplement g July 1981 testimony.
Q.3 What actions have been taken by Region III in response to the information contained in your previous answer?
A.3 I met with the NRC supervisors and inspectors who had been closely involved with Midland during the past year to get a better understanding
~
of their concerns. As a result of these meetings, I concluded that the problems being experienced were ones of program implementation rather than problems with the QA program itself.
Because of my concerns, I requested the Region III Division Dire: tors most actively involved with the Midland inspection effort to try to identify the fundamental problems and their causes and to provide me with their recommendations to resolve these problems. They provided me with an assessment of technical and communications problems experienced by the licensee and made recomendations with respect to the licensee's workload, institution of independent verification programs, and QA organization realignments.- This response is included as Attachment A.
(Memorandum from Horelius and Spessard to Keppler, dated June 21,1982)
~~
In July 1982 I recognized that more NRC resources were going to have l-to be provided in overseeing activities at Midland and created the Office of Special Cases (OSC) to manage NRC field activities at Midland (and Zimer). Mr. Robert Warnick was assigned Acting Director. A Midland
(
j Section was formed comprised of a Section Chief, two regional based i
9 l
1 y~,
,... ~. - -
-a v --.. -,., - - -..
.~.-...-.......r..-.
(.
~ '
i s
inspectors, and two resident inspectors (the second resident inspector t
l reportedonsiteinAugust1982).
Before meeting with representatives of the Office of Nuclear Reactor Regulation (NRR) to discuss options for NRC action in connection with Midland, Mr. Warnick requested Senior Resident Inspector Cook to provide a summary of the indicators of questionable licensee performance.
Mr. Cook provided a memorandum documenting a number of problems and concerns, which is included as Attachment B.
(Memorandum R. J. Cook to R. F. Warnick, dated July 23,1982)
Mr. Warnick and I met with representatives of NRR on July 26, 1982 to discuss Consumers Power Company's performance. This meeting resulted i
in recommended actions concerning third party reviews of past work and i
ongoing work which are described in Attachment C.
(Memorandum, Warnick to Files, dated August 18,1982)
Following'the meetir.g with NRR, Mr. Warnick discussed with members of the Midland Section positions concerning third party reviews developed i
l at the meeting with NRR. The merters of the Midland Section were not convinced the reconcended actions were the best. solution, since the causes of the problems had not been clearly identified.
Instead, they j
proposed a somewhat different approach consisting of an augmented NRC inspection effort coupled with other actions to strengthen the licensee's QA/QC organization and management. This proposal is documented in Attachment D.
(!!emorandum, Warnick to Keppler, dated August 18,1982)
In response to these suggestions, Mr. Darrell Eisenhut. Director.
Division of Licensing,f;RR,.and I met with top corporate management representatives from Consumers Power Company on August 26, 1982, and Ii 4
n e
.,w
,w%.
- m
5 again on September 2,1982, to discuss NRC's concerns and possible recomended solutions. Because it was not clear to the NRC staff why Consumers Power was having difficulty implementing their QA program, we requested them to develop and propose to the NRC, actions which would be implemented to improve the QA program implementation and, at the same -
time, provide confidence that the program was being implemented properly.
Consumers Power subsequently presented its proposal for resolution of the identified problems in two. letters dated September 17, 1982, which are included as Attachments E and F.
(LettersCooktoKepplerand Denton, dated September 17,1982) 1 These proposals were lacking in detail, particularly with respect to the plant independent review programs. Following a meeting between NRC staff members and Consumers Power Company in Midland on September 29, 1982, Consumers Power submitted a detailed plan to NRC on October 5,1982 concerning the planned third party activities (Attachment G). Consumers i
Power Company's proposals (Attachments E, F, and G) are currently under review: by HRC.
Q.4 Do you believe that soils remedial work at the Midland plant should be permitted to continue?
A.4 Yes. This portion of my testimony discusses what has been acommplished and what will be accomplished in the near future to provide a basis for continued construction at the Midland plant.
We expect that Consumers Power Company will have independent third party assessments of the Midland construction project. These assessments will include reviews of safety related work in progress and of completed a
f f-
['
e I
,,[..,
, ~ ~ + -
..,_...m.-
.,,[.~.
. - + +.
~
work activities. The scope of, and contractors for, the third party assessments are presently under review by the NRC staff.
Alongwiththeindependentthirdpartyreviews,theOffice}of Special Cases, Midland Section, has expanded its inspection effort and has taken actions to assure compliance with the Licensing Board's April 30, 1982 requirement that the remedial soils work activities receive prior staff approval. Specifically, the Midland Section has (1) established a procedure for staff authorization of work activities proposed by Consumers Power Company (Attachment H. Work Authorization Procedure, dated August 12, 1982), and (2) has caused a stop of the remedial soils work on two occasions once in August 1982 and again in September 1982 (Attachments I and J. Confirmatory Action Letters dated August 12, 1982, and September '24,1982, respectively). The Section has also started ar. inspection of the work activities which have been accomplished by Consumers Power Company in the last twelve. months in the diesel generator building, the service water building and other safety related areas. This inspection was started during October 19P2 and is continuing as of the filing date of this testimony.
Based upon (1) the third party assessments of the plant which will be perfonned (2) the increased NRC inspection effort, and (3) the work authorization controls by the NRC. I believe that soils remedial work at the Midland plant may continue. As demonstrated by the previous stop-work effected in the remedial soils area, the staff will take whatever action is necessary to assure tnat construction is in accordance witn applicable reuqirements and standards.
~
g.
10/29/82 UNITED STATES OF AMERICA NUCLEAR REGULATORY ComISSION BEFORE THE ATOMIC SAFETY AhD LICENSING BOARD In the Matter of
)
CONSUMERS POWER COMPANY Docket Nos. 50-329 OM & OL 50-330 OM & CL (MidlandPlant, Units 1and2) l NRC STAFF TESTIMONY OF JOHN W. GILRAY RELATIVE TO THE OUALITY ASSURANCE PROGRAM FOR THE MIDLAND PR0;ECT UNDERPINNING ACTIVITIE5 OF THE SERVICE WATER PUMD STRUCTURE AND AUXILIARY BUILDING Q.
Will you please state your full name, employer, job title, and specifically your responsibilities relative to the Midland Project.
A.
John William Gilray, U.S. Nuclear Regulatory Comission. Office of, Nuclear Reactor Regulation, Division of Engineering, Quality Assurance Branch; Principal Quality Assurance Engineer.
Q.
Have you previously submitted a statement of your education and professional qualifications in this proceeding?
A.
Yes.
4 Q.
Has Consumers Power Company (CPC) submitted to NRC for review a QA plan for soils remedial work?
4 I
A.
Yes, on January 7, 1982. J. W. Cook of.CPC submitted a letter to l
.H. R. Denton and J. G. Keppler enclosing Midland Quality Phns for the remedial soils activities.
l.
Q.
Describe the scope of these quality plans.
A.
These plans describe the basic quality assurance controls to be applied to items and activities associated with the soils' remedial work which includes underpinning activities, service water pump structure underpinning activities and auxiliary building under-pinning system and the feedwater isolation value pit areas.
These plans provide a commitment to follow the quality assurance program controls of the NRC previously approved Consumers Power Company's Quality Assurance Topical Report CPC-1A Revision 12 and Bechtel's Quality Assurance Topical Report BQ-TOP-1 Revision IA.
Q.
Who in NRC was assigned the responsibility of reviewing these plans for acceptability?
A.
Dr. Ross Landsman of Region III and myself.
Q.
What were the results of your reviews?
A.
We found the Midland Quality Plans conditionally acceptable. The acceptance and conditions are described -in the NRC D. Eisenhut letter to J. W. Cook dated May 25, 1982. (Attachment 1).
Q.
What were the conditions of acceptance of these quality plans?
A.
The conditions are that the quality plans are to apply to (1) all items and activities identified in the ASLB Memorandum and Order of April 30,1982, and (2) all the to-go underpinning Q-listed and non-Q-listed work described in CPC's April 5, 1982 letter to J. Keppler (Attachment 2), except for work stated in attachment 1
of that letter. In addition we emphasized in the May 25, 1982 letter that the NRC interprets these quality plans to mean that.the Midland nehbels Project Quality Assurance Department be activity involved in reviewing contractor's, sub-contractor's and consultant's quality assurance capabilities and assuring through review of procedures and verifications that hardware is built and work is perfonned in accordance with design, specifications, and procedural requirements.
4 3
Q.
Has Consumers Power Company revised the quality plans for remedial soils work to incorporate these conditions?
A.
Yes, the Consumers Power Company's letter of August 9,1982 to H. Denton (Attachment 3) transmitted copies of the revised j
qualit/ plans.
4 Q.
What are the results of NRC's review of these revised quality plans?
A.
The revised plans have been reviewed and found acceptable. See Chapter 17 of Supplement No. 2 of the Midland Safety Evaluation Report dated October 1982 (NUREG-0793).-
a Q.
Suainarize the important elements of these quality plans.
A.
Midland Project Quality Plan 2. Revision 0 " Quality Plan for Remedial Soil. Activities & Soils Related Work in Q Areas" describes the overall Consumers Power Company and Bechtel Power Corpo.ation quality assurance plan for remedial soils activities whereas Midland Project Quality Plan 1. Revision 3. " Quality Plan l
,for Underpinning Activities" describes in more detail the quality i
e--,
,,.,,,,n-
.-,,q--
a
.e-m.,-.g- - -
m,,,py,-p,,~
assurance plans for the underpinning activities associated with the auxiliary building and service water pump structure. These plans, which apply to safety related and non-safety related remedial soils activities comply with the previously NRC approved quality assurance requirements described in Consumers Power Company's and Bechtel's Quality Assurance Topical Reports CPC-1-A, and BQ-TOP-1 Revision IA respectively. The important areas covered by the l
quality plans are:
1 1.
Underpinning of service water pump structure.
1 2.
Removal, replacment of fill, and underpinning beneath the feedwater isolation valve pit areas, auxiliary building electrical penetration areas, control tower, and beneath the turbine building.
3.
Installation of monitoring system and the monitoring of both permanent and temporary dewatering systems.
4.
Dewatering systems. The installation, operation, and i
monitoring of both permanent and temporary dewatering systems.
5.
Freeze wall.
~
6.
BWST foundation repairs and tank releveling.
i 7.
Underground service water and BWST piping rebedding or replacment.
i 8.
Any placing, compseting, excavating, or drilling soil materials under or around safety-related structures and 1
systems,asdefinedbyBechteldrawingC-45(Q).
j l
l The Consumers Power Company Midland Project Quality Assurance Department is responsible for the review of design documents, procurement orders and implementing procedures of Consumers Power Company, Bechtel and subcontractors to hssure that the necessary quality requirements are specified. Throughout the implementation phase Midland Project Quality Assurance Department is also
2.
5-responsible for overviewing and auditing the soils activities to verify that they are correctly being carried out in accor. dance with previously approved requirements.
These plans meet the conditions specified in the May 25, 1982 6 -
letter of D. Eisenhut to J. Cook and in the ASLB Memorandura and Order of April 30, 1982.
Q.
Will MRC be involved in reviewing and commenting on revisions to I
these quality plans prior implementing the revision?
A.
Yes Consumers Power Company letter of August 9,1982 to H. Denton provides the coenitment to submit revisions of the quality plans to NRC for comment prior to implementation.
Q.
Have any additional QA improvements for the remedial soils areas 1
j been initiated since August 9,19827 A.
Yes. As a result of discu~ssions between Consumers Power Company f
and NRC Region III office, Consumer Power Company submitted two letters to H. Dentori and J. Kappler which address additional l
quality assurance improvements over and above those controls described in the quality plans.
1 l
i Q.
What is the NRC review status of these two letters?
A.
As of October 19, 1982 NRC,(withNRRandRegionIIIinvolvement),
has not completed its review of the additional quality assurance improvements.
l l
\\
t i
2
. -. ~.
')
=
.r n.
i 10/29/82 UNITED STATES OF AMERICA j
NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of 4
CONSUMERS POWER COMPANY Docket Nos. 50-329 OM & OL 50-330 DM & OL (MidlandPlant, Units 1and2) l NRC STAFF TESTIMONY OF R. J. COOK, R. 8. LANDSMAN, j
R. N. GARDNER AND W. D. SHAFER WITH RESPECT TO QUALITY ASSURANCE l
Q.1 Please state your names and positions.
4 A.1 My name is Ronald J. Cook. I am the Senior Resident Inspector for the NRC at the Midland Plant. I attach a copy of my professional i
qualifications.
j My,name is Ross 8. Landsman. I am an Inspector for the NRC (Region III) at the Midland Plant. My professional qualifications have previously been submitted in this proceeding.
i My name is Ronald N. Gardner. I am an Inspector for the NRC f
(RegionIII),assignedtotheMidlandPlant. My professional I
qualifications have been previously submitted in this proceeding.
My name is Wayne D. Shafer. I am the Chief. Midland Section. Office i
ofSpecialCasesfortheNRC(RegionIII). A copy of my professional
)
qualifications is attached.
L Q.2 Dr. Landsmen and Mr. Gardnsr. has pr.gicn III recently aderessed the issue of the quelificatiens of Bechtel QC Inspect:rs at Midland?
(July 7,1982 Order, p. 4.)
l
'.n /
j
)
+
ewa '..
-P w-7-9 9
4'-w.m-
+
-*y' t
y'--w*~-
ww PT W
ww'T
-'wW--Ww
'vr y
-rw
. w ww,is-.
-w--
+4 w
4 A.2 Yes. There were several instances in the past where the qualifications of Bechtel QC inspectors at Midland in the areas,of mechanical and electrical work activities were questionable. See, for example, Inspection Reports 82-06 (Attachment 10 discussed at prges 5-6, infra)and82-07(Attachment 1). As a result, Region III has urged CPC to take control of the QC activities, including requalifying and recertifying of all Bechtel QC inspectors to Consumers Power Company's standards. CPC has agreed to do so.
Upon witnessing the QC requalification oral exams for the soils remedial work, we determined that the requalification effort was not acceptable. AConfirmatoryActionLetter(CAL)wasissuedon i
September 24,1982(Attachmentla.).
A public meeting between CPC and the NRC was held on September 29, 1982 to discuss the requalification and recertification of QC personnel involved in the remaining safety-related work at the Midland Plant.
During this meeting, the licensee comitted to developing a retraining program for QC personnel and to 1use a combination of written and oral examinations for the QC requalification effort. At the time of this j
filing, CPC has not submitted its program.
!J Q.3 Dr. Landsman and Mr. Gardner, what is your response to the questions
~'
concerning the effects of structural movements during the under-inning process, posed by Judge Harbor at Tr. 7122-71287 (July 7, i
982 Order,p.4.)
1 A.3 Consumers Pcwer Company's prcgram for systematic detection of and j
I arresting of structure movement is described in Specification 7220-C-200(Q), Revision 0(Attacheent2).
1
-i I
Li
_a,
_. ~.
3 The protective plan for arresting structure movement is implemented 4
through proceoue n OP40 Monitoring, Reducing and Reporting (Attachment 3) and OP41, Data Acquisition System Investigation in the Event of Observed Large Movements (Attachment 4) which describe the methods for monitoring and assessing structure movement and load data.
/
The program and procedures have been reviewed by Region III i
inspectors and no major concerns were identified.
i On August 23,1982, weconductedaninspection(82-18,pp.3-4)
(Attachment 5) of installed underpinning instrumentation to detemine the capabilities of the computerized instrumentation system to monitor and l
respond to simulated structural movements. We selected three instruments I
for testing. For each of the selected instruments, baseline data were initially recorded. Then displacement shims were installed and the subsequent computer printout examined to detemine the system response to the simulated displacement.
i An audible alam condition was noted after the 0.110 inch displacement shim was installed. The subsequent computer printout further identified the aiarm condition.
During each of the displacement simulations, the underpinning instrumentation system identified, within the allowable tolerances, the l.
i z
displacement simulated and, when required, the resulting alam condition.
The results of the tests perfomed on the selected instrumentation i
were acceptable. No concerns were identified.
During the urderpinning activities, the Bechtel Resident Structural
~
.i Engineer will evaluate and trend the instrument data. The decision to
- ^
proceed or not to proceed with the underpinning activities (See Board i
z 4
-c
_,.,n
...,n..
,.,_.. _..+ -......
.-n...
question at Tr. 7125) will be made by Bechtel Construction and must be consistent with the acceptance criteria set forth on pp. 2-48 through 2-51 of $5ER #2.
1 Q.4 Dr. Landsman, describe the QA program for soils related activities (July 7,1982 Order, p. 4.)
A.4 The Quality Assurance Program for remedial soils activities is describedinMPQP1andMPQP2(Attachment 6). These procedures have been j
reviewed by the Staff and are addressed in Section 17 of the SSER #2.
The Region III office will perform periodic inspections of the remedial soils work in progress. The major underpinning activities at '
l pier 12 the first pier to be constructed, will be closely monitored by i
the Staff and additional c:itical underpinning activities will not be j
authorized until the Staff is assured that all quality elements have been met.
f Q.5 Dr. Landsman, what is the Staff response tp the various nonconformance reports referenced by the Board in its Orders of April 30,1982 and July 7, 19827 A5 TheNRCStaffhasreviewedNCR#M01-4-2-008(Attachment 7A),NCR
- M-01-9-2-038(Attachment 78),NCR#M-01-9-2-051(Attachment 7C).NCR
- 4245 (Attachment 70), NCR-4199 (Attachment 7E). Region III has taken ro j
action regarding these specific nonconformance reports. The Staff I
_]
recognizes that these reports represent instances where the quality
(
- j assurance requirements were either not established or not adequately I
~
.j implemented. However, the Staff feels that the Work Authorization t
Procedure (AttachmentHtotestimonyofJamesKeppler)aswellas
!~
i l
a l
l procedures implemented by Bechtel to control excavation on site should ensure that future work activities in the remedial soils area will be
~
accomplished in accordance with the quality requirements.
4 Q.6 Dr. Landsman, please discuss Staff Inspection Report 82-05 (Attachment 8). (July 7,1982 Order, p. 4.)
A.6 This inspection report documents an inspection conducted in February j
and March 1982, by me. I identified one item of noncompliance and one deviation from a commitment as described below.
i i
The item of noncompliance represented a significant weakness in the quality of the procedures being used for the remedial soils work. There
.i l
were four examples of poor qnlity assurance ranging from " failure to review and approve" to inadequate procedure content. The significance of I
this violation was recognized by the assignment of a severity level IV class'fication.
The deviation addressed in Appendix B of the report identified a l
failure on the part of the licensee to comply with a commitment to j
provide additional qualified QA personnel. This commitment was made to meduringapreviousinspection(InspectionReport81-12,pp.16-17) j (Attachment 9). It was my assessment that CPC's QA staff was not fully adequate and was judged not to be connensurate with the complexity of the f
task.
i i'
Page three of the inspection report (82-05) details further connitments mede by CPC ~regarding the previously described deviation.
This concern, however, is still under review and will be pursued in future inspections. In addition, in the documented exit interview (p. 9 l
)
I(
i l,
^
- .~.
e t
ofB2-05). I noted that it was clear that upper management was not playing an active role in conveying the principles of Quality. Assurance to the working staff.
Q.7 Dr. Landsman and Mr. Gardner, please discuss Inspection Report 82-06 m
(Attachment 10). (July 7,1982 Order, p. 4.)
)
A.7 This inspection report documents ar. inspection conducted in March i
1982 by us. The report contains two items of noncompliance considered to f
have a severity level IV significance.
The first noncompliance addresses CPC's failure to apply the Quality b
Assurance Program comitments to the installation of the ur.derpinning instrumentation. This concern was identified on March 17 through 19, 1982. We detemined that the installation work had been initiated on March 11, 1982, one day after CPC had been notified that all remaining underpinning activities were classified as "Q," therefore requiring the l
application of the Quality Assurance Program.
The second item of noncomplir.nce addressed inadequate QC inspections
[
in that fifty-five (55) class IE cables were inspected and accepted even E
I though the cables were not correctly routed; and that class IE cables I
were inspected and accepted after nonconforming cable reel numbers were identified. These problems were identified during overinspections conducted by CPC since May 1981.
The significance of these concerns are twofold. First, the I
installation of the cables was improper and second, the QC inspections,
{
which are intended to identify improper installation, failed to do so.
j The second concern reflects on the QC inspectors' ability to perform
~
+.
l !
inspections. To ensure that there are no other misrouted cables, CPC 1
was directed by Region III to perform a 100% overinspection of all safety related cables.
The concern about QC inspector qualifications is being addressed as described in the response to q9estion 2 of this written testimony.
Q.8 What is the Staff's response to the suggestion in the interim ACRS report of June 8,1982, that there be a broader assessment of Hidland's design adequacy and construction quality. (July 7,1982 Order, p. 5.)
A.8 Mr. Keppler addresses the third party independent assessment of 4
Midland construction in his testimony.
4 i
i Q.9 Dr. Landsman, what are the results of the Staff evaluation of drawing 7220-C-45 (July 7,1982 Order, p. 5.)
I A.9 Staff requirements for this drawing were provided by the Staff on May 7,1982, to Messrs. J. Mooney, J. Schaub and others of CPC. These i
were:
4 (1) The seismic Category L retaining wall to the east of the
]
service water pump structure is shown to be located in th( non-Q zone.
CPCo should review the drawing to provide for Q-listed control in the i
M vicinity of this wall.
I (2) The drawing should be revised to provide for Q control of soils i
activitiesfortheemergencycoolingwaterreservoir(ECWR),theconcrete service water discharge lines, and the perimeter and baffle dikes adjacent ta the ECWR.
(3) Cpc should implement Q controls for two types of situations.
i The first is that which is intended to occur outside the Q zone of i
a I
i<
4
-,.b.
8 Drawing 7720-C-45, but actually occurs within that zone. The second is i
that which actually occurs outside the Q zone of Drawing 7720-C-45 but j
nonetheless may impact safety related structures and systems.. Examples include potential removal of fines by dewatering wells, improper location of borings near the Q boundary, and soil excavations at the boundary involving both Q and non-Q areas.
I (4) CPCo should re-confirm that no seismic Category I underground utilities extend beyond the Q area bounds of the drawing.
CPC has submitted a revised Drawing 7720-C-45. With respect to (1)revisingthedrawingtoprovideQControlsfortheperimeterand j
baffledikesadjacenttotheECWRand(2)reconfirmationbyCPCthatno seismic Category I underground utilities extend beyond the 0 areas of the i
drawing, the Staff does not find the submittal acceptable. With respect to the other requirements for the drawing, mentioned above, the Staff finds the submittal acceptable.
l 4
l
]
I t
4 i
5
,,w y
9
-.e o-,,
.p-wy,
~,-.. - -.,.,
---w,-_m,
---4.,-.--.i-.w,
,y
-i---,--#,s_9-g,--g.,.
,-w,y, n,9,9, y
e
i l
RONALD J. COOK STATEMENT OF PROFESSIONAL QUALIFICATIONS My name is Ronald J. Cook. I was born May 24,1934 at Niles. Ohio.
I am employed by the U.S. Nuclear Regulatory Comission as the Senior Resident Inspector at the Midland Nuclear Plant. I graduated from the Ohio State i
University in 1967 with a Bachelor of Mechanical Engineering degree and again in 1974 with a Master of Science degree.
I have worked with the AEC/NRC since April 1971 and have been the Senior Resident / Resident Inspector at the Midland site since July 1978 with i
responsibilities for planning, supervising and conducting NRC inspections of the construction activities at the site to determine whether the licensee is
?
complying with the provisions of the construction permit. Prior to involvement with the reactors under construction I was a Regional Based Reactor Inspector in the Nuclear Support Section for the Operating Reactors Branch. In this capacity I primarily inspected operating reactors which had experienced mechanical, thermelhydraulic, vibration and corrosion events and assisted in the implementation of selected portions of the basic AEC/NRC i
inspection program. Before joining the Nuclear Support Group I was the Principal Inspector for the Lacrosse Boiling Water Reactor and the Palisades Nuclear Generating Station.
l Prior to joining the U.S. Atomic Energy Comission I was the Operations Supervisor for the Ohio State Nuclear Reactor Laboratory and was responsible for the safe operation of this research facility.
t In 1962-1963 I was a Licensed Reactor Operator and Instrumentation Machinist i
responsible for experiment equipment fabrication and installation and reactor operation at the NASA Plum Brook Research Reactor.
t l
From 1958 to 1962, I was associated with the Navy Nuclear Program and was advanced to Chief Machinist's Mate and was a Qualified Chief Machinery i
1 Operator. I was responsible for the implementation of safe construction, i
testing, maintenance and operation of the eight' reactor complex of the U.S.S.
t Enterprise CVA(N)-65 and the A1W dual reactor prototype plant for the U.S.S.
Enterprise. I was an instructor and shift crew supervisor.
i Prior to being assigned to the Navy Nuclear Program. I had been a First Class Machinist's Mate aboard the U.S.S. Irwin D0-794, a fossil fueled destroyer.
I was responsible for the safe operation and maintenance of the main t
propulsion steam plant.
l i
L Prior to joining the U.S. Navy, I was a Machinist Apprentice at the New York L
Central Railread and performed maintenance and overhaul on diesel and steam 1 riven locomotives.
i
+
l e
l
.e
.s l
l WAYNE D. SHAFER STATEMENT OF PROFE55,10NAL QUALIFICATIONS i
My name is Wayne D. Shafer. I was born October 11, 1937 at Chicago, i
Illinois. I sat employed by the U. 5. Nuclear Regulatory Commission as i
the Chief. Midland Section Office of Special Cases.
i l
I graduated from Iowa State University in 1972 with a Bachelor of Science Degree in Mechanical Engineering.
I worked for Argonne National Laboratory at the Experimental Boiling Water Reactor from 1959 to 1967. I was a qualified Santor Operator and i
l Assistant Shift Supervisor.
I worked for Ames Laboratory at the Ames Laboratory Research Reactor from 1967 to 1972. I was a qualified Chief Operator and Shift Supervisor.
i I worked for Northern Indiana Public Service Company from 1972 to 1974. -
I was an Engineer in the Nuclear Engineering Group.
From October 1974 to March,1982. I was employed by the NRC/AEC as a Reactor Inspector and Inspection Specialist. As a Reactor Inspector I was qualified to inspect Boiling Water Reactors (BWRs) and Pressurized Water Reactors (PWRs), and was a project inspector at four BWR facilities. I was selected as an Inspection Specialist in November l
1979. I have participated in five management appraisal inspections, one as a team leader. I served as the Acting Chief. Performance Appraisal Branch, from May 1980 to March 1982.
From March 1982 to July, 1982, I served as the Chief Management Program Section Engineering Inspection Branch in Region III. I received my present assignment in July,1982.