Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20093G4541995-10-18018 October 1995 Comment Supporting Proposed Rules 10CFR2,50 & 51 Re Decommissioning Procedures for Nuclear Power Reactors ML20058K7381993-12-0303 December 1993 Memorandum & Order CLI-93-25.* Commission Denies State of Nj Petition for Leave to Intervene & Request for Adjudicatory Hearing Filed on 931008.W/Certificate of Svc.Served on 931203 ML20058E0151993-11-14014 November 1993 Comment Opposing Proposed Rule 10CFR50 Re Exemptions in Accident Insurance for Nuclear Power Plants Prematurely Shut Down ML20059B0301993-10-22022 October 1993 NRC Staff Response to Commission Questions Posed W/Respect to State of New Jersey Petition for Leave to Intervene & Request for Hearing.* Denies Petition to Intervene & Request for Hearing.W/Certificate of Svc & Notice of Appearance ML20059B1111993-10-20020 October 1993 Philadelphia Electric Co Response to NRC 931014 Order.* State Failed to Demonstrate Entitlement to Hearing to Challenge Util Amend to Permit Util to Receive Shoreham Fuel ML20059B0621993-10-20020 October 1993 Long Island Power Authority Response to Nuclear Regulatory Commission Order of 931014.* Requests That NRC Reject State of Nj Filing.W/Certificate of Svc ML20057G2141993-10-14014 October 1993 Order.* Requests for Simultaneous Responses,Not to Exceed 10 Pages to Be Filed by State,Peco & Lipa & Served on Other Specified Responders by 931020.NRC May File by 931022. W/Certificate of Svc.Served on 931014 ML20059A4581993-10-14014 October 1993 Order Requesting Answers to Two Questions Re State of Nj Request for Immediate Action by NRC or Alternatively, Petition for Leave to Intervene & Request for Hearing. Operations Plans for Marine Transportation Withheld ML20059F0191993-10-0808 October 1993 Long Island Power Authority Reply to New Jersey Filing of 931020.* Licensee Requests That NRC Deny State of Nj Intervention Petition.W/Certificate of Svc ML20057F2191993-09-30030 September 1993 Exemption from Requirements of 10CFR50.54(q) Eliminating Licensee Requirement to Follow & Maintain in Effect Emergency Plans ML20059B1291993-09-14014 September 1993 Affidavit of Jh Freeman.* Discusses Transfer of Slightly Used Nuclear Fuel from Shoreham Nuclear Power Station to Limerick Generating Station.W/Certificate of Svc & Notice of Appearance ML20097C3241992-06-0303 June 1992 Petitioners Consented Motion to Dismiss Joint Opposition to Issuance of Decommissioning Order Prior to Hearing.* W/Certificate of Svc ML20097C2911992-06-0303 June 1992 Petitioner Consented Motion to Dismiss Appeal.* Dismisses 911203 Notice of Appeal W/Prejudice & W/Each Party Bearing Own Costs & Atty Fees Due to Encl Settlement Agreement. W/Certificate of Svc ML20097C2891992-06-0303 June 1992 Petitioner Consented Motion to Dismiss Appeals.* Appeals Being Dismissed Due to Encl Settlement Agreement.Nrc Should Dismiss Appeals W/Prejudice & W/Each Party Bearing Own Costs & Atty Fees.W/Certificate of Svc ML20097C1361992-06-0303 June 1992 Petitioners Consented Motion to Dismiss.* Petitioners by Counsel Move ASLB to Dismiss Petitioners as Petitioners for Leave to Intervene & Request for Hearing in Proceeding W/ Prejudice.W/Certificate of Svc ML20097C2631992-06-0303 June 1992 Petitioner Consented Motion to Dismiss.* NRC Should Issue Order Dismissing School District & Scientists & Engineers for Secure Energy,Inc as Petitioners in Proceeding.W/ Settlement Agreement & Certificate of Svc ML20097C1081992-06-0303 June 1992 Petitioners Consented Motion to Dismiss Appeal.* Petitioners Hereby Move to Dismiss 910628 Notice of Appeal in Matter W/Prejudice & W/Each Party to Bear Own Costs & Atty Fees.W/ Certificate of Svc ML20096A5921992-05-0707 May 1992 Motion to Withdraw Supplemental Filing.* Petitioners Urge NRC to Allow Withdrawal of Supplement for Good Cause Shown. W/Certificate of Svc ML20096A5311992-05-0606 May 1992 Long Island Power Authority Comments on SECY-92-140 & Response to Petitioner Joint Opposition to Decommissioning Order.* Util Urges NRC to Adopt Recommendation in SECY-92-140 & Approve Order.W/Certificate of Svc ML20096A5071992-05-0505 May 1992 Suppl to Joint Opposition to NRC Staff Recommendation for Issuance of Decommissioning Order Prior to Hearing & Contingent Motion for Stay.* Supplements Joint Opposition Prior to Hearing.W/Certificate of Svc ML20095K8991992-04-29029 April 1992 Joint Opposition to NRC Staff Recommendation for Issuance of Decommissioning Order Prior to Hearing & Contingent Motion for Stay.* Petitioners Urge Commission to Reject NRC Staff Proposal in SECY-92-140.W/Certificate of Svc ML20095H5611992-04-28028 April 1992 Affidavit of Lm Hill.* Affidavit of Lm Hill Supporting Util Position That Circumstances Exist Warranting Prompt NRC Action on NRC Recommendation That Immediately Effective Order Be Issued Approving Decommissioning Plan ML20094G3971992-02-26026 February 1992 Notice of State Taxpayer Complaint & Correction.* NRC Should Stay Hand in Approving Application for License Transfer as Matter of Comity Pending Resolution of Question as Util Continued Existence in Ny State Courts.W/Certificate of Svc ML20094G2261992-02-25025 February 1992 Petitioner Notice of Lilco/Long Island Power Authority Exaggeration & of Commencement of State Court Action.* NRC Should Await Ny State Decision Re Matter within Special Jurisdiction.W/Certificate of Svc ML20092K9021992-02-24024 February 1992 Petitioner Opposition to Ltr Request for Dismissal of Pages.* Suggests That Transfer of License Inappropriate at Present Time.W/Certificate of Svc ML20092K9511992-02-21021 February 1992 Response of Lilco & Long Island Power Authority to Petitioner Opposition to NRC Staff Recommendation for License Transfer Approval.* W/Certificate of Svc ML20092K8701992-02-20020 February 1992 Petitioners Opposition to NRC Staff Recommendation for Approval of License Transfer.* Urges Commission to Reject NRC Recommendation in SECY-92-041 & Remand Matter for Consideration in Normal Proceeding.W/Certificate of Svc ML20091E2661992-02-20020 February 1992 Petitioner Opposition to NRC Staff Motion to Dismiss.* Petitioners Urge NRC to Deny Staff Motion or Defer Action Until Petitioners Have Fully Developed Petitions & Supplied Detailed Contentions.W/Certificate of Svc ML20091E4011992-02-18018 February 1992 Answer of Long Island Power Authority to NRC Staff Motion to Dismiss Intervention Petitions.* Util Urges NRC to Grant Motion & Dismiss Intervention Petitions.W/Certificate of Svc ML20091E3161992-02-13013 February 1992 Lilco Response to NRC Staff Motion to Dismiss Intervention Petitions on Decommissioning Plan.* Requests That Petitions Be Struck & Petitioners Be Instructed of Possible Dismissal.W/Certificate of Svc ML20092D2931992-02-0606 February 1992 Answer Denying Petitions for Leave to Intervene & Request for Prior Hearing Re Decommissioning ML20091E2741992-02-0606 February 1992 Answer of Long Island Power Authority to Intervention Petitions Concerning Shoreham Decommissioning Plan.* Requests That Petitions for Leave & Requests for Hearing Be Denied.W/Certificate of Svc & Notice of Appearance ML20091E2941992-02-0606 February 1992 Lilco Opposition to Petitioner Request for Hearing on Shoreham Decommissioning Plan.* Informs That Util Opposes Both Requests for Hearing.W/Certificate of Svc ML20091E2831992-01-22022 January 1992 Shoreham-Wading River Central School District Petition for Leave to Intervene & Request for Prior Hearing.* Requests That Petition for Leave Be Granted & Hearing Held. W/Certificate of Svc & Notice of Appearance ML20091E2811992-01-22022 January 1992 Scientists & Engineers for Secure Energy,Inc Petition for Leave to Intervene & Request for Prior Hearing.* Requests That Petition Be Granted & Hearing Be Held.W/Certificate of Svc & Notice of Appearance ML20086T7231992-01-0303 January 1992 Motion of Long Island Power Authority for Leave to File Supplemental Matls.* Requests That Supplemental Memorandum & Supplemental Legislative History Matls Be Filed. W/Certificate of Svc ML20086T7541992-01-0303 January 1992 Memorandum of Long Island Power Authority Concerning Supplemental Legislative History Matls.* Supports Legislative History & Argues That License Not Subj to Termination Under Section 2828.W/Certificate of Svc ML20086Q9171991-12-30030 December 1991 Lilco Opposition to Petitioners Request for Stay & Suggestion of Mootness.* Suggests That Stay Request & Suggestion of Mootness Be Denied.W/Certificate of Svc ML20086Q9281991-12-30030 December 1991 Opposition of Util to Motion for Stay of License Transfer & to Suggestion of Mootness.* Concluded That Relief Sought in Petitioner Motion & Suggestion Should Be Denied. W/Certificate of Svc ML20091H8261991-12-19019 December 1991 Suggestion of Mootness Due to Long Island Power Authority Imminent Demise.* Concludes That If Commission Were to Transfer Shoreham Licenses to Lipa,Nrc Could Find Itself W/Class 103 Facility W/O Licensee.W/Certificate of Svc ML20091H8661991-12-18018 December 1991 Lilco Opposition to SE2 Appeal from LBP-91-26 & LBP-91-39. Concludes That Appeal Should Be Summarily Rejected or Be Denied on Merits.W/Certificate of Svc ML20086N1661991-12-17017 December 1991 Motion for Stay of License Transfer Pending Final Order on Petition to Intervene & Request for Hearing & for Addl or Alternative Stay.W/Certificate of Svc ML20086M0791991-12-16016 December 1991 Certificate of Svc.* Certifies Svc of Petitioner Notice of Appeal & Brief in Support of Appeal in Proceeding to Listed Individuals ML20086J6351991-12-0909 December 1991 Lilco Opposition to Petitioners Contentions on License Transfer Amend.* Concludes That License Transfer Amend Contentions Be Rejected & Petitioner Request to Intervene Denied.W/Certificate of Svc ML20086J3521991-12-0909 December 1991 Response of Long Island Power Authority to Petitioners Joint Supplemental Petition.* Board Should Dismiss Petitions to Intervene for Lack of Standing & Reject All Contentions Proffered by Petitioners.W/Certificate of Svc ML20094E1041991-12-0909 December 1991 Response to Long Island Power Authority to Petitioners Joint Supplemental Petition ML20091G2051991-12-0303 December 1991 Brief in Support of Appeal.* Commission Should Consider Appeal on Basis That Findings of Matl of Facts Clearly Erroneous.W/Certificate of Svc ML20091G1971991-12-0303 December 1991 Notice of Appeal.* Informs of Appeal of LBP-91-26 & LBP-91-39 in Facility possession-only License Proceeding ML20086C5381991-11-18018 November 1991 Petitioner Joint Supplemental Petition.* Petition Includes List of Contentions to Be Litigated in Hearing Re License Transfer Application.W/Certificate of Svc ML20086C5471991-11-18018 November 1991 App to Joint Supplemental Petition of Shoreham-Wading River Central School District & Scientists/Engineers for Secure Energy,Inc.* 1995-10-18
[Table view] Category:TRANSCRIPTS
MONTHYEARML20245K9371989-04-20020 April 1989 Transcript of Commission 890420 Affirmation/Discussion & Vote in Rockville,Md.Pp 1-5 ML20247R4421989-04-20020 April 1989 Transcript of Commission 890420 Press Conference in Rockville,Md.Pp 1-10 ML20245G5661989-04-17017 April 1989 Transcript of 890417 Discussion of Plant Full Power OL in Rockville,Md.Pp 1-70.Supporting Documentation Encl ML20236E1021989-03-0303 March 1989 Transcript of Commission 890303 Affirmation,Discussion & Vote in Rockville,Md Re SECY-89-77, Shoreham Sanction Decision. Pp 1-5 ML20247R4321989-03-0303 March 1989 Transcript of Commission 890303 Press Conference in Rockville,Md Re Shoreham Proceedings.Pp 1-10 ML20235V6301989-03-0101 March 1989 Testimony of F Kantor,Em Podolak & Rt Hogan of NRC Staff on Scope of Exercise.* Purpose of Testimony Is to Rebut Testimony of Intervenors Re Contention 1 ML20235V3841989-03-0101 March 1989 Direct Testimony of Iw Husar & Jh Keller Concerning June 1988 Emergency Preparedness Exercise.* Certificate of Svc Encl.Related Correspondence ML20235N1221989-02-24024 February 1989 Rebuttal Testimony of Jr Asher,Dm Crocker,Rb Kelly,Jj Kozak & Cl Stovall on Contention 1 (Scope of Exercise).* Related Documentation Encl.Related Correspondence ML20235N1501989-02-24024 February 1989 Lilco Rebuttal Testimony on Contention 6 (Emergency Broadcast Sys Messages) & 7.E & F (Enc).* Attachments Encl. Related Correspondence ML20235N1641989-02-24024 February 1989 Lilco Rebuttal Testimony on Contention 18 (Communications Equipment & Reception Failures).* Related Correspondence ML20235Y5811989-02-21021 February 1989 Transcript of Commission Oral Argument on 890221 in Rockville,Md Re Sanction Issue in Shoreham Proceeding ML20247R4091988-12-31031 December 1988 Transcript of Commission 881221 Press Conference in Rockville,Md.Pp 1-31 ML20196F2881988-12-0606 December 1988 Transcript of 881206 Hearing in Bethesda,Md Re Plant. Pp 1-122 ML20154E4761988-09-14014 September 1988 Transcript of 880914 Hearing in Bethesda,Md Re Appeal of Initial Decision Concerning Emergency Exercise.Pp 1-91 ML20154E4631988-09-14014 September 1988 Transcript of 880914 Hearing in Bethesda,Md Re Util Reception Ctrs That Will Be Used in Event of Radiological Emergency.Pp 1-98 ML20151C3041988-07-19019 July 1988 Transcript of 880719 Hearing in Bethesda,Md Re Emergency Planning.Pp 21,830-22,074.Witnesses:F Jones,We Regan, R Shepherd & D Davidoff ML20151B3391988-07-14014 July 1988 Partial Transcript of 880714 Hearing in Bethesda,Md Re Emergency Planning.Pp 21,537-21,720.Witnesses:N Kelly & D Axelrod ML20151B3671988-07-14014 July 1988 Partial Transcript of 880714 Hearing in Bethesda,Md Re Emergency Planning.Pp 21,721-21,829.Witnesses:N Kelly, D Axelrod & Aj Geramo ML20150E0791988-07-11011 July 1988 Transcript of 880711 Hearing in Bethesda,Md Re Emergency Planning.Pp 20,944-21,174 ML20150F7781988-07-11011 July 1988 Transcript of 880711 Evening Session in Bethesda,Md Re Emergency Planning.Pp 21,175-21,290.Witnesses:JD Papile & DA Devito ML20196J4891988-06-29029 June 1988 Transcript of 880629 Conference in Bethesda,Md Re Remand/ Emergency Planning.Pp 20,929-20,943 ML20196A4261988-06-24024 June 1988 Transcript of 880624 Hearing in Bethesda,Md Re Remand/ Emergency Planning.Pp 20,894-20,928 ML20155K5671988-06-17017 June 1988 Transcript of 880617 Telcon Hearing in Bethesda,Md Re Emergency Planning/School Bus Driver Issue.Pp 20,863-20,893 ML20154D1181988-06-15015 June 1988 Transcript of FEMA 880615 Public Meeting in Patchougue,Ny Re Util.Pp 1-131 ML20155E1751988-06-10010 June 1988 Transcript of 880610 Telcon in Washington,Dc Re Remand/ Emergency Planning.Pp 20,845-20,862 ML20197E3231988-06-0303 June 1988 Transcript of 880603 Hearing in Hauppauge,Ny Re Emergency Planning/School Bus Driver Issue.Pp 20,686-20,844.Supporting Documentation Encl.Witness:D Hartgen ML20154R2881988-06-0202 June 1988 Transcript of 880602 Hearing in Happauge,Ny Re Emergency Planning.Pp 20,555-20,685.Supporting Documentation Encl ML20197E0401988-05-31031 May 1988 Corrections to Rebuttal Testimony of Eb Lieberman & Dp Dreikorn on Remanded Issue of Bases & Accuracy of Lilco Hosp Evacuation Time Estimates.* Certificate of Svc Encl ML20154M8571988-05-27027 May 1988 Transcript of 880527 Hearing in Hauppauge,Ny. Pp 20,440-20,554.Witness:T Urbanik ML20154M8511988-05-26026 May 1988 Transcript of 880526 Hearing Re Emergency Planning/School Bus Driver Issue in Hauppauge,Ny.Pp 20,245-20,439.Supporting Documentation Encl.Witnesses:Bg Brodsky,Ej Doherty, Hm Koenig,Ar Rossi,Rw Petrilak,Nf Muto,Jt Smith,Rn Suprina ML20197E1201988-05-26026 May 1988 Surrebuttal Testimony of Dt Haertgen on Behalf of State of Ny Re Hosp Evacuation Time Estimates.* Certificate of Svc Encl ML20197E1631988-05-24024 May 1988 Addendum to Direct Testimony of Bg Brodsky,Ej Doherty, Hm Koenig,Nf Muto,Rw Petrilak,Ar Rossi,Jt Smith & Rn Suprina on Behalf of Suffolk County Re Contention 25.C.* W/ Certificate of Svc.Related Correspondence ML20154F7741988-05-18018 May 1988 Transcript of 880518 Hearing in Hauppauge,Ny. Pp 19,831-19,998.Witnesses:D Mileti,Mk Lindell,Rb Kelly ML20154H7981988-05-18018 May 1988 Rebuttal Testimony of Eb Lieberman & Dp Dreikorn on Remanded Issue of Base & Accuracy of Lilco Hosp Evacution Time Estimates.Certificate of Svc Encl ML20154F7421988-05-17017 May 1988 Transcript of 880517 Hearing in Hauppauge,Ny. Pp 19,612-19,830 ML20154D4751988-05-16016 May 1988 Transcript of 880516 Hearing in Hauppauge,Ny Re Emergency Planning/School Bus Driver Issue.Pp 19,390-19,611.Supporting Documentation Encl.Witnesses:Dm Crocker,D Mileti,Mk Lindell, RB Kelly ML20154D9221988-05-12012 May 1988 Direct Testimony of Dt Hartgen,On Behalf of State of Ny Re Immateriality Issues.* Hartgen Resume & Certificate of Svc Encl.Related Correspondence ML20153H6721988-05-10010 May 1988 Transcript of 880510 Prehearing Conference in Bethesda,Md. Pp 19,323-19,389 ML20154B4621988-05-10010 May 1988 Lilco Supplemental Testimony on Remanded Issue of Role Conflict of School Bus Drivers.* Certificate of Svc Encl ML20154B7841988-05-0606 May 1988 Direct Testimony of Gc Minor & Sc Sholly on Behalf of Suffolk County Re Immateriality.* Certificate of Svc Encl. Related Correspondence ML20154B5421988-05-0606 May 1988 Testimony of DM Behr,Dm Crocker,Dp Dreikorn,Eb Lieberman & Ja Weismantle on Best Efforts Contentions EP 1-2,4-8 & 10.* Supporting Documentation & Certificate of Svc Encl.W/One Oversize Map.Related Correspondence ML20154C7511988-05-0404 May 1988 Transcript of 880504 Annual Briefing on State of Nuclear Industry in Rockville,Md.Pp 1-60. Introductory Remarks, State of Industry Rept & Status Rept on Util Research... Encl.Served on 880509 ML20151V9271988-04-28028 April 1988 Transcript of 880428 Hearing in Bethesda,Md Re Emergency Preparedness Exercise.Pp 1-94 ML20151Z0711988-04-28028 April 1988 Testimony of Jj Boursy.* Addresses Issue of Measured Signal Strength of Fm Radio Station Wplr,New Haven,Ct within EPZ for Plant.Related Correspondence ML20154B7061988-04-22022 April 1988 Deposition of D Axelrod.* Deposition Taken in Albany,Ny Re Emergency Planning ML20154H6621988-04-21021 April 1988 Deposition of Gc Minor.* Transcript of Gc Minor Deposition in Washington,Dc Re Emergency Planning.Supporting Documentation Encl.Related Correspondence ML20154H6311988-04-21021 April 1988 Deposition of Sc Sholly.* Transcript of Sc Sholly Deposition in Washington,Dc Re Emergency Planning.Supporting Documentation Encl.Related Correspondence ML20154B6861988-04-19019 April 1988 Deposition of Pg Halpin.* Deposition Taken in Happauge,Ny Re Emergency Planning/Best Efforts Issue ML20148T0191988-04-13013 April 1988 Testimony of DM Crocker,Rb Kelly,Mk Lindell & Ds Mileti on Remanded Issue of Role Conflict of School Bus Drivers.* Addl Info Re Bus Driver Issue During Emergency Evacuations Encl.W/Certificate of Svc.Related Correspondence ML20151N9191988-04-13013 April 1988 Direct Testimony of Dt Hartgen,On Behalf of State of Ny Re Hosp Evacuation Time Estimates.* Util Hosp Evacuation Time Estimates Not Reliable for Stated Reasons.Certificate of Svc Encl.Related Correspondence 1989-04-20
[Table view] Category:DEPOSITIONS
MONTHYEARML20245K9371989-04-20020 April 1989 Transcript of Commission 890420 Affirmation/Discussion & Vote in Rockville,Md.Pp 1-5 ML20247R4421989-04-20020 April 1989 Transcript of Commission 890420 Press Conference in Rockville,Md.Pp 1-10 ML20245G5661989-04-17017 April 1989 Transcript of 890417 Discussion of Plant Full Power OL in Rockville,Md.Pp 1-70.Supporting Documentation Encl ML20236E1021989-03-0303 March 1989 Transcript of Commission 890303 Affirmation,Discussion & Vote in Rockville,Md Re SECY-89-77, Shoreham Sanction Decision. Pp 1-5 ML20247R4321989-03-0303 March 1989 Transcript of Commission 890303 Press Conference in Rockville,Md Re Shoreham Proceedings.Pp 1-10 ML20235V6301989-03-0101 March 1989 Testimony of F Kantor,Em Podolak & Rt Hogan of NRC Staff on Scope of Exercise.* Purpose of Testimony Is to Rebut Testimony of Intervenors Re Contention 1 ML20235V3841989-03-0101 March 1989 Direct Testimony of Iw Husar & Jh Keller Concerning June 1988 Emergency Preparedness Exercise.* Certificate of Svc Encl.Related Correspondence ML20235N1221989-02-24024 February 1989 Rebuttal Testimony of Jr Asher,Dm Crocker,Rb Kelly,Jj Kozak & Cl Stovall on Contention 1 (Scope of Exercise).* Related Documentation Encl.Related Correspondence ML20235N1501989-02-24024 February 1989 Lilco Rebuttal Testimony on Contention 6 (Emergency Broadcast Sys Messages) & 7.E & F (Enc).* Attachments Encl. Related Correspondence ML20235N1641989-02-24024 February 1989 Lilco Rebuttal Testimony on Contention 18 (Communications Equipment & Reception Failures).* Related Correspondence ML20235Y5811989-02-21021 February 1989 Transcript of Commission Oral Argument on 890221 in Rockville,Md Re Sanction Issue in Shoreham Proceeding ML20247R4091988-12-31031 December 1988 Transcript of Commission 881221 Press Conference in Rockville,Md.Pp 1-31 ML20196F2881988-12-0606 December 1988 Transcript of 881206 Hearing in Bethesda,Md Re Plant. Pp 1-122 ML20154E4761988-09-14014 September 1988 Transcript of 880914 Hearing in Bethesda,Md Re Appeal of Initial Decision Concerning Emergency Exercise.Pp 1-91 ML20154E4631988-09-14014 September 1988 Transcript of 880914 Hearing in Bethesda,Md Re Util Reception Ctrs That Will Be Used in Event of Radiological Emergency.Pp 1-98 ML20151C3041988-07-19019 July 1988 Transcript of 880719 Hearing in Bethesda,Md Re Emergency Planning.Pp 21,830-22,074.Witnesses:F Jones,We Regan, R Shepherd & D Davidoff ML20151B3391988-07-14014 July 1988 Partial Transcript of 880714 Hearing in Bethesda,Md Re Emergency Planning.Pp 21,537-21,720.Witnesses:N Kelly & D Axelrod ML20151B3671988-07-14014 July 1988 Partial Transcript of 880714 Hearing in Bethesda,Md Re Emergency Planning.Pp 21,721-21,829.Witnesses:N Kelly, D Axelrod & Aj Geramo ML20150E0791988-07-11011 July 1988 Transcript of 880711 Hearing in Bethesda,Md Re Emergency Planning.Pp 20,944-21,174 ML20150F7781988-07-11011 July 1988 Transcript of 880711 Evening Session in Bethesda,Md Re Emergency Planning.Pp 21,175-21,290.Witnesses:JD Papile & DA Devito ML20196J4891988-06-29029 June 1988 Transcript of 880629 Conference in Bethesda,Md Re Remand/ Emergency Planning.Pp 20,929-20,943 ML20196A4261988-06-24024 June 1988 Transcript of 880624 Hearing in Bethesda,Md Re Remand/ Emergency Planning.Pp 20,894-20,928 ML20155K5671988-06-17017 June 1988 Transcript of 880617 Telcon Hearing in Bethesda,Md Re Emergency Planning/School Bus Driver Issue.Pp 20,863-20,893 ML20154D1181988-06-15015 June 1988 Transcript of FEMA 880615 Public Meeting in Patchougue,Ny Re Util.Pp 1-131 ML20155E1751988-06-10010 June 1988 Transcript of 880610 Telcon in Washington,Dc Re Remand/ Emergency Planning.Pp 20,845-20,862 ML20197E3231988-06-0303 June 1988 Transcript of 880603 Hearing in Hauppauge,Ny Re Emergency Planning/School Bus Driver Issue.Pp 20,686-20,844.Supporting Documentation Encl.Witness:D Hartgen ML20154R2881988-06-0202 June 1988 Transcript of 880602 Hearing in Happauge,Ny Re Emergency Planning.Pp 20,555-20,685.Supporting Documentation Encl ML20197E0401988-05-31031 May 1988 Corrections to Rebuttal Testimony of Eb Lieberman & Dp Dreikorn on Remanded Issue of Bases & Accuracy of Lilco Hosp Evacuation Time Estimates.* Certificate of Svc Encl ML20154M8571988-05-27027 May 1988 Transcript of 880527 Hearing in Hauppauge,Ny. Pp 20,440-20,554.Witness:T Urbanik ML20154M8511988-05-26026 May 1988 Transcript of 880526 Hearing Re Emergency Planning/School Bus Driver Issue in Hauppauge,Ny.Pp 20,245-20,439.Supporting Documentation Encl.Witnesses:Bg Brodsky,Ej Doherty, Hm Koenig,Ar Rossi,Rw Petrilak,Nf Muto,Jt Smith,Rn Suprina ML20197E1201988-05-26026 May 1988 Surrebuttal Testimony of Dt Haertgen on Behalf of State of Ny Re Hosp Evacuation Time Estimates.* Certificate of Svc Encl ML20197E1631988-05-24024 May 1988 Addendum to Direct Testimony of Bg Brodsky,Ej Doherty, Hm Koenig,Nf Muto,Rw Petrilak,Ar Rossi,Jt Smith & Rn Suprina on Behalf of Suffolk County Re Contention 25.C.* W/ Certificate of Svc.Related Correspondence ML20154F7741988-05-18018 May 1988 Transcript of 880518 Hearing in Hauppauge,Ny. Pp 19,831-19,998.Witnesses:D Mileti,Mk Lindell,Rb Kelly ML20154H7981988-05-18018 May 1988 Rebuttal Testimony of Eb Lieberman & Dp Dreikorn on Remanded Issue of Base & Accuracy of Lilco Hosp Evacution Time Estimates.Certificate of Svc Encl ML20154F7421988-05-17017 May 1988 Transcript of 880517 Hearing in Hauppauge,Ny. Pp 19,612-19,830 ML20154D4751988-05-16016 May 1988 Transcript of 880516 Hearing in Hauppauge,Ny Re Emergency Planning/School Bus Driver Issue.Pp 19,390-19,611.Supporting Documentation Encl.Witnesses:Dm Crocker,D Mileti,Mk Lindell, RB Kelly ML20154D9221988-05-12012 May 1988 Direct Testimony of Dt Hartgen,On Behalf of State of Ny Re Immateriality Issues.* Hartgen Resume & Certificate of Svc Encl.Related Correspondence ML20153H6721988-05-10010 May 1988 Transcript of 880510 Prehearing Conference in Bethesda,Md. Pp 19,323-19,389 ML20154B4621988-05-10010 May 1988 Lilco Supplemental Testimony on Remanded Issue of Role Conflict of School Bus Drivers.* Certificate of Svc Encl ML20154B7841988-05-0606 May 1988 Direct Testimony of Gc Minor & Sc Sholly on Behalf of Suffolk County Re Immateriality.* Certificate of Svc Encl. Related Correspondence ML20154B5421988-05-0606 May 1988 Testimony of DM Behr,Dm Crocker,Dp Dreikorn,Eb Lieberman & Ja Weismantle on Best Efforts Contentions EP 1-2,4-8 & 10.* Supporting Documentation & Certificate of Svc Encl.W/One Oversize Map.Related Correspondence ML20154C7511988-05-0404 May 1988 Transcript of 880504 Annual Briefing on State of Nuclear Industry in Rockville,Md.Pp 1-60. Introductory Remarks, State of Industry Rept & Status Rept on Util Research... Encl.Served on 880509 ML20151V9271988-04-28028 April 1988 Transcript of 880428 Hearing in Bethesda,Md Re Emergency Preparedness Exercise.Pp 1-94 ML20151Z0711988-04-28028 April 1988 Testimony of Jj Boursy.* Addresses Issue of Measured Signal Strength of Fm Radio Station Wplr,New Haven,Ct within EPZ for Plant.Related Correspondence ML20154B7061988-04-22022 April 1988 Deposition of D Axelrod.* Deposition Taken in Albany,Ny Re Emergency Planning ML20154H6621988-04-21021 April 1988 Deposition of Gc Minor.* Transcript of Gc Minor Deposition in Washington,Dc Re Emergency Planning.Supporting Documentation Encl.Related Correspondence ML20154H6311988-04-21021 April 1988 Deposition of Sc Sholly.* Transcript of Sc Sholly Deposition in Washington,Dc Re Emergency Planning.Supporting Documentation Encl.Related Correspondence ML20154B6861988-04-19019 April 1988 Deposition of Pg Halpin.* Deposition Taken in Happauge,Ny Re Emergency Planning/Best Efforts Issue ML20148T0191988-04-13013 April 1988 Testimony of DM Crocker,Rb Kelly,Mk Lindell & Ds Mileti on Remanded Issue of Role Conflict of School Bus Drivers.* Addl Info Re Bus Driver Issue During Emergency Evacuations Encl.W/Certificate of Svc.Related Correspondence ML20151N9191988-04-13013 April 1988 Direct Testimony of Dt Hartgen,On Behalf of State of Ny Re Hosp Evacuation Time Estimates.* Util Hosp Evacuation Time Estimates Not Reliable for Stated Reasons.Certificate of Svc Encl.Related Correspondence 1989-04-20
[Table view] Category:NARRATIVE TESTIMONY
MONTHYEARML20245K9371989-04-20020 April 1989 Transcript of Commission 890420 Affirmation/Discussion & Vote in Rockville,Md.Pp 1-5 ML20247R4421989-04-20020 April 1989 Transcript of Commission 890420 Press Conference in Rockville,Md.Pp 1-10 ML20245G5661989-04-17017 April 1989 Transcript of 890417 Discussion of Plant Full Power OL in Rockville,Md.Pp 1-70.Supporting Documentation Encl ML20236E1021989-03-0303 March 1989 Transcript of Commission 890303 Affirmation,Discussion & Vote in Rockville,Md Re SECY-89-77, Shoreham Sanction Decision. Pp 1-5 ML20247R4321989-03-0303 March 1989 Transcript of Commission 890303 Press Conference in Rockville,Md Re Shoreham Proceedings.Pp 1-10 ML20235V6301989-03-0101 March 1989 Testimony of F Kantor,Em Podolak & Rt Hogan of NRC Staff on Scope of Exercise.* Purpose of Testimony Is to Rebut Testimony of Intervenors Re Contention 1 ML20235V3841989-03-0101 March 1989 Direct Testimony of Iw Husar & Jh Keller Concerning June 1988 Emergency Preparedness Exercise.* Certificate of Svc Encl.Related Correspondence ML20235N1221989-02-24024 February 1989 Rebuttal Testimony of Jr Asher,Dm Crocker,Rb Kelly,Jj Kozak & Cl Stovall on Contention 1 (Scope of Exercise).* Related Documentation Encl.Related Correspondence ML20235N1501989-02-24024 February 1989 Lilco Rebuttal Testimony on Contention 6 (Emergency Broadcast Sys Messages) & 7.E & F (Enc).* Attachments Encl. Related Correspondence ML20235N1641989-02-24024 February 1989 Lilco Rebuttal Testimony on Contention 18 (Communications Equipment & Reception Failures).* Related Correspondence ML20235Y5811989-02-21021 February 1989 Transcript of Commission Oral Argument on 890221 in Rockville,Md Re Sanction Issue in Shoreham Proceeding ML20247R4091988-12-31031 December 1988 Transcript of Commission 881221 Press Conference in Rockville,Md.Pp 1-31 ML20196F2881988-12-0606 December 1988 Transcript of 881206 Hearing in Bethesda,Md Re Plant. Pp 1-122 ML20154E4761988-09-14014 September 1988 Transcript of 880914 Hearing in Bethesda,Md Re Appeal of Initial Decision Concerning Emergency Exercise.Pp 1-91 ML20154E4631988-09-14014 September 1988 Transcript of 880914 Hearing in Bethesda,Md Re Util Reception Ctrs That Will Be Used in Event of Radiological Emergency.Pp 1-98 ML20151C3041988-07-19019 July 1988 Transcript of 880719 Hearing in Bethesda,Md Re Emergency Planning.Pp 21,830-22,074.Witnesses:F Jones,We Regan, R Shepherd & D Davidoff ML20151B3391988-07-14014 July 1988 Partial Transcript of 880714 Hearing in Bethesda,Md Re Emergency Planning.Pp 21,537-21,720.Witnesses:N Kelly & D Axelrod ML20151B3671988-07-14014 July 1988 Partial Transcript of 880714 Hearing in Bethesda,Md Re Emergency Planning.Pp 21,721-21,829.Witnesses:N Kelly, D Axelrod & Aj Geramo ML20150E0791988-07-11011 July 1988 Transcript of 880711 Hearing in Bethesda,Md Re Emergency Planning.Pp 20,944-21,174 ML20150F7781988-07-11011 July 1988 Transcript of 880711 Evening Session in Bethesda,Md Re Emergency Planning.Pp 21,175-21,290.Witnesses:JD Papile & DA Devito ML20196J4891988-06-29029 June 1988 Transcript of 880629 Conference in Bethesda,Md Re Remand/ Emergency Planning.Pp 20,929-20,943 ML20196A4261988-06-24024 June 1988 Transcript of 880624 Hearing in Bethesda,Md Re Remand/ Emergency Planning.Pp 20,894-20,928 ML20155K5671988-06-17017 June 1988 Transcript of 880617 Telcon Hearing in Bethesda,Md Re Emergency Planning/School Bus Driver Issue.Pp 20,863-20,893 ML20154D1181988-06-15015 June 1988 Transcript of FEMA 880615 Public Meeting in Patchougue,Ny Re Util.Pp 1-131 ML20155E1751988-06-10010 June 1988 Transcript of 880610 Telcon in Washington,Dc Re Remand/ Emergency Planning.Pp 20,845-20,862 ML20197E3231988-06-0303 June 1988 Transcript of 880603 Hearing in Hauppauge,Ny Re Emergency Planning/School Bus Driver Issue.Pp 20,686-20,844.Supporting Documentation Encl.Witness:D Hartgen ML20154R2881988-06-0202 June 1988 Transcript of 880602 Hearing in Happauge,Ny Re Emergency Planning.Pp 20,555-20,685.Supporting Documentation Encl ML20197E0401988-05-31031 May 1988 Corrections to Rebuttal Testimony of Eb Lieberman & Dp Dreikorn on Remanded Issue of Bases & Accuracy of Lilco Hosp Evacuation Time Estimates.* Certificate of Svc Encl ML20154M8571988-05-27027 May 1988 Transcript of 880527 Hearing in Hauppauge,Ny. Pp 20,440-20,554.Witness:T Urbanik ML20154M8511988-05-26026 May 1988 Transcript of 880526 Hearing Re Emergency Planning/School Bus Driver Issue in Hauppauge,Ny.Pp 20,245-20,439.Supporting Documentation Encl.Witnesses:Bg Brodsky,Ej Doherty, Hm Koenig,Ar Rossi,Rw Petrilak,Nf Muto,Jt Smith,Rn Suprina ML20197E1201988-05-26026 May 1988 Surrebuttal Testimony of Dt Haertgen on Behalf of State of Ny Re Hosp Evacuation Time Estimates.* Certificate of Svc Encl ML20197E1631988-05-24024 May 1988 Addendum to Direct Testimony of Bg Brodsky,Ej Doherty, Hm Koenig,Nf Muto,Rw Petrilak,Ar Rossi,Jt Smith & Rn Suprina on Behalf of Suffolk County Re Contention 25.C.* W/ Certificate of Svc.Related Correspondence ML20154F7741988-05-18018 May 1988 Transcript of 880518 Hearing in Hauppauge,Ny. Pp 19,831-19,998.Witnesses:D Mileti,Mk Lindell,Rb Kelly ML20154H7981988-05-18018 May 1988 Rebuttal Testimony of Eb Lieberman & Dp Dreikorn on Remanded Issue of Base & Accuracy of Lilco Hosp Evacution Time Estimates.Certificate of Svc Encl ML20154F7421988-05-17017 May 1988 Transcript of 880517 Hearing in Hauppauge,Ny. Pp 19,612-19,830 ML20154D4751988-05-16016 May 1988 Transcript of 880516 Hearing in Hauppauge,Ny Re Emergency Planning/School Bus Driver Issue.Pp 19,390-19,611.Supporting Documentation Encl.Witnesses:Dm Crocker,D Mileti,Mk Lindell, RB Kelly ML20154D9221988-05-12012 May 1988 Direct Testimony of Dt Hartgen,On Behalf of State of Ny Re Immateriality Issues.* Hartgen Resume & Certificate of Svc Encl.Related Correspondence ML20153H6721988-05-10010 May 1988 Transcript of 880510 Prehearing Conference in Bethesda,Md. Pp 19,323-19,389 ML20154B4621988-05-10010 May 1988 Lilco Supplemental Testimony on Remanded Issue of Role Conflict of School Bus Drivers.* Certificate of Svc Encl ML20154B7841988-05-0606 May 1988 Direct Testimony of Gc Minor & Sc Sholly on Behalf of Suffolk County Re Immateriality.* Certificate of Svc Encl. Related Correspondence ML20154B5421988-05-0606 May 1988 Testimony of DM Behr,Dm Crocker,Dp Dreikorn,Eb Lieberman & Ja Weismantle on Best Efforts Contentions EP 1-2,4-8 & 10.* Supporting Documentation & Certificate of Svc Encl.W/One Oversize Map.Related Correspondence ML20154C7511988-05-0404 May 1988 Transcript of 880504 Annual Briefing on State of Nuclear Industry in Rockville,Md.Pp 1-60. Introductory Remarks, State of Industry Rept & Status Rept on Util Research... Encl.Served on 880509 ML20151V9271988-04-28028 April 1988 Transcript of 880428 Hearing in Bethesda,Md Re Emergency Preparedness Exercise.Pp 1-94 ML20151Z0711988-04-28028 April 1988 Testimony of Jj Boursy.* Addresses Issue of Measured Signal Strength of Fm Radio Station Wplr,New Haven,Ct within EPZ for Plant.Related Correspondence ML20154B7061988-04-22022 April 1988 Deposition of D Axelrod.* Deposition Taken in Albany,Ny Re Emergency Planning ML20154H6621988-04-21021 April 1988 Deposition of Gc Minor.* Transcript of Gc Minor Deposition in Washington,Dc Re Emergency Planning.Supporting Documentation Encl.Related Correspondence ML20154H6311988-04-21021 April 1988 Deposition of Sc Sholly.* Transcript of Sc Sholly Deposition in Washington,Dc Re Emergency Planning.Supporting Documentation Encl.Related Correspondence ML20154B6861988-04-19019 April 1988 Deposition of Pg Halpin.* Deposition Taken in Happauge,Ny Re Emergency Planning/Best Efforts Issue ML20148T0191988-04-13013 April 1988 Testimony of DM Crocker,Rb Kelly,Mk Lindell & Ds Mileti on Remanded Issue of Role Conflict of School Bus Drivers.* Addl Info Re Bus Driver Issue During Emergency Evacuations Encl.W/Certificate of Svc.Related Correspondence ML20151N9191988-04-13013 April 1988 Direct Testimony of Dt Hartgen,On Behalf of State of Ny Re Hosp Evacuation Time Estimates.* Util Hosp Evacuation Time Estimates Not Reliable for Stated Reasons.Certificate of Svc Encl.Related Correspondence 1989-04-20
[Table view] |
Text
_ _ _ . _
LILCO, March 21, 1984
,.e "C g' o c(
D2thETEq UNITED STATES OF AMERICA U P;c -
NUCLEAR REGULATORY COMMISSION
'84 jn'n n2
< P2 :45 Before the Atomic Safety and Licensing Board In the Matter of ) .
) -
LONG ISLAND LIGHTING COMPANY ) Docket No. 50-322-OL-3
) (Emergency Planning Proceeding)
(Shoreham Nuclear Power Station, ) '
Unit 1 )
+
LILCO'S TESTIMONY ON CONTENTION 85 (RECOVERY AND REENTRY)
Hunton & Williams 707 East Main Street Post Office Box 1535 Richmond, Virginia 23212 (804) 788-8200
,,;r 8403230073 840321 PDR ADOCK 05000322 PDR T
9
LILCO M rch 21, 1984
. f 'g c,#ef$" ,f'iED UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION '84 ffjp y v .,
BeforetheAtomicSafetyandLicensingBoaY:dg, g ,
BRM;,[~ ~
In the Matter of )
)
LONG ISLAND LIGHTING COMPANY ) Docket No. 50-322-OL-3
) (Emergency Planning (Shoreham Nuclear Power ) Proceeding)
Station, Unit 1) )
LILCO'S TESTIMONY ON CONTENTION 85 (RECOVERY AND REENTRY)
PURPOSE Contention 85 alleges that LILCO's Emergency Plan does not include general plans for recovery and reentry. This allegation is simply,not accurate. LILCO's Emergency Plan, at OPIP 3.10.1, delineates specific standards and procedures for implementing recovery and reentry operations. Indeed, OPIP 3.10.1 anticipates a number of different emergency situations and sets forth specific recovery and reentry procedures for each such situation.
Attachments Attachment 1 OPIP 3.10.1 1
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of )
)
LONG ISLAND LIGHTING COMPANY ) Docket No. 50-322-OL-3
) (Emergency Planning (Shoreham Nuclear Power ) Proceeding)
Station, Unit 1) )
LILCO'S TESTIMONY ON CONTENTION 85 (RECOVERY AND REENTRY)
TESTIMONY
- 1. Q: Please state your name and business address.
A: [Cordaro) My name is Matthew C. Cordaro. My business address is Long Island Lighting Company, 175 Old Country Road, Hicksville, New York 11801.
4
[Daverio] My name is Charles A. Daverio. My business address is Long Island Lighting Company, 175 Old Country Road, Hicksville, New York 11801.
[Miele) My name is Michael L. Miele. My business address is Long Island Lighting Company, Shoreham Nuclear Power Station, Post Office Box 628, Wading River, New York 11792.
[ Watts] My name is Richard J. Watts. My business address is Impell Corporation, 225 Broad Hollow Road, Melville, New York 11747.
- 2. Q: Please state your professional qualifications.
A: [Cordaro) I am Vice President, Engineering for LILCO. My professional qualifications are being oftered into evidence as part of the document entitled " Professional Qualifications of LILCO Witnesses." I am participating on this panel to provide the LILCO management perspective on Emergency Planning, and to answer any questions pertinent to management. My role in emergency planning for Shoreham is to ensure that the needs and requirements of emergency planning are being met, and that the technical direction and content of emergency planning are being conveyed to corporate management.
[Daverio) I am LILCO'S Supervisor of Emergency Planning and Regulatory Services. I am also Assistant Manager of LILCO'S Local Emergency Respo'nse Implementing Organization (LERIO). My professional qualifications are being offered into evidence as part of the document entitled " Professional Qualifications of LILCO Witnesses." As Supervisor of Emergency Planning and Assistant Manager of LERIO, I am responsible for implementing LILCO's Local Emergency Response Plan. As such, I am familiar with the issues surrounding this contention.
[Miele] I am employed by LILCO as the Radiation Protection Section Supervisor in the Nuclear Engineering Department. My professional qualifications are being separately offered into evidence as part of the document entitled
" Professional Qualifications of LILCO Witnesses." I am responsible for the overall management and technical direction of all onsite and offsite aspects of radiological protection for the Shoreham Nuclear Power Station. As such, I am familiar with the issues surrounding this contention.
[ Watts] I am the Health Physics Supervisor for the Radiological Services Section-Northeast Region of Impell Corporation. My professional qualifications are being offered into evidence as part of the document entitled " Professional Qualifications of LILCO Witnesses." I have been retained by LILCO to serve as one of the Radiation Health Coordinators for the Local Emergency Response Organization (LERO) and have participated in LERO drills in this capacity.
As such, I am familiar with the issues surrounding this contention.
l
- 3. Q: Would you please summarize the issues raised by SC Contention 85?
A: In essence, Suffolk County Contention 85 maintains that LILCO'S Emergency Plan does not include a general plan for recovery and reentry into evacuated areas after a radiological emergency. Specifically, the Contention raises concerns that:
Contention 84-91: Recovery and Reentry Preamble to Contentions 84-91. The LILCO Plan proposes that short-term and long-term recovery and reentry operations will be performed by LILCO personnel following a radiological emergency at Shoreham (Plan, at 3.10-1 and 3.10-2; OPIP 3.10.1). For the reasons specified in Contentions 84-91, Intervenors contend that contrary to the emergency planning standards of 10 CFR Section 50.47(b)(13) and NUREG 0654,Section II.M, the LILCO Plan fails to include ge,neral plans for recovery and reentry, including the development of necessary procedures and methods that are capable of being implemented.
Contention 85 (Recovery / Reentry).
The LILCO Plan at 3.10-1 states that after site conditions are controlled, the Director of Local Response will appoint a Recovery Action Committee which "will plan and implement actions for the restoration of the affected areas to their pre-emergency conditions." (Id.) The LILCO Plan thus provides merely that planning for recovery and reentry will commence after the appointment of the Recovery Action Committee; at this time, no such plan exists. This is contrary to the requirement of 10 CFR Section 50.47(b)(13) that "[g]eneral plans for recovery and reentry are developed," (emphasis added),
and NUREG 0654 Section II.M. '
\
- 4. Q: Would you briefly describe the scope of this testimony?
A: This testimony will address Contention 85 in its entirety.
- 5. Q: Where do the concerns expressed in Contention 85 fit into the overall concept of emergency planning?
A: Contention 85 raises concerns about the existence of any general plan or procedures for recovery and reentry into evacuated areas after a radiological emergency. Emergency planning for Shoreham, as for all commercial nuclear power plants, is structured against a background of technical / regulatory documents issued by the Nuclear Regulatory Commission (NRC) and other agencies, including the Environmental Protection Agency and the Federal Emergency Management Agency. Of these, the most directly relevant are NUREG-0654/EEMA-REP-1(Rev.1), Criteria For Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants (November 1980) and NUREG-0396/ EPA-529/1-78-Ol6, Planning Basis for the Development of State and Local Government Radiological Emergency Response Plans in Support of Light Water Nuclear Power Plants (December 1978), as well as the NRC's regulations, 10 CFR 5 10.47 and
Part 50 Appendix E. While these documents form a backdrop, this and other testimony will address them only to the extent they bear on issues in contention here.
Similarly, this and other testimony will not attempt to summarize, in any once place, the contents of LILCO's entire Local Offsite Radiological Emergency Response Plan for Shoreham, but simply to make use of those portions which are particularly relevant to those issues actually in contention. With respect to general plans for recovery and reentry, the principal relevant portion of LILCO's Emergency Plan is Offsite Emergency Planning Implementing Procedure (OPIP) 3.10.1 (Recovery / Reentry), which is appended to this testimony as Attachment 1.
- 6. Q: Does LILCO's Emergency Plan include a general plan for recovery and reentry?
A: Yes. Contrary to the allegations of Contention 85, LILCO's Plan, at OPIP 3.10.1, sets forth detailed procedures for initiating recovery operations and facilitating reentry of the public into previously .
evacuated areas. .
- 7. Q: Would you describe LILCO's plan and procedures for recovery and reentry?
A: In the first place, Section 5.1 of OPIP 3.10.1 establishes a Recovery Action Committee. The function of this Committee is twofold: (i) to assist the Director of Local Response in making recovery / reentry decisions; and (ii) to facilitate reentry upon authorization by the Director of Local Response. The chairman of the Recovery Action Committee is the Manager of Local Response. Other members of the Committee include the Health Services
, Coordinator, Evacuation Coordinator, Support Services Coordinator, Coordinator of Public Information and Radiation Health Coordinator. Representatives of the Federal Emergency Management Agency, Department of Energy, and New York State and County governments also will be invited to participate in the Committee's deliberations.
As stated in OPIPs 3.10.1 and 3.6.6, the Radiation Health Coordinator has the overall responsibility of coordinating environmental surveillance and ingestion pathway monitoring activities in the event of a radiological emergency. Specifically, the Radiation Health Coordinator is responsible for air monitoring
l as well as the sampling and analysis of water, milk, foodstuffs, animal fodder and forage, grass, soil and other ground depositions, to determine the nature and extent of any radioactive contamination. On the basis of these data, the Recovery Action Committee will take appropriate recovery and reentry actions in accordance with OPIP 3.10.1.
Section 5.4 of OPIP 3.10.1 sets forth specific reentry procedures for three general classes of emergency situations, depending on the existence and amount of radioactive surface contamination. First, if the radiological emergency does not involve a radiological release, LERO will determine that all utilities are properly functioning in the evacuated area; inform the public, via EBS bulletin, that it is appropriate to reenter the area; and provide public transportation for those who required it during the evacuation.
Second, if the emergency involves a radiological release which results in no offsite surface contamination or in a level of contamination that is deemed acceptable under Attachment 1 of OPIP 3.10.1, LERO will advise the public that it is appropriate to l
reenter the previously evacuated area only after it has determined that offsite contamination levels are acceptable, that all utilities are properly functioning, and that transportation is available for evacuees who required it during the evacuation. In addition, LERO will continue to conduct environmental surveillance activities and monitor the level of radioactive contamination, if any, in the affected area. Moreover, if necessary, LERO will arrange for the provision of emergency food supplies to evacuees, in cooperation with the American Red Cross and the United States Department of Agriculture.
Finally, Section 5.4.3 of OPIP 3.10.1 embodies specific recovery and reentry procedures where the radiological release has resulted, at any offsite location, in an unacceptably high level of radioactive surface contamination based on Attachment
- 1. In such circumstances, LERO initially will undertake to define the area that has been subjected to radioactive contamination. The public then will be instructed, both via EBS bulletin and by LERO personnel stationed at the perimeter of the contaminated area, not to reenter that area. LERO will continue to survey the affected area and proceed
_g-
m l
C with appropriate protective measures. In addition, LERO will continue to sample and analyze milk, water and foodstuffs in the affected area. On the basis of 9
these analyses, the Radiation Health Coordinator will determine the need, if any, to dispose of contaminated milk and foodstuffs and to arrange for
, alternative food and water supplies. Once it has been determined that the level of surface contamination in the area no longer exceeds that deemed acceptable under Attachment 1 and that ~f uncontaminated food and water supplies are available, the public will be advised that it is appropriate to reenter the area.
Moreover, it should be noted that Section 5.5 of OPIP 3.10.1 also contains specific procedures for temporary reentry into an evacuated area. Temporary reentry may be necessary to attend to matters of some urgency, such as firefighting or livestock feeding.
In such circumstances, the Health Services Coordinator will decide whether to permit an individual to reenter an evacuated area based on the latest radiological surveys, the circumstances involved, and a cost / benefit analysis.
- c
If temporary reentry is permitted, the reentering person or persons will be escorted by an individual equipped with radiological monitoring equipment. The reentering group will be instructed not to deviate from the prescribed destination or the allotted time.
Moreover, upon exiting the area, these individuals will report for a contamination survey at the Brentwood Emergency Worker Decontamination Facility.
- 8. Q: How does LILCO's Emergency Plan compare with the New York State Radiological Emergency Preparedness Plan with respect to recovery and reentry provisions?
A: The general provisions governing recovery and reentry in the New York State Radiological Emergency Preparedness Plan (the New York Plan) are essentially the same as those of LILCO's Plan in many salient respects, and not in conflict with it, to the extent of our knowledge, in any. For example, like OPIP
, 3.10.1 of the LILCO Plan,Section IV of Part I of the New York Plan (Rev. 11/83) calls for the establishment of a Recovery Committee (the Committee) which will be responsible for undertaking recovery and reentry operations. Furthermore, as provided in p the LILCO Plan, the Committee will determine the c'.'"is of decontamination activities, operability of us .ity services, availability of suitable food and
.I water supplies, and availability of public transportation before terminating any protective actions. Further, as in the case of the LILCO Plan, the New York State Plan calls for continued environmental surveillance and ingestion pathway monitoring after recovery and reentry operations have commenced. In addition, like the LILCO Plan, the New York Plan, at page IV-2 of Part I, provides for temporary reentry into evacuated areas "if the situation warrants," as in the case of a " farmer who must tend to his livestock." Both plans moreover require that parties who reenter affected areas on a temporary. basis be equipped with dosimetry equipment.
In short, the provisions for recovery and reentry in LILCO's Emergency Plan are comparable to those in the New York State Plan.
ATTACHMENT 1 h
(
e a
h
ATTACHMENT 1 EPC OPIP 3.10.1 Page 1 of 8 Approved:
Iffective Date
+0 PIP 3.10.1 RECOVERY / REENTRY 1.0 PURPOSE This procedure provides (1) decision-making guidance for the initiation of recovery operations and the implementation of evacuee re-entry into evacuated areas and (2) guidance for the formation and operation of the Recovery Action Committee.
2.0 RESPONSIBILITY 2.1 The Director of Local Response is responsible for initiating the recovery /re-entry operation.
2.2 The Manager of Local Response is res7onsible for implementing this procedure and is the Chairman of the Recovery Action Committee.
3.0 PRECAUTIONS Special situations requiring temporary re-entry require implementation of Section 5.5.
4.0 PREREQUISITES The prerequisites for the formation of the Recovery Action Committee are:
4.1 An evacuation has been implemented for part or all of the 10-mile EPZ.
4.2 Conditions at the SNPS site have been declared stable and safe by the SNPS Response Manager /Emergen:y Director.
4.3 No further releases of radioactivity having offsite con-sequences are expected, as determined by the SNPS Response Manager / Emergency Director.
4.4 Radiological conditions in the evacuated area have been determined by the Radiation Health Coordinator to be stabilized.
Rev. 3
l OPIP 3.10.1 Page 2 of a 5.0 ACTIONS 5.1 Recovery Action Committee The Director of Local Response directs the formation of the Recovery Action Committee. This committee is convened prior to recovery /re-entry to gather information to assist decision making regarding recoven/re-entry and to imple-ment re-entry upon authorization by the Director of Local Response.
5.1.1 Composition of the Committee The Director of Local Response will ensure that the Recovery Action Committee is staffed by the following LERO members:
- a. Manager of Local Response - Chairman
- b. Health Services Coordinator
- c. Evacuation Coordinator
- d. Support Services Coordinator
- e. Coordinator of Public Information
- f. Radiation Health Coordinator
- g. Others, see Section 5.1.2 5.1.2 Additional committee members may participate if available. They are:
- a. FEMA Representative
- b. DOE Representative
- c. State Representative
- d. County Representative 5.2 Tasks and assigned responsibilities of the Recovery Action Committee members are as follows:
Task Responsible Individual
- a. Administration Manager of Local Response
- b. Air Monitoring Radiation Health Coordinator
- c. Ingestion Pathway Radiation Health Coordinator Sampling
- d. Environmental Media Radiation Health Coordinator Survey ,
- e. Laboratory Analyses Radiation Health Coordinator
- f. Re-entry Area Radiation Health Coordinator Identification
- g. Public Dose Commitment Radiation Health Coordinator Rev. 3
OPIP 3.10.1 Page 3 of ;
Task Responsible . Individual ,
- h. Environmental Health Services Coordinator Decontamination
- i. Transportation Evacuation Coordinator
- j. Traffic Control Evacuation Coordinator
- k. Communications Manager of Local Response
- 1. Security Support Services Coordinator
- m. Public Information Coordinator of Public Information 5.2.1 The Recovery Action Committee will perform the actions identified in Sections 5.3, 5.4, and 5.5 of this procedure.
5.3 Initial Recovery /Re-Entry Actions 5.3.1 The Radiation Health Coordinator will:
- a. Direct that surveys of the offected area b2 initiated. These surveys will include the i following as appropriate:
- 1. Air Monitoring
- 2. Ingestion Pathway Sampling - Surface water (including lakes, ponds, and sumps), potable water, milk, crops (vegetables, fruit), forage, fin fish, shell fish
- 3. Environmental Survey - Ground, equipment, structures, vehicles
- c. Compare the results of the surveys with the guidance contained in Attachment 1 (for re-entry) and Attachment 1 of OPIP 3.6.6 (for ingestion considerations).
- d. Advise the Manager of Local Response as to the results of the surveys and the indicated actions.
5.3.2 The Manager of Local Response will convene the Recovery Action Committee to discuss the status of tasks enumerated in Section 5.2 in preparation for re-entry.
Rev. 3
OPIP 3.10.1 Page 3a of 8 5.3.3 The Manager of Local Response will indicate to the Director of Local Response when all facets of the re-entry operation are determined to be ready.
5.3.4 The Director of Local Response will authorize the initiation of the re-entry operation.
5.3.5 The Support Services Coordinator advises the American Red Cross to begin deactivation of the relocation centers.
5.3.6 All Recovery Action Committee coordinators notify the members of the response organization that re-entry operations are initiated.
5.3.7 All Recovery Action Committee coordinators notify the members of the response organization that re-entry operations are initiated.
5.3.8 Either the Radiation Health Coordinator or the U.S. Environmental Protection Agency Office of Radiation Programs in accordance with their FRMAP assessment functions estimates total population exposure.
5.4 Re-Entry - Permanent (Note: Re-Entry / Temporary is detailed in Section 5.5)
The Recovery Action Committee gives consideration to the number of people that have been evacuated, the transpor-tation needs (including special), and the logistics at the relocation centers. Re-entry actions may vary depending upon the specific emergency condit.ons.
Following are the three major re-entry scenarios:
5.4.1 The radiological emergency involved an evacuation but did not involve a radiological release. The Manager of Local Response will direct the appro-priate Recovery Action Committee members to ini-tiate these tasks:
- a. Determine that all utilitias are functioning in the evacuated area.
- b. Provide transportation for those who required it during evacuation.
- c. Inform the public of LERO recommendations to re-enter the evacuated areas.
Rev. 3 i
OPIP 3.10.1 Page 4 of 8 j 5.4.2 The radiological emergency involved an evacuation and a radiological release; however, no contamin-
. ation is identified or the level isThe less than Manager of that described in Attachment 1.
Local Response directs the appropriate coordina-tors to initiste these tasks:
- a. Determine that all utilities are functioning in the evacuated area.
- b. Provide transportation for those who required it during evacuation.
- c. Inform the public of LERO recommendations to re-enter the evacuated areas.
- d. Place TLDs in predetermined, strategic locations throughout the evacuated area consistent with the locations utilized by SNPS as described in EPIP 2-6 and 2-15.
Determine exposure of these units as frequently as the results require.
- e. Depending on the_ elapsed time that the evacuees had been absent, emergency food provisions may be supplied in cooperation with the American Red Cross mobile feeding facilities and the U.S. Department of Agriculture (USDA).
5.4.3 The radiological emergency involved evacuation and a radiological release where the evacuated area or a portion of it is determined to be contaminated beyond the levels stated in Attach-ment 1. The Manager of Local Response ensures that the following tasks are performed:
- a. Continue radiological surveys (per Section 5.3) and plot the data on a map so that those portions of the evacuated area that are contaminated are accurately defined. These areas are not recommended for re-entry.
- b. Around those contaminated areas (as defined
- in the preceding paragraph), create a buffer zone with readily recognized physical boundaries and place personnel so that the returning population will be advised of the Rev. 3,,
I i
t l
I OPIP 3.10.1 Page 4 a nf F possible exposure. EBS messages will also advise the public of the physical boundaries
_ of these areas.
- c. Survey the contaminated area (s) as much as poscible with consideration of the degree of contemination and the safety of the Radio-logical Assessment Teams to determine the means of decontamination or other disposition.
The decision with regard to this area (s) is made by the Director of Local Response.
- d. Wastes from decontamination operations are collected and safely transported from the affected areas.
- e. Based on the results of laboratory analyses of food samples taken from the affected area, the Radiation Health Coordinator makes a comprehensive evaluation of the possible need to transport drinking water or food stuffs into that area.
- f. For areas not contaminated, proceed as described in Sections 5.4.2a-e.
5.4.4 ,The Recovery Action Committee will meet periodi-cally, as required by existing conditions, until the evacuated area is returned to normal. The committee will consider problems such as addi-tional arens to be re-entered, the situation of evacueen not yet permitted re-entry, and the mitigation of offsita radiological consequences.
-5 . 5 Re-Entry - Temporary '
There are situations wh'erein the evacuated zone must be re-entered Mur , civilians either during the radiological
- emergency cv after it--when the area has not been radio-i logically cleared for re-entry. Such situations may -
include the need to turn off/on utilities, attend to livestock, fight a fire, or other matters of a pressing nature. In these instances, the individual (s) seeking
_tcuporary reten'try contact (s) the Health Services Coor-
- e
- dinator at the Local Emergency Response Organization at j the Emergency Operations Center in Brentwood.
'x a i
Rev. 3 s'
OPIP 3.10.1 -
s Page 5 of 8 j Use the following procedure for these situations-5.5.1 The Health Services Coordinator considers the
=
request to re-enter the evacuated area and makes .
his decision based on the latest radiological surveys, the circumstances involved, and the cost-benefit analysis provided by the NRC in 10 -
CFR Part 50, Appendix I, Section IID.
CAUTION PERMISSION IS TO BE AUTHORIZED ONLY FOR A SPECIFIC DESTINATION AND TIME PERIOD.
5.5.2 The individual will be directed to report to a' staging area near the destination. The staging ~-
area will be advised of the special re-entry permission.
5.5.3 The re-entering individual is assigned an escort with a vehicle to provide transportation and radiological monitoring capability.
5.5.4 The re-entering person is assigned personnel dosimetry, if necessary.
5.5.5 The group may not deviate from the designated 4 T
destination nor the allotted time.
5.5.6 Upon exit, the individuals report to the Brentwood AP Emergency Worker Decontamination facility to be checked.
5.6 The Director of Local Response may halt or reverse the recovery /re-entry operation when a change of conditions warrants such actions. ,
6.0 REFERENCES
6.1 U.S. Nuclear Regulatory Commission, Regulatory Guide 1.86, " Termination of Operating Licenses for Nuclear Reactors," June 1974. ,
Rev. 3
OPIP 3.10.1 PageSe of 6 6.2 Code of Federal Regulations, Title 10, Part 50, Appendix I.
6.3 OPIP 2.1.1, Organizatior. Implementation s
9 4
L b .
I e -
3
/
a Rev. 3 3 i
i
. , I
l OPIP 3.10.1 Page 6 of 8 5.4 OPIP 3.5.1, Downwind Surveying 6.5 OPIP 3.6.6, Ingestion Pathway Protective Actions 7.0 ATTACRMENTS
- 1. Acceptable Surface Contamination Levels Rev. 2 10/14/83
OPIP 3.10.1 Page 7 of 8 Attachment 1 Page 1 of 2 ACCEPTABLE SURFACE CONTAMINATION LEVELS Average (2)(3) Maximum (2)(4) Removable (2)(5)
Nuclide (1) 2 2 2 100 cm 100 cm 100 cm U-nat, U-235 5,000 dpm (6) 15,000 dpm 1,000 dpm U-238, and alpha alpha alpha associated decay products Transuranics 100 dpm 300 dpm 20 dpm RA-226, Ra-228, Th-230, Th-228, Pa-231, Ac-227, I-125, 1-129 Th-nat, Th-232 1,000 dpm 3,000 dpm 200 dpm Sr-90 Ra-22d,Ra-223 U-232, I-126, I-131, I-133 Beta gamma emitters 5,000 dpm 15,000 dpm 1,000 dpm (nuclides with decay beta gamma beta gamma beta gamma modes other than alpha emission or spontaneous fission) except Sr-90 and others noted above NOTES:
(1) Where surface contamination by both alpha- and beta gamma-emitting nuclides exists, the limits established for alpha- and beta-gamma-emitting nuclides should apply independently.
(2) As used in this table, dpm (disintegrations per minute) means the rate of emission by radioactive material as determined by correcting the counts per minute observed by an appropriate detector for background, efficiency, and geometric factors associated with the instrumentation.
Rev. 0 5/9/83
OPIP 3.10.1 Page 8 of 8 Attachment 1 Page 2 of 2 ACCEPTABLE SURFACE CONTAMINATION LEVELS (continued)
NOTES: (continue)
(3) Measurments of average contaminant should not be averaged over more than 1 square meter. For objects of less surface area, the average should be derived for each such object.
(4) The maximum 2 contamination level applies to an area of not more than 100 cm ,
(5) The amount of removable radioactive material per 100 cm2 og surface area should be determined by wiping that area with dry filter or sof t absorbent paper, applying moderate pressure, and assessing thei amount of radioactive material on the wipe with an appropriate instrument of known efficiency.
(6) dpm-Disintegrations per minute Reference : Regulatory Guide 1.86, Termination of Operating License for Nuclear Reactors, Table 1.
Rev. 0
, 5/9/83