Proposed Changes to Tech Specs Re Hydrogen Offgas Monitors to Permit Main Condenser Leak Check Using Helium Tracer Gas
ML20083D546
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 12/22/1983
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20083D537 List:
References
NUDOCS 8312280109
Download: ML20083D546 (2)


Text

- - --- - - - - - - - - - - - - - - - - - -

PM .-s- o- .

t *: is l'Ohl't)

L[MI'IING CONDITIONS __ FOR OPEPATION_ SURVEILLANCE RECUIREMENTS 3.8.C (Ccnt'd.)

1 O .a . l'urni ng of the primary containment shall be through the S tandby Cas Treatment System whenever primary containment integri ty is requi red aa specifi ed in 3.7.A.7.

h. Primary containment purging via the Peactor Buildino Ventilation Eyhaust Fystem may be performed whenever primary contai nment i ntegrity is not reoni red as r:reci fi ed in 3.7.A.2.
c. The Standby Cas Treatment System shall be availabl e whenever the primary containment is beino purced vi a the Peactor RuiJ di nq Vent ilation Exhaust System.

10.a. I'xce pt as specified in

3. 8.C .10b bel ow , two monitors downstream of the reccmbinerc cha33 be operab3e durino power opera ti on ,
b. I f the altvo speci fi ed reouired hydrogen moni tore are not operabl e, an orderly reduction of power sha]I be initiated to brino the hydrogen productica rate to less than 4 of the off-cas flow rate.*

4

  • Temporary Chance: The off-cas recombiner compressor trip on high hydrogen may be bypassed ~for a pe ri od of no t more than 8 hrs. per day to accommodate l eak testing of the mai n condenrer and annociated vacuum systems, provided recombiner performance i c veri fi ca by continuous observation of the following parameters durinq the pe ri od that the trips are hypassed.
1. I!ccombiner di f f orential temperature.
2. Ilydrogen content downstream of recombi ner as measured on a temporary analyzer.

Trip the off-gas mechanica] compressors if the temporary hydrogen mcnitor indi cates a hydrogen content downstream ci the recombiner in excess of 2%

or i f the recombiner di f ferential temperature indicates a f ail ure to recombi ne hydrogen .

The temporary change is ef f ecti ve thorugh the 30 days followino the initial heli um l eak test . 8312280109 831222 PDR ADOCK 05000277 O

p PDR

CERTIFICATE OF SERVICE I certify that service of the foregoing Application was made upon the Commonwealth of Pennsylvania, by mailing a copy thereof, via first-class mail, to Thomas R. Gerusky, Director, Bureau of Radiological Protection, P. O. Box 2062, Harrisburg, PA 17120; all this 22nd day of December, 1983.

EUG(NE 1. BRADLEY /

Attorney for Philadelphia Electric Company e