ML20082E555

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses DPR-77 & DPR-79, Consisting of TS Change 95-05,deleting Component Lists from TS
ML20082E555
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/06/1995
From: Shell R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20082E561 List:
References
NUDOCS 9504110260
Download: ML20082E555 (2)


Text

~

. e ls el Tennessee Valley Authonty. Post Offee Box 2000, Soddy Daisy. Tennessee 37379 April 6, 1995 l

l' TVA-SQN-TS-95-05 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION (TS) CHANGE 95-05, COMPONENT LIST DELETION In accordance with 10 CFR 50.90, we.are enclosing a requested amendment to Licenses DPR-77 and DPR-79 to change the TSs of SQN Units 1 and 2.

The proposed changes to the containment system and electrical sections will delete the component lists in accordance with Generic Letter (GL) 91-08, " Removal of Component Lists From Technical Specifications."

Tables 3.6-1, 3.6-2, and 3.8-2 are being relocated to other administrative 1y controlled documents in accordance with the guidance provided in GL 91-08.

The proposed TS change is identified in Enclosure 1. The justification for the proposed TS change is provided in Enclosure 2. A proposed determination of no significant hazards consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3.

Modifications are planned during the upcoming Unit 1 Cycle 7 refueling outage that may affect the list of components in Table 3.8-2.

Accordingly, NRC approval of the proposed TS change is requested in time to support this outage, which is currently scheduled to start on September 9, 1995. We are requesting an implementation period of 60 days from the receipt date of the TS change to allow for procedural changes.

110032 fSE**A85$8!!888$27 PDR i I

m

. a; ,

Lt 18

-p s

lU.S. Nuclear Regulatory Commission Page 2

w. LApr11c6,'1995 Please direct questions'concerning this issue to W. C. Ludwig at

~(615) 843-7460. -r Sincerely, M. JJA R. H. Shell Manager ST( Site Licensing Swornj tp and subscr bed, fore me is 0 day of s 1995 fM1 . t W NotEff'Public My Commission Expires .p 2/

Enclosures cc (Enclosures): ,

Mr. D. E. LaBarge, Project Manager U.S.' Nuclear Regulatory Commission One White Flint, North

.11555 Rockville Pike Rockville, Maryland-20852-2739 f

Mr. Michael H. Mobley, Director (w/o Enclosures)

Division of Radiological Health 3rd Floor L & C Annex >

401 Church Street Nashville, Tennessee 37243-1532 NRC Resident Inspector ,

Sequoyah Nuclear Plant l 2600 Igou Ferry Road .

Soddy-Daisy, Tennessee 37379-3624 i Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 ,

Atlanta, Georgia 30323-2711 i L

t a --. - - - - - - - ~ -

~....su~ ' -