Testimony of Re Fortier & ML Miele Re Suffolk County Contention 26 on ALARA Radiation Exposure.Describes Provisions Which Demonstrate Util Commitment to Achieving Radiation Doses ALARA
ML20052E551
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 05/04/1982
From: Fortier R, Miele M
LONG ISLAND LIGHTING CO.
To:
Shared Package
ML20052E543 List:
References
ISSUANCES-OL, NUDOCS 8205110224
Download: ML20052E551 (29)


Text

f .

e. ,

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of )

)

LONG ISLAND LIGHTING COMPANY ) Docket No. 50-322 (OL)

)

(Shoreham Nuclear Power Station, )

Unit 1) )

TESTIMONY OF RAYMOND E. FORTIER AND MICHAEL L. MIELE FOR THE LONG ISLAND LIGHTING COMPANY ON SUFFOLK COUNTY CONTENTION 26 --

ALARA RADIATION EXPOSURE Purpose This testimony establishes that LILCO meets the require-ments of 10 CFR 20.1(c) at Shoreham by maintaining occupational radiation exposure as low as is reasonably achievable (ALARA).

ALARA has been considered in plant and equipment layout and arrangement to minimize exposure time during maintenance; com-j ponents have been separated or isolated where compatible with design functions for protection during maintenance; low-cobalt materials generally have been used throughout the plant, reduc-ing the source of radiation, and systems have been installed to reduce cobalt accumulation; provisions have been made for flu-shing or decontaminating areas; and the number of condenser 8205110224 820504 PDR ADOCK 05000322 T PDR

shell connections used is below the average. In addition, procedures have been developed to limit iron-cobalt buildup in the primary water system, minimize exposure during work in radiologic'al areas of the plant, and monitor and control indi-vidual and plant total annual occupational radiation doses.

These provisions demonstrate LILCO's commitment to achieving radiation doses as low as is reasonably achievable.

Exhibits I. SP 12.012.01 Radiation Work Permits II. SP 61.071.01 ALARA Job Review III. SP 61.071.05 ALARA Review of Station Procedures and Design Modification IV. SP 23.103.01 Condensate V. SP 22.001.01 Start-Up Cold Shutdown to 20%

VI. ARP 4103 Feedwater Conductivity High VII. ARP 4104 Feedwater pH High--Low i

VIII. ARP 4076 Condensate Polishing Ion Exchanger
DE-2A Effluent Conductivity High l

( IX. ARP 4077 Condensate Polishing Ion Exchanger DE-2B Effluent Conductivity High X. ARP 4078 Condensate Polishing Ion Exchanger DE-2C Effluent Conductivity H.igh XI. ARP 4079 Condensate Polishing Ion Exchanger DE-2D Effluent Conducti'vity High XII. ARP 4080 Condensate Polishing Resin Trap Differential Pressure High XIII. ARP 4081 Condensate Polishing System Influent Conductivity High L

r XIV. ARP 4082 Condensate Polishing Ion Exchanger DE-2E Effluent Conductivity High XV. ARP 4083 Condensate Polishing Ion Exchanger DE-2F Effluent Conductivity High XVI. ARP 4084 Condensate Polishing Ion Exchanger DE-2G Effluent Conductivity High XVII. ARP 4085 Condensate Polishing Ion Exchanger DE-2H Effluent Conductivity High XVIII. ARP 0451 Condensate Pumps Discharge Conductivity High--High/High XIX. ARP 0452 Condensate Pumps Discharge Sample Conductivity High--High/High XX. ARP 0452 Condenser Tube Troughs Conductivity High--High/High XXI. ARP 0454 Condenser Sample Conductivity High--High/High XXII. ARP 0455 Hotwell Conductivity High--High/High XXIII. ARP 0253 Condensate Oxygen Content High XXIV. ARP 0254 Condensate Oxygen Content Low XXV. SP 29.008.01 Fuel Cladding Failure l

XXVI. SP 29.011.01 Hotwell Salt Water Intrusion XXVII. SP 61.012.01 Radiation Dose Limits and Guides XXVIII. SP 61.012.05 Authorization to Exceed Dose Guides XXIX. SP 61.012.07 Investigation of Unauthorized Exceeding of Administrative Dose Guides.or NRC Limits XXX. SP 61.016.03 Minimizing Exposure to External Radiation XXXI. SP 62.004.01 Station Personnel Monitoring Program

_4 XXXII. SP 61.070.01 ALARA Review Committee XXXIII. SP 61.071.03 ALARA Goals and Measurements I

l l

1 l

i l

r .

UNITED STATES.0F AMERICA NUCLEAR REGULATORY COMMISSICN B6 fore the Atomic Safety and Licensing Board In the Matter of. )

! )

LONG ISLAND LIGHTING COMPANY ) Docket No. 50-322 (OL)

)

(Shoreham Nuclear Power Station, )

Unit 1) )

TESTIMONY OF RAYMOND E. FORTIER AND MICHAEL L. MIELE FOR THE LONG ISLAND LIGHTING COMPANY ON SUFFOLK COUNTY CONTENTION 26 --

ALARA RADIATION EXPOSURE

1. Q. Please state your names and business addresses.

A. My name is Raymond E. Fortier; my business address is Stone & Webster Engineering Corporation, 245 Summer Street, Boston, Massachussetts.

My name is Michael L. Miele; my business address is Long Island Lighting Company, P.O. Box 628, Wading

! River, New York.

2. Q. By whom and in what capacity are you employed?

l l

l

A. (Fortier) I am employed by the Stone & Webster Engineering Corporation (SWEC) as a Lead Power

! Engineer and have held this position since December 1979. In this capacity, I am responsible for overall technical and administrative activities in the Power discipline on the Shoreham Project.

< (Miele) I am employed by the Long Island Lighting Company as the Health Physics Engineer at the Shoreham Nuclear Power Station (Shoreham). In this capacity, I am resp >nsible for the formulation and implementation of LILCO's ALARA policy and program for radiation pro-tection.

3. Q. Please state your professional qualifications.

A. (Fortier) The attached resume summarizes my profes-sional qualifications. My familiarity with the ALARA issue stems from my assignments on Shoreham as a sys-

? tems engineer, principal engineer, and lead power j

engineer. As a systems engineer and principal engin-eer, I was responsible for the ALARA considerations

! included in the Shoreham system desig and equipment l

l layout. As lead. power engineer, I have personally l

been involved in a complete walkdown of the reactor building secondary containment to address ALARA

{

considerations concerning wall and floor penetrations, and I have been directly involved with the Shoreham ALARA Task Force.

(Miele) The attached resume summarizes my professional qualifications. My familiarity with the ALARA issue stems from my nine years of experience working as a radiation protection professional in university, na-tional laboratory and power reactor radiological environments. I have primary responsibility for de-velopment and implementation of the ALARA program at Shoreham. In addition, I serve as a member of the Edison Electric Institute's Task Force on Occupational Exposure Standards. The Task Force provides detailed feedback on proposed standards and regulatione con-cerning ALARA and occupational exposure.

4. Q. Are you familiar with Suffolk County Contention 26?

A. (Fortier and Miele) Yes.

S. Q. What issue is presented in that contention?

l A. (Fortier) Suffolk County contends that LILCO has not developed plant and equipment designs and procedures to minimize occupational radiation exposure at Shoreham.

l l

i l .__ _ _

6. Q. What does the acronym ALARA stand for?

A. (Miele) ALARA means "as low as reasonably achievable."

The ALARA program takes into account the state of technology and the cost of improving that technology in relation to the benefits those improvements might provide to the worker. LILCO's ALARA program is de-signed to minimize the risk of radiation exposure while optimizing the benefits to be gained from the nuclear technology.

7. Q. How does LILCO minimize occu,ational radiation doses at Shoreham?

A. (Fortier) LILCO has used plant and equipment design criteria and appropriate procedures to ensure that occupational radiation doses are ALARA.

8. Q. Suffolk County claims in its contention that there are several areas where LILCO is deficient in maintaining doses ALARA at Shoreham. Would you please describe each of these areas?

A. (Fortier) Suffolk County alleges that five areas of 4

plant equipment and design are deficient: (1) equip-ment layout and arrangement, (2) separation and isola-tion of components and piping systems, (3) selection l


.-------------------------------------------------------------------~-----------------------------------------------

of low-cobalt materials, (4) provisions for flushing or decontaminating systems and portions of systems, and (5) a condenser design using a minimum number of shell connections.

(Miele) In addition, Suffolk County lists three areas where it claims procedures have not been established to maintain doses ALARA: (1) limiting iron-cobalt buildup in the primary system through water chemistry control, (2) monitoring and controlling individual'and plant total annual occupational radiation doses, and (3) taking actions to reduce radiation levels or expo-sures if the in-plant total doses significantly exceed U.S. plant averages.

9. Q. Taking these items as you've listed them, would you please first describe how equipment layout and ar-rangement at Shoreham maintain doses ALARA during maintenance?

A. (Fortier) Pre-determined and pre-designed walkways and equipment removal aisles along with equipment removal and laydown areas have been provided in the Shoreham design to minimize exposure time for access to and removal of equipment for maintenance. Heavy equipment that may require maintenance has been reviewed to

ensure that appropriate attachments such as overhead monorails, floor tracks, lifting beams and lugs, plat-forms and ladders (both permanent and portable) are

~

installed for removing equipment if necessary.

Permanently installed manual or motorized lifting

, devises such as overhead cranes, hoists, and pulleys are often used to speed up and simplify maintenance.

Also, various system _ design considerations are taken into account. These include (1) radioactive fluid processing, (2) the volume of radioactive sources in an area, (3) redundancy of equipment, (4) maintenance requirements, (5) method of operation (continuous or intermittent), (6) ability to flush or decontaminate components or portions of systems, (7) isolation and separation of components, and (8) temporary and perma-nent shielding. Various combinations of these system-design considerations have been utilized in the equip-ment layout and arrangements at Shoreham. Two ex-amples follow:

(1) In some instances, low maintenance items like the Reactor Water Cleanup (RWCU) series heat exchan-gers, which can be flushed or decontaminated and are in systems that can be operated on an

1 intermittent basis, are located within the same cubicle.

t (2) Pumps are sometimas located within the same cubi-cle where the system design has provided for main-tenance purposes redundant components that can be operated on an intermittent basis, such as the Fuel Pool Cleanup pumps and some Radwaste pumps.

10. Q. How do separation and isolation of components and pip-ing systems contribute to maintaining doses ALARA during maintenance?

A. Separation and isolation of components are part of the overall equipment layout and arrangement considera-tions at Shoreham to achieve ALARA. Separation and isolation reduce the potential radiological exposure from one component or piping system while maintenance is being performed on the other.

11. Q. Has Shoreham considered in its design the separation and isolation of components and piping systems that i contain radioactive fluid?

A. Yes, to the maximum extent practical.

l l

1 -

12. Q. What do you mean by "to the maximum extent practical"?

A. There are other system design requirements, such as safety considerations or system functionability, that take precedence over separation and isolation of com-ponents and piping systems. For example:

(1) Components and piping systems within the drywell are designed to satisfy their safety function.

(2) System design evolution involves making physical modifications to the original system design.

These modifications sometimes are limited by cer-tain existing physical structures, thereby limit-ing the ability to separate and isolate components and piping systems.

(3) In some cases, components are deliberately de-signed to be in close proximity to one another.

An example is the Post Accident Sampling Facility, where most of the air-operated valves,' pumps, and instruments are packaged on a single skid. This design concept reduces operational exposure by minimizing the amount of radioactive fluid in the piping between components. Maintenance exposure is minimized by providing flush capability, rather than by isolating and separating components.

l 1

1

Of course, the way the equipment is handled and the maintenance performed also serves to maintain doses ALARA.

13. Q. Mr. Miele, how do maintenance procedures followed at Shoreham contribute to maintaining doses ALARA?

A. (Miele) Shoreham's Health Physics program and proce-dures facilitate work and minimize exposure within the radiological areas of the plant. Prior to beginning work in a radiological area, the level of ALARA review of maintenance and operations procedures necessary for that area is determined. Those Station Procedures that govern the planning for and conduct of work in a radiological area are SP 12.012.01, Radiation Work Permits (Exhibit I), SP'61.071.01, ALARA Job Review (Exhibit II), and SP 61.071.05, ALARA Review of Station Procedures and Design Modification (Exhibit III). A qualified Radiological Engineer reviews the procedures and suggests methods for reducing doses resulting from the work in the radiological area.

[

These methods may include installation of additional j shielding, removal of the c:omponent from the area, l

flushing or decontamination of the area, or use of special tools. A pre-planning meeting or briefing l

1

with the. workers performing the job is then held to ensure that all equipment needed to perform the job is ready and that the workers are made aware of the radiological conditions in the work area. At the con-clusion of the job, a debriefing of workers by the job supervisor is performed and suggested improvements are incorporated into the procedure or work plan to be used the next time the job is performed.

14. Q. Mr. Fortier, how have low-cobalt materials been used in the Shoreham design to minimize doses ALARA?

A. (Fortier) Generally, low-cobalt materials are used throughout the plant to reduce the potential for radiation exposure during maintenance. Exceptions occur where stellite materials are used, such as in the rollers and pins in the upper end of.the control blades, and in the valve seats. The primary reason for using stellite is its superior wear resistence which provides reliable and maintenance-free service, thereby minimizing the need for maintenance on compo-nents and thus reducing the potential for radiation exposure.

15. Q. What is the most likely source for radiation exposure at the plant?

A. (Fortier) Most maintenance is performed during station shutdown. The source for radiation exposure during station shutdown is from longer-lived activated cor-rosion and erosion products. Of these, Cobalt 60 (Co-60) is the major contributor to the average radia-tion exposure experienced at a plant during shutdown.

However, during normal operation, the carry-over of Co-60 from primary reactor water to reactor steam is less than 0.01%. Therefore, deposition of activated' corrosion and erosion products occurs mostly on sur-faces in contact with primary system water.

These surfaces include the reactor pressure vessel, the main recirculation system, and the RWCU system, where the accumulated activated corrosion and erosion products become the principal radiation sources during shut-down.

l l

16. Q. What design features limit the buildup of corrosion and erosion products, contributing to maintaining doses ALARA?

9

A. (Fortier) To minimize the potential for corrosion and erosion products to be activated and deposited on sur-faces in contact with the primary system water,

~

Shoreham first processes all feedwater flow to the reactor pressure vessel through the' full-flow conden-sate demineralizers. Further, a high degree of purity in the primary system water is maintained by contin-ually processing the primary system water through the RWCU filter /demineralizer. There activated corrosion and erosion products can be collected and processed properly by providing the necessary shielding, remote valve operation, separation and isolation of equip-ment, and flushing and decontamination connections in the basic system design.

Additionally, the Reactor Pressure Vessel (RPV) is shielded by the biological shield wall to minimize radiation exposure from the RPV during maintenance.

The main recirculation system, located in the drywell, inherently resists potential deposits of activated corrosion and erosion products due to system. contin-uous fluid-flow operation. Shoreham has eliminated the stagnant bypass line and valves in the recircula-tion system where activated corrosion and erosion products can accumulate, thereby minimizing the potential for radiation exposure.

17. Q. How are operating procedures used to limit the buildup .

of corrosion and erosion products?

A. (Miele) Proper controls of the chemical environment can minimize the corrosion rate. These controls are contained in procedures already developed at Shoreham.

As Mr. Fortier explained, corrosion occurs during shutdown due to the presence of dissolved oxygen in process systems. Therefore, start-up of the plant after shutdown is a critical time for properly con-trolling iron and cobalt. The procedures for system operation during start-up include filtra-tion / demineralization of the condenser, condensate, feedwater and reactor systems.

Station Procedure 23.103.01, Condensate (Exhibit IV),

i provides for recirculation of the hotwell contents through condensate demineralizers and back to the hotwell to remove cobalt from the system by deoxygena-tion, filtration and demineralization prior to permit-ting water into the feedwater system. During.this time a vacuum is established in the condenser to encourage deoxygenation of this water. When the con-densate is valved into the feedwater system, it will l be recirculated through the feedwater heater train, l

i 1

back to the condenser, and through the condensate demineralizers. This process permits filter-ing/ demineralization and further deoxygenation before the condensate and feedwater systems are valved to the reactor.

I Station Procedure 23.103.01 also calls for heating of the hotwell contents when steam is available to the steam coils to further encourage removal of dissolved oxygen in the presence of the existing condenser vacu-um. At the same time, the-reactor is heated gradually under conditions that permit oxygen removal from the coolant before temperatures reach 200 F, in accordance with Station Procedure 22.001.01, Start-Up Cold Shutdown to 20% (Exhibit V). This avoids an environ-i ment which encourages iron-cobalt transport. The Reactor Water Cleanup system is run, as an operating policy, at the maximum flow possible during plant start-up to permit removal of corrosion products in the reactor.

18. Q. You've talked about control of the chemical environ-ment during start-up. How are corrosion products l

limited during operation of the plant?

l i

I I

A. (Miele) During normal operation, extensive on-line sampling and analysis equipment is used to monitor condensate and reactor-water chemistry continuously.

Interpretation of these readings along with additional sampling and chemical analysea by a Radiochemistry Technician are used to minimize iron-cobalt transport.

Optimum use of the Reactor Water Cleanup System and the Condensate Demineralizer System is described in the applicable procedures. For example, Station Procedure 23.103.01, Condensate -(Exhibit IV), calls for maintaining flow rates through the condensate demineralizers at optimum values for filtration and demineralization, requiring valving demineralizers in and out of service as condensate system flow rates increase or decrease. This combination of control of the systems chemistry environment and good filtra-tion / demineralization will limit iron-cobalt trans-port.

Additionally, should a system upset occur, ranging from out-of-specification chemistry conditions to a more serious emergency, preplanned actions are dicta-ted by procedures already written. The Alarm Response Procedures associated with the various systems-I've mentioned (Exhibits VI through. XXIV) and the Emergency

I 1

Operating Station Procedures (Exhibits XXV and XXVI) l detail actions appropriate to avoid corrosive environ-ments in systems while maintaining the plant in a safe c'onfiguration.

19. Q. What provisions have been made at Shoreham for flush-ing and decontaminating systems?

i A. (Fortier) Various design provisions facilitate flush-ing and decontaminating equipment and systems that come in contact with primary reactor water. That por-tion of the RHR system that processes primary reactor water and is used during the normal reactor cooldown mode can be flushed with demineralized water after plant start-up to maintain potential occupational radiation exposure ALARA. The RWCU system, which pro-cesses primary reactor water during normal plant oper-ation, is provided with flushing and decontamination connections around equipment such as the main recircu-lation pumps, heat exchangers, and fil-ter/demineralizers. The main recirculation system is also provided with flushing and decontamination con-nections around the recirculation pumps. The fuel peal cleanup system has flushing and decontamination connections around the demineralizers and filters.

Liquid radwaste pumps have flushing and decontamination connections on each side of the pump.

20. Q. Regarding condenser design using limited shell connec-tions, how do limited connections help achieve ALARA levels?

A. (Fortier) Condenser shell connections consist of the pressure and level instrument taps, heater vents, and condensate pump recirculation lines. The number of condenser shell connections is generally unrelated to expected radiation doses during maintenance. The num-ber of shell connections at Shoreham is slightly less than the industry average and far less than the high-est (400).

The number of connections is determined by the basic turbine plant decign. Combining these lines upstream in a collection tank where design would allow will not necessarily reduce air in-leakage and may increase the amount of air in-leakage. This fact is based on two conditions: first, the condenser is maintained at a vacuum and will draw air inward whether the connection is directly on the condenser shell or on the piping upstream; second, the amount of welding (where leakage is most likely to occur) along with the larger

manifold headers or collection tank would arguably be increased for this more complex design.

However, doses ALARA during maintenance operations have been considered in the condenser design.

l Re-tubing and tube plugging are the most common con-denser maintenance operations. Since condenser main-tenance is only planned to take place during plant shutdown, doses received by the7e operations are usually insignificant due to appropriate radiation protection measures such as flushing and use of brea-

. thing apparatuses. Titanium ' condenser tubes are being used at considerably increased expense at Shoreham to minimize corrosion and leaking tubes, thereby reducing potential radiation exposures and maintenance.

21. Q. You mentioned the County's assertion that LILCO does not have procedures to monitor individual and plant total annual occupational radiation doses. What are the applicable dose levels and how are those ' levels

! achieved at Shoreham?

A. (Miele) Contrary to the County's assertion in the con-tention, S rem per year is not a legal limit for indi-viduals with radiation exposure histories. Title 10 CFR 20.101 establishes 3 rem per quarter (rem /qtr)

as the limit. In addition, Station Procedure 61.012.01, Radiation Dose Limits and Guides (Exhibit XXVII), Sec. 8.2, lists 3 rem /qtr as the maximum whole body dose, and Sec. 8.3 states a 1 rem /qtr administra-tive guide to be used at Shoreham. To' exceed this guide requires management approval as stated in Station Procedure 61.012.05, Authorization to Exceed Dose Guides (Exhibit XXVIII), Sec. 8.3.

Shoreham has developed a variety of procedures to mon-itor radiation doses. In addition to those I've re-ferred to above, the following procedures are also used in monitoring and controlling personnel doses:

SP 61.012.07, Investigation of Unauthorized Exceeding of Administrative Dose Guides or NRC Limits (Exhibit

.XXIX);

SP 61.016.03, Minimizing Exposure to External Radiation (Exhibit XXX);

SP 62.004.01, Station Personnel Monitoring Program (Exhibit XXXI);

SP 61.070.01, ALARA Review Committee (Exhibit XXXII); and SP 61.071.03, ALARA Goals and Measurements (Exhibit XXXIII).

~

22. Q. How will doses be monitored and recorded?

l i

A. (Miele) The computerized Dose Record System used at i

Shoreham will maintain the recording of doses as required by the other procedures. Individuals will wear direct-reading dosimeters and thermoluminescent dosimeters. The Dose Record System will tabulate per- -

sonnel doses and collective doses for specific jobs on

a daily basis. Computerized flagging for personnel approaching the Shoreham administrative dose limits will ensure that personnel do not exceed administra-tive exposure limits without proper authorization.

Computerized flagging for jobs where collective doses are approaching or have exceeded the estimated dose for the job will signal the radiation protection staff that additional measures may be needed to maintain doses ALARA. In addition, daily printouts of person-nel doses will provide individuals and their super-visors with their current doses for the quarter.

l l 23. Q. Are tnere any other ALARA procedures or programs used by LILCO at Shoreham? ,

A. (Miele) Yes. Other ALARA efforts that are being l

l implemented include system walkdowns to identify po-tential exposure problems, to determine if corrective action is necessary and to assign responsibilities for the corrective action. Two groups, the l

Maintainability Task Force and the ALARA Task Force, are engaged in a system-by-system review of plant com-ponents. Both groups are composed of LILCO, Stone &

~

Webster and outside consultant personnel knowledgeable in their area of review. The ALARA Task Force uti-lizes a specific ALARA design-features checklist that aids in identifying potential exposure problems. In addition, each section head at Shoreham is required to establish a goal for low exposure, and the Company sponsors an ALARA Suggestion Program, awarding em-ployees who suggest methods to reduce radiation expo-sure on the job.

Given the numerous actions taken at Shoreham to reduce radiation levels and exposures, LILCO has no plans at present to monitor <hether in-plant cotals at Shoreham "significantly exceed U.S. plant averages", nor is such monitoring required. Shoreham will meet the ap-plicable regulatory requirements regarding doses ALARA, and will continue to attempt to meet doses even lower than those allowed by the regulations.

24. Q. Mr. Fortier, please summarize your testimony regarding the plant and equipment design criteria used at Shoreham to ensure that occupational radiation exposure ALARA is maintained.

A. (Fortier) The Shoreham equipment layout and arrange-ment, separation and isolation of components, use of low-cobalt materials, provisions for flushing and decontaminating systems, and use of minimum condenser shell connections all contribute to maintaining radia-tion doses as low as reasonably achieveable at i

Shoreham.

25. Q. Mr. Miele, please summarize your testimony on the op-erating procedures to be used at Shoreham to maintain doses ALARA.
h. (Miele) The numerous procedures discussed throughout i

my testimony will allow Shoreham to maintain doses ALARA by (1) limiting cobalt buildup in the primary rystem through water-chemistry control, (2) minimizing exposure during work in radiological areas of the plant, and (3) controlling individual and plant total annual occupational radiation doses.

1

(

PROFESSIGNAL QUALIFICATIONS Raymond E. Fortier Senior Power Engineer / Power Division Stone and Webster Engineering Corporation My name is Raymond Fortier. My business address is 245 Summer Street, Boston, Massachusetts 02107. I am employeo by Stone &

Webster Engineering Corporation (SWEC) as a Lead Power Engineer and have held this position since December 1979. In this capacity, I am responsible for overall technical and adminis-trative activities in the Power discipline on the Long Islanc Lighting Company (LILCO) Shoreham Nuclear Power Station Unit 1 (Shoreham).

In 1963 I received a Bachelor o'f Science degree in mechanical engineering f rom the University of Rhoae Island. Since 1974 through the present, I have completea graduate courses at i

Nortneastern University in nuclear engineering, power plant design and economics, computer systems and engineering manage-ment. In addition, I have participated in Stone & Webster's Continuing Education Department course offerings in technical -

and management subjects.

My engineering career began with Rohm ano Baas Company, Bristol, Pennsylvania (1963-1968). As Field Engineer, I super-vised construction of plastics plants in Pennsylvania and

, England. As Project Engineer, I was responsible for design, estimating, development, purchasing and construction of various projects. I also was assigned to the planning, estimating ano designing of a blown film and plastic manufacturing tacility.

Later with Qryogenic Technology, Inc. (CTI), Walthmn, Massachusetts (1968-1970), I was a Product Engineering Manager responsible' tor the design and manufacture of miscellaneous cryogenic (extremely low temperature) laboratory equipment. I was also the Program Manager responsible for the design and development of the Model 1400 helium retrigerator, liquefier and purification system.

In November 1970, I joined Stone & Webster as an Engineer in the Process Projects Division, responsible for the design or chemical plants and later transferred to the Power Division in November 1971. I was assigned to the Wisconsin Electric Power Company, Point Beach Nuclear Plants (December 1970 - October 1973), with responsibility for the design and engineering or a liquid and gaseous radioactive waste treatment and disposal system. My duties includea preparation of addenda to the Final Safety Analysis Report (FSAR). I also prepareo flow diagrams, equipment and bidder lists, process equipment and pipe sizing calculations, system descriptions, preoperational instructions and miscellaneous specifications for the installation of a blowdown and waste evaporator, a gas stripper ano a cryogenic noble gas separation system.

l l

, I have been associated with Long Island Lighting Company pro-jects since March 1973. Initially (March 1973 - May 1974) as an Engineer, I was assigned to the Jamesport Nuclear Power Plant Project and was responsible for the emergency core cool-ing system (ECCS), containment isolation, chemigal and volume control, and reactor coolant systems. I also functioned as nuclear steam supply system (NSSS) coordinator and prepared sections of the Environmental Report and Preliminary Safety Analysis Report.

In June 1974, I was reassigned to the Shoreham Nuclear Power Station Unit 1 Project. My experience on Shoreham covers a broad spectrum spanning eight years. Formerly, I was involved in the day-to-day detail engineering and design decisions coin-ciaent to a project of this scope. I was appointed Principal Nuclear Engineer in January 1978 with responsibility for over-all coordination with NSSS supplier and technical responsi-bility for nuclear and radwaste portions of the plant.

Currently, I have overall responsibility for manpower, buoget, planning, scheduling and sequencing of engineering and design efforts, including Three Mile Island-relateo items, for all power discipline groups. This results f rom my appointment as Lead Power Engineer in December 1979. In addition, I have overall responsibility for all Power discipline activities being performed at the Site bngineering Office and coordination of Hydraulic, Environmental and N mlaar Technology Division activities relating to Shoreham.

. . I am a registered Professional Engineer in New York and Massachusetts. -

As Engineer on the Shoreham Project, I prepared the Design Specification Report entitled, " Thermal ano Pressure Transients

~

of ASME III, Class 1 Piping Systems."

9 i

I

PROFESSIONAL CUALIFICATIONS Michael L. Miele Health Physics Engineer Long Islano Lighting Company

  • My name is Michael Miele. My business address is Long Island Lighting Company, P.O. Box 626, Wading River, New York.

I am employed by Long Island Lighting Company (L1LCO) as the Health Physics Engineer at the shoreham Nucledr Power Station (Shoreham). I have been employed by LILCO since 1970.

I received the Bachelors Degree in Mechanical Engineering from City College of New York in 1970; the Masters of Science Degree, specializing in Radiological Health, from the University of Michigan in 1974; and the Masters of Business Administration from Adelphi University. in 1977.

i As the Heulth Physics Engineer of Shoreham, I am responsi-ble for the supervision of engineers, consultants, foremen, ano technicians as part of the overall direction of the Station's Health Physics activities, including the radiological safe-guarding of plant personnel and the public, planning ano imple-menting the ALARA program, detecting ano controlling radiation for plant surveillance, operations and maintenance functions, and shipping, receiving, controlling and procuring licenses for

all radioactive materials. My duties include airecting radiation protection training programs for Health Physics per-sonnel as well as other plant and temporary people, administra-ting records and reports on personnel exposure, and supervising

! radiological surveys, respiratory protection and bioassay.

Other tasks include controlling the selection and set-up of laboratory and counting room facilities, portable survey equip-ment, an6 area and process monitors; formulating, developing and implementing Health Physics programs and procedures to l

insure regulatory compliance; and overseeing the Industrial Hygiene program of occupational and environmental testing, sur-veys, and inspections for noise levels, toxic materials and other hazards.

Over the years I have been involved in a variety of training assignments, including positions at Iowa Electric's Duane Arnold Energy Center, James A. Fitzpatrick Nuclear Station, Nine Mile Point Nuclear Station, and the Savannah River Plant. These assignments gave me valuable practical experience in staffing, training, and qualifying personnel; 1

coordinating ALARA programs; using dose control, dosimetry anc i

l whole body counting; supervising personnel decontamination; l

l implementing radiation shieloing startup testing ano chemistry 1

and radiochemistry startup testing; and coordinating radwaste operations and disposal.

1

. . I am past president of the Greater New York Chapter of the Health Physics Society, and hold a guest engineer appointment from Brookhaven National Laboratory. I am a member of the National He'alth Physics Society. the EEI Health Physics Committee, the EEI Standards Task Force, the American Industrial Hygiene Association, and the New Englana Hedith Physicists.