ML20045J251

From kanterella
Jump to navigation Jump to search
Revised Emergency Public Info Organization Implementing Instruction Manual,Including Temporary Change (TC) 2 to Rev 1 of App D,Tc 2 to Rev 0 of App I,Part A,Pages 1-2 & 3-4 & TC 3 to Rev 0 of App I,Part B,Page 19-20.W/930715 Ltr
ML20045J251
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 07/15/1993
From: Stratman R
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PROC-930715, PY-CEI-NRR-1679, NUDOCS 9307230240
Download: ML20045J251 (20)


Text

_ . . - _ _. . . _ ._

4

.{ CONTERf0R ENERGY b

PERRY NUCLEAR POWER PLANT Mail Address:

PO. BOX 97 Robert A. Stratman

! 10 CENTER ROAD PEW, OHIO 44081 VICE PRESIDENT - NUCLEAR 1 PERRY, OHIO 44081

} (216) 259-3737 I

July 15, 1993

PY-CEI/NRR-1679 L U.S. Nuclear Regulatory Commission Document Control Desk Vashington, D. C. 20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Submittal of Changes to Emergency Public Information Organization Implementing Instruction Manual Gentlemen

The Cleveland Electric Illuminating Company hereby submits _ changes to controlled copy #123 of the Emergency Public Information Organization Implementing Instruction Manual. Please follov the updating instructions per the attached-Controlled Document Transmittal form.

If you have any questions concerning this matter, please contact Kevin Donovan of my staff at (216) 259-3737 extension 5606.

Sincerely, f- _

/. w -

ob'ert A. Stratman RAS:BSF:jem Attachment cc: NRC Resident Office v/ attachment NRC Region III, Incident Response Center v/2 attachments 210034 I

Operchng Corrpenies ,

j Cleveland Electne illuminohng .

Toledo Ed: son 9307230240 930715 i PDR ADOCK 05000440 F PDR- p

?

6 The Cleveland Electric lliuminating Company l Perry Nuclear Power Plant  ;

.l CONTROLLED DOCUMENT TRANSMITTAL To: Afg( h(C&t7u-fCC 7v'IMD 2 Date: . July 14, 1993 w The controlled document (s) listed below is--(are) attached for' inclusion into your Emernency Public Infoldation Organization Instruction Manual.

?

Controlled Revision Temporary Remove &:

Copy No. Number Change No. Insert Destroy Appendix D (re-issued'all- Superseded Appendix D '

/23 1 2 i pages) and any 'ICN's '

-i I

Appendix I Part A Superseded'pages ,

l

  • O 2

. paces (1-2) (3-4) (1-2) (3-4)-

0 3 Appendix I Part B Superseded page (19-20) I l

i pace (19-20)

Special Instructions ,

I l l l

l Please sign below acknowledging receipt &. inclusion into your Emeroency Public Infor_mation

! 3rganization InstrucHnn Manual and return this form to:

- Perry Nuclear Power Plant Licensing Unit, E210, s P.O. Box 97 Perry, Ohio 44081.

Signature Date Title i

y ,,.<-w r -r , ei .-.-.~,.,-,v.Erm.- , , , , ..c.w,-..-.. ...<,,~.,r,..w_-....v,,.[-ee., --w.~.,.,,.+.r, .-myw_.<-e.-..,,..-. . .

. E

'e. ' NON-INTENT "E"ca^a' :-^"o* 'o

(' aseo so nos a. INSTRUCTION TEMPORARY....cs22

. a,90 CHANGE

! "' k -

sr=uc ;c~ so spc aEv hts;uh B i ss acc~ Rettmg=v hs x,:5.s :ss,lA el

. r a o anc-E: =^aa 2:vw _sE :v D-t, D- E D-S~. M

_e- ' '

A E n ua_s d L h w u v l'5-MC6 FNPp l i =os:. .

CONTROLLED COPY

% k c h n s. % % g No. I ' lI 4 > I gpq M ane.m tc,% 1 -

l _

,r)

INFORMATION I

ONLY i

2 CONCIT:CNAL AP ACVAL i: .. *'w.AGEYEN~5at: CATE /, .  ;;*5 l

l  ; dm i __

S3:r//A -

i i 2 alNAL APAAOVAL CNLY N C E 8' 'E.1E A E A  : ATE

~

//

. .,=c---

E io s =
u:  : E ,

a a m Jo ib f.$

ass =O.E0 CA!E AP D AC'. E D CATE i FA NA ,

', 3".m0 v"G NO =CQc vic OATE 2ECOMMENCED8CA

_. APDQCVAL f. EFFECTIVE
ATE 2

[ OiSAPeoC'.AL

_# ,/

~

l

P CONDITIONAL TC'S CNLY'  !

2TE '  !

0 S 3DSCtE: i l g

J f i' 5 5 4 3C N S ' e' [i 3anE E E ',',4L 6

4 e

4

'M 4

NON-INTENT

' ~

INSTRUCTION TEMPORARY CHANGE EEMPORAM CME NG ,

PP No. 7309 Rev. 9/90 PAP 4S22 h0CTION NO. REV INSTRUCTION TTTLE M 4Ndik D DI bMC M ~- htK4 ~

N L T C\ b (W M cts httCLh kML\

CANCELS TCN<Sr L:ST EACH AT* ACHED PAGE AcutN USE CNLY D'\

PAEFAR CATE AEASON Nh1 4

b h% l l' D3-k b g Nb# U

"" kEh1 C CONDITIONAL APPROVAL Pij.NT MANAGEMENT STAFF DATE SS or US CATE hNAL APROVAL ONLY IN: FTM A I ER [ OATE

_ >

  • k)- w 1 %\ Z k g j .w -

E a APAACVEO QATE APPROVED CATE

$ 4 f f fl-,

/ J l 3 ll 173

\

A 7 OVED DATE APPROVED CATE

^

. l I

  • CRC MTG NQ; PORC MTG. CATE: RECOMMENDED FOR. l l EMCTWE DATE v ' WACVAL A

Q\{\ %g\Q C OISA*Pnows

],g,Q3  :

~. CONDITIONAL TC'S ONLY:

itSAPPROVED 8 lLEASON FOR DISAPPROVAL 8I fl

i 9

j ,. m e e , sc73 mev. 2/90 i

O EMERGENCY PUBLIC INFORMATION l ORGANIZATION INSTRUCTIONS MANUAL l ~;

i INSTRUCTION REV.

l l

4 TITLE

FLOOR PLANS a

O l .

j PREPARER EFFECTIVE D. Traverso ]

WERS APPROVERS

- f/$b , m L.2 lMb l'

^

I Q .

. -9 JOINT PUBLIC INFORMATION CENTER

~.- CEI WORK AREA LAYOUT O PERFORMING ARTS CENTER / ROOM D 2117 O

g

=

269 7112 7113 h

m vo INFORMATICN vv CLERICAL 1 SUPERVISOR MOVABLE h h CLERICAL SERVICES CLERICAL SUPERVISOR NORTH PARTITICN WRITER 26 11 269-7110 h TECHNICAL L/ COORDINATOR D TECHNICAL SPOKESPERSON (D

v _ L g -

MEDIA RELATIONS k -

EMERGENCY SUPERVISCR t" 7 SYSTEMS STATUS y PHONE

. BOARD

~

RADIOLOGICAL CLERICAL

, BOARD ,

N "

EMERGENCY g O DEDICATED PHONE 3 STATUS GOVERNMENT j BOARD 269 7114 tlAigog j TV MONITOR R/ O O JPIC MANAGER HISTORIAN COMPUTER k I

.L REFERENCE TABLE COPY MACHINE JPIC STAFF STATUS TYPEWRITER BOARD

/ EMERGENCY PUBLIC INFORMATION

( D-1 RGANIZATION INSTRUCTIONS MANUAL

el JOINT PUBLIC INFORMATION CENTER

-l MEDIA RESPONSE / RUMOR CONTROL AREA LAYOUT PERFORMING ARTS CENTER ROOM D 2119 gl Ac== A c=

A

== A A

== A

' C O O O 269-7100 269-7101 Rumor Rumor -

Controller Controller ["]

Rumor Rumor c3 T Controller Controller y 269 7102 269-7103 O O

!" 9/ ==

g / v v== VO a

tJ g

O8 Od T

N ""' ""

()

C C 269-7104 269 7105 --

A Media Media Response Response -

NORTH 3

T 8 O

Media Media g Response Response 269-7106 269-7107 O O O N/ v

e

OV OV

==

LEGEND:

^'"

Phone Computer Column "ofk$i$[on INSTRUCTIONS MANUAL TV Monitor Printer

JOINT PUBLIC INFORMATION CENTER l FEDERAL / STATE / COUNTY Tc- l WORK AREA LAYOUT A n v ,

PERFORMING ARTS CENTER ROOM D 2115 l

CONFERENCE ROOM O '

269-7117

( 2e9 7525 269-7526

} l4 )

269-7123 UV OHIO

( >

(. 269 7527 l% EMA h

( 269-7528 269 7529

)

./

269-7118 269-7115 AP 269-7530 OTHER h v

< )

269-7119 rarvC PIO 0

} FEMA  %

ASHTABU O O < )

269-7120

Pe~"t o '

~

269-7122 STAFFING r NRC k j, NORTH

< )

269-7121 GEAUGA EffNW(h LEGEND:

A PHONE ALL >

g DEDICATED  ;

PHONE _

h TV MONITOR j

Q-COPY MACHINE O TvPEwRiTER EuERGENCv euBliC iNPORuATiON ORGANIZATION l TELECOPIER j D-3 l

JOINT PUBLIC INFORMATION CENTER -

BRIEFING ROOM LAYOUT .

PERFORMING ARTS CENTER -

AUDIT 0AIUM  :

Ol l

I I I j 9 t E EcfE: ..

STAGE -

Po0Zum

~

l l

6 e -

)

w:

0000 cC Oa 0nD 0g -

O 00 On0 09 0 cC Cg g

=

0 0g O C00 EN CE D Qg c0 0 _

/ /

orsNErron sex g

GATE ' ' '

GALLERY' O E mes,s *I75 vtDco rarts LEGENO: -

i """' "

NORTH

. mm ven EMEAGENCY PUBLIC INFCRMATICN b 2.:::n INSTN[7[CNSMANUAL D-4 Rev. 1 4/91

JOINT PUBLIC INFORMATION CENTER MEDIA MONITOR WORK AREA LAYOUT 1 PERFORMING ARTS CENTER ROOM D 2118 sg m m m m (C NN) (ABC) (CBS) (NBC)

C J C J C J .

O C J RADIO O

@ !A O ITOR 4 LEGEN0; y PHONE NORTH l A Tv NONI10 g l W VCR t ENERGEN ORMATION INSTR TICNS MANUAL 4/91-

JOINT PUBLIC INFORMATION CENTER 1 MEDIA WORK AREA LAYOUT 3l PERFORMING ARTS CENTER / FIRST FLOOR ART GALLERY  !

OOOO 10-MILE EPZ MAP ON EASEL 269-7125 4 I A 269 7d1 1 V V 269 7127 269-7126 A uvuv E i nnnn 269-7129 269-7126 A A 1

L31 u97%

uvuu nnnnE g

l 2gn33 u,7g V

269-7135 V

269-7134 uvuu nnnn5 2gn37 269-7g v v 269-7139 269-7138 g

vuuv N nnnn 2 7141 269-7 og Zg PRESS KITS O

" 7H 2E7143 269 7 2 g ygD uuuu INFORMATION kh nnnn 269-7145 269 7144

= ag 5E O O E $$0 Uvvv n9Es Bl/ PERSONNEL BOARD E k 269-7147 NORTH h

LEGEND: _

ACCESS CONTROL Emergency Public Information b COLUMN Organization Instructions Manual COLUMN D-6

NON-INTENT ': TEMPORARY CHANGE NO.

/] INSTRUCTION TEMPORARY CHANGE PNPP No. 7309 Rev. 9/90 PAP-0522  :

W E""l M A "E ESFU'hbb d-% Et b mmb \ft. *

' '" " ' "% A  % - w-cus % h m s '

ADMIN. USE ONLY LIST EACH ATTACHED PAGE:

\,% kN l l

]^"'"M Y. has% I ^"d @ 4S CONTROLLED COPY No. I1 IINIO.}

htA %)

INFORMATION o ONLY U

E CONDITIONAL APPROVAL SS cr US DATE PLANT VANAGEN1ENT STAFF CATE

~

, \

IFINAL APPROVAL ONLY IN-C, TH AEVIE ER DATE 00(/ALOM l Sb/95 < <

,1, \ ,AT E

= APPROVE ~" CATE APPROWC

= M 4

' APPAOVED DATE APPAOVED DATE

^

M \ A64 l A POAC viG NO POAC MTG. DATE AECOMMENDED FOA- EFFECTIVE DATE MA MA

^'

^IOPIROVAL D ~/P95

- 'R CONDITIONAL TC'S ONLY:

OtSAPP ACN ED 7 l S

AEASONF 0 DISAFC20 VAL

."i

. ~.

I-A STANDARD OPERATING PROCEDURE POR ACTIVATION OF THE JOINT PUBLIC INFORMATION CENTER (JPIC) POR RESPONDING LCC NON-SECURITY PERSONNEL

1. PURPOSE This Standard Operating Procedure (SOP) establishes responsibilities and 1 provides the facilities, equipment, farniture and personnel necessary to support the operation of the Perry Power Plant Joint Public Information l Center (JPIC) per the Cleveland Electric Illuminating Company (CEI) - l Lakeland Community College (LCC) Agreement. l l

l l

2. GENERAL INPORMATION A. The Perry Power Plant is located in North Perry Village, Ohio. In j the event of an accident at the plant, releases of radioactive material could occur and affect off-site areas.

B. The Joint Public Information Center is a specifically designated off-site location and physical point of contact for dissemination of information during a Perry Power Plant emergency to the news media, and thus the public, by CEI, Federal, State, and local officials.

The JPIC is located in the Performing Arts Center at Lakeland Community College. The facilities, personnel, equipment, and k services required by CEI for the operation of the JPIC and provided by LCC are outlined in the CEl-LCC Agreement dated July 1, 1990, on file with the Vice President of Administrative Services, LCC.

C. The LCC Police Dispatcher shall be notified by the JPIC Support Services Supervisor, CEI, and vill initiate an operational response for the JPIC and Lakeland personnel identified in this procedure.

D. The JPIC Support Services Supervisor, CEI, and the JPIC Manager, CEI, vill be the principal points of contact for LCC personnel l responding to the JPIC for an emergency at the Perry Pover Plant. .

E. Definitions and abbreviations to promote common understanding of terminology are contained in Attachment 1. t 1

I

3. ACTIONS 1

A. Director, Physical Plant, LCC:

1. Receive notification from LCC Police Dispatcher of intent to l activate JPIC.

Tc- 2. Contact Maintenance Technicians to serve as: LCC Audio-Video 9- Control Room Operator, Camera Operator, and Audio Soundboard O)

( Operator, and instruct them to report to the JPIC.

1 Rev. O TC/VAX/Page 1 of 4 4/90

4 5

3. Proceed to the JPIC, sign in at the Performing Arts Center lobby and receive an LCC armband to wear from Access Control Personnel.
4. Ensure that the board room table, desks, chairs, rolling gates, and miscellaneous items are cleared from the rooms and areas used for JPIC.
5. Set up LCC facilities in accordance with the JPIC Layout Diagrams (Attachments 2 through 7).
6. Complete a Joint Public Information Center Activity Log (PNPP No. 6400, Attachment 8) noting any problems or unusual activities.
7. Once the LCC facilities are set up, work with the JPIC Support Services Supervisor as directed.
8. Work with the JPIC Audio-Visual Coordinator to provide feeds to JPIC staff and the media.
9. Supervise the Audio-Video Control Room Engineer, Camera Engineer, and Audio Soundboard Engineer, ensuring that the "k{l Audio-Video Control Room Engineer remains available on an on-call basis.
10. Upon completion of assignment, forward Joint Public Information h Center Activity Log to the JPIC Support Services Supervisor, CEI.
11. When notified that a media briefing is scheduled, provide assistance to the JPIC Audio-Visual Coordinator, CEI, to ensure that the media has power available to operate their lights and recording equipment if requested.

B. Audio-Video Control Room Engineer, LCC:

1. Sign in at the Performing Arts Center lobby and receive an LCC armband to wear from Access Control Personnel.
2. Report to Director, Physical Plant, upon arrival, for special instructions.
3. Report to the JPIC Audio-Visual Coordinator, CEI, for further instructions.
4. Set up and activate the Audio-Video Control Room equipment.
5. Ensure the lighting on the stage and in the auditorium is at proper levels for media briefings.

I 2

Rev. O TC/VAX/Page 2 of 4 4/90

i 1

^

9 i

g

6. Verify that all video equipment is properly working, making any modifications or repairs.to obtain proper operation.
7. Wait for CEI JPIC personnel handling the audio and video '

2 equipment to arrive and provide a brief training.

8. Ensure that CEI JPIC personnel handling the-video and audio j equipment are knowledgeable in the operation of the equipment.
9. Remain available (on-call basis) to resolve video or audio equipment problems which may occur. i 1
C. Camera Engineer, LCC

$ 1. Sign in at the Performing Arts Center lobby and receive an LCC  !

j armband to wear from Access Control Personnel.

2. Report to the Director, Physical Plant,.upon arrival, for

! special instructions.

i 3. Report to the CEI JPIC Audio-Visual Coordinator for further [

instructions. -

4. Set up and activate the camera equipment. .

r'"x 5. Verify that camera equipment is working,. making any

(,,) modifications or repairs to obtain. proper operation.

6. Vait for CEI JPIC personnel handling the camera to arrive and provide a brief training.
7. Report any problems, actual or potential, to the Director, Physical Plant, who vill note them on the Joint Public Information Activity Log.

fG" Audio Soundboard Engineer, LCC:

p D.

1. Sign in at the Performing Arts Center lobby and receive an LCC armband to wear from Access Control Personnel.
2. Report to Director, Physical Plant, upon arrival, for special instructions.
3. Report to the CEI JPIC Audio-Visual Coordinator for further instructions.
4. Set up and activate the Public Address. System.
5. Verify that the Public Address System is properly working, making any modifications or repairs to obtain proper operation.

O 3

Rev. O TC/VAX/Page 3 of 4 4/90

6. Conduct sound tests on all microphones to ensure reliability and proper audio levels.

fo'j g 7. Vait for CEI JPIC personnel handling the audio soundboard to arrive and provide a brief training.

8. Report any problems, actual or potential, to the Director, Physical Plant, who vill note them on the Joint Public Information Center Activity Log.

E. Publication Specialist, LCC:

1. Sign in at the Performing Arts Center and receive an LCC armband to wear from Access Control Personnel.
2. Upon notification by the Police Dispatcher of the intent to activate JPIC, open the LCC Copy Center and prepare it for operation.
3. Operate the Copy Center and provide services as requested by the JPIC Staff.
4. Provide personnel to transport materials between the JPIC offices and the Copy Center.

F. Food Services Manager, LCC:

1. Sign in at the Performing Arts Center and receive an LCC O armband to wear from Access Control Personnel.
2. Upon notification by the Police Dispatcher of the intent to activate JPIC, contact staff and prepare the food service / cafeteria for operation.

1

3. Work with the JPIC Support Services Supervisor to provide ,

coffee, refreshments, and meals for JPIC personnel, delivering I as necessary.

4. Vork with the JPIC Support Services Supervisor to be prepared to provide additional food when requested.

G. Vice President, Administrative Services:

1

1. Sign in at the Performing Arts Center lobby and receive an LCC armband to wear from Access Control Personnel.

l

2. Upon notification by the Police Dispatcher of the intent to activate JPIC, establish contact with the JPIC Hanager when he l arrives at Lakeland.

l 4

Rev. O TC/VAX/Page 4 of 4 4/90 i

NON-INTENT INSTRUCTION TEMPORARY CHANGE { TEMP RARY CHANGE NO

] PNPP No. 7309 Rev. 9S0 PAP 4522 b REV INSTRUOTION NSTRUCTION NO.

AbiA 1 , dt e O W r- Mabcw c4 4t ME kr h34tm (R A dt(.h h M2-\

LIST EACH ATTACHED PAGE: ADMIN. USE ONLY

$D PREPARER.' D l klo A3 ' l REASON Mnm1 3 buw_ PNFP i l

CONTROLLED COPY oQ \I\ NM Mu I4 NO. b b iMFORgiOR 0M0' O

V 1

O CONDITIONAL APPROVAL PLANT MANAGEMENT STAF DATE SS or US DATE N\b I

~

b FINAL APPROVAL ONLY t -DEPTH REV E 'E DATE .

. 1.@ l b

' APPROVED DATE r APPROVE DATE

.) - , l bN~ -

l 7 / 71 DATE APPROVED DATE APPROVED AM I M i PORC MT3. NO: PORC MTG. DATE: RECOMMENDED FOR; g EFFE IVE DATE v

A g4 /d C APPROVAL O DISAPPROVAL p FOR CONDITIONAL TC'S ONLY:

DATE ClOs DLMPPROVED l

REASON FOR DISAPPROVAL O

A L

La "

y..

6. Remain at the post until properly relieved or released by the O 14C Police Chief or Detail. Commander. .l Forward.the JPIC Activity Log-to the' Detail Commander or LCC

~

7.

Police' Chief when released from the post. .

. i i

n P

. 1 I

J A ,

~

O l

.1 l

1 4

O 19 Rev. 0 4/90 l

, _ ~ - . . _ . . , ,-,_-,,,_,._-.._.!

Lake County Police Department Activities ALTERNATE POLICE DEPT. EPZ RELOCATION STATION ACTIVITIES EDCATION s ife h 1. Eastlake O No TC, CCS, CCT, HF TC - TBDAN l3 M CCS/CCT - North High School N

N m 2. Fairport Harbor I Yes Mentor P.D. TC, AC, SP TSDAN 09

3. Grand River I Yee Mentor P.D. TC, AC, SP TSDAN W

O 4. Kirtland O No TC, CCS, CCT TC/AC/SP - TBDAN W CCS/CCT - Kirtland High School W

5. Kirtland Hills O No TC TBDAN
6. Sheriff Dept. 1/0 Yes willoughby TC, AC, SP, RP, EOC, RI TC/AC/SP - TBDAN RP l1e 3
7. Lakeline O No TC TBDAN
8. Madison Twp. I Yes Mentor P.D. TC, AC, SP TBDAN
9. Madison Village I Yes Mentor P.D. TC, AC, SP TBDAN
10. Mentor I/O No TC, AC, SP, HF, RP TC/AC/SP - TBDAN RP - Great Lakes Mall / Mentor Shore School
11. Mentor-on-Lake O No TC TBDAN 9

O

12. North Perry Vill. I Yes Mentor P.D. TC , AC, SP TC/AC/SP - TBDAN
13. Painesville City I Yes Mentor P.D. TC, AC, SP, RI TNDAM
14. Perry Village I Yes Chardon P.D. TC, AC, SP TNDAN
15. Timberlake Village O No TC TBDAN
16. Waite Hill' O No TC TBDAN
17. Wickliffe City O No TC, CCS, CCT TC - TBDAN ft. "

CCS/CCT - Wickliffe High, Middle, CFL 3

18. Willoughby City 0 No TC, CCS, CCT, MF, RP TC - TBDAN RP - Hodson Rd.

CCS/CT - South High School

19. Willoughby Hills O No TC TBOAN y p7 n N t#

No TC, CCS, CCT TC - TBDAN {

y[ 20. Willowick O willowick Middle School n O CCS/CCT - Royalview Elementary {

TC Traffic control SP Security Patrols CCT Care Center Traffic Control R1 Relocate Inmates e AC Access Control CCS Care Center Security HF Holding Facility RP Referral Point  %

TBDAN To Be Determined As Needed EOC EOC Security CPL Center for Pastoral Le ade r shirp M O Outside EP3

  • I Inside EPZ 3 .

O

e. e.a