ML20101B781

From kanterella
Jump to navigation Jump to search
Partially Withheld Rev 17 to Security Plan
ML20101B781
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/20/1992
From:
CENTERIOR ENERGY
To:
Shared Package
ML20101B774 List:
References
FOIA-95-364, FOIA-95-A-20 PROC-921120, NUDOCS 9603150046
Download: ML20101B781 (2)


Text

{{#Wiki_filter:_ _ _ _ _ _ _ _. _. _ _ _ _ _ _ _. _ _. _ _ _ _... !./ ~ 't .l 1 I I h.3 l i c I ) 4 i 1.3.1 Access Authorization Program i The Cleveland Electric Illuminating Company has an Accesk Authorization Program which utilizes all the elements of Regulatory Guide 5.66. Access Authorization Ngram for g-Nuclear Power Plants. All personnel (Licensee and Contractor) I are granted unescorted access authorization in accordance with i 10CFR73.56, Personnel Access Authorization Requirements for j Nuclear Power Plants and Regulatory Guide 5.66, Access l Authorization Program for Nuclear Power Plants. I ] 1-2 Revision 17 (11/20/92) pO A IN M 4 ~ 9603150046 960304 PDR FOIA i SAGQ1095-A-20 PDR

_. y -,--- y-w a v ru MIVrA 'V W h e. ' '1 All access authorizations will be documented in accordance fG-with Regulatory Guide 5.66. Documents are available at PNPP S for NRC inspection and are controlled in accordance with federal.and state privacy legislation. The contractor's certification of access authorization is available at PNPP for I NRC inspection. Access authorization documentation 1s I available for NRC inspection at the contractors' offices. l 1 0 l 4 f J J 1-3 Revision 17 (11/20/92)

s/ ii. 1 j I h-1 c-I 1 l ) 1 l p l 1.3.1 Access Authorization Program i i l The Cleveland Electric Illuminating Company has an Access Authorization Program which utilizes all the elements of Regulatory Guide 5.66, Access Authorization Program for i Nuclear Power Plants. All personnel (Licensee and Contractor) I are granted unescorted access authorizatics in accordance with 10CFR73.56, Personnel Access Authorization Requirements for i Nuclear Power Plants and Regulatory Guide 5.66, Access Authorization Program for Nuclear Power Planta. i a ) 1-2 Revision 17 (11/20/92) h 9603150046 960304 PDR FOIA l SAGGIO95-A-20 PDR 3 --

,_..,._,..-7--- - - - "- ~~ " ' ' ~~-- 7-w wt a M 3--U k-{ [\\/@ ~I M h t k' All access authorizations will be documented in accordance gG-withRedulatorycuide5.66.Documentsareavailableat PNPP I for NRC inspection and are controlled in accordance with federal.and state privacy legislation. The contractor's certification of access authorization is available at PNPP for { NRC inspection. Access authorization documentation is \\ j available for NRC inspection at the contractors' offices. 1 i i i i i { l k i i I 1 4 i i i l i i 1-3 Revision 17 (11/20/92) i ,_n -~ ~ - -,

1 -.. _ - /~) s hk h/ l$ N CENTERROR ENERGY l----__ PERRY NUCLEAR POWER PLANT Mail Address: Robert A.Stratman ~ 10 CENTER ROAD RR, OHIO 44081 "ERRY, OHIO 44081 216) 259 3737 April 14, 1994 PY-CEI/NRR-1785L U.S. Nuclear Regulatory Commission Document Control Desk Vashington, D. C. 20555 i Perry Nuclear Power Plant i Docket No. 50-440 PNPP Security Plan Gentlemen: Pursuant to 10 CFR 50.54(p), enclosed are four (4) copies of changes to the Security Plan for the Perry Nuclear Power Plant (PNPP). These changes constitute revisions, temporary changes, or reissued pages. Please return the signed Perry Safeguards Information Transmittal Form in the enclosed self-addressed ervelope. The changes have been reviewed in accordance with 10 CFR 50.54(p) and it has been determined that the changes do not decrease the effectiveness of the Security Plan. The attached pages contain Safeguards Information, and are to be handled in accordance with 10 CFR 73.21, " Requirements For The Protection Of Safeguards Information." If you have questions or require additional information, please contact Henry Hegrat - Regulatory Affairs at (216) 280-5606. Very trulygours, / h .s O RAS:BSF:sc Attachments - Attachments to be Withheld from Public Disclosure, they contain 10 CFR 73.21 material. When transmittal letter is separated from attachments, handle transmittal letter as decontrolled. r cc NRC Project Manager (w/o attachments) d ~ NRC Resident Inspector Office (w/o attachments) NRC Region III (with 2 attachments) Q g /- m v41eogia,40414 l hDR ADOCK 0500 0 / Operating Companies. Clevelond Electnc illuminating toledo Edison $ *DfOO}}