Partially Withheld Rev 18 to Security Plan
ML20101B784
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 04/01/1994
From:
CENTERIOR ENERGY
To:
Shared Package
ML20101B774 List:
References
FOIA-95-364, FOIA-95-A-20 PROC-940401, NUDOCS 9603150047
Download: ML20101B784 (3)


Text

{{#Wiki_filter:. - - _ . _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . . _ _ _ _ _ _ _ _ _ , _ _ _ , , , _ _ _ _ _ _ . _ _ _ . , _ _ , _ _ ,,j j spiUARD

                                               .                                                               p                                              yINF RM/)eT4pR    L l

i

;                                                                4.            Approval by the Director, Perry Nuclear Services Department, or                                                            I
'                                                                                                                                                                                                         l his designee.

l l'

5. Addition of the approved individual to the authorization list, detailing type of authorization (areas).

i l 2 h i l 4 d i a d

  '                                      9603150047 960304
-                                        PDR                   FOIA
  '                                      SAGGIO95-A-20                                                    PDR                                                   9  Revision 18 (04-01-94) l S,AI E                                                                ARDS IN                                    OR       AT O 9             _

axvppwx w v W a y

                                                                                      ^
                                                                                                                                     }

eO 1.3.1 Access Authorization Program The Cleveland Electric Illuminating Company has an Access Authorization Program which utilizes all the elements of Regulatory Guide 5.66, Access Authorization Program for Nuclear Power Plants. All personnel (Licensee and Contractor) are granted unescorted access authorization in accordance with 10CFR73.56, Personnel Access Authorization Requirements for Nuclear Power Plants and Regulatory Guide 5.,66, Access

  • Author 1zation Program for Nuclear Power Plant 1.

l All access authorizations will be documented in accordance , with Regulatory Guide 5.66. Documents are available at PNPP I for NRC inspection and are controlled in accordance with federal and state privacy legislation. The contractor's , certification of access authorization is available at PNPP for NRC inspection. Access authorization documentation is ' available for NRC inspection at the contractors' offices. I h, D n 3 l' 1*. g ii

                                                                                                                              ?>   .

c%. f p.. t ) l:

                                                                                                                          '                  I;
                                                                                                                    .-{.'

1-3 Revision 18' (04-01-94) , 1

l

4. Approval by the Director, Perry Nuclear Services Department, or his designee.
5. Addition of the approved individual to e authorization list, detailing type of authorization (areas) .
                                                                                           \

a. 3 m p .h, y .;r

                                                                                        ?         %
t N,1
                                                                                                 %g
  '                                                                                                1 n                                                                                      ,.

i y  ;.g

                                          -9          Revision 38 (04-01-94)

SA E RD-__ N j

   ....                                              )
4. Approval by the Director, Perry Nuclear Setvices Department, or his designee.
5. Addition of the approved individual to the authorization list, detailing type of authorization (areas).

h l < 31 7 960304 SAGGIO95-A-20 PDR 9 Revision 18 (04-01-94) SAF ORWA -

sxFtpowwrewira q 1.3.1 Access Authorization Program The Cleveland Electric Illuminating Company has an Access Authorization Program which utilizes all the elements of 1 Regulatory Guide 5.66, Access Authorization Program for Nuclear Power Plants. All personnel (Licensee and Contractor) are granted unescorted access authorization in accordance with 10CFR73.56, Personnel Access Authorization Requirements for Nuclear Power Plants and Regulatory Guide 5.,66, Access - Author 1zation Program for Nuclear Power Plant 1. ~ All access authorizations will be documented in accordance , with Regulatory Guide 5.66. Documents are available at PNPP I for NRC inspection and are controlled in accordance with federal and state privacy legislation. The contractor's , certification of access authorization is available at PNPP for  ! 1 NRC inspection. Access authorization documentation is ' available for NRC inspection at the contractors' offices.

                       /

a(. 3 D n e e M ;k,

                                                                                                               ?>   .
                                                                                                                             +%
                                                                                                            ~;
                                                                                                               ~

Q N h* f (, h) Q' rr - i:

                                                                                                            .I                   i, 3
                                                                                                    . p.

1-3 Revision 18' (04-01-94) .

EA1bUAD b f

s e ion I

4. Approval by the Director, Perry Nuclear Services Department, or his designee.
5. Addition of the approved individual to the authorization list, detailing type of authorization (areas) .
            /

a Y=

3 7
                                                                                                                                                                                         .h
                                                                                                                                                                                         ..        i, I               kb
N ie N

h Di . r

                                                                                                                                                                                               '  y y                    4
                                -                                                                      9      Revision 38 (04-01-94)                                           --

l s, e no MMN i

k... ,_ kh[ h. f# $ g l Ijf ? f{~s.: ~ (({k 5 CENTERCOR ' , ENERGY , _ _

          =_

Michael D. Lyster IRRY NUCLEAR POWER PLANT Mdy5: MCE PRESIDENT - NUCLEAR CENTER ROAD PERRY. OHIO 44081 RRY. OHIO 44088

16) 25SW37 l

l June 8, 1992 PY-CEI/NRR-1506 L U.S. Nuclear Regulatory Commission Document Control Desk Vashington, D. C. 20555 Perry Nuclear Power Plant Docket No. 50-440

  • PNPP Security Plan Gentlemen:

Please find attached four (4) copies of Revision 17 to the PNPP Security The Plan. Changes in this revision vere made in accordance with 10 CFR 50.54(p). CEI has scope of this revision is described on page vi of the attachment. determined that the changes do not decrease the effectiveness of the Security Plan. If you have any questions, please feel free to call. Sincerel , h Hichael D. Ly ter HDL:BSF:ss Attachment - Attaclunent to be withheld from Public Disclosure, contains 10 CFR 73.21 material. When transmittal letter is separated from attachment, handle transmittal letter as decontrolled. NRC Project Manager (v/o attachments) cc: NRC Resident Office (w/o attachments) tu

                                                                                      ,,,,'g'-=g
h. J NRC Region III (2 copies, with attachments) -
                                                                              ,/-   NF       *AT         *
                                                                                                             ^g FtLF. c.o uta o t n o o s o o o 4 4 o t s ua A,                     g(

20600 s PDR F ADOCK 05000440 PDR

                                                                                                    ,(p j6 o-, c

_ ,--, 3 Ih ff",g-Q.f f .}h}}