ML20205C635 | 16 March 1999 | Preliminary Rev 0 to Wps 01-43-T-801, Preliminary Weld Procedure for Perry Nuclear Power Plant Feedwater Nozzle Repair | |
ML20195H538 | 18 November 1998 | Rev 4 to Pump & Valve Inservice Testing Program Plan | Safe Shutdown High Radiation Area Stroke time Squib Scram Discharge Volume Cold shutdown justification Power Operated Valves Pressure Boundary Leakage Scaffolding |
ML20196H513 | 8 October 1998 | Rev 4,Vol 1 to Inservice Exam Program for Perry Nuclear Power Plant | Non-Destructive Examination Hydrostatic Coatings Nondestructive Examination VT-2 Incorporated by reference Moisture barrier Liquid penetrant Pressure Boundary Leakage Fire Protection Program Dissimilar Metal Weld Grace period |
PY-CEI-NRR-2395, Rev 5 to Perry NPP Odcm. with | 2 September 1998 | Rev 5 to Perry NPP Odcm. with | Time of Discovery Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report Power change |
ML20236T845 | 24 June 1998 | Rev 3,Change 3 to Vol 1 of Inservice Examination Program, for Pnpp | Non-Destructive Examination Hydrostatic Nondestructive Examination VT-2 B.5.b Mitigating Strategies Liquid penetrant Through-Wall Leak Dissimilar Metal Weld Scaffolding |
ML20203G478 | 23 February 1998 | Maint Progress Review for Perry Nuclear Power Plant | Packing leak Coatings |
ML20210U870 | 8 September 1997 | Rev 3,change 2 to Vol 1 of Inservice Exam Program, for Pnpp | Nondestructive Examination EVT-1 Liquid penetrant |
ML20147B827 | 24 January 1997 | Rev 3 to Vol 1 of Inservice Exam Program | High Radiation Area Non-Destructive Examination Hydrostatic Nondestructive Examination VT-2 EVT-1 Liquid penetrant Pressure Boundary Leakage Fire Protection Program Dissimilar Metal Weld Grace period |
ML20100G016 | 1 February 1996 | Draft Rev 0 to Pnpp NUMARC/NESP-007 Plant-Specific EAL Guidelines | Safe Shutdown High winds Ultimate heat sink Offsite Dose Calculation Manual Hydrostatic Operating Basis Earthquake Safeguards Contingency Plan Earthquake Fuel cladding Pressure Boundary Leakage Offsite Circuit Power change Unidentified leakage Unidentified leak |
ML20108B285 | 22 November 1995 | Rev 5 to Offsite Dose Calculation Manual | Safe Shutdown Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report Power change |
ML20087D797 | 7 July 1995 | Vol 1 to Rev 3, Perry Nuclear Power Plant Inservice Exam Program | High Radiation Area Non-Destructive Examination Hydrostatic Nondestructive Examination VT-2 Liquid penetrant Pressure Boundary Leakage Fire Protection Program Dissimilar Metal Weld Grace period |
ML20082C275 | 29 March 1995 | Rev 5 to Odcm | |
ML20082C277 | 29 March 1995 | Rev 6 to Process Control Program | Safe Shutdown Offsite Dose Calculation Manual Coatings Annual Radioactive Effluent Release Report Process Control Program |
ML20108B282 | 29 March 1995 | Rev 6 to Process Control Program | Safe Shutdown Offsite Dose Calculation Manual Coatings Annual Radioactive Effluent Release Report Process Control Program |
ML20085A050 | 7 February 1995 | Rev 2 to ISI Exam Program | |
ML20083A861 | 20 October 1994 | Rev 2 to Plant Administrative Procedure PAP-0806, Oil/ Chemical Release Contingency Plan | Fire Barrier Hydrostatic Coatings |
ML20101B795 | 14 October 1994 | Partially Withheld Rev 19 to Security Plan | |
PY-CEI-NRR-1827, Revised Emergency Public Info Organization Implementing Instruction Manual Including,Temporary Change Number,(Tcn) TCN-1 to Rev 10 to Instruction 1,TCN-2 to Rev 20 to App B & TCN-4 to Rev 0 to App I-B | 18 July 1994 | Revised Emergency Public Info Organization Implementing Instruction Manual Including,Temporary Change Number,(Tcn) TCN-1 to Rev 10 to Instruction 1,TCN-2 to Rev 20 to App B & TCN-4 to Rev 0 to App I-B | |
ML20065E934 | 5 April 1994 | Rev 3 to Pump & Valve IST Program Plan | Safe Shutdown High Radiation Area Fire Barrier Stroke time Squib Scram Discharge Volume Cold shutdown justification Power Operated Valves Scaffolding |
ML20101B784 | 1 April 1994 | Partially Withheld Rev 18 to Security Plan | |
ML20063K717 | 17 January 1994 | Rev 2,Temporary Change 1 to Vol 1 of Inservice Exam Program | High Radiation Area Non-Destructive Examination |
PY-CEI-NRR-1736, Temporary Change 1 to Rev 0 to App H of Emergency Public Info Organization Instructions Manual | 20 December 1993 | Temporary Change 1 to Rev 0 to App H of Emergency Public Info Organization Instructions Manual | |
ML20063L150 | 16 December 1993 | Rev 1,to Industrial Radiography Program | |
PY-CEI-NRR-1715, Temporary Change 3 to Rev 1 to Emergency Public Info Organization Instructions Manual | 26 October 1993 | Temporary Change 3 to Rev 1 to Emergency Public Info Organization Instructions Manual | |
ML20058N395 | 11 October 1993 | Inservice Examination Program, Rev 2 | |
ML20045J251 | 15 July 1993 | Revised Emergency Public Info Organization Implementing Instruction Manual,Including Temporary Change (TC) 2 to Rev 1 of App D,Tc 2 to Rev 0 of App I,Part A,Pages 1-2 & 3-4 & TC 3 to Rev 0 of App I,Part B,Page 19-20.W/930715 Ltr | |
ML20045D401 | 16 June 1993 | Revised Emergency Public Info Organization Implementing Instruction Manual,Including Temporary Change Number (Tcn) TCN-1 to Rev 8 to Section II,TCN-1 to Rev 1 to Section IV & TCN-1 to Rev 8 Instruction 5.W/930616 Ltr | |
ML20138D183 | 14 January 1993 | Rev 2 to Perry Operations Manual,Inservice Exam Program | High Radiation Area Non-Destructive Examination Hydrostatic Nondestructive Examination VT-2 Liquid penetrant Pressure Boundary Leakage Grace period |
ML20101B781 | 20 November 1992 | Partially Withheld Rev 17 to Security Plan | |
ML20118A833 | 22 September 1992 | Revised Emergency Public Info Organization Implementing Instructions Manual,Including Rev 17 to JPC-App-B,Rev 9 to JPC-Instruction 1,TC-1 to JPC-Instruction 2 & Rev 8 to JPC-Instruction 3 | Chernobyl |
ML20045B344 | 31 July 1992 | Temporary Change 1 to Rev 1 to Perry Operation Manual OM1A:PAP-0806, Oil/Chemical Release Contingency Plan. | |
ML20101B787 | 27 April 1992 | Partially Withheld Rev 17 to Security Plan | |
PY-CEI-NRR-1445, Rev 15 to Emergency Public Info Organization Instructions Manual App B, Personnel/Access List | 12 February 1992 | Rev 15 to Emergency Public Info Organization Instructions Manual App B, Personnel/Access List | |
ML20044G815 | 10 January 1992 | Rev 1 to Perry Operations Manual OM1A:PAP-0806, Oil/ Chemical Release Contingency Plan. | Fire Barrier Hydrostatic Coatings |
ML20091K486 | 3 January 1992 | Rev 1 to Inservice Exam Program | High Radiation Area Non-Destructive Examination Hydrostatic Nondestructive Examination VT-2 Liquid penetrant Pressure Boundary Leakage Grace period |
ML20082P891 | 4 September 1991 | Rev 0 to Temporary Instruction TXI-0122, Zebra Mussel Treatment | Grab sample Zebra Mussel Biofouling |
PY-CEI-NRR-1366, Apps B & D to Emergency Public Info Organization Instructions Manual | 14 June 1991 | Apps B & D to Emergency Public Info Organization Instructions Manual | |
ML20029B157 | 27 February 1991 | Revised Emergency Public Info Organization Instructions Manual. W/910227 Ltr | |
ML20077J969 | 31 December 1990 | Rev 3 to Pump & Valve Inservice Testing Program Plan | Safe Shutdown Stroke time Squib Cold shutdown justification Power Operated Valves Scaffolding |
ML20028H758 | 26 December 1990 | Emergency Public Info Organization Instructions Manual,App B, Personnel/Access Lists. W/910124 Ltr | |
ML20058E813 | 17 October 1990 | Instruction II to Rev 8 to Emergency Public Info Organization Instructions Manual, Purpose,Scope,Company Policy,Responsibilities & Refs | |
ML20058E804 | 17 October 1990 | Instruction I to Rev 8 to Emergency Public Info Organization Instructions Manual, Manual Distribution | |
PY-CEI-NRR-1223, Rev 11 to Emergency Public Info Organization Implementing Instruction Manual,App B, Personnel/Access Lists | 10 September 1990 | Rev 11 to Emergency Public Info Organization Implementing Instruction Manual,App B, Personnel/Access Lists | |
ML20058L172 | 30 May 1990 | Rev 0 to Inservice Exam Program | Non-Destructive Examination Hydrostatic Nondestructive Examination VT-2 Liquid penetrant Pressure Boundary Leakage Grace period |
ML20043A650 | 14 May 1990 | Revised Emergency Public Info Organization Implementing Instructions Manual. W/900514 Ltr | Stolen |
ML20248H248 | 2 October 1989 | Rev 2 to Pump & Valve Inservice Testing Program Plan | |
ML20246K810 | 14 August 1989 | Temporary Change Notice 6 to Rev 3 to OM12D:ODCM, Odcm | |
ML20246K802 | 25 February 1989 | Temporary Change Notice 5 to Rev 3 to OM12D:ODCM, Odcm | Offsite Dose Calculation Manual |
ML20101B791 | 16 January 1989 | Partially Withheld Rev 12 to Security Plan | |
ML20236V483 | 23 November 1987 | MSIV EQ Validation Task 3,Solenoid Valve Environ (Thermal Endurance) Test Plan for Perry Nuclear Power Plant | FLEX |