ML20100N950
| ML20100N950 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 03/01/1996 |
| From: | CENTERIOR ENERGY |
| To: | |
| Shared Package | |
| ML20100N946 | List: |
| References | |
| NUDOCS 9603060575 | |
| Download: ML20100N950 (2) | |
Text
. _ _
o CONTAINMENT SYSTEMS m nt DRYWELL BYPASS LEAKAGE LIMITING CONDITION FOR OPERATION 3.6.2.2 Drywell bypass leakage shall be less than or equal to 10% of the minimum acceptable A/ 4 design value of 1.68 ft.2 APPLICABILITY: When DRYWELL INTEGRITY is required per Specification 3.6.2.1.
ACTION:
With the drywell bypass leakage greater than 10% of the minimum acceptable A/8 design value of 1.68 ft.2, restore the drywell bypass leakage to within the limit prior to increasing reactor coolant system temperature above 200 F.
SURVEILLANCE REQUIREMENTS 4.6.2.2 The r ell bypass leakage rate test shall be conducted at least once per 18 mon' s*
an initial differential pressure of 2.5 psi and the A/8 shall be calcula from the measured leakage. One drywell air lock door shall remain open during the drywell leakage test such that each drywell door is leak tested during at least every other leakage rate test.
If any drywell bypass leakage test fails to meet the specified limit, the schedule for subsequent tests shall be reviewed and approved by the Commission.
If two consecutive tests fail to meet the limit, a test shall be performed at least every 9 months until two con-secutive tests ineet the limit, at which time the 18 month test schedule may be resumed.
9603060575 960301 PDR ADOCK 05000440 p
PDR N
Tkm prfor m u, d N gw.Al gpus (c@p rda hst is d*M w h 5:xW n>*d:
3
.w+ ay, mA nwA not 6 pMor-ol brig h MEN,a-('ueU^j eda $e.,
PERRY - UNIT 1 3/4 6-16
Drywell 3.6.5.1 L
PY-CEl/NRR-2033L 3.6 CONTAINHENT SYSTEMS Attachment Page 2 of 2 3.6.5.1 Drywell LCO 3.6.5.1 The drywell shall be OP,ERABLE.
l APPLICABILITY:
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME i
-A.
Drywell inoperable.
A.1 Restore drywell to
) hour OPERABLE status.
B.
Required Action and B.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.
AND B.2 Be'in MODE 4.
36 hour4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />s-I l
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.5.1.1 Verify bypass leakage is less than or equal to the bypass leakage limit.
f However, during the first unit startup following bypass leakage testing performed in accordance with this SR, the acceptance criterion is s; 10% of the j
drywell bypass leakage limit.
i (continued) aam of A Ary -tt b y s.tu Cg &c.s.t i., uma A g gr 9 go 3 b n. c.A.. D)..h o
3 nu.A a,r 6 c.e6cm d Au ri ng q ad ftf m reA ue,4 6 c) wh c.
3 PEKKT - UriiT 1 SS Amendment No. 69 3
1 i
_ _