Forwards LER 93-005-00 Re Blown Fuse Resulting in Unplanned Actuations of ESF
ML20044D590
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 05/14/1993
From: Beckham J
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20044D591 List:
References
HL-3292, NUDOCS 9305190378
Download: ML20044D590 (1)


Text

  • Georg!a Power Company CD Inverrecs Center Parttway

' Post Offm Box 1295

. Bemeng%m Alabama 35201

, Telpphone 205 877-7279 m

J. T. sockham, Jr. Georgia Power.-

Vice Prer.ident . Ndar '

Hatch Propict the marNen(*ctrc system May 14, 1993 Docket No. 50-321 HL-3292 005419 U.S. Nuclear Regulatory Commission ATIN. Document Control Desk Warhington, D.C. 20555 Edwin I. Hatch Nuclear Plant - Unit 1 Licensee Event Report Blown Fuse Results in Unplanned Automatic Actuations of Enoineered Safety Features Gentlemen:

In accordance with the requirements of 10 CFR 50.73(a)(2)(iv), Georgia Power Company is submitting the enclosed Licensee Event Report (LER) concerning a blown fuse which caused unplanned automatic actuations of engineered safety features. This event occurred at Plant Hatch - Unit 1.

Sincerely,

'cW J. T. Beckham, Jr.

MCMlcr

Enclosure:

LER 50-321/1993-005 cc: Georoia Power Company Mr. H. L. Sumner, General Manager - Nuclear Plant NORMS U.S. Nuclear Reculatory Commission. Washinoton. D.C.

Mr. K. Jabbour, Licensing Project Manager .- Hatch U.S. Nuclear Reculatory Commission. Reaion II Mr. S. D. Ebneter, Regional Administrator Mr. L. D. Wert, Senior Resident Inspector - Hatch