ML20044B993
ML20044B993 | |
Person / Time | |
---|---|
Site: | Sequoyah |
Issue date: | 03/10/1993 |
From: | Fenech R TENNESSEE VALLEY AUTHORITY |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
Shared Package | |
ML20044B994 | List: |
References | |
NUDOCS 9303160079 | |
Download: ML20044B993 (2) | |
Similar Documents at Sequoyah | |
---|---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20217F9551999-10-14014 October 1999
[Table view]Application for Amends to Licenses DPR-77 & DPR-79,proposing Change to TS SRs & Bases to Incorporate ARC for Axial Primary Water Stress Corrosion Cracking at Dented Tube Support Plant Intersections ML20217E4211999-10-12012 October 1999 TS Change 99-15 to Licenses DPR-77 & DPR-79,providing Unisolation of Containment Penetrations Under Administrative Controls ML20211K1521999-08-30030 August 1999 TS Change 99-10 to Licenses DPR-77 & DPR-79,providing Clarification to Current TS Requirements for Containment Isolation Valves ML20211M7261999-08-30030 August 1999 TS Change 99-08,for Amends to Licenses DPR-77 & DPR-79 to Provide Alternative to Requirement of Actually Measuring Response times.Marked-up & Revised TS Pages,Encl ML20209B7661999-06-30030 June 1999 Application for Amends to Licenses DPR-77 & DPR-79,updating Current TS Requirements for RCS Leakage Detection & RCS Operational Leakage Specifications to Be Consistent with NUREG-1431 ML20196G4441999-06-24024 June 1999 Application for Amends to Licenses DPR-77 & DPR-79,to Revise TS to Be Consistent with Rev to ISTS Presently Submitted to NEI TSTF for Submittal as Rev to NUREG-1431 ML20196F2121999-06-24024 June 1999 Application for Amends to Licenses DPR-77 & DPR-79,to Change TS Allowing Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20195E9661999-06-0707 June 1999 Application for Amend to License DPR-79,increasing Max Allowed Specific Activity of Primary Coolant from 0.35 Microcuries/Gram Dose Equivalent I-131 to 1.0 Microcuries/ Gram Dose Equivalent I-131 for Plant Cycle 10 (U2C10) Core ML20206E1551999-04-29029 April 1999 Application for Amends to Licenses DPR-77 & DPR-79, Consisting of TS Change 99-04, Auxiliary Feedwater Suction Pressure Low Surveillance Frequency Rev. Change Deletes Surveillance ML20206E1341999-04-29029 April 1999 Application for Amends to Licenses DPR-77 & DPR-79, Consisting of TS Change Request 99-03, Main Control Room Emergency Ventilation Sys Verses Radiation Monitors. Change Adds LCOs 3.3.3.1 & 3.7.7 & NUREG-1431 Changes ML20204H3991999-03-19019 March 1999 TS Change 99-01 to Licenses DPR-77 & DPR-79,relocating TS Associated with Electrical Equipment Protective Devices to Technical Requirements Manual ML20207D5941999-02-26026 February 1999 Application for Amend to Licenses DPR-77 & DPR-79,relocating TS 3.7.6, Flood Protection Plan & Associated Bases from TS to Plant TRM ML20207D6251999-02-26026 February 1999 Application for Amends to Licenses DPR-77 & DPR-79,revising TS to Provide for Consistency When Exiting Action Statements Associated with EDG Sets ML20199K5841999-01-15015 January 1999 Application for Amends to Licenses DPR-77 & DPR-79,adding New Action Statement to TS 3.1.3.2 That Would Eliminate Need to Enter TS 3.0.3 Whenever Two or More Individual RPIs Per Bank May Be Inoperable,While Maintaining Protection ML20206S0061999-01-15015 January 1999 TS Change 98-09 for Licenses DPR-77 & DPR-79,relocating TS 3.3.3.3, Seismic Instrumentation & Associated Bases from TS to Plant Technical Requirements Manual ML20195H6041998-11-16016 November 1998 Application for Amends to Licenses DPR-77 & DPR-79,revising EDG SRs by Adding Note to Allow SR to Be Performed in Modes 1,2,3 or 4 If Associated Components Are Already OOS for Testing or Maint & Removing SR Verifying Lockout Features ML20154H7201998-10-0808 October 1998 Supplemental Application for Amends to Licenses DPR-77 & DPR-79,changing TS to Add CRMP to Administrative Controls Section & Bases of TS ML20238F1051998-08-27027 August 1998 Application for Amend to License DPR-79,revising TS to Provide for Insertion of Limited Number of Lead Test Assemblies,Beginning W/Unit 2 Operating Cycle 10 Core ML20238F2981998-08-27027 August 1998 Revised Applications for Amends to Licenses DPR-77 & DPR-79, Replacing 72 H AOT of TS 3.8.1.1,Action b,w/7 Day AOT Requirement for Inoperability of One EDG or One Train of Edg.Response to RAI Included in Encl ML20249C6321998-06-26026 June 1998 Application for Amends to Licenses DPR-77 & DPR-79,lowering Specific Activity of Primary Coolant from 1.0 Uci/G Dose Equivalent I-131 to 0.35 Uci/G Dose Equivalent I-131,as Provided in GL 95-05 ML20248E9841998-05-28028 May 1998 Suppl TS Change 95-19 to Licenses DPR-77 & DPR-79,replacing Direct Ref to Nuclear QA Plan in TS Section 6.3.1,facility Staff Qualification,W/Actual Requirements Stated in TVA-NQA-PLN89-A ML20217N3411998-04-30030 April 1998 Application for Amends to Licenses DPR-77 & DPR-79,modifying TS Surveillance Requirement 4.4.3.2.1.b to Change Mode Requirement to Allow PORV Stroke Testing in Modes 3,4 & 5 W/Steam Bubble in Pressurizer Rather than Only in Mode 4 ML20203J1511998-02-25025 February 1998 Application for Amends to Licenses DPR-77 & DPR-79 to Change TS for Units 1 & 2,revising EDG Surveillance Requirements ML20202J6601998-02-13013 February 1998 Application for Amends to Licenses DPR-77 & DPR-79, Incorporating MSIV Requirements to Be Consistent W/Std TS (NUREG-1431) ML20202J7101998-02-13013 February 1998 Application for Amends to Licenses DPR-77 & DPR-79,adding New LCO That Addresses Requirements for Main Feedwater Isolation,Regulating & Bypass Valves ML20202J7421998-02-13013 February 1998 TS Change 97-04 to Application for Amends to Licenses DPR-77 & DPR-79,relocating Snubber Requirements from Section 3.7.9 of TS to Plant Technical Requirements Manual ML20198T4211998-01-21021 January 1998 Suppl TS Change 95-19 to Licenses DPR-77 & DPR-79,revising Title for President,Tva Nuclear & Chief Nuclear Officer to Generic Title of Chief Nuclear Officer ML20199K4441997-11-21021 November 1997 Application for Amend to License DPR-55,adding one-time Allowance Through Operating Cycle 9 to Surveillance Requirement 4.4.3.2.1.b to Perform Stroke Testing of PORVs in Mode 5 Rather than Mode 4,as Currently Required ML20211A3091997-09-17017 September 1997 TS Change 97-02 to Licenses DPR-77 & DPR-79,revising Pressure Differential Surveillance Requirements for Containment Spray Pumps ML20137C8271997-03-19019 March 1997 Revised TS Change 96-01 to Licenses DPR-77 & DPR-79,revising Appropriate Specifications,Surveillances & Bases to Allow for Conversion from Westinghouse Fuel to Framatome Cogema Fuel ML20136J0251997-03-13013 March 1997 Application for Amends to Licenses DPR-77 & DPR-79,revising Allowed Enrichment of Fuel in TS Section 5.6.1.2 for New Fuel Pit Storage Racks from 4.5 to 5.0 Weight % U-235 ML20129D2561996-10-18018 October 1996 Application for Amends to Licenses DPR-77 & DPR-79,removing Existing Footnotes That Limit Application of Apc for Plant SG Tubes to Cycle 8 Operation for Both Units ML20129G7111996-09-26026 September 1996 Application for Amends to Licenses DPR-77 & DPR-79,revising Fire Protection License Conditions & Relocation of Fire Protection Tech Spec ML20113G2421996-09-20020 September 1996 Application for Amends to Licenses DPR-77 & DPR-79, Clarifying Work Shift Durations for Overtime Limits ML20117J3341996-08-28028 August 1996 Application for Amends to Licenses DPR-77 & DPR-79, Revising Psv & MSSV Setpoint Tolerance from Plus or Minus 1% to Plus or Minus 3% ML20117D0921996-08-22022 August 1996 Application for Amends to Licenses DPR-77 & 79 Changing Tss of Sqb Units 1 & 2 by Deleting Table 4.8-1, DG Reliability & Revising Sectio 3.8.1 to Allow a Once Per 18 Month 7 Day AOT for EDGs ML20117D3271996-08-21021 August 1996 TS Change 96-06 to Licenses DPR-77 & DPR-79,removing Surveillance Requirement 4.8.1.1.1.b to Verify Ability to Transfer Unit Power Supply from Unit Generator Supported Circuit to Preferred Power Circuit ML20117D2931996-08-21021 August 1996 TS Change 96-03 to Licenses DPR-77 & DPR-79,revising TS 3.7.1.3, Condensate Storage Tank, to Include New Mode of Applicability to Read Mode 4 When SG Relied Upon for Heat Removal ML20112H0361996-06-0707 June 1996 Application for Amends to Licenses DPR-77 & DPR-79,revising Section 6, Administrative Controls, to Be More Closely Aligned W/Requirements of STSs ML20101N6981996-04-0404 April 1996 TS Change 96-01 to Licenses DPR-77 & DPR-79,allowing Use of Nuclear Fuel Provided by Framatome Cogema Fuels (Fcf). Proprietary & Nonproprietary Versions of Fcf TR Supporting TS Change 96-01 Encl.Proprietary Version of TR Withheld ML20096B3671996-01-0404 January 1996 Application for Amends to Licenses DPR-77 & DPR-79,revising TS Change 95-22,extending Radiation Monitoring Instrumentation Surveillance Period Per GL 93-05 ML20095F0271995-12-12012 December 1995 Application for Amend to License DPR-79,consisting of TS Change 95-23 Revising TS SRs & Bases to Incorporate Alternate S/G Tube Plugging Criteria at Tube Support Plate Intersections,Per GL 95-05 ML20095D5731995-12-0808 December 1995 Application for Amends to Licenses DPR-77 & DPR-79, Consisting of TS Change 95-20,extending Containment Spray & RHR Sys Nozzles Testing Period from 5 to 10 Yrs in Accordance W/Gl 93-05 ML20095D5431995-12-0808 December 1995 Application for Amend to Licenses DPR-77 & DPR-79,consisting of TS Change 93-09,revising Setpoints & Time Delays for AFW loss-of-power & 6.9 Kv Shutdown Board loss-of-voltage & degraded-voltage Instrumentation ML20095D5811995-12-0808 December 1995 Application for Amend to Licenses DPR-77 & DPR-79,revising TSs to Implement Recent Rule Change to 10CFR50,App J ML20092E0191995-09-11011 September 1995 Application for Amend to License DPR-79,consisting of TS Change Request 95-13,rev 1 Re Extension of Response Time Surveillance Requirements for Unit Two Cycle 7 ML20092E0351995-09-0808 September 1995 Application for Amends to Licenses DPR-77 & DPR-79,revising Section 3/4.7.8 to Clarify Intent of Vacuum Relief Flow During TS Required Testing of Auxiliary Bldg Gas Treatment Sys ML20092E2741995-09-0707 September 1995 Revised TS Change 95-15 for Amend to License DPR-77,revising TS Surveillance Requirements & Bases to Incorporate Alternate S/G Tube Plugging Criteria at Tube Support Plate Intersections,Per GL 95-05 ML20091K4241995-08-21021 August 1995 Proposed TS Change 95-21 to Licenses DPR-77 & DPR-79, Revising TS LCO 3.7.5.c to Allow for Increase in Ultimate Heat Sink Temp to 87 F Until 950930 ML20087D3751995-08-0707 August 1995 Application for Amends to Licenses DPR-77 & DPR-79,revising Time Constants for Overtemp Delta Temp & Overpower Delta Temp Equations 1999-08-30 Category:TEXT-LICENSE APPLICATIONS & PERMITS MONTHYEARML20217F9551999-10-14014 October 1999
[Table view]Application for Amends to Licenses DPR-77 & DPR-79,proposing Change to TS SRs & Bases to Incorporate ARC for Axial Primary Water Stress Corrosion Cracking at Dented Tube Support Plant Intersections ML20217D2641999-10-12012 October 1999 Amends 248 & 239 to Licenses DPR-77 & DPR-79,respectively, Deleting License Condition 2.C(22).A from License DPR-77 & License Condition 2.C.(16).b from License DPR-79 ML20217E4211999-10-12012 October 1999 TS Change 99-15 to Licenses DPR-77 & DPR-79,providing Unisolation of Containment Penetrations Under Administrative Controls ML20217B3581999-10-0606 October 1999 Amends 247 & 238 to Licenses DPR-77 & DPR-79,respectively, Request Approval to Remove TS 3.7.6, Flood Protection Plan & Associated Bases from TS for Sequoyah Nuclear Power Plant, Units 1 & 2 ML20212F4601999-09-23023 September 1999 Amends 246 & 237 to Licenses DPR-77 & DPR-79,respectively, Approving Request to Revise TSs to Allow Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20211N8811999-09-0707 September 1999 Amends 245 & 236 to Licenses DPR-77 & DPR-79,respectively, Requesting Approval to Remove Seismic Instrumentation Requirements & Associated Bases from SQN TSs for Units 1 & 2 ML20211K1521999-08-30030 August 1999 TS Change 99-10 to Licenses DPR-77 & DPR-79,providing Clarification to Current TS Requirements for Containment Isolation Valves ML20211M7261999-08-30030 August 1999 TS Change 99-08,for Amends to Licenses DPR-77 & DPR-79 to Provide Alternative to Requirement of Actually Measuring Response times.Marked-up & Revised TS Pages,Encl ML20209B7661999-06-30030 June 1999 Application for Amends to Licenses DPR-77 & DPR-79,updating Current TS Requirements for RCS Leakage Detection & RCS Operational Leakage Specifications to Be Consistent with NUREG-1431 ML20196F2121999-06-24024 June 1999 Application for Amends to Licenses DPR-77 & DPR-79,to Change TS Allowing Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20196G4441999-06-24024 June 1999 Application for Amends to Licenses DPR-77 & DPR-79,to Revise TS to Be Consistent with Rev to ISTS Presently Submitted to NEI TSTF for Submittal as Rev to NUREG-1431 ML20195E9661999-06-0707 June 1999 Application for Amend to License DPR-79,increasing Max Allowed Specific Activity of Primary Coolant from 0.35 Microcuries/Gram Dose Equivalent I-131 to 1.0 Microcuries/ Gram Dose Equivalent I-131 for Plant Cycle 10 (U2C10) Core ML20207A5781999-05-20020 May 1999 Errata to Amend 163 to OL DPR-79 on 931126.SR 4.1.1.1.1.d Was Inadvertently Omitted from Pp 3/4 1-1 of Unit 2 TS ML20206G3691999-05-0404 May 1999 Amends 244 & 235 to Licenses DPR-77 & DPR-79,respectively, Adding New Action Statement to TS 3.1.3.2 That Eliminates Need to Enter TS 3.0.3 Whenever Two or More IRP Indicators Per Bank May Be Inoperable as Listed ML20206E1551999-04-29029 April 1999 Application for Amends to Licenses DPR-77 & DPR-79, Consisting of TS Change 99-04, Auxiliary Feedwater Suction Pressure Low Surveillance Frequency Rev. Change Deletes Surveillance ML20206E1341999-04-29029 April 1999 Application for Amends to Licenses DPR-77 & DPR-79, Consisting of TS Change Request 99-03, Main Control Room Emergency Ventilation Sys Verses Radiation Monitors. Change Adds LCOs 3.3.3.1 & 3.7.7 & NUREG-1431 Changes ML20205N0291999-04-12012 April 1999 Amend 234 to License DPR-79,revising Plant,Unit 2 TSs for Reactor Core by Adding Sentence at End of TS Section 5.3 Authorizing Installation of Limited Number of LTAs Containing Downblended U IAW TR BAW-2328 ML20204H3991999-03-19019 March 1999 TS Change 99-01 to Licenses DPR-77 & DPR-79,relocating TS Associated with Electrical Equipment Protective Devices to Technical Requirements Manual ML20204E8051999-03-16016 March 1999 Amends 243 & 233 to Licenses DPR-77 & DPR-79,respectively, Revising SQN Licenses by Deleting License Conditions 2.C.(23)F for Unit 1 & 2.C.(16)g for Unit 2 Which Authorizes TVA to Operate ML20207D5941999-02-26026 February 1999 Application for Amend to Licenses DPR-77 & DPR-79,relocating TS 3.7.6, Flood Protection Plan & Associated Bases from TS to Plant TRM ML20207D6251999-02-26026 February 1999 Application for Amends to Licenses DPR-77 & DPR-79,revising TS to Provide for Consistency When Exiting Action Statements Associated with EDG Sets ML20206U4191999-02-0909 February 1999 Amends 242 & 232 to Licenses DPR-77 & DPR-79,respectively, Revising SQN TSs for EDG by Adding Note to SR 4.8.1.1.2.d.10 & Deleting SR 4.8.1.1.2.d.11 ML20199K5841999-01-15015 January 1999 Application for Amends to Licenses DPR-77 & DPR-79,adding New Action Statement to TS 3.1.3.2 That Would Eliminate Need to Enter TS 3.0.3 Whenever Two or More Individual RPIs Per Bank May Be Inoperable,While Maintaining Protection ML20206S0061999-01-15015 January 1999 TS Change 98-09 for Licenses DPR-77 & DPR-79,relocating TS 3.3.3.3, Seismic Instrumentation & Associated Bases from TS to Plant Technical Requirements Manual ML20198C0051998-12-16016 December 1998 Amends 241 & 231 to Licenses DPR-77 & DPR-79,respectively, Revising Sequoyah Nuclear Plant TSs by Extending AOT for Plant EDGs from 72 Hours to 7 Days ML20196C3721998-11-19019 November 1998 Amends 238 & 228 to Licenses DPR-77 & DPR-79,respectively, Revising TS 3.7.1.3 to Extend Limiting Condition for Operation of Condensate Storage Tanks to Mode 4 When SG Relied Upon for Heat Removal ML20196B0171998-11-19019 November 1998 Amends 239 & 229 to Licenses DPR-77 & DPR-79,respectively, Revising Plant,Units 1 & 2 TS SR 4.4.3.2.1 by Changing Mode Requirement to Allow power-operated Relief Valve Stroke Testing in Modes 3,4 & 5 with Steam Bubble in Pressurizer ML20195G3101998-11-17017 November 1998 Amends 237 & 227 to Licenses DPR-77 & DPR-79,respectively, Revising Plant TSs by Lowering Specific Activity Limit of Primary Coolant from 1.0 Uci/Gram Dose Equivalent iodine-131 to 0.35 Uci/Gram Dose Equivalent iodine-131 ML20195H6041998-11-16016 November 1998 Application for Amends to Licenses DPR-77 & DPR-79,revising EDG SRs by Adding Note to Allow SR to Be Performed in Modes 1,2,3 or 4 If Associated Components Are Already OOS for Testing or Maint & Removing SR Verifying Lockout Features ML20154H7201998-10-0808 October 1998 Supplemental Application for Amends to Licenses DPR-77 & DPR-79,changing TS to Add CRMP to Administrative Controls Section & Bases of TS ML20238F2911998-08-28028 August 1998 Amends 235 & 225 to Licenses DPR-77 & DPR-79,respectively, Revising SQN TSs by Relocating Snubber Requirements from Section 3.7.9 of TS & Bases,To SQN Technical Requirements Manual ML20238F2981998-08-27027 August 1998 Revised Applications for Amends to Licenses DPR-77 & DPR-79, Replacing 72 H AOT of TS 3.8.1.1,Action b,w/7 Day AOT Requirement for Inoperability of One EDG or One Train of Edg.Response to RAI Included in Encl ML20238F1051998-08-27027 August 1998 Application for Amend to License DPR-79,revising TS to Provide for Insertion of Limited Number of Lead Test Assemblies,Beginning W/Unit 2 Operating Cycle 10 Core ML20236S3301998-07-0101 July 1998 Amends 233 & 223 to Licenses DPR-77 & DPR-79,respectively, Revise Section 6, Administrative Controls, Snp TS by Relocating Certain QA Provisions from TS to TVA Nuclear Quality Assurance Plan ML20249C6321998-06-26026 June 1998 Application for Amends to Licenses DPR-77 & DPR-79,lowering Specific Activity of Primary Coolant from 1.0 Uci/G Dose Equivalent I-131 to 0.35 Uci/G Dose Equivalent I-131,as Provided in GL 95-05 ML20248L1911998-06-0808 June 1998 Amends 232 & 222 to Licenses DPR-77 & DPR-79,respectively,to Revise SQN TS by Adding New Limiting Condition for Operation 3.7.1.6 That Addresses Requirements for Main FW Isolation Valve Functions Required by SQN Accident Analysis ML20248E9841998-05-28028 May 1998 Suppl TS Change 95-19 to Licenses DPR-77 & DPR-79,replacing Direct Ref to Nuclear QA Plan in TS Section 6.3.1,facility Staff Qualification,W/Actual Requirements Stated in TVA-NQA-PLN89-A ML20217N3411998-04-30030 April 1998 Application for Amends to Licenses DPR-77 & DPR-79,modifying TS Surveillance Requirement 4.4.3.2.1.b to Change Mode Requirement to Allow PORV Stroke Testing in Modes 3,4 & 5 W/Steam Bubble in Pressurizer Rather than Only in Mode 4 ML20203J1511998-02-25025 February 1998 Application for Amends to Licenses DPR-77 & DPR-79 to Change TS for Units 1 & 2,revising EDG Surveillance Requirements ML20202J6601998-02-13013 February 1998 Application for Amends to Licenses DPR-77 & DPR-79, Incorporating MSIV Requirements to Be Consistent W/Std TS (NUREG-1431) ML20202J7421998-02-13013 February 1998 TS Change 97-04 to Application for Amends to Licenses DPR-77 & DPR-79,relocating Snubber Requirements from Section 3.7.9 of TS to Plant Technical Requirements Manual ML20202J7101998-02-13013 February 1998 Application for Amends to Licenses DPR-77 & DPR-79,adding New LCO That Addresses Requirements for Main Feedwater Isolation,Regulating & Bypass Valves ML20198T4211998-01-21021 January 1998 Suppl TS Change 95-19 to Licenses DPR-77 & DPR-79,revising Title for President,Tva Nuclear & Chief Nuclear Officer to Generic Title of Chief Nuclear Officer ML20198P9051998-01-13013 January 1998 Amend 230 to License DPR-77,revising TS SR 4.4.3.2.1.b for Remainder of Cycle 9 to Perform Stroke Testing of power-operated Relief Valves in Mode 5 Rather than Mode 4 ML20199K4441997-11-21021 November 1997 Application for Amend to License DPR-55,adding one-time Allowance Through Operating Cycle 9 to Surveillance Requirement 4.4.3.2.1.b to Perform Stroke Testing of PORVs in Mode 5 Rather than Mode 4,as Currently Required ML20217D7791997-09-29029 September 1997 Amends 229 & 220 to Licenses DPR-77 & DPR-79,respectively, Revises as-found Setpoint Tolerance Band for Pressurizer Code Safety Relief Valves & Ms Code Safety Relief Valves from 1% to 3% ML20211G1981997-09-23023 September 1997 Amends 228 & 219 to Licenses DPR-77 & DPR-79,respectively, Deleting TS Surveillance Requirement 4.8.1.1.1.b ML20211A3091997-09-17017 September 1997 TS Change 97-02 to Licenses DPR-77 & DPR-79,revising Pressure Differential Surveillance Requirements for Containment Spray Pumps ML20210J5841997-08-12012 August 1997 Amends 227 & 218 to Licenses DPR-77 & DPR-79,respectively, Revising TS 3/4.3.3, Monitoring Instrumentation, TS 3/4.7.11, Fire Detection Sys, TS 3/4.7.12, Fire Barrier Penetrations & TS 6.2.2, Facility Staff ML20151L7911997-07-14014 July 1997 Amends 226 & 217 to Licenses DPR-77 & DPR-79,respectively, Change TS by Eliminating EDG Accelerated Testing & Special Reporting Requirements of TS 4.8.1.1.2.a 1999-09-07 |
Text
. - _ _
J t
BA Tennessee Vahey Aatnonty. Post Office Box 22 Soddy-Datsy. Tenner.see 37379 2 cod Robert A. Fenech Vice Prescent. Sequoyah Nuclear Plant March 10,.1993 TVA-SQN-TS-92-08 10 CFR 50.90 t
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION (TS) CHANGE 92-08,-
" BORIC ACID CONCENTRATION REDUCTION" In accordance with 10 CFR 50.90, we are enc?osing a requested amendment to Licenses DPR-77 and DPR-79 to change the TSs of SQN Units 1 and 2.
The proposed change will reduce the boric acid concentration in the boric acid tanks from 12 percent to 4 percent by weight.
The proposed TS change is identified in Enclosure 1.
The justification for the proposed TS change is provided in Enclosure 2.
A determination of no significant hazards consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3.
The technical analysis supporting the TS I
change is provided as Enclosure 4.
l l
Implementation of the reduced boron concentration for both units will not be accomplished until the Unit 2 Cycle 6 refueling outage that is currently scheduled to begin on September 17, 1993.. Accordingly, NRC approval of the proposed change is requested at the beginning of the Unit 2 Cycle 6 refueling outage.- A period of 60 days from the start of the Unit 2 outage is also requested to implement the TS change.
Additionally, during this implementation period, Unit I will reduce the l
boron concentration while in an operational mode. This task will be l
factored into the Unit 2 restart schedule and planned to ensure that power operation is not affected. Please note that the proposed TS change
)
is similar to that approved for Turkey Point Nuclear Plant on July 16 -1991.
160002 4
PDR-ADOCK 05000327 hgf
]
l 9303160079 930310
^
p PDR
.,a,
i-g
.-.~
I t
l t
U.S. Nuclear Regulatory Commission Page 2 March 10, 1993 l
1 I
Please direct questions concerning this change to W. C. Ludwig at l
(615) 843-7460.
i i
Sincerely, j
="
Robert A. Fenech Sworn to and subscribed before me I
this /4 day of 7)h24cl' 1993 l (L/1Cf N?lAJh77Vn'l Ngdary/Public My Commission Expires /M /- 96 Enclosures cc (Enclosures):
Mr. D. E. LaBarge, Project Manager l
U.S. Nuclear Regulatory Commission
{
One White Flint, North j
11555 Rockville Pike i
Rockville, Maryland 20852-2739 I
Mr. Michael H. Mobley, Director (w/o Enclosures) i Division of Radiological Health 3rd Floor L & C Annex 401 Church Street Nashville, Tennessee 37203-1532 NRC Resident Inspector Sequoyah Nuclear. Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission
. Region.II 101 Marietta Street, NW, Suite 2900 Atlanta,- Georgia 30323-0199 1
'I
-..