ML20044B993

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses DPR-77 & DPR-79, Consisting of Proposed Changes to TS Including SQN Units 1 & 2 & Change, Boric Acid Concentration Reduction.
ML20044B993
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/10/1993
From: Fenech R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20044B994 List:
References
NUDOCS 9303160079
Download: ML20044B993 (2)


Text

. - _ _ _

J t

BA l Tennessee Vahey Aatnonty. Post Office Box 22 Soddy-Datsy. Tenner.see 37379 2 cod Robert A. Fenech Vice Prescent. Sequoyah Nuclear Plant March 10,.1993 TVA-SQN-TS-92-08 10 CFR 50.90 t

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen: >

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION (TS) CHANGE 92-08,-

" BORIC ACID CONCENTRATION REDUCTION" In accordance with 10 CFR 50.90, we are enc?osing a requested amendment to Licenses DPR-77 and DPR-79 to change the TSs of SQN Units 1 and 2.

The proposed change will reduce the boric acid concentration in the boric acid tanks from 12 percent to 4 percent by weight.  ;

The proposed TS change is identified in Enclosure 1. The justification for the proposed TS change is provided in Enclosure 2. A determination of no significant hazards consideration performed pursuant to 10 CFR 50.92 ,

is provided in Enclosure 3. The technical analysis supporting the TS I

change is provided as Enclosure 4. I l

l Implementation of the reduced boron concentration for both units will not .

be accomplished until the Unit 2 Cycle 6 refueling outage that is currently scheduled to begin on September 17, 1993.. Accordingly, NRC approval of the proposed change is requested at the beginning of the Unit 2 Cycle 6 refueling outage.- A period of 60 days from the start of l the Unit 2 outage is also requested to implement the TS change.

Additionally, during this implementation period, Unit I will reduce the l boron concentration while in an operational mode. This task will be l factored into the Unit 2 restart schedule and planned to ensure that ,

power operation is not affected. Please note that the proposed TS change )

is similar to that approved for Turkey Point Nuclear Plant on July 16 -1991.

160002 " 4 hgf

^

l 9303160079 930310 - ]

PDR- ADOCK 05000327 i-p PDR . ,a ,

g

. - . . . .-.~ - - . . . - - -. .. .-. - . - . -

I t

l t

U.S. Nuclear Regulatory Commission .

Page 2  !

March 10, 1993 l 1

I Please direct questions concerning this change to W. C. Ludwig at l (615) 843-7460. i i

Sincerely, j

="

Robert A. Fenech Sworn to and subscribed before me I

> this /4 day of 7)h24cl' 1993 l (L/1Cf N?lAJh77Vn'l ,

Ngdary/Public  !

My Commission Expires /M /- 96 Enclosures ,

cc (Enclosures):  !

Mr. D. E. LaBarge, Project Manager l U.S. Nuclear Regulatory Commission {

One White Flint, North j 11555 Rockville Pike i Rockville, Maryland 20852-2739 I l

Mr. Michael H. Mobley, Director (w/o Enclosures) l i

Division of Radiological Health 3rd Floor L & C Annex 401 Church Street Nashville, Tennessee 37203-1532 NRC Resident Inspector Sequoyah Nuclear. Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission

. Region.II 101 Marietta Street, NW, Suite 2900 Atlanta,- Georgia 30323-0199 1

'I

- ..