BA Tennessee Vahey Aatnonty. Post Office Box 22 Soddy-Datsy. Tenner.see 37379 2 cod Robert A. Fenech Vice Prescent. Sequoyah Nuclear Plant March 10,.1993 TVA-SQN-TS-92-08 10 CFR 50.90 t
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION (TS) CHANGE 92-08,-
" BORIC ACID CONCENTRATION REDUCTION" In accordance with 10 CFR 50.90, we are enc?osing a requested amendment to Licenses DPR-77 and DPR-79 to change the TSs of SQN Units 1 and 2.
The proposed change will reduce the boric acid concentration in the boric acid tanks from 12 percent to 4 percent by weight.
The proposed TS change is identified in Enclosure 1.
The justification for the proposed TS change is provided in Enclosure 2.
A determination of no significant hazards consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3.
The technical analysis supporting the TS I
change is provided as Enclosure 4.
l l
Implementation of the reduced boron concentration for both units will not be accomplished until the Unit 2 Cycle 6 refueling outage that is currently scheduled to begin on September 17, 1993.. Accordingly, NRC approval of the proposed change is requested at the beginning of the Unit 2 Cycle 6 refueling outage.- A period of 60 days from the start of the Unit 2 outage is also requested to implement the TS change.
Additionally, during this implementation period, Unit I will reduce the l
boron concentration while in an operational mode. This task will be l
factored into the Unit 2 restart schedule and planned to ensure that power operation is not affected. Please note that the proposed TS change
)
is similar to that approved for Turkey Point Nuclear Plant on July 16 -1991.
160002 4
PDR-ADOCK 05000327 hgf
]
l 9303160079 930310
^
p PDR
.,a,
i-g
.-.~
I t
l t
U.S. Nuclear Regulatory Commission Page 2 March 10, 1993 l
1 I
Please direct questions concerning this change to W. C. Ludwig at l
(615) 843-7460.
i i
Sincerely, j
="
Robert A. Fenech Sworn to and subscribed before me I
this /4 day of 7)h24cl' 1993 l (L/1Cf N?lAJh77Vn'l Ngdary/Public My Commission Expires /M /- 96 Enclosures cc (Enclosures):
Mr. D. E. LaBarge, Project Manager l
U.S. Nuclear Regulatory Commission
{
One White Flint, North j
11555 Rockville Pike i
Rockville, Maryland 20852-2739 I
Mr. Michael H. Mobley, Director (w/o Enclosures) i Division of Radiological Health 3rd Floor L & C Annex 401 Church Street Nashville, Tennessee 37203-1532 NRC Resident Inspector Sequoyah Nuclear. Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission
. Region.II 101 Marietta Street, NW, Suite 2900 Atlanta,- Georgia 30323-0199 1
'I
-..