ML20044B454
From kanterella
Jump to navigation
Jump to search
ML20044B454 | |
Person / Time | |
---|---|
Site: | Nine Mile Point |
Issue date: | 03/29/1991 |
From: | Murley T Office of Nuclear Reactor Regulation |
To: | Russell W Office of Nuclear Reactor Regulation |
Shared Package | |
ML17056C371 | List: |
References | |
CON-IIT07-463A-91, CON-IIT7-463-91A, CON-IIT7-463A-91 NUREG-1455, NUDOCS 9104080215 | |
Download: ML20044B454 (2) | |
Similar Documents at Nine Mile Point | |
---|---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217E1501999-10-0707 October 1999
[Table view]Notification of 991022 Meeting with NMPC to Discuss Nine Mile Point Performance as Documented in Mid-Cycle PPR of Nine Mile Point Nuclear Station ML20216F5061999-09-16016 September 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petitions as of 990831.During August,Directors Decision (DD-99-10) on Seabrook Issued & Petition Closed.Six Petitions Open,Five in NRR & One in Nmss.Attachment 2 Withheld ML20210L6431999-08-0606 August 1999 Notification of 990901 Meeting with NMP in Rockville,Md to Discuss NMP Plans to File Application Re Transfer of Interest & Authorities Under Plant Licenses to Amergen ML20210C1631999-07-19019 July 1999 Forwards Monthly Rept Which Gives Status of 10CFR2.206 Petitions as of 990630.Six Open NRR,1 OE & 2 NMSS Petitions Available.Attachment 2 Withheld ML20195G6941999-06-0808 June 1999 Rev 1,rescheduling Notification of 990625 Licensee Meeting 99-32 in King of Prussia,Pa with Util to Discuss Recent Plant Initiatives to Improve Corrective Action Program & Processes ML20195C5081999-06-0303 June 1999 Submits Summary of 990527 Telcon Between J Rajan of NRC & K Korcz of Niagara Mohawk Power Co Re Util Requesting NRC Approval of Proposed Mod to Upper Spring Assembly of Four Core Shroud Tie Rods ML20207F2701999-05-25025 May 1999 Notification of 990608 Meeting with Licensee in King of Prussia,Pa to Discuss Licensee Recent Initiatives to Improve Corrective Action Program & Processes ML20206R3691999-05-0707 May 1999 Notification of Significant Licensee Meeting 99-24 with Util Current Employee on 990513 to Discuss Apparent Violation of 10CFR55,noted in NRC Correspondence to Individual Ref OI Rept 1-1998-033 ML20154D8211998-10-0505 October 1998 Forwards SE Accepting Licensee 980619 Submittal of Proposed Changes to PT Limits to Provide New Limits Valid to 28 EFPYs ML20151V1241998-09-0909 September 1998 Notification of 980924 Meeting W/Util & Public in Oswego,Ny to Review NMPC Request to Extend Current Core Shroud Vertical Weld Insp Interval & to Receive Comments/Questions Re NMPC Request to Extend Unit 1 Core Shroud Vertical Weld ML20237C9501998-08-20020 August 1998 Forwards Facility Submitted Outline & Initial Exam Submittal W/As Given Operating Exam for Tests Administered on 980119- 23 IR 05000220/19980031998-08-20020 August 1998 Forwards Exam Rept 50-220/98-03OL Administered on 980119-23 W/As Given Written Exam,Designated for Distribution ML20236X5631998-07-31031 July 1998 Discusses NMP & Several Supporting Ltrs, Requesting That NRC Authorize Extension of Insp Interval for Cracks in Plant,Unit 1 Core Shroud Welds from 10,600 Hot Operating H to 14,500 Hot Operating H ML20217F4411998-03-19019 March 1998 Forwards Order Approving Application Re Acquisition of New York State Electric & Gas Corp by Holding Co Affecting License NPF-69,Nine Mile Point Nuclear Station,Unit 2 for Fr Publication ML20203A3041998-02-0606 February 1998 Notification of 980224 Meeting W/Niagara Mohawk Power Corp in Rockville,Md to Discuss Schedules for Current & Projected Licensing Actions & Licensing Activities for Project Mgt Purposes ML20199C0771998-01-23023 January 1998 Corrected Notification of 980128 Meeting W/Nmp in Rockville, Md,To Disduss NRC Position That Exceeding Relief Pressures Stated in FSAR Design Bases for Blowout Panels of Reactor & Turbine Bldgs Should Have Been Reported in 1993 ML20198J4911998-01-0606 January 1998 Notification of 980128 Meeting W/Nmp in Rockville,Md to Discuss NRC Position That Exceeding Relief Pressure Stated in FSAR Design Bases for Blowout Panels of Reactor & Turbine Bldgs That Should Have Been Reported to NRC in 1993 ML20202B2321997-12-0101 December 1997 Responds to 960313 Memo Requesting NRR Technical Assistance to Determine Adequacy of NMPC Revised Design Calculations for Reactor Bldg & Turbine Bldg Pressure Relief (or Blowout) Panels.Partially Withheld ML20217E8371997-10-0101 October 1997 Notification of 971009 Meeting W/Util in Rockville,Md to Discuss Mgt Aspects of Current & Pending Licensing Activities,Including Plans to Convert Unit 2 to Improved Std TSs Plans Re Unit 1 Core Shroud Insp & Associated Schedule ML20202B1451997-09-24024 September 1997 Discusses Response to Nine Mile Point on Blow Out Panels ML20199J0971997-08-21021 August 1997 Emails Info Re Plant Blowout Panels ML20149F1531997-07-16016 July 1997 Forwards NRC Approved Operator Licensing Written Retake Exam (Facility Outline & Initial Exam Submittal) for Tests Administered on 970606 ML20202B1721997-07-0707 July 1997 Requests Concurrence on by 970714.Partially Withheld ML20199J1041997-07-0707 July 1997 Emails Util Ltr for concurrence,EA-96-079.Comments Requested ML20138C7071997-04-29029 April 1997 Forwards Summary for Two Public Meetings Held W/Nmp on 970414 to Discuss Core Shroud Issues at Plant,Unit 1.Copies of Subj Meeting Videotape Have Been Sent to PDR ML20140C4811997-04-11011 April 1997 Discusses Exams of Core Shroud Welds & Tie Rod Repair Assemblies Conducted During Current Refueling Outage at Plant,Unit 1 & Initiation of Adjustments to One of Core Tie Rods ML20137S3611997-04-0303 April 1997 Notification of Cancelled 970410 Meeting W/Util in Rockville Md,Rescheduled on 970414 in Oswego,Ny,To Discuss Evaluations & Conclusions Re Core Shroud Integrity in View of Insp Results That Revealed Cracks in Heat Affected Zones ML20137L4441997-04-0303 April 1997 Notification of 970410 Meeting W/Util in Rockville,Md to Discuss Evaluations & Conclusions Re Core Shroud Integrity in View of Insp Results Revealing Cracks in Heat Affected Zones of Horizontal & Vertical Welds ML20147H6501997-04-0101 April 1997 Forwards Copies of Core Shroud Insp Results & Schedules That Licensee Has Telecopied to NRC Staff Since 970320 ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20147D7251997-02-0707 February 1997 Forwards from Mj Mccormick Requesting Data from NRC Sponsored Tests on Pressure Locking of motor-operated Gate Valves ML20133J4681997-01-13013 January 1997 Discusses 961114 AEOD Presentation of Assessment of Spent Fuel Cooling Viewgraph 13, Reduced Time to Boil at Nine Mile Point Unit 2, & Forwards Figures IA-97-375, Forwards SE Re Reactor & Turbine Building blow-out Panels1997-01-0303 January 1997 Forwards SE Re Reactor & Turbine Building blow-out Panels ML20203J4821997-01-0303 January 1997 Forwards SE Re Reactor & Turbine Building blow-out Panels ML20203J4611997-01-0202 January 1997 Forwards SE Accepting Subj Panels as Modified & Supported by Discussed Engineering Analysis Results ML20135C6361996-12-0404 December 1996 Forwards Signed Original of Order Imposing Monetary Penalty for Plant,Unit 1.W/o Encl ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129J4781996-11-0404 November 1996 Summarizes 961030 Operating Reactors Events Briefing 96-14 Re Notification of Senior Managers from Commission,Oe,Aeod, Res,Nrr & Regional Offices of Selected Events That Occurred Since 961023 Briefing.List of Attendees Encl ML20199J0911996-05-0101 May 1996 Requests Technical Assistance Supplement 1,in Determining If Util Interpretation Re Reactor & Turbine Bldgs Blowout Panels,Per 10CFR50.59 SE Requirements ML20199J0841996-03-13013 March 1996 Submits Request for Technical Assistance to Determine Technical Adequacy of Util Revised Design Calculations for Reactor & Turbine Bldgs Blowout Panels NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl NUREG-1231, Forwards Documents Referenced in Suppl 16 to NUREG-09331993-11-29029 November 1993 Forwards Documents Referenced in Suppl 16 to NUREG-0933 ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20044B4711991-08-15015 August 1991 Informs of Request That AEOD Take Necessary Actions to Upgrade Current Augmented Insp Team to Seven Members Due to Potential Safety Significance & Regulatory Questions Raised During 910813 Event at Facility Re Reactor Trip ML20044B4541991-03-29029 March 1991 Summarizes Findings of Review of BWROG Appeal of Previous Staff Positions Re Proposed Requirement of Upgraded Nf Monitoring Sys for BWR ML20033E2411990-03-0505 March 1990 Notification of 900307 Meeting W/Ge in Rockville,Md to Discuss Potential Power Reactor Upgrades ML20072M7551989-08-25025 August 1989 Discusses Listed Media Info Which Includes R Burnes of Associated Press Interview W/T Murley on Story About Problem Plants & How NRC Detects Degradation of Performance ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart 1999-09-16 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20217E1501999-10-0707 October 1999
[Table view]Notification of 991022 Meeting with NMPC to Discuss Nine Mile Point Performance as Documented in Mid-Cycle PPR of Nine Mile Point Nuclear Station ML20216F5061999-09-16016 September 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petitions as of 990831.During August,Directors Decision (DD-99-10) on Seabrook Issued & Petition Closed.Six Petitions Open,Five in NRR & One in Nmss.Attachment 2 Withheld ML20210L6431999-08-0606 August 1999 Notification of 990901 Meeting with NMP in Rockville,Md to Discuss NMP Plans to File Application Re Transfer of Interest & Authorities Under Plant Licenses to Amergen ML20210C1631999-07-19019 July 1999 Forwards Monthly Rept Which Gives Status of 10CFR2.206 Petitions as of 990630.Six Open NRR,1 OE & 2 NMSS Petitions Available.Attachment 2 Withheld ML20195G6941999-06-0808 June 1999 Rev 1,rescheduling Notification of 990625 Licensee Meeting 99-32 in King of Prussia,Pa with Util to Discuss Recent Plant Initiatives to Improve Corrective Action Program & Processes ML20195C5081999-06-0303 June 1999 Submits Summary of 990527 Telcon Between J Rajan of NRC & K Korcz of Niagara Mohawk Power Co Re Util Requesting NRC Approval of Proposed Mod to Upper Spring Assembly of Four Core Shroud Tie Rods ML20207F2701999-05-25025 May 1999 Notification of 990608 Meeting with Licensee in King of Prussia,Pa to Discuss Licensee Recent Initiatives to Improve Corrective Action Program & Processes ML20206R3691999-05-0707 May 1999 Notification of Significant Licensee Meeting 99-24 with Util Current Employee on 990513 to Discuss Apparent Violation of 10CFR55,noted in NRC Correspondence to Individual Ref OI Rept 1-1998-033 ML20154D8211998-10-0505 October 1998 Forwards SE Accepting Licensee 980619 Submittal of Proposed Changes to PT Limits to Provide New Limits Valid to 28 EFPYs ML20151V1241998-09-0909 September 1998 Notification of 980924 Meeting W/Util & Public in Oswego,Ny to Review NMPC Request to Extend Current Core Shroud Vertical Weld Insp Interval & to Receive Comments/Questions Re NMPC Request to Extend Unit 1 Core Shroud Vertical Weld ML20237C9501998-08-20020 August 1998 Forwards Facility Submitted Outline & Initial Exam Submittal W/As Given Operating Exam for Tests Administered on 980119- 23 IR 05000220/19980031998-08-20020 August 1998 Forwards Exam Rept 50-220/98-03OL Administered on 980119-23 W/As Given Written Exam,Designated for Distribution ML20236X5631998-07-31031 July 1998 Discusses NMP & Several Supporting Ltrs, Requesting That NRC Authorize Extension of Insp Interval for Cracks in Plant,Unit 1 Core Shroud Welds from 10,600 Hot Operating H to 14,500 Hot Operating H ML20217F4411998-03-19019 March 1998 Forwards Order Approving Application Re Acquisition of New York State Electric & Gas Corp by Holding Co Affecting License NPF-69,Nine Mile Point Nuclear Station,Unit 2 for Fr Publication ML20203A3041998-02-0606 February 1998 Notification of 980224 Meeting W/Niagara Mohawk Power Corp in Rockville,Md to Discuss Schedules for Current & Projected Licensing Actions & Licensing Activities for Project Mgt Purposes ML20199C0771998-01-23023 January 1998 Corrected Notification of 980128 Meeting W/Nmp in Rockville, Md,To Disduss NRC Position That Exceeding Relief Pressures Stated in FSAR Design Bases for Blowout Panels of Reactor & Turbine Bldgs Should Have Been Reported in 1993 ML20198J4911998-01-0606 January 1998 Notification of 980128 Meeting W/Nmp in Rockville,Md to Discuss NRC Position That Exceeding Relief Pressure Stated in FSAR Design Bases for Blowout Panels of Reactor & Turbine Bldgs That Should Have Been Reported to NRC in 1993 ML20202B2321997-12-0101 December 1997 Responds to 960313 Memo Requesting NRR Technical Assistance to Determine Adequacy of NMPC Revised Design Calculations for Reactor Bldg & Turbine Bldg Pressure Relief (or Blowout) Panels.Partially Withheld ML20217E8371997-10-0101 October 1997 Notification of 971009 Meeting W/Util in Rockville,Md to Discuss Mgt Aspects of Current & Pending Licensing Activities,Including Plans to Convert Unit 2 to Improved Std TSs Plans Re Unit 1 Core Shroud Insp & Associated Schedule ML20202B1451997-09-24024 September 1997 Discusses Response to Nine Mile Point on Blow Out Panels ML20199J0971997-08-21021 August 1997 Emails Info Re Plant Blowout Panels ML20149F1531997-07-16016 July 1997 Forwards NRC Approved Operator Licensing Written Retake Exam (Facility Outline & Initial Exam Submittal) for Tests Administered on 970606 ML20202B1721997-07-0707 July 1997 Requests Concurrence on by 970714.Partially Withheld ML20199J1041997-07-0707 July 1997 Emails Util Ltr for concurrence,EA-96-079.Comments Requested ML20138C7071997-04-29029 April 1997 Forwards Summary for Two Public Meetings Held W/Nmp on 970414 to Discuss Core Shroud Issues at Plant,Unit 1.Copies of Subj Meeting Videotape Have Been Sent to PDR ML20140C4811997-04-11011 April 1997 Discusses Exams of Core Shroud Welds & Tie Rod Repair Assemblies Conducted During Current Refueling Outage at Plant,Unit 1 & Initiation of Adjustments to One of Core Tie Rods ML20137S3611997-04-0303 April 1997 Notification of Cancelled 970410 Meeting W/Util in Rockville Md,Rescheduled on 970414 in Oswego,Ny,To Discuss Evaluations & Conclusions Re Core Shroud Integrity in View of Insp Results That Revealed Cracks in Heat Affected Zones ML20137L4441997-04-0303 April 1997 Notification of 970410 Meeting W/Util in Rockville,Md to Discuss Evaluations & Conclusions Re Core Shroud Integrity in View of Insp Results Revealing Cracks in Heat Affected Zones of Horizontal & Vertical Welds ML20147H6501997-04-0101 April 1997 Forwards Copies of Core Shroud Insp Results & Schedules That Licensee Has Telecopied to NRC Staff Since 970320 ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20147D7251997-02-0707 February 1997 Forwards from Mj Mccormick Requesting Data from NRC Sponsored Tests on Pressure Locking of motor-operated Gate Valves ML20133J4681997-01-13013 January 1997 Discusses 961114 AEOD Presentation of Assessment of Spent Fuel Cooling Viewgraph 13, Reduced Time to Boil at Nine Mile Point Unit 2, & Forwards Figures IA-97-375, Forwards SE Re Reactor & Turbine Building blow-out Panels1997-01-0303 January 1997 Forwards SE Re Reactor & Turbine Building blow-out Panels ML20203J4821997-01-0303 January 1997 Forwards SE Re Reactor & Turbine Building blow-out Panels ML20203J4611997-01-0202 January 1997 Forwards SE Accepting Subj Panels as Modified & Supported by Discussed Engineering Analysis Results ML20135C6361996-12-0404 December 1996 Forwards Signed Original of Order Imposing Monetary Penalty for Plant,Unit 1.W/o Encl ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129J4781996-11-0404 November 1996 Summarizes 961030 Operating Reactors Events Briefing 96-14 Re Notification of Senior Managers from Commission,Oe,Aeod, Res,Nrr & Regional Offices of Selected Events That Occurred Since 961023 Briefing.List of Attendees Encl ML20199J0911996-05-0101 May 1996 Requests Technical Assistance Supplement 1,in Determining If Util Interpretation Re Reactor & Turbine Bldgs Blowout Panels,Per 10CFR50.59 SE Requirements ML20199J0841996-03-13013 March 1996 Submits Request for Technical Assistance to Determine Technical Adequacy of Util Revised Design Calculations for Reactor & Turbine Bldgs Blowout Panels NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl NUREG-1231, Forwards Documents Referenced in Suppl 16 to NUREG-09331993-11-29029 November 1993 Forwards Documents Referenced in Suppl 16 to NUREG-0933 ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20044B4711991-08-15015 August 1991 Informs of Request That AEOD Take Necessary Actions to Upgrade Current Augmented Insp Team to Seven Members Due to Potential Safety Significance & Regulatory Questions Raised During 910813 Event at Facility Re Reactor Trip ML20044B4541991-03-29029 March 1991 Summarizes Findings of Review of BWROG Appeal of Previous Staff Positions Re Proposed Requirement of Upgraded Nf Monitoring Sys for BWR ML20033E2411990-03-0505 March 1990 Notification of 900307 Meeting W/Ge in Rockville,Md to Discuss Potential Power Reactor Upgrades ML20072M7551989-08-25025 August 1989 Discusses Listed Media Info Which Includes R Burnes of Associated Press Interview W/T Murley on Story About Problem Plants & How NRC Detects Degradation of Performance ML20245L5981989-08-17017 August 1989 Staff Requirements Memo on 890802 Briefing in Rockville,Md Re Status of Nine Mile Point Unit 1 ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys 1999-09-16 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20044B454&oldid=4533195"