Discusses Response to Nine Mile Point on Blow Out Panels
ML20202B145
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 09/24/1997
From: Lieberman J
NRC OFFICE OF ENFORCEMENT (OE)
To: Thadani A
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML20202B115 List:
References
FOIA-97-375 NUDOCS 9712030063
Download: ML20202B145 (1)


Text

_ - _ . . - . _ .-_ . . _ . _ _ _ _ . . . . . _ . . . . . _ . - - - _ . . . . . _ _ _ . _ _ _ . _ . _ .

From: James Lieterman 8b- -

71 '

To: WNDI,WNPl.Adr (( - [ 7 6 d<t A - /

Instet . 9/24/9712:17pm . .

Subjects  : response to nine mile point on blow out panels

~

As you imw we issued our response on September 12,1997 concluding that there were violations but noted that the staff was continuing to review the generic issue of reporting. Carl Terry, from 9 Mile called me today requesting an extension of time to respond, They are not sa'isfied without response and realize it is only a severity level 4 issue. They are concerned

- with the generic issue and what will they tell their operators to do. I told him he needs to make sure that the FSAR is consulted to determine if the particular discrepancy is described as part of the design lusis. Smile is consu' ting with NEI and our de-ision. They asked for an extension to tie end of the year. We agreed on an extension to December 8.1997.

CC: 'IVDI.TWP4.TTM. WNP3.DSil, WNP4.RPZ KPDI.KPP2.CWII s