October 5, 1998 MEMORANDUM TO:

Singh S. Bajwa, Director Project Directorate 1-1 Division of Reactor Projects,I/II FROM:

Keit c$rnan,Mef Section A Materials and Chemical Engineering Branch Division of Engineering

SUBJECT:

PRESSURE TEMPERATURE LIMITS EVALUATION FOR NINE MILE POINT 1 (TAC NO.: MA1413)

By letter dated June 19,1998, Niagara Mohawk Power Corporation, the licensee, submitted changes related to the pressure-temperature (P-T) limits in the Nine Mile Point Unli 1 Technical Specifications (TS). The licensee revised the P-T limits to provide new limits that are valid to 28 effective full power years (EFPY).

Based on our evaluation of the submittal, we conclude that the proposed P-T limits for heatup and cooldown for non-critical operations; heatup and cooldown for critical operations; and non-critical leakage /hydrotest are acceptable to 28 EFPY, and may be incorporated in the Nine Mile Point Unit 1 TS.

Our evaluation is submitted as Attachment 1 and our SALP input is submitted as Attachment 2.

This completes our efforts for TAC NO. MA1413.

Docket No.: 50-220 Attachments: As stated i

CONTACT: A D. Lee, NRR 415-2735 DISTRIBUTION:

File conter;,

DHood LLois PUBLIC JCushing SSheng EMCB RF ESullivan MMayfield G:\\ LEE \\NMP1__PT.WPD To receive a copy of this document, indicate in the box C= Copy w/o attachment /e osure E= Copy with attachment / enclosure N = No copy f

l OFFICE b

DE;EhQkl b

k DE:EMCB DE:EMCB lNAME Aleeh0L BElliot h K

n lDATE 10/k98 10/5/98 10598

\\

~

D 9810070354 981005 PDR ADOCK 05000220 hk hh

>RTQV UNITED STATES 6

Tg j

NUCLEAR REGULATORY COMMISSION o$ p ( y V /

WASHINGTON, D.C. 30666 0001 o.g #

October 5, 1998 MEMORANDUM TO:

Singh S. Bajwa, Director Project Directorate 1-1 Division of Reactor Projects,1/11 l

FROM:

N Keith R. Wichman, Chief h

Section A i

J Materials and Chemical Engineering Branch Division of Engineering

SUBJECT:

PRESSURE TEMPERATURE LIMITS EVALUATION FOR NINE MILE POINT 1 (TAC NO.: MA1413)

By letter dated June 19,1998, Niagara Mohawk Power Corporation, the licensee, submitted changes related to the pressure temperature (P-T) limits in the Nine Mile Point Unit 1 Technical Specifications (TS). The licensee revised the P-T limits to provide new limits that are valid to 28 effective full power years (EFPY).

Based on our evaluation of the submittal, we conclude that the proposed P-T limits for heatup and cooldown for non-critical operations; heatup and cooldown for critical operations; and non-critical leakage /hydrotest are acceptable to 28 EFPY, and may be incorporated in the Nine Mile Point Unit 1 TS.

Our evaluation is submitted as Attachment 1 and our SALP input is submitted as Attachment 2.

This completes our efforts for TAC NO. MA1413.

Docket No.: 50-220 Attachments: As stated CONTACT: A.D. Lee, NRR 415-2735 i