ML20199C077
| ML20199C077 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 01/23/1998 |
| From: | Hood D NRC (Affiliation Not Assigned) |
| To: | Bajwa S NRC (Affiliation Not Assigned) |
| References | |
| NUDOCS 9801290119 | |
| Download: ML20199C077 (3) | |
Text
January 23, 1998 MEMORANDUM TO: S. Singh Baj.va, Director Project Directorate 11 CORRECTION Division of Reactor Projects.1/ll Retssued due to change in room j
j Office of Nuclear Reactor Regulation number.
Please note new room number below.
FROM:
Dar' 1 Hood, Senior Project Manager ORIGINAL $1GNED BY:
Proj.
Directorate 11 i
Divisic.i of Reactor Project: 1/11 Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING MEETING WITH NIAGARA MOHAWK POWER CORPORATION (NMPC) RELATED TO NINE MILE POINT NUCLEAR STATION, UNIT NO.1 DATE AND TIME:
Wednesday, January 28,1998 1:30 p.m. 2:30 p.m.
4 LOCATION:
U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 04*B6 Rockville, MD y
.i PURPOSE:
To discuss the NRC position that exceeding the relief pressures stated in f
the FSAR design bases for the blowout panels of the Reactor and Turbine Buildings should have been reported to the NRC in 1993. See A. Thadani letter to R. Sylvia, September 12,1997 and B. Sylvia's reply of October 27,1997, i
PARTICIPANTS:'
Participants from the NRC include the Director of the Office of Nuclear Reactor Regulation (NRR).
NBQ NMPC S. Collins, NRR R. Sylvia etal.
C. Terry D. Wolnlak Docket No. 50 220
= s a xt a=*
EC RE CETE] COPY
[
CONTACT: Dart Hood 415-3049 0
- Meetings between NRC technical staff and applicants or liceneses are open for interested -
members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federgj Reaister 48340,9/20/94.
Afu[
DOCUMENT NAME: G:\\NMPl\\NM194858.HTN
- See previous concurrence To receive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure
- E" = Copy with j
. attrchment/ enclosure "N" = No copy-OfflCE PMtPolat lE LAtPDl*1 l
D P0l*1 l
D DRPE*
D ADRP*
l l
WAME DMood/rst
$little
$5ajwa -
Stoger R21mnerman DAlf 01/06/98 01/06/98 01/06/98 12/10/97 12/?4/97 OffIc1ei Record Copy 9901290119 900123 PDR ADOCK 05000220 ll lllil!Il ll e
eaa
- ',/#'%
CORRECT 10N f*g Yetssued due to change g.-
UNITED STATES in room number.
Please note a
P NUCLEAR REGULATORY COMMISSION new room number below.
g j
WASHINGTON, D.c. 300tH001 January 23, 1998 MEMORANDUM To: S. Singh Bajwa, Director Project Directorate 11 Division of Reactor Projects t/ll office of Nuclear Reactor Regulation FROM:
Dari S. Hood, Senior Project Manager Project Directorate 11 M
Division of Reactor Projecta.1/ll Office of Nuclear Reactor Regulation j
SUBJECT:
FORTHCOMING MEETING WITH NIAGARA MOHAWK POWER CORPORATION (NMPC) RELATED TO NINE MILE POINT NUCLEAR
{
STATION, UNIT No.1 DATE AND TIME:
Wednesday, January 28,1998
{
1:30 p.m. - 2:30 p.m.
4 LOCATION:
U.S. Nuclear Regulatory Commission i
One White Flint North i
11555 Rockville Pike, Room 04 B6 i
Rockville, MD j
PURPOSE:
To discuss the NRC position that exceeding the relief pressures stated in the FSAR design bases for the blowout panels of the Reactor and Turbine Buildings should have been reported to the NRC in 1993. See A. Thadani l
letter to R. Sylv;a, September 12,1997 and B. Sylvia's reply of October 27,1997.
PARTICIPANTS:*
Participants from the NRC include the Director of the Office of Nuclear Reactor Regulation (NRR),
i NdQ NMPC l
S. Collins, NRR R. Sylvia et al.
C. Terry D. Wolniak i
Docket No. 50 220 cc: See next page CONTACT: DarlHood 415 3049
- Meetings between NRC technical staff and applicants or licensees are open for interested -
members of the pub!b. petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Sta3 ment on Staff Meetings Open to the Public" 59 Federal Reaister 48340,9/20/94.
d 4
...,., _ ~ -,
. - - - -. = -. - -
I o,
l J
l Magtina Notice E MaH Hard Cony S. Collins /F. Miraglia Docket File R. Zimmerman (RPZ)
PUBUC B.Boger.
PDl.1 R/F
- J. Zwolinski OGC-
T. Martin J. Lieberman OPA (email to OPA)
C. Hehl (CWH)
B. McCabe (BCM)
D. Screnci(DPS)
PMNS (Meeting Announcement Coordinator) l
~'
i 5
I i
1