ML20151V124

From kanterella
Jump to navigation Jump to search
Notification of 980924 Meeting W/Util & Public in Oswego,Ny to Review NMPC Request to Extend Current Core Shroud Vertical Weld Insp Interval & to Receive Comments/Questions Re NMPC Request to Extend Unit 1 Core Shroud Vertical Weld
ML20151V124
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/09/1998
From: Hood D
NRC (Affiliation Not Assigned)
To: Bajwa S
NRC (Affiliation Not Assigned)
References
NUDOCS 9809140088
Download: ML20151V124 (8)


Text

.._

w 1

a ras %

},P.220 1

p i.

UNITED STATES g

j NUCLEAR REGULATORY COMMISSION

\\ g g /j WASHINGTON. D.C. enmaa anni g

September 9, 1998 MEMORANDUM TO: S. Singh Bajwa, Director Project Directorate 1-1 Division of Reactor Projects - 1/ll i

Office of Nuclear Reactor Regulation Darl S. Hood, Senior Project Manager y/f FROM:

Project Directorate 1-1 i

Division of Reactor Projects - 1/11 l

Office of Nuclear Reactor Regulation i

SUBJECT:

FORTHCOMING MEETINGS WiTH NIAGARA MOHAWK POWER CORPORATION (NMPC) AND THE PUBLIC RELATED TO NINE MILE POINT NUCLEAR STATION, UNIT NO.1 DATE AND TIME:

Thursday, September 24,1998 5:00 p.m. - 7:00 p.m. NRC Session with NMPC (Session No.1)*

7:30 p.m. - 9:30 p.m. NRC Session with the Public (Session No. 2)

LOCATION:

State University of New York at Oswego Building 24, Snygg Hall Washington Boulevard Oswego, New York Room 203 - NRC Session with NMPC*

Room 102 - NRC Session with the Public and Local Officials PURPOSE:

Session No.1: -To review NMPC's request to extend the current core shroud vertical weld inspection interval from 10,600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br /> of hot operation to 14,500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> of hot operation. This willincluds review of core shroud boat sample tests and evaluations, shroud fluence measurement results, 4

and technicaljustification for applying a crack growth rate of 2.2 x 10 inch / hour to the Unit i shroud.

Session No. 2: To receive comments / questions from members of the public and local officials regarding NMPC's request to extend the Unit 1 core shroud vertical weld inspection interval from 10,600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br /> of hot operation to 14,500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> of hot operation.

i PARTICIPANTS:*

The participants from the NRC will be from the Office of Nuclear Reactor Regulation (NRR) in Rockville, Maryland, and from Regional Office 1 in 110033 J

TN 3

1

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Reaister 48340,9/20/94.

j l

9809140008 980909 PDR ADOCK 05000220

,-, ((

] _ j(- ( _7.

,j

}

P PDR I

_.. _ __... _ _ ~ - _ -

d King of Prussia, Pennsylvania, including the NRC Senior Resident inspector at the Nine Mile Point Nuclear Station.

NRC NMPC R. Hermann, NRR B. Norris, RI J. Mueller R. Caruso, NRR W. Koo, NRR R, Abbott K. Kavanagh, NRR L. Lois, NRR C. Terry S. Bajwa, NRR D. Hood, NRR G. Inch L. Doerflein, RI et al et at Docket No. 50-220

Enclosures:

1. Agenda
2. Campus Map
3. Directions to Campus cc w/encls: See next page CONTACT: Dari Hood (301)415-3049 dsh@nrc. gov W

J w

-,n w

4 September 9, 1998

> King of Prussia, Pennsylvania, including the NRC Senior Resident inspector at the Nine Mile Point Nuclear Station.

NRC NMPC R. Hermann, NRR E. Norris, RI J. Mueller R. Caruso, NRR

\\A Koo, NRR R. Abbott K. Kavanagh, NRR L. '.ois, NRR C. Terry S. Bajwa, NRR D. Hood, NRR G. Inch L. Doerflein, RI et a' et al Docket No. 50-220

Enclosures:

1. Agenda
2. Campus Map ORIGINAL SIGNED BY DARL S. HOOD l
3. Directions to Campus ec w/encts: See next page CONTACT: Darl Hood I

(301)415-3049 dsh@nrc. gov 1,

4 DOCUMENT NAME: G:\\NMPl\\092498.MTN To receive a copy of this document, indicate in the box:

"C" - Copy without attachment / enclosure "E" - Copy yjth attachment / enclosure "N" - No copy 0FFICE PM: POI-1 lE LA:P01-1 di \\/

l D:poJ 1,f) /,

l l

l NAME DHood/rst.PJ/f SLittle_M ~

SIL[jd//I/ l DATE 09/ 4 /98 09/'l/98 09/9 /9I Official Record Copy

-~ -. -___

Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Unit No.1 cc:

Mr. John H. Mueller Resident inspector Chief Nuclear Officer U.S. Nuclear Regulatoy Commission Niagara Mohawk Power Corporation P.O. Box 126 Nine Mile Point Nuclear Station Lycoming, NY 13093 Operations Building, Second Floor P.O. Box 63 Charles Donaldson, Esquire Lycoming, NY 13093 Assistant Attomey General New York Department of Law Regional Administrator, Region i 120 Broadway U.S. Nuclear Regulatory Commission New York, NY.10271 -

475 Allendale Road King of Prussia, PA 19406 Mr. Paul D. Eddy State of New York Mark J. Wetterhahn, Esquire Department of Public Service Winston & Strawn Power Division, System Operations 1400 L Street, NW 3 Empire State Plaza Washington, DC 20005-3502 Albany, NY 12223 Supervisor Mr. F. William Valentino, President Town of Scriba New York State Energy, Research, Route 8, Box 382 and Development Authority Oswego,NY 13126 Corporate Plazs West 286 Washington Avenue Extension Gary D. Wilson, Esquire Albany, NY 12203-6399 Niagara Mohawk Power Corporation 300 Erie Boulevard West Syracuse, NY 13202 c

y-c-c, w +

l AGENDA I

September 24,1998

~

Meeting Regarding Inspection of Core Shroud Vertical Welds at Nine Mile Point Nuclear Station Unit 1 l

1. NRC SESSION WITH NIAGARA MOHAWK POWER CORPORATION (NMPC) 5:00 NRC Opening Remarks Darl Hood Purpose Introduction of Participants 5:05 Background Robert Hermann 5:10 NMPC's Review of Request to Richard Abbott Extend Core Shroud et al.

Inspection interval Introduction Core Shroud Boat Sample Tests and Evaluations Application of BWRVIP-14 to Unit 1 Core Shroud Weld Cracks Conclusions

'T 6:30 NRC Questions / Comments 7:00 Break II. NRC SESSION WITH PUBLIC 7:30 NRC Opening Statements Darl Hood

~

7:35 Questions / Comments from Audience 9:30 NRC Closing Remarks Singh Bajwa 4

l

'SEP-03-1998 16:09 DRP 610 337 5349 P.02/03 5

~,

l l

~.Q r,.

j i

(9-Q..,; ;..,, i f'u h w \\..W):

~

  • f.jlle$,

l y,AWm

~ k, M__

' %...., l i

~Rle

?

M9 c

in 2

V I

<?

.... ;-l..,

?}.,
%
.k.d,.,'

l

Q;
9. :.

.} ')

j

' f.

!m, lgl9

\\.

, g,-

a a
t

!k. ?h.

. WI M

'g'2 i

i I

-i - --$3 -h g i.,

f 5'I 0 05 d.

bi, />.{.

is

. h

-a
z d

\\z I

[

(

{

k

?

I, o

i 1

E N l ; YD T ll j

/

g 2.m ys

g s
p

. e x y

( %rdE-k oN m

j 1

I M

l l <,,j fu N, ' N ) 0 >\\k b

(

o,,1%

1 2.

}gh;,g

)

g w

w lD

.h

^

?<

8i dl 8!

-e'..

-=

_ g ~~~ ~~

i 3

--a

~

~

. h- -

-m-e.L oin i

g

w

~

1 I

ik'p3 los

s..~

j

. =

  • e y,

~

T 7,5 y n m_m _~

-~

=.

J' v

e gl (T1 i

P_N

{

7

-s tg mano ol e*

als

,o'

'e e

p, '

.h[

w s

~

    • e g o

..,f g

\\

4 ft

?

g-t G

~ T' '

  • ~ '

r'

__.w w _

,,7

^.lEll.y o.

~.,.v.

,e c=,

e c=casr mo g

FYom potats north:

Take Route l-81 south to Reuse 104; follow Route 104 west through Oswege to campus.

Procee<lnorth on Route 461,thmugh 7ulton, to Route 104 its Ostwge. Fo G

m 3

enmpus.

u M

o

{

From potets south: Take Route 131 north to Exit t 6A (Syracuse). Proceed soph on Route 48t g

lhrousin Fulton, so Route 104 in Oswego. Fellow Route 104 west to caropus.

Frem points west: Take l 90 (New York Srate Thruwayl eest to Emit 40 (Weedsport) *aerei north on w

Rouac 34 to Route 104, then east on Route 104 tocampus. Or take Route 164 directly to cantpus.

Y S'

S

t Meetina Notice E-Mail Hard Copy S. Collins /F, Miraglia Docket File -

B.Boger PUBLIC J. Zwolinski PDI-1 R/F S. Bajwa OGC D. Hood ACRS R. Hermann Receptionist (OWFN and R. Caruso TWFN)

K. Kavanagh L. Doerficin B. Norris W. Koo L. Lois S. Little H. Miller (e-mail to SLM3)

. OPA (e-mail to OPA)

C. Hehl(CWH)

B. McCabe (BCM)

D. Serenci(DPS)

PMNS (Meeting Announcement Coordinator)