ML20203J461
| ML20203J461 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 01/02/1997 |
| From: | Bagchi G NRC (Affiliation Not Assigned) |
| To: | Berkow H NRC (Affiliation Not Assigned) |
| Shared Package | |
| ML20197C458 | List: |
| References | |
| FOIA-97-375 NUDOCS 9712190211 | |
| Download: ML20203J461 (1) | |
Text
.-
g,as:p g
4 UNITED STATES y+l
(
NUCLEAR REGULATORY COMMISSION j
WASMINGT ON. 0.C. seMHoot January 2,1997 t
MEMORANDUM T0:
Herbert N. Berkow, Director Project Directorate 11-2 DivisionofReactorProject 1/II chi Chief FROM:
GoutamBafneer,ingand
~
Civil Eng eosciences Branch i
Division of Engineering
SUBJECT:
SAFETY EVALUATION REPORT FOR HINE MILE P0bli 1 REACTOR AND TURBINE BUILDING PRESSURE RELIEF PANEL OUTSIDE DESIGN BASIS ISSUE The staff of the Civil Engineering and Geosciences Branch has completed review of the engineering calculations submitted by the Nine Mile Point I licensee in support of its effort to resolve the reactor and turbine building pressure relief. panel design basis issue. As part of.our review, the steff also implemented a design audit at the plant site and performed a walk down of the reactor and turbine building pressure relief panels.
Our safety evaluation report is attached.
Docket No.:
50-220
Attachment:
As stated cc:
G. Lainas r
J. Strosnider D. Hood
Contact:
D. Jeng, NRR/ECGB 415-2727 I
9712190211 971212 N LI N -375' PDR,
I
..