ML20217E150

From kanterella
Jump to navigation Jump to search
Notification of 991022 Meeting with NMPC to Discuss Nine Mile Point Performance as Documented in Mid-Cycle PPR of Nine Mile Point Nuclear Station
ML20217E150
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 10/07/1999
From: Marilyn Evans
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 9910190087
Download: ML20217E150 (4)


Text

F' )

  • i October 7, 1999 l 4; I i

U.S. NUCLEAR REGULATORY COMMISSION REGION I No. 99-54 NOTICE OF SIGNIFICANT LICENSEE MEETING l

1 Licensee: Niagara Mohawk Power Corporation l Facility: Nine Mile Point Unit 1 and Unit 2 Docket No. 50-220 and 50-410 Time and Date: 1:00 p.m., Friday, October 22,1999 Location: Nine Mile Point Nuclear Training Center Lake Road Lycoming, New York 13093

Purpose:

A public meeting for the NRC to discuss Nine Mile Point performance as documented in the Mid-Cycle Plant Performance Review of Nine Mile Point Nuclear Station dated Septembu 30,1999.

NRC Attendees: H. Miller, Regional Administrator A. Blough, Director, Division of Reactor Projects R. Crienjak, Deputy Director, Division of Reactor Projects M. Evans, Chief, Division of Reactor Projects, Branch 1 G. Hunegs, Senior Resident inspector - Nine Mile Point R. Fernandes, Resident inspector - Nine Mile Point B. Fuller, Resident inspector - Nine Mile Point  !

I E. Adensam, Director, Project Directorate 1, NRR D. Hood, Licensing Project Manager, NRR Licensee Attendees: J. Mueller, Senior Vice President, Chief Nuclear Officer i C. Terry, Vice-President-Quality Assurance, Nuclear J. Conway, Vice President Nuclear Generation R. Abbott, Vice President Engineering Et.Al NOTE: This meeting is open to the public for observation. Attendance by additional NRC personnel should be made known by October 15,1999, via telephone call to Michele Evans, Chief, Projects Branch 1, at (610) 337-5224. Handicapped persons requiring assistance to attend or participate in the meeting shall make their requests known no later than two business days priot to the meeting.

Prepared by: : Foaw ,

Michele G. Evans, Chief Projects Branch 1 Q Division of Reactor Projects 9910190087 991007 PDR ADOCK 05000220 P' PDR OFFICIAL RECORD COPY IE:45

r;- 1 l

4

i. .2 ,

l-cc: ... .

l - G. Wilson, Esquire l M. Wetterhahn, Winston and Strawn

. J. Rettberg, New York State Electric and Gas Corporation P. Eddy, Electric Division, Department of Public Service, State of New York

. C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law J. Vinquist, MATS, Inc.

F. Valentino, President, New York State Energy Research and Duelopment Authority J. Spath, Program Director, New York State Energy Research and Development Authority i I

i i

l l

i l-l l

o I.

  • 3 Distribution:

H. Miller, RA/J. Wiggins, DRA (1)

Region 1 Docket Room (with concurrences)

' Nuclear Safety information Center (NSIC) -

' PUBLIC

- NRC Resident inspector

' M. Evans, DRP W. Cook, DRP R. Junod, DRP J. Mueller, Chief Nuclear Officer

. T.'Judson, Central New York - Citizens Awareness Network D. Lochbaum, Union of Concerned Scientists State of New York-

' Regional Administrator, Secretary, RI

- DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region i Receptionist l

l .-

i l

l  !

l I-o l

l

?

I L

l I

y e

4 Distribution (Via E-Mail):

W. Travers, Executive Director for Operations, OEDO M. Knapp, Deputy Executive Director for Materiais, Research and State Programs, OEDO

- F. Miraglia, Jr., Deputy Executive Director for Reactor Programs, OEDO

.. S. Coliins, Director, Office of Nuclear Reactor Regulation, NRR D. Matthews, Director, Division of Regulatory improvement Programs, NRR B. Boger, Director, Division of Inspection Program Management, NRR R. Borchardt, Director, Office of Enforcement

. R. Zimmerman, Deputy Director, Office of Nuclear Reactor Regulation (NRR/ADPR)

J. Zwolinski, Director, Division of Licensing Project Management J. Crutchley, Secretary, incident Response Organization M. Tschiltz, Rl EDO Coordinator, OEDO '

E. Adensam, Project Directorate l_-1 (PD1/2), NRR D. Hood, Project Manager D. Screnci, Public Affairs, RI N. Sheehan, Field Public Affairs Officer, Ri M. Campion, ORA R. Bores, ORA i W. Lanning, DRS i l B. Holian, DRS PMNS G. Hunegs - Nine Mile Point .

i inspection Program Branch (IPAS)

I R. Correia, NRR '

DOCDESK l

l l

DOCUMENT NAME: G:\ branch 1\ meetings \102299nmpmtg.WPD i Tc receive a copy of this document, indicate in the box: "C" = Copy without )

attachment / enclosure "E" = Copy with attachnient/ enclosure "N" = No copy I Rl/DRP Rl/DRP l OFFICE f lNAME WCook # 7 f MEvans &  !

lDATE 10Afl /99 104 /99 OFFICIAL RECORD COPY l

i l

? l